HomeMy WebLinkAbout105jl - L1. - t5U rUrM.LL 71'LJJJL
Addn. Rough In only Phase I 7 '.._�� 1
B. Tolbert - ($1,280.)
3 -27 -81 Permit #15702
Frame stairs to 2nd story addn.
rough stage only -not trimmed
Bill Tolbert- ($340.)
11-17 --89 Permit #24455
Owner
Erect Clab & Stem Wall
For Screen Enclosure
(1,120)
Final Inspection
FEES:
Development Fees
Streets Paved
Street Paving Fee
UTILITIES:
Water Lines
Meter Set
Sewer Lines
Sewer Tap
,5,p-re eri P—m Storm Sewer
ENGINEERING / PUB. WORKS:
Drainage
& HUNTER)
Unpaved
PLUMBING ELECTRICAL li MECHANICAL
iL -ib -bu Yermit viioo/
CONTRACTOR CONTRACTOR
Rucker /Fonseca
FIXTURES I FIXTURES
Alteration
1 � -1 2 -y'6 ux&xy- e t �vt
INSPECTIONS INSPECTIONS
ROUGH IN ROUGH IN
FINAL. FINAL
j -btiou uerm
CONTRACTOR
Sanford Htg. & A/C
FIXTURES
Heating & A/C p �
12 -14 -88 Permit # 4837
Ken's Air
Install Heat & Air
INSPECTIONS
ROUGH IN
FINAL