Loading...
HomeMy WebLinkAbout88ADDRESS OWNER OCCUPANCY 88 Mission Blvd New Tribes Mission Certificate of O cc up ancy_ __ LEGAL DESCRIPTION I 31-19-31-0300-0220 Date Approved: BUILDING CONTRACTOR PD 1952.00 #16213 9/25/89 Sub. Reg's. Apply: Yes_ No 9 Permit # 24310 BUILDING: BUILDING RECORD Daniel Taube Final Inspection Erect Multi Family Bldg (16 Units) FEES: RC? ($400,000) Development Fees j : Streets Paved Unpaved a Street Paving Fee UTILITIES: c, i Water Lines Meter Set Sewer Lines Sewer Tap k; - Storm Sewer ENGINEERING/PUB. WORKS: rage i 3 ig() Pm, ws - Pb_zb,:1 - Kk he4- k,40Strect Pav i ng Ptreet Name Signs Street Lights IOVE�l -Waintenance Bond ADDRESS OWNER OCCUPANCY 88 Mission B1 New Tribes Mission Certificate of Occupancy I-EGAL DESCRIPTION Date Approved: I- I 0_9 6 BUILDING CONTRACTOR Sub. Reg's. Apply: Yes No BUILDING: BUILDING RECORD A -C IO -, — �_ns r - Final Inspection FEES: 6) j 16 - ego -5 Development Fees Streets Paved _ Unpaved Street Paving Fee UTILITIES Water Lines Meter Set Sewer Lines Sewer Tap Storm Sewer ENGINEERING/PUB. WORKS: Drainage Street Paving Street Name Signs Street Lights [OVER] Maintenance Bond PLUMBING ELECTRICAL MECHANICAL �i -A & ermit # 2988 9 -26 -89 Permit # 12862 12- -12 -89 Permit # 5154 CONTRACTOR CONTRACTOR Tropical Plumbing Delight Electric Air Conditioning World FIXTURES FIXTURES rIXTURES 66- Fixtures 800 amp service Install Heat & Air 1- Sewer I `� ` �. (assembly Hall only) 1 - Water Piping I- Gas Piping (o I 0 _ � �' �� c S i (0-, O d We's •�' \ �)�. VIJ is - qo. f? - , p 'l�'c°uL O' s-SE 40,;�-LW �a'�i.�`� �,� v KJCAe4 4-5-90 Permit # 5211 9i `ic�-a`�a�bS'�� ���cl�e�1- ®- C -- Install Food System -ALA �_�..C��- � I'n�- [�.,�c_.��' South Seminole Sheet Metal INSPECTIONS ROUGH IN FINAL INSPECTIONS ROUGH IN FINAL. INSPECTIONS ROUGH IN FINAL PLUMBING ELECTRICAL MECHANICAL 4 -6--90 Permit 11 5212 CONTRACTOR CONTRACTOR CONTRACTOR jOrlando Fire Equipment FIXTURES FIXTURES FIXTURES Install Hood Ssytem Fire Sprinkler INSPECTIONS ROUGH IN FINAL INSPECTIONS ROUGH IN FINAL INSPECTIONS ROUGH IN FINAL