HomeMy WebLinkAbout300 N (City Hall)BUILDING RECORD BUILDING:
Final Inspection
4-5-77 Permit Vaived EES
Williams Development Corp. Development Fees
($1,406,000.) Erect new City Hall Qfts P4 Hn aved
— 11
Bunn, Inc. ' Street Paving Fee
UTILITIES:
Water Lines
Meter Set
Sewer Lines
Interior Space Management ($30,000.) Sewer Tap
12-20-77 Permit(Waived) J.M.
Demolish old City Hall -
11/15/82 Permit #18067
Install Interior Non-Bearing
Partitions - lst Floor
Storm Sewer
ENGINEERING/PUB. WORKS
Drainage
Street Paving
Street Name Signs_
Street Lights
Maintenance Bond
OVER
OWNFP OCCUPANCY
300 N. Park Ave. City of Sanford-Cit• Hall Cer0i ic-af.
LEGAL DESCRIPTION P-f Occupancy:
INSPECTIONS-
Date Approved:
-
BUILDING CONTRACTOR
Sub. Reg's. Apply: Y
13UILDING RECORD
BUILDING:
Final Inspection
2 —
FEE&
Development Fees
Streets Paved Unpaved
Street Paving Fee
UTILITIES:
Pj 'S)i4,
Z, -u
Water Lines
Meter Set
Sewer Lines
D/
Sewer Tap
Storm Sewer
7
ENGINEERING/PUB. WORKS:
2
Drainage
kg
f
Street Paving
Street Name Signs
Street Lights
-
2
Maintenance Bond
OVER
!)W FR accuPANcy
300 Na Park Ave. City Hall
Certificate of
LEGAL. DESCMPTION
Date Approved:
-INSPECTIONS- Card #2
BUILDING CONTRACTOR Sub. Reg's. Apply: Yes_ No
BUILDING RECORD BUILDING:
R.P- Final Inspection
ADDRESS owNFrs McUPANCY
300
Hall Certificate
of Occu pancy:
LEGAL. DESCRIPTION
INSPECTIONS- Card #3 Date Approved:
3P
r)
C . .... . S , - ,
- 7
7, AY
, S
9
- 7 7
�J
0
OVER
BUILDING CONTRACTOR Reg's. Apply: Yes_ No
BUILDING RECORD
V- o X,
CV-15 - 17
e,
-4 - 77 C-
- q- 4 1� 24 u h,,-tr 4-•
FEES:
Development Fee
Streets Paved
Street Paving Fee
UTILITIES:
Water Lines
Unpaved
Meter Set
Sewer Lines
Sewer Tap
Storm Sewer
ENGINEERING/PUB. WORKS:
Drainage
Street Paving
Street Name Signs
Street Lights
Maintenance Bond
BUILDING:
Final Inspection_
FEES:
Development Fee
Streets Paved
Street Paving Fee
Unpaved
UTILITIES:
Water Lines
Meter Set
Sewer Lines
Sewer T
Storm Sewer
ENGINEER ING/PUB. WORKS:
Drainage
Street Paving
Street Name Signs
Street Lights
Maintenance Bond
( OVER )
INSPECTIONS INSPECTIONS INSPECTIONS
ROUGH IN ROUGH IN ROUGH IN
FINAL, FINAL FINAL
i
PLUMBING � ELECTRICAL MECHANICAL
CONTRACTOR CONTRACTOR CONTRACTOR
J'rpy d t e / i. -7 - 71 [Nn1 Lf�e.ct_v
I IXTUIIES FIXTURES 7 FIXTTJRE'S
a i e
¢:.fit r.1cl P9
INSPECTIONS INSPECTIONS � � � -� �- f�i INSPECTIONS
ROUGH IN RotrGH IN "-�.- _,�. -. � � -_ � � ' � {.Z;' - "'�� ROUGH IN
' FINAL FINAL FINAL
,
PLUMBING
ELECTRICAL
MECHANICAL
6 -28 - Perm - Waived
Permit
6-28-7T Permit - Waived
CONTRACTOR.
CONTRACTOR
CONTRACTOR
Harper Plumbing & Htg.
Clark Electric
Harper P1bg. & Htg.
FIXTURES
15 water closets
FIXTURES
Wire new City Hall
FIXTURES
5 urinals
Heating, ventilating
15 lavatories
2 -25 -80 Permit -Fee waived
air cond -Total
I s i n k
Delta Star Electric
152 To-as.
lshower
Alteration & addition for Sanf
2w. heaters -
Housing Authority
1
floordrains - 5
1 sewer
2 drinking fountains
1 water piping
- J
INSPECTIONS INSPECTIONS INSPECTIONS
ROUGH IN ROUGH IN ROUGH IN
FINAL, FINAL FINAL
i
PLUMBING � ELECTRICAL MECHANICAL
CONTRACTOR CONTRACTOR CONTRACTOR
J'rpy d t e / i. -7 - 71 [Nn1 Lf�e.ct_v
I IXTUIIES FIXTURES 7 FIXTTJRE'S
a i e
¢:.fit r.1cl P9
INSPECTIONS INSPECTIONS � � � -� �- f�i INSPECTIONS
ROUGH IN RotrGH IN "-�.- _,�. -. � � -_ � � ' � {.Z;' - "'�� ROUGH IN
' FINAL FINAL FINAL
,
PLUMBING
CONTRACTOR
FIXTURES
INSPECTIONS
ROUGH IN
FENAL
ELECTRICAL
CONTRACTOR
FIXTURER
p .
MECHANICAL
CONTRACTOR
i
FIXTURF: S
iPECTIONF INSPECTIONS
`r�,[) 9 ti - : _.
ROUGH W ��..r`'° a Si},�aeP'L�aI ROUGH IN 00
FE7dAL� � b ttn- _77— •.= "d'�G3�fLf�c����:v .�j6 ,
FINAL