HomeMy WebLinkAbout109AB BA E55 OWNF. ii OCCUPAN ,,
109 Laguna Ct. Residential Communities of .America C of Occu ,!/
i £GAL DESCRIPTION
Lot 5, 4,_Phase 11, Unit
BUILDING CONTRACTOR
Date Approved:
pp y' es o
_ — - BUILDING:
BUILDING RECORD
Final Inspection
7- 15--80 Permit #14948 A �
J. Feinstein -Erect S/F res. Model 1057 t
c
($15,977) � � 3 ��,; DevelopmentFees
Streets Paved Unpaved
Street Paving Fee
UTILITIES;
Water Lines
Meter Set
Sewer Lines
Sewer Tap
Storm Sewer
ENGINEERING/PUB. WORKS:
Drainage
Street Paving
Street Name Signs
Street Lights
Maintenance Bond
PLUMBING
7 -16 -80 Permit #11420
CONTRACTOR
Muns Plumbing
rIXTURES
New 2 -bath res.
INSPECTIONS
ROUGH IN
FINAL /
ELECTRICAL
8 -13 -80 Permit. #7382
CONTRACTOR
Tri City
FIXTURES
New Res.
t
INSPECTIONS
ROUGH IN
._ � /v 42 kt F I N A L' �G f � � V/ t g ? k)
MECHANICAL
8 -18 -80 Permit #1755
CONTRACTOR
Air Flaw
FIXTIJRFS
Central heat & A/C
INSPECTIONIS
ROUGK IN
FINAL !6 : �f _K