Re. Certificate of Compliance
Private Provider Inspections
Southgate Garden Apartments — Building No. 8
8000 Soltice Loop
Sanford, Florida
Dear Sir:
August 1, 2014
GFA Project #13- 1469.00
With regard to project listed above, to the best of my knowledge and belief, inspected under my
authority, the above - referenced permits have been completed in conformance with the approved plans
and the applicable codes.
Our Private Provider inspections for Florida Statute 553.791 have been conducted in accordance with
Section 110 of the Florida Building Code as it. relates to the Building systems, as follows:
Permit Number
Inspection Type
Approval Date (MM /DDlYYYY)
13 -148
BUILDING FINAL
08/01/2014
13 -148
MECHANICAL FINAL
07/31/2014
13 -148
ELECTRICAL FINAL
07/31/2014
13 -148
PLUMBING FINAL
07/31/2014
If you have any questions or require additional information, please contact Darcee M. Pilarski at (772)
924 -3575.
- FBPE CA # 4930
Prof &Abn il''Ehgineer #44653
Special Inspector #1103
State of Florida
OFFICES THROUGHOUT FLORIDA
521 NW Enterprise Drive, Port St. Lucie, Florida 34986 v (772) 924.3375 - (772) 924.35110 (fax) a www.teamgfa.com
Southgate Apartments
Sanford, Florida
INSPECTION REQUEST
yTEANA'[���P
Date: 7 -30 -14 Permit No: 13 -148
Facility: Building 8 Project: Southgate
Inspection Location: 8000 Solstice LP
When will work be ready? Date: 7 -31 -14
Requestor; Eric Zimmermann
Check one:
N Regular Inspection::
Time: 9Am
PJtone No: 407 - 467 -4255
❑ Re inspection: Date of Initial inspection:
This form must be faxed or emailed and received by 2:00 p.m. for next day inspection
Email T'n: pdanforth(@teamef.i.com; jpeck@ teamgfa. com; dpilarslci@ teamgfa .corn;tenglish @teamgfa.cotr►
Fax: (772) 489 -2989
Inspection Type Requested (check):
BUILDING/ STRUCTURAL
ELECTRICAL
PLUMBING
A4ECHANICAL
Footing
Underground
Underground
Duct Rough -I»
Slab
Floor Rough -In
Rough-In
Steam Pi ing & Test
Masonry
Wall Rouglt -In
Stack Piping& Test
MV Piping & Test
Wall/ Ceiling
Ceiling Rough-In
Water Piping & Test
CHW Piping & Test
Framing
Panel / Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/ Ground
Storm Piping & Test
I Insulation
Sheet Rock
Appliance/ Equipment
Fixtures
Wall & Ceiling,
Roofing
Lighting Protection
I E ui ment
Equipment
Re-inspection
Re-inspection
Re-inspection
Re-inspection
Final Building
Final Electrical
t
I Final Plumbing
Final Mechanical
Other Inspection Type: Final
Area Inspected:
Inspection Results:
Conditions/ Comments
1.
2.
3,
=1•
5.
F.
7.
Inspector's Signature_
AP - Approved AE — Approved DA- DP - Not Ready ❑
X with Exceptions Disallowed Disapproved
❑ ❑ ❑
11ME hrs Date 07 -31 -2019
OFFICES THROUGHOUT FLORIDA
521 NW Enterprise Drive, Port St. Lucie, Florida 34986 • (772) 489 -9989 , (772) 489 -2989 (fax) , www.team9fa,com
Southgate Apartments
Sanford, Florida
INSPECTION REQUEST
ytFAtlA�ti��p
Date: 7-31-14 Permit No: 13 -148
Facility: Building 8 Project: Southgate
Inspection Location: 8000 Solstice LP
When will work be ready? Date: 8 -1 -14
Requestor: Eric Zimmermann
Check one:
® Regular Inspection:
Time.: 9Am
Phone No: 407 -467 -4255
u�
❑ Re inspection: Date of Initial inspection:
This form must be faxcd or emailed and received by 2:00 p.m. for next day inspection
Email To: pdanforthna,teamefa.com; jpeck @teamgfa.com;dpilarski@ team gfa.com;tenglish @teamgfa.com
Fax: (772) 489 -2989
Inspection Type Requested (check):
BUILDING/ /STRUCTURAL .
