HomeMy WebLinkAbout217 & 217 1/2abb PSSS f ��� up"I ff
O W NF_R OCCUPANCY
217 Oak Ave Dr. Willie Sherman ce fic t of occu anc
LEGAL DESCRIPTION
E. k Traffords W 7 Ft of Lot 10 Rk 4 T Date Approved:
gU1LO1PlG CONTRACTOR
Sub. Reg's. Apply: Yes No
BUILDING RECORD
BUILDING:
12/14 /73 Permit # 10232
Final Inspection
Steimmey,er Robfing
( 175 000)
FEES:
Development Fees
7- 26-74 Permit # 10690 Owner
Streets Paved Unpaved
Remodel Commerial Bldg. (5000.00)
Street Paving Fee
5/18/$2 Permit #17137
UTILITIES.
Erect Temporary Mobile Sign
1 `
d'l
Water Lines
Trail-R- a 60 days `
/ 4 14 's
Meter set
4
Sewer Lines
6-10 -83 Permit #18908
Sewer Tap
Trail R Signs
3t' - ok-NAL ak§"Zewer
Erect Mobile Trailer Sign
1 - -lF ..� , ,�C
60 days -next sign 2 -10 ®83
- °c Gf 1 CSC =)
ENGINEERING /PUB. WORKS:
Street Paving
Street Name Signs
Street Lights
.
OVER } _
Maintenance Bond'..,
I A£JO RESg C
OWN;
217 z Oak Ave
_
Amy A nders on
OCCUPANCY
Certificate of Occupancy:
LEGAL, Ur.5CRIPTIQN
Date Approved:
RVILpING COlJTRAGTOR ---- -- _ —i��
BUILDING RECORD
(Second story finaled only
Final Inspection
/ FEES:
51 6 2 " Development Fees
Streets Paved Unpaved
Street Paving Fee
UTILITIES:
Water Lines
Meter Set
Sewer Lines
Sewer Tap
Storm Sewer
ENGINEERING/PUB. WORKS:
Drainage__
Street Paving
Street Name Signs
Street Lights
Maintenance Bond
OVER
PLUMBING
8 -1 -74 Permit
CONTRACTOR
Hawkins
FIXTURES
2 Water Closets
2 Lavatories
1 - Water piping
9 -25 -74 Permit 9972
Hawkins
6 lavatories
1 water heater
4 door drians
1 water piping
ELECTRICAL
8 -19 -74 Permit
CONTRACTOR
Holloway
FIXTURES
32 Outlets
19 Futures
1 300 Amp Service
2 10 KW Heating Appl
4 E1ec Water heater
3 X -Ray
Dental Unit
INSPECTIONS INS IO �9
ROUGW_F]N, ! d f P _ j ROU Cr ti Ihl 62 i,J
) e4
FIN
FINAL
v 14 j
PLUMBING ELECTRICAL
CONTRACTOR CONTRACTOR
FIXTURES 11 FIXTURES
INSPECTIONS (� INSPECTIONS
ROUGH IN ROUGH IN
FINAL F €NAL-
Ci 7
MECHANICAL
8 -6 -74 Permi i 342
CONTRACTOR
Southern Air
FIXTURES
Htg. and A/C
48,000 BTU
(2600)
INSPECTIONS
ROUGH IN
FINAL
It MECHANICAL
CONTRACTOR
FIXTURF: S
INSPECTIONS
ROUGH IN
FINAL