HomeMy WebLinkAbout109AbOVESs OWNER
109 Centennial Dr. R. C.A.
OCCUPANf.Y
LEGAL DESCRIPTION
Lot 147 Hidden Lake, Phase II Unit IV Date Approved �1102
BUILDING CONTRACTOR Sub. Reg's. Apply: Yes / No
BUILDING RECORD BUILDING: °
4/8/82 Permit #16661 Final Inspection
Erect S/F Residence IX/ -
Model 1266 51,11k2 ` FEES: �
J. Feinstein ($36,318.) 2 - -- Development Fees
5'{ y1j2' �`'�' Streets Paved Unpaved
6k _ Street Paving Fee
UTILITIES:
Water Lines
Meter Set
Sewer Lines
Sewer Tap
Storm Sewer
ENGINEERINGIPUB. WORKS:
Drainage
Street Paving
Street Name Signs
Street Lights
Maintenance Bond
( OVER
PLUMBING ELECTRICAL MECHANICAL
4/15/82 Permit #0158 4 - 16 -82 Permit #8416 5/17/82 Permit #2415
CONTRACTOR CONTRACTOR CONTRACTOR
Muns Plumbing Tri City Air Flow Designs
FIXTURES FIXTURES FIXTURFS
New 2 Bath Residence I New res. A/C & Heating
INSPECTIONS �y 5
ROUGH IN 7/L 3 /fl- A r
V� YlfZ - ",�G st- ;S
FINAL -/ /kAp - pK — X-
INSPECTIONS [� 4
ROUGH IN
INSPECHONS
ROUGH INV2vt2 ' 0 ix
FINAL ?Ilkl,f � - i PAk! )S
F I N A L -211400ki -a- C$-