Loading...
HomeMy WebLinkAbout209A4DP�55 LSWNFR 209 McVay Drive Dan —Way, Inc. LEGAL DE5CRIPTIPN To t BUILDING CONTRAG7 Date Approved: — fteff u eg's. pply: es No BUILDING RECORD BUILDING: Final Inspection 8-28 -80 Permit #15102 �� �.� �. P. Oiglia- �- Brect: S/F res. Model Briarwood ®' �- -) ` _' ($20,520) ��) 11�- 6(J l /(7��U Development Fees 46", Streets Paved Unpaved �dk" ?It) Street Paving Fee 1� fj146� UTILITIES: n-5-0 �' /��'�� ' ����� Water Lines L� pa 21 ��S�f Meter Set Sewer Lines Sewer Tap Storm Sewer ENGINEERING /PUB, WORKS: Drainage Street Paving Street Name Signs Street Lights Maintenance Bond ( OVER PLUMBING 9- -5W-80 Permit #11536 CONTRACTOR A & E Plumbing FIXTURES New 2 --bath res 1- 10-84 Permit #1139 Energy Clinic Install Solar System ELECTRICAL - 10 -10-80 ermit CQNTRACTOR G � � �lectrid FIXTURES New Residence MECHANICAL 11 -7 -80 Permit 1912 CONTRACTOR ,lack Frost FIXTURES Install Heat & A/C INSPECTIONS ROUGH IN �- II- FINAL 12 INSPECTIONS ROUGH IN FINAL / INSPECTIONS ROUGH IN FINAL fo G"