Loading...
HomeMy WebLinkAbout109AbOVESs OWNER 109 Centennial Dr. R. C.A. OCCUPANf.Y LEGAL DESCRIPTION Lot 147 Hidden Lake, Phase II Unit IV Date Approved �1102 BUILDING CONTRACTOR Sub. Reg's. Apply: Yes / No BUILDING RECORD BUILDING: ° 4/8/82 Permit #16661 Final Inspection Erect S/F Residence IX/ - Model 1266 51,11k2 ` FEES: � J. Feinstein ($36,318.) 2 - -- Development Fees 5'{ y1j2' �`'�' Streets Paved Unpaved 6k _ Street Paving Fee UTILITIES: Water Lines Meter Set Sewer Lines Sewer Tap Storm Sewer ENGINEERINGIPUB. WORKS: Drainage Street Paving Street Name Signs Street Lights Maintenance Bond ( OVER PLUMBING ELECTRICAL MECHANICAL 4/15/82 Permit #0158 4 - 16 -82 Permit #8416 5/17/82 Permit #2415 CONTRACTOR CONTRACTOR CONTRACTOR Muns Plumbing Tri City Air Flow Designs FIXTURES FIXTURES FIXTURFS New 2 Bath Residence I New res. A/C & Heating INSPECTIONS �y 5 ROUGH IN 7/L 3 /fl- A r V� YlfZ - ",�G st- ;S FINAL -/ /kAp - pK — X- INSPECTIONS [� 4 ROUGH IN INSPECHONS ROUGH INV2vt2 ' 0 ix FINAL ?Ilkl,f � - i PAk! )S F I N A L -211400ki -a- C$-