Loading...
HomeMy WebLinkAbout9000 Solstice Lp 13-149Southgate Apartments �. Sanford, Florida 'NTFRNATIO�Pv INSPECTION REQUEST ` Date: 3 -25 -14 Permit No: 13 -149 Facility: Bldg 9 Project: Southgate Inspection Location: 9000 Solstice LP When will work be ready? Date: 3 -26 -14 Requestor: Gunnar Jacobsen Check one: ® Regular Inspection: Time: 9Am Phone No: 352 -585 -6851 ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth a team2fa.com; jpeck@teamgfa.com;dpilarski@teamgfa.com;tenglish@teamgfa.com teamgfa.com;dpilarski@ teamgfa .com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing X Panel/ Feeder Gas Piping & Test I Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re- inspection Re-inspection Re- inspection Re- inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Windows Area Inspected: Inspection Results: AP - Approved AE —Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Signature. BILLED TIME hrs Date-03-26-2014— OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 • (772) 489.9989 • (772) 489 -2989 (fax) • www.teamgfa.com Southgate Apartments Sanford, Florida INSPECTION REQUEST ,yTFRNAY��aPv Date: 3 -25 -14 Permit No: 13 -149 Facility: Bldg 9 Project: Southgate Inspection Location: 9000 Solstice LP When will work be ready? Date: 3 -26 -14 Requestor: Gunnar Jacobsen Check one: ® Regular Inspection: Time: 9Am Phone No: 352 -585 -6851 ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: PdanforthQteam2fa.com; jpeck@ teamgfa. com ;dpilarski @teamgfa.com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In X Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder Gas Piping & Test I Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment E ui ment Re- inspection Re- inspection Re- inspection Re- inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Plumbing rough Area Inspected: Inspection Results: AP - Approved AE —Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments Note: Water Piping Test still needs to be done 1. 2. 3. 4. 5. 6. 7. Inspector's erry TIME hrs Date-03-26-2014— OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489.9989 - (772) 489 -2989 (fax) - www.teamgfa.com Southgate Apartments �. Sanford, Florida INSPECTION REQUEST '�rfR17AZ��Pv Date: 3 -25 -14 Permit No: 13 -149 Facility: Bldg 9 Project: Southgate Inspection Location: 9000 Solstice LP When will work be ready? Date: 3 -26 -14 Requestor: Gunnar Jacobsen Check one: ❑ Regular Inspection: Time: 9Am Phone No: 352 -585 -6851 ® Re inspection: Date of Initial inspection: 2 -14 -14 This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: adanforth a.teamefa.com; jpeck@ teamgfa. com ;dpilarski @teamgfa.com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough-In X Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panell Feeder Gas Piping & Test I Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment E ui ment Re- inspection Re- inspection Re- inspection Re- inspection X Final Building Final Electrical I Final Plumbing Final Mechanical Other Inspection Type: Mechanical rough Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Signature `Zf �2,�BILLED TIME hrs Date_03 -26 -2014 OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489 -9989 - (772) 489 -2989 (fax) - www.teamgfa.com Southgate Apartments Sanford, Florida - � INSPECTION REQUEST ryTFRNAT��P Date: 3 -25 -14 Permit No: 13 -149 Facility: Bldg 9 Project: Southgate Inspection Location: 9000 Solstice LP When will work be ready? Date: 3 -26 -14 Time: 9Am Requestor: Gunnar Jacobsen Phone No: 352 -585 -6851 Check one: ❑ Regular Inspection: ® Re inspection: Date of Initial