HomeMy WebLinkAbout150ADDRESS
OWN ER
OCCUPANCY
150 Bolivia Ct
New Tribe Mission
Certific of Occupancy: /- o
LEGAL DESCRIPTION
Date Approved:
31 -19 -31 -300 - 0020
]BUILDING CONTRACTOR O PEN
SPACOE FEE
Sub. Reg's. Apply: Yes No
NG:
BUILDING:
7 -24 -89 Permit # 24104
BUILDING RECORD
Daniel Daniel Taube
- a�`�`�-
A.wncl - CD K - DW
eO p 10?
Erect S/F Res
�- I `�`+-
S� 6 - p k_ 040)4
FEES: a�.5o d (x
($26,048)
x'
I " fir 0W 14
Development Fees
Q - QJ FJW l4
Streets Paved Unpaved
1-"C&- " - sU3
Street Paving Fee
5 —qd-
4%^%" - "- AW
1 - 5-90'
Q O. S +0-C Ltj
UTILITIES:
Water Lines
Meter Set
Sewer Lines
Sewer Tap
Storm Sewer
ENGINEERING /PUB. WORKS:
Drainage
Street Paving
Street Name Signs
Street Lights
[OVER]
Maintenance Bond
PLUMBING
7 -25 -89 Permit # Z9ZV
CONTRACTOR
Tropical Plumbing
FIXTURES
One water closet
Additional water closet
INSPECTIONS
/
ROUGH IN 4 — -0 ��
ELECTRICAL
8/3/89 Permit #12777
CONTRACTOR
Delight Electric
FIXTURES
101 -200 Amp Service
INSPECTIONS
ROUGH IN �`�� O y`�"^� 14J Ad
MECHANICAL
8 -16 -89 Permit # 5051
CONTRACTOR
A/C World Inc
FIXTURES
Install Heat & Air
INSPECTIONS
ROUGH IN �/ �' V 0 A
FIN11-L 6 - Q44- Aw 11 FINAL L - ��. T 11 FINAL I S `O —Q -1—