ELECTRICAL-
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough-In
Rough -In
Steam Piping & Test
Masonry
Wall Rough-In
Stack Pi in & Test
HW Piping & Test
Wall/ Ceiling
Ceilin Rou h -In
Water Piping &Test
CIiW Piping & Test
Framing
Panel/ Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
I Service/ Ground
Storm Piping & Test
I Insulation
Sheet Rock
1
Appliance/ Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
E ui ment
Re- inspection
Re-inspection
Re-inspection
Re-inspection
FinalBuUding
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type: Rated walls/ Drywall
Area Inspected:
Inspection Results: A11 - Approved AE — Approved DA- DP - Not Ready
X with Exceptions Disallowed Disapproved
❑ ❑ ❑
Conditions/ Comments Inspected and Approved 06 -05 -2014 at same time as Building 7 Rated Walls
2.
3.
4.
5.
6.
7•
Inspector's Signature BILLED TIME hrs Date_08 -01 -2014_
erry eek
OFFICES THROUGHOUT FtoRmA
521 NW Enterprise Drive, Port St. Lucie, Florida 34986 • (772) 489 -9989 - (772) 489 -2989 (fax) - www.teamgfa.com
Southgate Apartments
�.
Sanford, Florida
III INSPECTION REQUEST
�ruaa�o�a
Date: 7 -30 -14 Permit No: 13 -148
Facility: Building 8 Project: Southgate
Inspection Location: 8000 Solstice LP
Wben will wort: be ready? Date: 7 -31 -14 Time: 9Am
Requestor: Eric Zimmermann Phone No: 407 -467 -4255
Check one:
Q Regular Inspection:
❑ Re inspection:
Date of Initial inspection:
P(
This form must be taxed or emailed and received by 2:00 p.m. for next day inspection
Email To: pdanforth iNeamefa.eom; jpecic@ tearngfa. com; dpilarski@ tearngfa .eom;tenglish @tenmgfi.coWTI
Fax: (772) 489 -2959
Inspection Type Requested (check):
BUILDING / STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough-In
Stack Pi ing &Test
HW Piping & Test
Wall/ Ceiling
Ceiling Rough-In
WaterPiping & Test
CHW Piping & Test
Framing
Panel/ Feeder
Gas Piping & Test
I Cond. Pi in .& Test
Structural
Service/ Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/ E ui ment
Fi,\rtures
Wall &Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re-inspection
Re- i
Re-inspection Re -ins ection
Re -ins ection
Final Building
Final Electrical
Final Plumbing
X
Final Mechanical
Other Inspection Type: Final
Area Inspected:
Inspection Results: AP - Approved AE—Approved
X with Exceptions
Conditions/ Comments
I .
2.
3.
4.
5.
6.
7.
Inspector's Signature
DA- DP - Not Ready
Disallowed Disapproved
❑ ❑
BILLED TIME hrs Date-07-3 1 =2014_
`Jerry Iteck- -
OFFICES THROUGHOUT FLORIDA
521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489.9989 - (772) 489 -2989 (fax) - WWW.teamgfa.com
Southgate Apartments
Sanford, Florida
INSPECTION REQUEST
ylFRNATI�aP
Date: 7 -30 -14 Permit No: 13 -148
Facility: Building 8 Project Southgate
Inspection Location: 5000 Solstice LP
When will %York be ready? Date: 7 -3I -14
Requestor: Eric Zimmermann
Check one:
® Regular Inspection:
Time: 9Arn
Phone No: 407- 467 -4255
❑ Re inspection: Date of Initial inspection:
This form must be faxed or emailed and received by 2:00 p.m. far next day inspection
Email To: Pdanforth(ageamefa.com; jpeek @teamgfa:cont;dpilarslci@ teamgfa .com;teriglish @teamgfa.cont
Fax: (772) 489 -2989
Inspection Type Requested (check):
BUILDING/ STRUCTURAL
ELECTRICAL
PLUMBING'
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Pi ing& Test
HW Piping & Test
Wall/ Ceiling
Ceiling Rou h -In
Water Piping & Test
CHW Piping &.Test:
Framing
Panel/ Feeder
Gas Piping & Test
I Cond. Piping & Test
Structural
Service/ Ground
Storm Piping & Test
Insulation
Sheet Rock
Appli ance/ Equipment
Fixtures
Wall & Ceiling
Roofing
Li htin Protection
Equipment
Equipment
Re- inspection
Re-inspection
Re-inspection
Re-inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
X
Other Inspection Type: Final
Area Inspected:
Inspection Results: AP - Approved AE—Approved DA- DP - Not Ready ❑
1 with Exceptions Disallowed Disapproved
❑ ❑ ❑
Conditions/ Comments
2.