inspection: 3 -21 -14 This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth�team�fa.com; jpeck@ teamgfa. com ;dpilarski @teamgfa.com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough-in Water Piping & Test CHW Piping & Test Framing X Panel/ Feeder I Gas Piping & Test I Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equi ment Re-inspection X Re-inspection Re- inspection Re-inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Framing Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ ❑ with Exceptions Disallowed Disapproved X ❑ ❑ Conditions/ Comments 1. 3'u Floor approved 03 -21 -2014 2. 2 Floor approved 03 -26 -2014 3. 1" Floor not yet approved — insulation needs to be finished before framing is signed off 4. 5. 6. 7. Inspector's Signature. BILLED TEVIE hrs Date-03-26-2014— OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489.9989 - (772) 489 -2989 (fax) - www.teamgfa.com OZR Date: 4 -08 -14 Facility: Bldg 9 Inspection Location: 9000 Solstice LP When will work be ready? Date: 04 -09 -14 Southgate Apartments Sanford, Florida INSPECTION REQUEST Permit No: 13 -149 Project: Southgate Time: 9Am Requestor: Gunnar Jacobsen Phone No: 352 -585 -6851 Check one: ® Regular Inspection: ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth a.teamefa.com; jpeck@ teamgfa. com; dpilarski@ teamgfa .com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling X Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing I Panel/ Feeder Gas Piping & Test Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment I Equipment Re-inspection Re- inspection Re- inspection Re- inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: I" floor insulation Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Sia ature `1 ��BILLED TIME hrs Date 04 -09 -2014 OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489.9989 - (772) 489.2989 (fax) - www.teamgfa.com ,yTERNAT���Py Date: 4 -08 -14 Facility: Bldg 9 Inspection Location: 9000 Solstice LP When will work be ready? Date: 04 -09 -14 Requestor: Gunnar Jacobsen Check one: ® Re lar Ins ection• Southgate Apartments Sanford, Florida INSPECTION REQUEST Permit No: 13 -149 Project: Southgate Time: 9Am Phone No: 352 -585 -6851 � P ❑ Re inspection: ( Date of Initial inspection: This- m ust be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth a,teamgfa.com; jpeck@teamgfa.com;dpilarski@teamgfa.com;tenglish@teamgfa.com teamgfa .com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing X Panel/ Feeder Gas Piping & Test Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Applianc e / Equipment Fixtures Wall & Ceiling Roofing Lighting Protection E ui ment Equipment Re- inspection Re-inspection Re- inspection Re-inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Exterior wall sheathing stair towers Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments 1. 2. 3. 4. 5. 6. 7. Inspector's TIME OFFICES THROUGHOUT FLORIDA hrs Date 04 -09 -2014 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489 -9989 - (772) 489.2989 (fax) - www.teamgfa.com - -G ,yTFRNATt���Pv Date: 4 -08 -14 Facility: Bldg 9 Inspection Location: 9000 Solstice LP Southgate Apartments Sanford, Florida INSPECTION REQUEST Permit No: 13 -149 Project: Southgate When will work be ready? Date: 04 -09 -14 Time: 9Am Requestor: Gunnar Jacobsen Phone No: 352 -585 -6851 Check one: ® Regular Inspection: ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth a.teamgfa.com; jpeck@ teamgfa. com; dpilarski@ teamgfa .com;tenglish @teamgfa.com Fax: (772) 489 -2989 • JIpe on Type Requested (check): \•BbltDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough-In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing X Panel/ Feeder Gas Piping & Test Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock I Appliance/ Equipment Fixtures I Wall & Ceiling Roofing Lighting Protection Equipment E ui ment Re- inspection Re- inspection Re- inspection Re- inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Framing 1" floor Area Inspected: Inspection Results: Conditions/ Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Signature, AP - Approved AE — Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ TIME hrs Date-04-09-2014— OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489 -9989 - (772) 489 -2989 (fax) - www.teamgfa.com Southgate Apartments Sanford, Florida INSPECTION REQUEST aNnt�a Date: 6 -9 -14 Permit No: 13 -149 Facility; Bldg 9 Project: Southgate Inspection Location: 9000 Solstice LP When will work be ready? Date: 6 -10 -14 Requestor: Gunnar Jacobsen Check one: ® Regular Inspection: Time: 9Am Phone No: 352 -585 -6851 ❑ Re inspection: Date of initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth(ateamefa.com; jpeck @teamgfa.com ;dpilar ski@ teamgfa .com ;tenglish @teamgfa.com Fax: (772) 489-2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Routh -In Rough In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough-In Water Piping & Test CHW Piping & Test Framing Panel / Feeder Gas Piping & Test Cond. Piping & Test Structural Service/ Ground I Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing. X Lighting Protection Equipment Equipment Re -fns ection Re- inspection Re- inspection Re-inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Roof final Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments Inspected 12 -20 -2013 — as In- Progress, Approved at end of day as Roof Final 1. 2. 3. 4. 5. 6. 7. Inspector's Signature BILLED TEVIE hrs Date-06-1.0-2014— eriy rtecx OFF ICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 • (772) 489.9989 • (772) 489.2989 (fax) - www.teamgfa.com Southgate Apartments Sanford, Florida 1 INSPECTION REQUEST '�rERHAi1�';�y Date: 6 -16 -14 Permit No: 13 -149 Facility: Bldg 9 Proiect: Southgate Inspection Location: 9000 Solstice LP When will work be ready? Date: 6 -17 -14 Requestor. Gunnar Jacobsen Check one: 0 Regular Inspection: Time : 9Am Phone No: 352 - 585 -6551 ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: PdanforthAteamgfn.com; jpeck a teamgfa.corn;dpilarski@ teamgfa .com;tenglish@.teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL. Footing Underground Underground Duct Rough-In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Pi ing& Test HW Piping & Test Wall/ Ceiling Ceiling Rough-In Water Piping & Test CHW Piping & Test Framin Panel/ Feeder Gas Piping & Test I Cond. Piping & Test Structural Service/ Ground X Storm Piping & Test Insulation Sheet Rock Appliance/ E uipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment E uipment Re-inspection. Re-inspection Re- inspection Re- inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Pre power Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Signature BILLED TIME lus Date-06-17-2014— .Jerry Xectc- OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 • (772) 489.9989 - (772) 489.2989 (fax) • www.teamgfa.com Southgate Apartments Sanford, Florida f "Na /zc�F• INSPECTION REQUEST Date: 6 -16 -14 Permit No: 13 -149 Facility; Bldg 9 Project: Southgate Inspection Location: 9000 Solstice LP When Will Work be ready? Date; 6 -17 -14 Time: 9Am Requestor, Gunnar Jacobsen Phone NO: 352-585-6851 r� Check one: Regular Inspection: ❑ Re inspection: Date of Initial inspection: This form must be fazed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth(a teamgfa.com; jpeckQ teamgfn. com; dpilarski® teamgfa .com;tenglish@teamgfsi.com Fax- (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough In Stack Piping& Test HW Pi inb & Test Wall/ Ceiling Ceiling Rou h-In Water Pi in & Test X MW Piping & Test Framing Panel/ Feeder Gas Piping & Test I Cond. Piping & Test Structural Service/ Ground I Storni Piping & Test Insulation Sheet Rock Appliance/ Equipment ures Wall & Ceiling Roofing Li hting.Protection i ment Equipment Re-inspection Re-inspection J!Re-inspection Re- inspection Final Building Final Electrical l Plumbin Final Mechanical Other Inspection Type: Water supply test Area Inspected: Inspection Results: AP-Approved AE— Approved DA- DP - Not Heady ❑ Y with Exceptions Disallowed Disapproved El ❑ Conditions/ Comments Inspected same time as Plumbing Rougli 03- 26.2014 — Approved at that time 2. 3_ 'l. 5- 6. 7- Inspector's Signature ` f —t _[,,BILLED TIME hrs Date 06 -17 -2014 OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 • (772) 489 -9989 • (772) 489.2989 (fax) - www.teamgfa.com �1, NATO Florida's Leading Engineering Source Environmental • Geotechnieal • Construction Materials Testing • Threshold and Special Inspections • Plan Review & Code Compliance Building Official City of Sanford P.O. Box 1788 Sanford, FL 32772 -1788 Re: Certificate of Compliance Private Provider Inspections Southgate Garden Apartments — Building No. 9 9000 Soltice Loop Sanford, Florida Dear Sir: July 14, 2014 GFA Project #13. 1469.00 With regard to project listed above, to the best of my knowledge and belief, inspected under my authority, the above - referenced permits have been completed in conformance with the approved plans and the applicable codes. Our Private Provider inspections for Florida Statute 553.791 have been conducted In accordance with Section 110 of the Florida Building Code as it relates to the Building systems, as follows: Permit Number Inspection Type Approval Date (MM /DDIYYYY) 13 -149 BUILDING FINAL 07/11/2014 13 -149 MECHANICAL FINAL 07/11/2014 13 -149 ELECTRICAL FINAL 07/11/2014 13 -149 PLUMBING FINAL 0711'11201.4 If you have any questions or require additional information, please contact Darcee M. Pilarski at (772) 924 -3575. oe 'OF�t FBPE CA # 4930 a �o }y �a: o 0 r -',, •� 4Q 0 , i Profe (a t9 er #44653 Special Inspddor #1103 State of Florida OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port 5t. Lucie, Florida 34986 • (772) 9243575 • (772) 924.3580 (fax) , www.teamgfa.com INSPECTION REQUEST LINE — 407.688.5151 pp� AA PERNIIT# U ` =r '' ADDRESS t l�0L)0 6I - IL 4(3 CONTRACTOR PROPERTY OWNERSV{'� TENANT DESCRIPTION OF WORK J Il ". it ? �� 4° i I;" 'e"t�4 ':�•`t' 1tM,I I do G it 4 BUILDING POOL PLUMBING GAS FOQTING ' j MAR DRAIN PIPING ! PIPING-, PRE Il ,T T rvl„ %/ 'UNOER)l 13 S 6 i r STEEL S:GROUN❑ ROUGH•IN ES J E T FIN /�L GAS- , LINTELITIE BEAM ( UIG POOL PIPING eWE zr sr FIRE WALL SHEATHING STRAPPING LIGHT NICHE ING CEILING COVER -COM'L FIRE ALARM Z`\ m __ n,p J p Y I� ROUGH IN FINAL FRAMING DECK t � IRRIGATION` - lyp \: 1 1 ±� �t� }' FIRE SPRINKLER UNDERGROUND INSULATION p !� F AL 4 ti FINAL a = ll- r� RATED ASSEMBLY FASTENING! EY`ALL S� Y�16 -lI Sr' OVERHEAD CEILINNG�G,�CJQ ER•COtA'L ELECTRICAL FIV1�iC HOOD -WELD TEST IY/i� his STU C{ Irl,' �H OO h TEPIP POL'r, v 1 ROUGH IN 6- l - '3-2 HOOD - SUPPRESSION FINAL TUG-POWER CEILINGCOVER - COM -L FIRE - PREPOWER ROOF UNDERGROUND 01_543W X FINAL !, �C FIRE -FINAL Uu 07./1-4 R�OFSH= ATHtNG /DEECKING P ROUGHIN Cl - 2 9_/11:;;'P UTILITIES PUBLIC WORKS INSULATIO —lU r— PRE•P017ER 'J -W ER GREASE TRAP DRIVEWAY 'MITtGATIO1 �/ KFIDgVIT CEILING C VER- OKl L CROSS CONNECTION CONTROL S\ _ l ORYjI�_I+sr FINAL TIl SEWER CONNECTION FINA Cam.'