HomeMy WebLinkAbout202ADDRESS OWNER OCCU
202 Arbor Cir Globetrust Dev. Co Certificate of Occupa
LEGAL DESCRIPTION Date Approved:
Lot 2 Phase II, The Ar
BUILDING CONTRACTOR Sub. Reg's. Apply: es No
10 - -86 Permit II 21273 BUILDING RECORD BUILDING:
Gerald Tannenbaum
Final
Erect Townhouse � � FEES:
($26,000) 1�. �� -SL- Slk b- ol -G•L °° i
Development Fees�(a— it =6
- P,.. -: -- %1,k --Grl Streets Paved Unpaved I
TIr%S, TiAJ Street Paving Fee
P1 --o l; UTILITIES:
Water Lines
Meter Set
Sewer Lines
Sewer Tap
Storm Sewer
ENGINEERINGIPUB. WORKS:
Drainage
Street Paving
Street Name Signs
Street Lights
[OVER] Maintenance Bond
PLUMBING ELECTRICAL MECHANICAL
12 -3 -86 Permit #2171 2 -13 -87 Permit # 11426 2 -20 -87 Permit # 4293
CONTRACTOR CONTRACTOR CONTRACTOR
Tillman Plumbing Lowry of F1 Central Fl Htg & Air
FIXTURES FIXTURES FIXTURES
3 Bath 101 -200 Amp Service Install Heat & Air
J SPECTIOJqS r .. _ INSPECTIONS INSPECTIONS
ROUGH IN Ip� C;- ? , 644-.. 61 ROUGH IN p!-�O O - D ' ROUGH IN P 1
FINAltoQ -Q 1 ►mr k FINAL".aq f - Q)L' OR FINAL