-3,
4.
6.
7•
Inspector's Signature. BILLED TIME hrs Date_07 -31 -2014_
erry eck
OFFICES THROUGHOUT FLQRIM
521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489.9989 - (772) 489.2989 (fax) - www.teanigfa.coni
City, of Sanford
GFA International, Inc: - Private Provider Inspection Summary
Listed below is summary of inspections performed.
PERMIT #tv'
' BLDG #—
LOT#i
ADDRESS
Number of Units
13 -148
1 8000
1 NA
1 8000 Solstice LP
1 24
SHELL INSPECTIONS
PERFORMED
BUILDING/ STRUCTURAL
DATE
APPROVED/
INITIALS
ELECTRICAL
DATE
APPROVED/
INITIALS
PLUMBING
DATE
APPROVED!
INITIALS
Footing
DATE
Underground
Slab/Electrical
v-7 -ZS- 13
Rough
Plumbing /
Underground
07115/13
(COS)
Slab
7126/13
(COS)
Footer /Ground
APPROVED/
Sanitary Line
Pressure Test
INITIALS
Wall Framing (ext) - Level 1
D
Temporary Pole
16 -W -(31F
'
Wall Sheathing (ext) - Level 1
d�1� 174
U3 %" / I
' Sewer- LI
V -W �p
Wall Framing (ext) - Level 2
Insulation-1-1
Ceiling Rough
Wall Sheathing (ext) - Level 2
Rough -In - L2
Floor Framing- Level 2
A& 09-/1-A11
ugh -lu -
a�- I -Ng7p
Floor Sheathing - Level 2
.
Lo
Wall Framing (ext) - Level 3
Wall Sheathing (ext) - Level :3::
ala 09-17-1
p
{J
_
Low Voltage
ss
Roof Framing (trues an 7P
tntss engineering) 04 -11 "t
Vq -jY -ry P
Ol% / ? "ItlJ
Roof Sheathing,
2-16 -13
-I-I
H74FF
Rough -L1
Roofing (in progress/ Dry -In)
!2-'/! -/ 3 Tp
- -
Drywall - L 1
Roofing (final) ..l
Low Voltage
Final LI
D?-�i /��k�
Second
Rough
Final Building
a t -t
-
INTERIOR INSPECTIONS
PERFORMED
DATE
DATE
DATE
DATE
BUILDING/
APPROVED/
ELECTRICAL.
APPROVED1
PLUMBING
APPROVED/
MECHANICAL
APPROVED/
STRUCTURAL
INITIALS
INITIALS
INITIALS
INITIALS
Frame - L
Rough -ht - Ll
U3 %" / I
' Sewer- LI
V -W �p
Rough-In - L1
Insulation-1-1
Ceiling Rough
Second
Rough -In - L2
Ll
ugh -lu -
a�- I -Ng7p
Lo
Window /Doors
Low Voltage
U7,� "Iy��
Sewer- L2
Ol% / ? "ItlJ
Rough -In - L3
-I-I
H74FF
Rough -L1
Drywall - L 1
Low Voltage
Final LI
D?-�i /��k�
Second
Rough
-
-1711-
D�j�! ?� /►( SP
L2
Rated Assembly
Rouen -In -L'-)
�/
Sewer - L'i
Firewall /
Fastening- L
Frame - L2
p
0 %7'/ 7'-L2
Ceiling Rough
r� j t{
Second
7
�'zrlrU .�
Rough -In-
L.3
Insulation - L3
0 �rl y
Low Voltage
Di
Rough - L2
Winslow /Doors
p i�(7 !