--.� I, q -rte L7ISCELLANEOUS MISCELLANEOUS MISCELLANEOUS r- C5 - r-l-rr O F 54,f4lP INSPECTION CARD SHALL BE DISPLAYED ON STREET SIDE OF LOT DO NOT REMOVE CARD UNTIL FINAL INSPECTION IS APPROVED SANITARY FACILITIES REQUIRED ON SITE "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." NOTICE OF COMMENCEMENT REQUIRED: YES NO BUILDING OFFICIAL u ' ? DATE ISSUE-iL 1 .1:' Issued permits must have an approved inspection within 6 months of the date of issuance or they will expire. An extension must be requested In writing, approved and paid for prior to expiration. ADDITIONAL RESULTS AND INSPECTOR COMMENTS C- K-1•E(LIOIc_ IVAI.4 5A6A, -, W y,-- 10. 19-�f3 P A�PP/1�.G W ( 14 6 � , V. QRGC -1-'1` `rrl)'�,Z rotfc- �J /tnls� Rx& (41C.e dW' -L<F "P tysf -w fillt%E 01 1-1 q St' A�j a#d6�9 "F iZ60 �PCT G,' UNI-& /� 5Al+17rj1L�` rFfT j 613 � ��f,6xCfi :ulrl iAnrrrr� re>s D2 -IL_1V -FA 1LP?tJh�G4� ��n�COT SG rr Scl5 pl - Il - tll4 r•I�YS U3- 21-7-dly V \ - 4-PF''1' cli Adi'41 -60 rti c > F Ir 2T Fr f �(11� -ti 4l, (5 ?- Zl -?lii, =) P / PtilirEP to L..Tl.1•L iAC� -iIAI- J� "�1'�ICr 3P l�- f'PR1vG9 1DFRF7-rTe %",Vf p71y.1_1y SP A- F4nLnr_P �wsn'tuY4- � f IdtiyOct {h r)3 -?d -/Y TP ,p('R17Ve �i if'l( Ih ✓G � �i0 i714C VC'- 5 fylj7CiL 1�s� rJtl.rr_ t4- 0 7 J'. i +(,1'1111zn nA,tcn -7lN 1od, - FNRMIII`. > Pt' � U� -z5 -1� p ,4P� 110✓yr �?� F1mn.. c�YdYllOi'� It /AL6 �Vkr4W/- �-rrt- A�'P!- OJtP1� =alh� �7�5 E�rEVOit SL Atl1%!r s1�r,�-O WAV oY -/g' 2 Tr APPE06-2 1'1I'awilll G�l� lylp 1 3 G / -211s� - rllst�t„1,� y Rams 1 3 �•l:/1� J I ow 1 ollage �l Ul�ul ;slum 1 03"? (yrwY? 1 ow Volrtlgt - 1'111:11 1- b?- Il'I`I ,) Uimill -U lay -lib- l.tla'I' I I RZICll Assembly j Firovall t rasteuinR- i.a G!1- 16�y�'P ! ` , •.� I`iivil t?uildin -� U�- ►l-rti 1=m;d e'lricnl lul r17�t(-1`c�' Il�llllll7l,t,_' � -1� -� �,I I1,<L'Iii111l�;1I 10-7-114 C i b r ,flf Sn-raford GFA International, Inc. - Private Provider- Inspection Summary Listed below is summary of inspections performed, PERMIT H tf BLDG4 LOT# ADDRES5 Number of Units 13- 149 9000 NA 19000 Solstice LP 36 SHELL INSPECTIONS PERFORMED DATE DATE DATE BUILDING) STRUCTURAL APPROVED/ ELECTRICAL APPROVED/ PLUMBING APPROVED/ INITIALS INITIALS _ INITIALS 1 oolnt! Linder V. 07 15 I Rru!h o7_ +r- v9 Slah;�lccfl•ical IC'4)S) Plumhue; {eafl Unduraueuld Y 07:2". 1 Purer- 'Gwmid Stuulm v Line 4COS) F're tiule Tetit r�7 }' 1 I Wall I ramU)!, (e &II Level I cl 0(0- .Temhortr%' VoIc io- 3b -/3'T� s. \1'al) Shenlh,m! (.:ell Level I og- yL� ^ y \Null I?ramint (dill 1 evrl ? C%�- ?.��(4 TP rW;IIIShcathlne(exl) I -evrl 2 G3 - 91-t k..;fP Floor 1'raminu Level'- I "Ipnr .Sheathing Level ? (- r -t3 \Nall Framing (ext) Level ? T -P _ y` Wall Slwathim-, (ext) - Level ; '� IRnnl' 1=r prow, (uusec. urtd n'u,s en=,neering) jv-I I RunrShdtullims ____ -- - f 2 -4 S'fi�' - I Ranlittl; (m progress Dry -1111) -(rTr I Roohne0 -Mal)- _— /Z_zD•(3 I find Buildim!, INTERIOR INSPECTIONS PERFORMED DATE DATE DATE DATE BUILDING/ APPROVED / I ELECTRICAL ' APPROVED/ PLUMBING APPROVED) MECHANICAL l APPROVED/. STRUCTURAL INITIALS INITIALS INITIALS I INITIALS s I r:ame LI 0 tf -06-t y 7P Rou! -h -lit I- I Q114. j-[V'q(1- -Sawer L I : Y�- //, LVTP KnuLlh -In L I 0'3- `j. hsulalinu I I vci.oj�-1 I�CeIlm_. Rough SumId Kow-41 -In 1 >ugh -1111 - I p t�Lb'I<<SP u3 -i -f J L �Vuu1o,) Door, Off- ' Lo1c VolUt!!d ! ( II Sd,tcr 1? Rout-'11-111 1 LI ..._ate cnst•t4r4, 7n Rough. LI i Drvwall 111 -1 11 1'o11 olta uc Second u3. L6�1 I�r I L'_ Mired : \s.cmhl; Rough -lit l.2 in pe7,11,IY ! Smer L3 { I rrc„all G4 -16 -114 ,f`' 103q t -a R I I- imelum_ 11 I rullle 121 ('etimL! Itou!