Loading...
HomeMy WebLinkAbout180 WAOORE54 Ro l " Ota r I la • iilC • OCCUPANCY 190 W. AIRPORT BLVD. ,4 attng Rtck Commercial LEG'.T.ES ,3 of E. 5 of lot 28 & W 5 of lots 29 -31 less S. 33 for. Rd Drury tark 9USLDING CONTRACTOR BUILDING RECORD 12/3/70 - PERMIT 6554 (Boone Sign Co.) Erect sign (Ground) ($50) 7/6/72 - PERMIT 8665 (Shoemaker Co. ( Remodel existing Building #f.) ($20,000) 9/22/72 Permit 8938 (Mel -Web Signs) Erect new sign and remodel the existing sign to commericli- building. 6 -14 -76 Perntit #11999 Summitt Roofing - Reroof commercial building ($19,980.) 4 -29 -85 Permit # 20965 Green Brothers Reroof Comm. Bldg ($25,000) OVER ADDRESS 180 W. Airport B1 OWNER Bowl America LEGAL DESCRIPTION Date Approved: OCCUPANCY eurLDING CONTRACTOR - Sub. Reg's. Apply: Yes No I 10 -16 -89 Permit # 24363 Owner Erect 1 banner sign NEXT BANNER: 6 -16 -90 FEES: Development Fees Streets Paved Unpaved Street Paving Fee UTILITIES: Water Lines Meter Set Sewer Lines Sewer Tap Storm Sewer ENGINEERING/PUB. WORKS: Drainage Street Paving Street Name Signs Street Lights [OVER] Maintenance Bond BUILDING RECORD BUILDING: Final Inspection PLUMBING 12 -18 -72 - PERMIT 9 CONTRACTOR Wall plmg and Htg IX URES Yavatorie 1 sink 1 water heater 7 floor drains 1 water cooler. INSPECTIONS ROUGH IN FINAL ELECTRICAL MECHANICAL 1 - 1 - -73 - PERMIT 9514 CONTRACTOR CONTRACTOR FIA ELECT CO. D.W. Browning Cont. M. FIIXY Outlet$ FIXTIJRF.S Install two range hoods, 1 10 fixtures two exhaust fans, two air 1 2 motor hp inlets, exhaust & air in- 1 ��2 motor 5 5 hp lets ducts and grills. i elec water heater ($6,000.) 2 built -in range top �' ------------------------- 2 built -in ovens 5 -1 -74 Permit #305 1 - - 73 Rz ')- 1,61 Watts Aix Cond. & Heat. 5 -2 -74 Permit 4345 Install 30 ton A /C.System Palmer Elec 2 15 Hp Motor $15,235.00 2 3 Hp Motor 2 20 KW Heat St INSPECTIONS ROUGH IN g ` ROUGH IN FINAL Tiff FINAL PLUMBING ELECTRICAL 6 - 28 -78 Permit CONTRACTOR CONTRACTOR Omar Elec. FIXTURES FIXTURES 600 amp service -,;2 S - - 74g _L, 0.5.OX cr.� INSPECTIONS INSPECTIONS ROUGH IN ROUGH IN FINAL CONTRACTOR FIXTURES INSPECTIONS ROUGH IN FINAL MECHANICAL FINAL