Loading...
HomeMy WebLinkAbout125A DD RES $ O W N FR OCcIJ PA 125 Centennial Dr . R.C.A. Certificate of Occupancy: Z L e-el LEGAL DESCRIPTION Lot 165, Hidden Lake Phase II, Unit IV Date Approved: BUILDING CONTRACTOR S ub. Reg's. Appl Y es N o 6/22/82 Permit #17496 BUILDING RECORD BUILDING: Erect S/F Residence ��sjff2- d Final Inspection Model 1266 1 A . FEES: J. Feinstein ($36,318.) /Ir1- _ (�,! D Development Fees X3/.77 30 /r2 - �' Streets Paved Unpaved 12 - 27 - 82 Permit #18210 �� � �, ,��,,� /� Street Paving Fee Artesian Pools c•° )103�,sz UTILITIES: Install in ground poo I- ILI -33- P Ins.- e- I - OV- IS Water Lines (6,000.) �Meter Set Sewer Lines Sewer Tap Storm Sewer ENGINEERING/PUB. WORKS: Drainage Street Paving Street Name Signs Street Lights Maintenance Bond OVER PLUMBING 6/28/82 Permit-#0230 CONTRACTOR Muns Plumbing FIXTURES New 2 Bath Residence INSPECTIONS ��// c ROUGH IN� � o ;Ilft - .6e- - FINAL ?11311-1 - g Ib� ELECTRICAL 7/21/82 Permit #8532 CONTRACTOR Tri City Electric If I7CTU ew re side nce ------------------------- L2 -27 -82 Permit #8795 kubrey Long mire Pool c -JP.r OK -SS MECHANICAL / 21/82 Permit 2 CONTRACTOR it Flow Designs A ft'T tNSPECI`IONS ROUGH IN 7/29/kz' INSPECTIONS ROUGH IN -)/'192 - 6 FINAL ;1131 r e & - ,5 FINAL