�h i I I� 1 Second - I Rrnl_,11 -111 - I * 41.1 '-' (. -- — '°- I Insulnmmi L 6-l> tj Low Voltage Wutdat- Jn6rs Low Vnlla.,!i: I — i - 0 "zt 114' r I innl I..' a"1 "I(-145P n P AV _ Drvtvall - L3 04 41( 7'V1 LIU :i i Rated Assembly (� (l(r_I C'eiliiw Rou-01 Southgate Apartments Sanford, Florida yrfRHAYI��tP INSPECTION REQUEST Date: 7 -07 -14 Permit No: 13 -149 Facility: Bldg 9 Project: Southgate Inspection Location: 9000 Solstice LP When will work be ready? Date: 7 -08 -14 Time: 9Am Requestor: Gunnar Jacobsen Phone No: 352 - 585 -6551 Check one: © Regular Inspection: ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforthOUcamefa.com; jpecl c@ teamgfa. com; dpilarslci@ teamgfa .com;tenglisih @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough-In Stab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rou h-In Stack Pi in & Test HW Piping & Test Wall/ Ceiling Ceiling Rough-In Water Piping & Test CHW Piping &'Test Framing Panel/ Feeder Gas Piping & Test I Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock A liance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment E ui ment Re-inspection Re—inspection Reins ection Re-inspection Final Building Final Electrical I I Final Plumbing Final Mechanical X Other Inspection Type: Final Mechanical Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ ❑ with Inceptions Disallowed Disapproved ❑ ❑ X Conditions/ Comments 1, FBC -B 107A — Not per approved documents; fire dampers have overspray on them, ciean fire dampers 2. 3. 4. 5. F, 7. Inspector's S TIME hrs Date-07-08-2014— eelry ttect: - OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489.9989 - (772) 489.2989 (fax) - www.teamgfa.com Southgate Apartments Sanford, Florida ,V,e 0�,Ow�, INSPECTION RE QUEST Date: 7 -10 -14 Permit No: 13 -149 Facility: Building 9 Project: Southgate Inspection Location: 9000 Solstice LP When will work be ready? Date: 7 -11 -14 Time: 9Am Requestor. Eric Zimmermann Check one: ❑X Regular Inspection: Phone No: 407 -467 -4255 ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth(a)teamgfa.com; , ipec. k@ teantgfa. com; dpilarski@ te: ttngf a.com;tenglish @.teamgfaxeIn Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough-In Slab Floor Rough -ln Rough -In Steam Piping & Test Masonry Wall Rough-In Stack Pi in & Test HW Piping & Test Wall/ Ceiling Ceiling Rough-In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder Gas Piping & Test Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re-inspection Re-inspection Re-inspection Re-inspection Final Building Y Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Final Building Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ Y with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments 1. Permit sign -off card reviewed for outstanding items from previous inspections — outstanding items from from previous inspections have been addressed previously Building 9 — Building Final is APPROVED 07 -11 -2014 Building 9 — Electrical Final APPROVED on 07-11 -2014 Building 9 — Plumbing FinaI APPROVED on 07 -11 -2014 Building 9— Mechanical Final APPROVED on 07 -11 -2014 Inspector's Signature BILLED TIME, hrs Date-07-11-2014— OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive; Port St. Lucia; Florida 34986 - (772) 489.9989 - (772) 469.2989 (fax) - www.teamgfa.com Southgate Apartments