T
ow Voltage
- L2
Final - L2
Drywall - L2
p
Rough -In - L3
►�
r
Rated Assembly
Ceiling Rough
Firewall /
� �
— U
Fastening — L2
Frame -13
LowVoltaec
Rou *h — L3
Insulation — L3
0$7jl���ll�
Low Voltage
��'17! i
Final —L3
d
I d
Window /Doors
pt ,1140
— L3
Drywall — L3
r
Rated Assembly
Firettall /
p6.pj«
Fastening — L3
Final Building
Final Electrical
Final
%'�
Final
Plumhin g
Z��
mechanical
o'�-0c jkj o6 -a( -(Y -'P 00,Vr -/k �P
CITY OF SANFORD INSPECTION CARD
INSPECTION REQUEST LINE — 407.688.5151 /�
PERMIT k 11— 149' ADDRESS _R000 S I�+iLe. L-P
CONTRACTOR[
PROPERTY OWNER
TENANT
DESCRIPTION OF WORK
Ilit,
BUILDING
\ POOL
\AICI
PLUMBING
GAS
FOOTING
M pRA1N ;NG
UPIDERSLAB
PIPING-PRE>SS\ EST
STEEL &�rUND /
ROSJ� •IN I PRE S F E.TEST
FI L GAS K- \
`
LINTfUTIE}SEEAM I
UIG POOLL PiP\G /
�WC� E - y -,7p
FIRE
S/
WALL SHEATHING /STRAPPING
LIGHT NICHE WINDING _
CEILING COVER - COM'L
FIRE ALARM
S�
ft
/ /�/ \ \\
_Nq _
ROUGH IN
FRAMING
DECKJ�
IRRIGATION
FINAL
d
�jJ
/ }
— ffpr
FIRE SPRINKLER
UNDERGROUND
M� TIOIV y
FINAL
/
FINAL 67-
RATED ASSEMBLY FASTENING TENING I
DRYWALL
oG -D 5-r
OVERHEAD
CEILING'COVER - COWL
ELECTRICAL
HVAC
HOOD- WELDTEST
STUCCO 164H
C?
TEMP POLE IC, ID _ 13 � �
ROUGCHSI[V ,�l l� P
HOOD!SUPPRESSION
FINAL
TUG -POWER
CEILING`COOIVER -COWL
FIRE - PREPOWER
o -o %l :rf
177-'10—IYT
---1/A --
ROOF }
UNDERGROUND
FINAL
FIRE- FINAL
ROOFSHETHIN /DF,C_ NG
ROUGH 1 -/�
UTILI'T'IES
PUBLIC WORKS
INS_ LATIOjy �'rl
PRE &rER^ 1 �\
GREASETRAP
DRIVEWAY
MfTIC�ATIIVOp{AFFt� DAY1T
CEILING COM'L
CROSS CONNECTION CONTROL
��ERI
DRY -I, j,_ " p7g
FINAL
G
SEWERCONNECTION
FINAL�_nT , -o-T–r R: r--r- n b c fk
S
MISCELI—id - ITF
MISCELLANEOUS
MISCELLANEOUS
*' C65 = cirr op S�f),PoKD
INSPECTION CARD SHALL BE DISPLAYED ON STREET SIDE OF LOT
DO NOT REMOVE CARD UNTIL FINAL INSPECTION IS APPROVED
SANITARY FACILITIES REQUIRED ON SITE
"WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF
COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS
TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED
AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU
INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT."
NOTICE OF COMMENCEMENT REQUIRED: YE5 NO
BUILDING OFFICIAL +)�� DATE ISSUE • / '
Issued permits must have an approved Inspection within 6 months of the date of Issuance or they will expire.
An extension must he requested In writing, approved and paid for prior to expiration.
