Loading...
HomeMy WebLinkAbout600 1/2OWNER OCCUPANCY H 7th St. Herbert Cherry Certificate of Occupancy: LEGAL. DESCRIPTION ��` -��' "� � Date Approved: Lot 10, Blk 8, Tr C E.R. Trafford's BUILDING CONTRACTOR Sub. Reg's. Apply: Yes N BUILDING R ECORD BUILDING: 7 -12 -82 Permit #1760 — - � Final Inspection H. Cherry -Add paint booth to exist. ��l �e c.. k i[s rv° comm. bldg 1200.) p J FEES: y � g'(�fls�l - ivvr�1���iG: ` Development Fees is 3i c I' "Streets Paved Unpaved 5 (l� C�00�4t1- ��� Street Paving Fee 3c��G�C,� t< }��UTILITIES: Water Lines Meter Set Sewer Lines Sewer Tap Storm Sewer ENGINEERING /PUB. WORKS: Drainage Street Paving Street Name Signs Street Lights Maintenance Bond OVER I PLUMBING ELECTRICAL � I MECHANICAL CONTRACTOR C6NIIA f0 7 Pe # 5 798 CONTRACTOR John Holloway FIXTURES FIXTURES FIXTURFS New Services (200amp) 1420 -83 Permit #8835 Delta Starr Electric Alteration INSPECTIONS INSPECTIONS INSPECTIONS ROUGH IN ROUGH IN ROUGH IN FINAL FINAL FINAL