Sanford, Florida INSPECTION REQUEST ,44 RNATI6,a~ Date: 7 -10 -14 Permit No: 13 -149 F:ieility: Building 9 Project: Southgate Inspection Location: 9000 Solstice LP WI }en will work be ready? Date: 7 -11 -14 Time; 9Am Requestor: Eric Zimmermann Check one: 7Q. Regular inspection: ❑ Re inspection: Phone No: 407 - 467 -4255 Date of Initial inspection: This form must be fared or emailed and received by 2:04 p.m. for next day inspection Email To: pdanforth(@tenmefa.com; jpeck @teamgfa.com;dpilarstti@ Lean ►gfa.com;tcnglisli@teamgfa.com Fax: (772) 489 -2939 Inspection Type Requested (check): BUILDING / STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footin,g Underground Underground Duct Rough-In Slab Floor Rough-In Rou lu -In Steam Pi in & Test Masonry Wall.Rou h -In Stack Pi in & Test . HW Piping & Test Wall/ Ceiling Ceiling Rough-In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder I Gas Piping & Test Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment E ui ment Re-inspection Re-inspection Re-inspection Re-inspection Final Building Final Electrical X Final Plumbing Final Mechanical Other Inspection Type: Final Electrical Area Inspected: Inspection Results: AP - Approved AE—Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments I . Permit sign -off card reviewed for outstanding items from previous inspections — outstanding items from from previous inspections have been addressed previously Electrical Final is APPROVED 4. 5. 6. 7. Inspector's Signature ` Z. �_/,BILLED TIME lus Date 07 -11 -2014 OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Wive, Port St. Lucie, Florida 34986 - (772) 469 -9989 - (772) 489 -2989 (fax) - WWW.ieamgfa.com Southgate Apartments San ford, Florida .. INSPECTION REQUEST f�rFRNPSi�aP Date: 7 -10.14 Permit No: 13.149 Facility: Building 9 Project: Southgate Inspection Location: 9000 Solstice LP When will work be ready? Date: 7 -11 -14 Time: 9Am Requestor: Eric Zimmermann Check one: 0 Regular Inspection: Phone No: 407-467-4255 ❑ Re inspection: Date of Initial inspection; This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: adanforth(7a,teamgfa.com; jpecic @teamgfa.com;dpilarslti@ teamgfa .com;tenglisli@teautgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough-In Slab Floor Rough -In Rough -In Steam Piping &Test Masonry Wall Rough-In Stack Pi' in &Test I-IW Pi in &Test Wall/ Ceiling Ceiling Rou h -In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder Gas Piping & Test Cond. Piping & Test Structural Service/ Ground Storm Piping & Test I I Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment E ui ment Re-inspection Re-inspection Re-inspection Re.-inspection Final Building I Final Electrical I Final Plumbing X Final mechanical Other Inspection Type: Final Plumbing Area Inspected; Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions / Comments 1. Permit sign -off card reviewed for outstanding items from previous inspections — outstanding items from from previous inspections have been addressed previously Plumbing Final is APPROVED 4. 5. 6. 