Loading...
HomeMy WebLinkAbout105jl - L1. - t5U rUrM.LL 71'LJJJL Addn. Rough In only Phase I 7 '.._�� 1 B. Tolbert - ($1,280.) 3 -27 -81 Permit #15702 Frame stairs to 2nd story addn. rough stage only -not trimmed Bill Tolbert- ($340.) 11-17 --89 Permit #24455 Owner Erect Clab & Stem Wall For Screen Enclosure (1,120) Final Inspection FEES: Development Fees Streets Paved Street Paving Fee UTILITIES: Water Lines Meter Set Sewer Lines Sewer Tap ,5,p-re eri P—m Storm Sewer ENGINEERING / PUB. WORKS: Drainage & HUNTER) Unpaved PLUMBING ELECTRICAL li MECHANICAL iL -ib -bu Yermit viioo/ CONTRACTOR CONTRACTOR Rucker /Fonseca FIXTURES I FIXTURES Alteration 1 � -1 2 -y'6 ux&xy- e t �vt INSPECTIONS INSPECTIONS ROUGH IN ROUGH IN FINAL. FINAL j -btiou uerm CONTRACTOR Sanford Htg. & A/C FIXTURES Heating & A/C p � 12 -14 -88 Permit # 4837 Ken's Air Install Heat & Air INSPECTIONS ROUGH IN FINAL