ADDITIONAL RESULTS AND INSPECTOR COMMENTS
— -fir / w14t
� 041-710V
Pee R.oc,,1-- 047Y 02 -07_r E ---PP AP826,10
CSC W E P— E =-,e1 p h� 40/6 - -p
spa.,, TEST 4 �. -ZG-r� �
TU)3 f S v _lit (' Af P -WO
� SC- 4 , ;
rW UVk- CAP no.a 0140- l k SP hf ?"Ve�> o y —l-741 Z �Wfl'W g:- W �
(p-& R-0 cl--
D-Yw, O k- /'Y-r 1( -�—P APPRa�, C
..c... NfI!�.�0 � �_/ � _lit 5� l��yC� Ex�O/Yf ~ cN61NNl�G� ?U,✓ 3� R-
Df AK- (4w1ij-A -0 -1 y "� P +PPILbY (4:-,
WAT6 - �_PPLr a ti -E rl �� A 'Prl -�v'�o
�P4-vNl%INt-
a:0zp,4- 01-1 -7-1 0 Af P Kw C-9
. :fNStll- ("I 3 R9 Fite) 2 6ftI&f- 1A-0,6 09-0 —1 ,fiad 0
Southgate Apartments
A Sanford, Florida
/.
INSPECTION REQUEST
'�,TFANATIO�P�.
Date: 4 -10 -14 Permit No: 13 -148
Facility: Bldg 8 Project: Southgate
Inspection Location: 8000 Solstice LP
When will work be ready? Date: 4 -14 -14 Time: 9Am
Requestor. Gunnar Jacobsen : Phone No: 352 -585 -6851
Check one:
® Regular Inspection:
❑ Re inspection: ate of Initial inspection:
This form must be faxed or emailed and received by 2:00 p.m. for next day inspection
Email To: pdanforth(a.teamQfa.com; jpeck@ teamgfa. com; dpilarski@ teamgfa .com;tenglish @teamgfa.com
Fax: (772) 489 -2989
Inspection Type Requested (check):
BUILDING/ STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping& Test
HW Piping & Test
Wall/ Ceiling
X
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/ Feeder
I Gas Piping & Test
I Cond. Piping & Test
Structural
Service/ Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/ Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equi ment
Re- inspection
Re- inspection
Re-inspection
Re- inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type: Insulation
Area Inspected:
Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑
❑ with Exceptions Disallowed Disapproved
X ❑ ❑
Conditions/ Comments Except ceiling blown -in insulation for 3`d floor
1.
2.
3.
4.
5.
6.
7.
Inspector's Signature ` V-4 _/ BILLED TIME hrs Date_04 -14 -2014_
OFFICES THROUGHOUT FLORIDA
621 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489 -9989 - (772) 489 -2989 (fax) - www.teamgfa.com
Southgate Apartments
Sanford, Florida
INSPECTION REQUEST
'yrFRHATtoaPv
Date: 4 -11 -14 Permit No: 13 -148
Facility: Bldg 8 Project: Southgate
Inspection Location: 8000 Solstice LP
When will work be ready? Date: 4 -14 -14
Requestor: Gunnar Jacobsen
Check one:
❑ Regular Inspection:
Time: 9Am
Phone No: 352 -585 -6851
® Re in pection: Date of Initial inspection: 4 -10 -14
This form must be faxed or emailed and received by 2:00 p.m. for next day inspection
Email To: adanforth a,team9fa.com; jpeck@ teamgfa. com; dpilarski@ teamgfa .com;tenglish @teamgfa.com
Fax: (772) 489 -2989
1\pec ion ype Requested (check):
BUILDING/ STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping& Test
HW Piping & Test
Wall/ Ceiling
Ceiling Rough—In.
Water Piping & Test
CHW Piping & Test
Framing
Panel/ Feeder
Gas Piping & Test
I Cond. Piping & Test
Structural
Service/ Ground
Storm Piping & Test
Insulation
Sheet Rock
X
Appliance/ Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
E ui ment
Re- inspection
I Re- inspection
Re- inspection
Re- inspection
Final Building
I Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type: Draftstopping
Area Inspected:
Inspection Results: AP - Approved AE — Approved DA DP - Not Ready ❑
X with Exceptions Disallowed Disapproved
❑ ❑ ❑
Conditions/ Comments
1.
