Loading...
HomeMy WebLinkAbout205•ODPEES 205 Borada Road rwNrrn RCA OCCUPANCY Certificate of Occupancy: (� L EGAI. DESCRIPTION ' Lot 3, Blk. 2, Phase 2, Hidden Lake Date Approved: BUILDING CONTRACTOR Su b. Reg's. Apply: Yes No 9 -23 -80 Permit #15197 BUILDING RECORD BUILDING: J.D. Feinstein - Erect S/F Res. �_,�p w„ Final Inspection Model 1057 ($15,977.) b x FEES: a¢ S/� = Development Fees �' 7 Streets Paved Unpaved /Z - I Jrb r = Street Paving Fee . - '051V UTILITIES: Water Lines Meter Set Sewer Lines Sewer Tap Storm Sewer ENGINEERING /PUB. WORKS: Drainage Street Paving Street Name Signs Street Lights Maintenance Bond OVER PLUMBING 10 -2 -80 Permit 1 CONTRACTOR Mums Plumbing FIXTURES New Residence V INSPECTIONS ROUGH IN / .f/ _fQO - 4k - � i� -fib jr�t - e -� FINAL ELECTRICAL LG -J-OU reL -Iri CONTRACTOR Tri City Electric FIXTURES New Residence INSPECTIONS ROUGH IN �L'v - oa 0k -�� FINAL" 7/69// MECHANICAL 1C .7U - ou r ermLL CONTRACTOR Air Flom. Designs I FIXTURF S A/C & Heating INSPECTIONS ROUGH IN JL',r ,fO -Ok FINAL �/ /�Gi /� - � J6