HomeMy WebLinkAbout101101 Red Cedar Drive RCA
LEGAJ., 0"CRIFTWN
Lot 84, Hidden Lake Villas, Phase'I
OCCUPANCY
Certificate of Occupancy: 1.` )2)u.cd
Date Approved
Ml�-DING CONTRACTOR
BUILDING RECORD
12-6-82 Permit #18133
J. Feinstein-Erect Townhouse-Model
($30,160) I-Q Lolel 0 - /"
_
( OVER )
Final Inspection
FEES:
Development
Streets Paved Unpaved
Street Paving Fee
UTILITIES:
Water Lines
Meter Set
Sewer Lines
Sewer Tap
Storm Sewer
ENGINEERING/PUB. WORKS:
Drainage
Street Paving
Street Name Signs
Street Lights
Maintenance Bond
PLUMBING
12 -1 -82 Permit
CONTRACTOR
Future Plumbing
FIXTURES
New Res. 2 Baths
INSPECTIONS
ROUGH IN �
4 lW -R 3 S
FINA
ELECTRICAL
2 -24 -83 Permit #8895
CONTRACTOR
Palmer Electric
FIXTURES
New Res. 101 -200 AYIP Service
INSPECTIONS n
ROUGH IN
FINAL
MECHANICAL
2 -21 -$3 Permit #264
CONTRACTOR
Comfort Pac Systems
FIXTURE'S
Install Heat & AC
INSPECTIONS
ROUGH IN
�I
FINAL