2.
3.
4.
5.
6.
7.
Inspector's Signature
BILLED TIME hrs Date-04-14-2014—
OFFICES THROUGHOUT FLORIDA
521 NW Enterprise Drive, Port St. Lucie, Florida 34986 • (772) 489.9989 - (772) 489.2989 (fax) • www.teamgfa.com
Southgate Apartments
Sanford, Florida
'v
INSPECTION REQUEST
yTfRNAT10�P
Date: 4 -09 -14 Permit No: 13 -148
Facility: Bldg 8 Project: Southgate
Inspection Location: 8000 Solstice LP
When will work be ready? Date: 4 -14 -14 Time: 9Am
Requestor: Gunnar Jacobsen
Check one:
® Regular Inspection,
Phone No: 352 -585 -6851
❑ Re inspection: Date of Initial inspection:
This form must be faxed or emailed and received by 2:00 p.m. for next day inspection
ail o: Pdanforth64team2fa.com; , jpeck@ teamgfa. com ;dpilarski @teamgfa.com;tenglish @teamgfa.com
Fax: (772) 489 -2989
Inspecti i T e equested (check):
BUILDS G—/ STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping& Test
HW Piping & Test
Wall/ Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/ Feeder
Gas Piping & Test
I Cond. Piping & Test
Structural
Service/ Ground
Storm Piping & Test
Insulation
Sheet Rock
X
Appliance/ Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
E ui ment
Re- inspection
Re- inspection
Re- inspection
Re- inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type: Pre rock
Area Inspected:
Inspection Results: AP - Approved AE — Approved DA DP - Not Ready ❑
X with Exceptions Disallowed Disapproved
❑ ❑ ❑
Conditions/ Comments
1.
2.
3.
4.
S.
6.
7.
Inspector's Signature <Z�_ /-,BILLED TIME hrs Date 04 -14 -2014
OFFICES THROUGHOUT FLORIDA
521 NW Enterprise Drive, Port St. Lucie, Florida 34986 • (772) 489 -9989 • (772) 489.2989 (fax) • www.teamgfa.com
Southgate Apartments
rWi . Sanf ord, Florida
INSPECTION REQUEST
FRr
Date: 4 -11 -14 Permit No: 13 -148
Facility: Bldg 8 Project: Southgate
Inspection Location: 8000 Solstice LP
When will work be ready? Date: 4 -14 -14 Time: 9Am
Requestor: Gunnar Jacobsen
Check one:
❑ Regular Inspection: -
Phone No: 352 -585 -6851
® Re inspec .a : Date of Initial inspection: 4 -10 -14
This form must be faxed or emailed and received by 2:00 p.m. for next day inspection
Emal To pdanforth(n�teamefa.com; jpeck@ teamgfa. com; dpilarski@ teamgfa .com;tenglish @teamgfa.com
9 Fax: (772) 489 -2989
Inspection Type Requested (check):
BUILDING/ STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
X
Steam Piping & Test
Masonry
Wall Rough-In
Stack Piping& Test
HW Piping & Test
Wall/ Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/ Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/ Ground
I Storm Piping & Test
I Insulation
Sheet Rock
Appliance/ Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
E ui ment
Re- inspection
Re- inspection
Re- inspection
X
Re- inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type: Plumbing rough
Area Inspected:
Inspection Results: AP - Approved AE — Approved DA- DP- Not Ready ❑
❑ with Exceptions Disallowed Disapproved
❑ ❑ X
Conditions/ Comments
1. FBC -B 107.4 —Not Der annroved documents — fireblocking/firestonning not completed; PVC and CPVC
support spacing too great
3.
4.
S.
6.
7.
Inspector's Signature ` BILLED TIME hrs Date_04 -14 -2014_
,/ferry eck
OFFICES THROUGHOUT FLORIDA
521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489.9989 - (772) 489.2989 (fax) - www.teamgfa.com