HomeMy WebLinkAbout1251 Central Fl Environmental Corp.SECTION 00520
AGREEMENT FORM
PART1 GENERAL
1.01 THIS AGREEMENT, made and entered into the day of �tccrr , Zoo 9
by and between the City of Sanford Florida 300 North Park Avenue, Sanford, Florida 32771 a
municipal corporation of the State of Florida, holding tax exempt status, hereinafter referred to
as the "CITY" (also referred to as "OWNER ") and Central Florida Environmental Corporation
whose principal and local address is 910 Belle Avenue Suite 1040, Winter Springs, Florida
32708 hereinafter referred to as to as the "CONTRACTOR ". The CITY and the CONTRACTOR
are collectively referred to herein as the Parties.
1.02 The Owner and Contractor Agree as Follows:
A. Contract Documents
The Contract Documents include the Agreement, Addenda (which pertain to the
Contract Documents), Contractor's Bid, Notice to Proceed, the Bonds, the
General Conditions, the Supplementary Conditions, the Specifications listed in
the Index to the Project Manual, any technical specifications as incorporated by
the Project Manual; the Drawings as listed in the Project Manual, all Written
Amendments, Change Orders, Work Change Directives, Field Orders, and
Engineer's written interpretations and clarifications issued on or after the
Effective Date of this Agreement. These form the Contract and all are as fully a
part of the Contract as if attached to this Agreement or repeated herein.
B. Scope of Work
The Contractor shall perform all work required by the Contract Documents for the
construction of the First Street Improvements - Phase 2 (IFB No. 07/08 -21)
C. Contract Time
The Contractor shall begin work after the issuance of a written Notice to Proceed
from Owner and shall substantially complete the work within the Contract Time
identified in Paragraphs 1.02.C.5 of the Bid Form, which is 165 calendar days.
The work shall be finally complete, ready for Final Payment in accordance with
the General Conditions, within 30 calendar days from the actual date of
substantial completion.
D. Liquidated Damages
OWNER and CONTRACTOR recognize that time is of the essence of this
Agreement and that OWNER will suffer financial loss if the Work is not
substantially complete within the time specified in Paragraph C above, plus any
extensions thereof allowed in accordance with the General Conditions. They
SPECLIB043008
00520 -1
NAME OF PROJECT: First Street Improvements - Phase 2 (IFB No. 07/08 -21)