HomeMy WebLinkAbout204ADDRESS OWNER OCCUPANCY
204 Borada Road R.C.A. Certificate of Occupancy , d
LEGAL DESCRIPTION
Lot 26, Blk. 3, Hidden Lake Phase II, Unit I " Date Approved:
BUILDING CONTRACTOR Sub. Reg's. Apply: Yes No
BUILDING RECORD BUILDING:
3 -2 -81 Permit #15615 _ �_ Q� Final Inspection
Erect S/F Residence 3 0%/ - ��"
�������- O FEES:
Model 1148E -� �- Develo ment Fees
Streets �llo5� *P7�Il�lo
J.Feinstein ($18,700.) y12 p
y p�� Paved Unpaved
tl
6`9�/ /� i —— Street Paving Fee
1)//4/r/ �� — UTILITIES:
Water Lines
Meter Set
Sewer Lines
Sewer Tap
Storm Sewer
ENGINEERING /PUB. WORKS:
Drainage
Street Paving
Street Name Signs
Street Lights
Maintenance Bond
OVER
PLUMBING ELECTRICAL MECHANICAL
Pemit 6/5/81 Permit #8039 ermit
CONTRACTOR CONTRACTOR CONTRACTOR
Muns Plumbing Co., Inc. Tri City Electric Air Flow Designs
FIXTURES FIXTURES FIXTURES
New res. 2 bathrooms New Residence A/C & Heating
INSPECTIONS
ROUGH IN
FINAL - )1
INSPECTIONS ( S
ROUGH IN� /S /Q� /_(/k -�"
FINAL /_ O/-� - s
INSPECTIONS /
ROUGH LN I0151
FINAL