7- Inspector's Signature '-- /,_- BILLED TIME, hrs Date-07-11-20 14 OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 , (772) 489.9989 , (772) 489.2989 (fax) • Www.teamgfa.com Southgate Apartments Sanford, Florida INSPECTION REQUEST ''FRNASIOPv Date: 7 -10 -14 Permit No: 13 -149 Facility: Building 9 Project: Southgate Inspection Location: 9000 solstice LP When. will work be ready? Date: 7 -11 -14 Time: 9Am Requestor: Eric Zimmermann Check one: © Regular Inspection: ® Re inspection: Phone No: 407 -457 -4255 Date of Initial inspection: 7-8-14 This form must be faxed or emailed and received by 2 :00 p.m. for next day inspection Email To: Pdanforth0teamafa.com; jpeelc @ten mgfa. eom; dpilarski @teamgfa.com; ten glishQa teamgfa coin Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rou h-ln Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Pi in & Test HW Piping & Test Wall/ Ceiling Ceilin Rou h - -In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder Gas Piping & Test Cond. Piping & Test Structural Service/ Ground Storm Pi ing & Test Insulation Sheet Rock A pliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Ligbting Protection Equipment E ui ment Re-inspection Re -ins ection Re-inspection Re-inspection Final Building Final Electrical Final Plumbing Final Mechanical X Other Inspectiou Type: Final Mechanical Area Inspected: Inspection Results: AP - Approved AE —Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments 1. Permit sign -off card reviewed for outstanding items from previous inspections — outstanding items from from previous inspections have been addressed previously Mechanical Final is APPROVED 4. 5. 6. 7. Inspector's Signature '�—f (�[,—BILLED TIME firs Date-07-1 1-2 0 14 OFFICES THROUGHOUT RoRw 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489.9969 - (772) 489.2989 (fax) • www.teamgfa.com '�TFRNAT�o��P Date: 12 -02 -13 Facility: Building 9 Inspection Location: 9000 Solstice LP Southgate Apartments Sanford, Florida INSPECTION REQUEST Permit No: 13 -149 Project: Southgate When will work be ready? Date: 12 -03 -13 Time: 9Am Requestor: Gunnar Jacobsen Phone No: 352 -585 -6851 Check one: ® Regular Inspection: ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth a,teamafa.com; jpeck@ teamgfa. com; dpilarski@ teamgfa .com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough-In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder Gas Piping & Test I Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing X Lighting Protection Equipment Equipment Re- inspection Re- inspection Re- inspection Re- inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Roof Sheathing Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Signature TIME hrs Date-12-03-2013— OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489 -9989 - (772) 489 -2989 (fax) - www.teamgfa.com iyT�RNAT`o�pv Date: 12 -12 -13 Facility: Bldg 9 Inspection Location: 9000 Solstice LP Southgate Apartments Sanford, Florida INSPECTION REQUEST Permit No: 13 -149 Project: Southgate When will work be ready? Date: 12 -13 -13 Time: 9Am Requestor: Gunnar Jacobsen Phone No: 352 -585 -6851 Check one: ® Regular Inspection: ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforthOteamafa.com; jpeck@ teamgfa. com; dpilarski@ teamgfa .com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough-In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder Gas Piping & Test I Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock A" Equipment Fixtures Wall & Ceiling Roofing X Lighting Protection Equipment E ui ment Re- inspection Re- inspection Re- inspection Re-inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Roof dry in Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments Make sure flashings at fascia returns are properly flashed 1. 2. 3. 4. 5. 6. 7. Inspector's erry TIME hrs Date-12-13-2013— OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489.9989 • (772) 489 -2989 (fax) • www.teamgfa.com Inspection Location: 9000 Solstice LP When will work be ready? Date: 12 -20 -13 Time: 9Am Requestor: Gunnar Jacobsen Phone No: 352 -585 -6851 Check one: ® Regular Inspection: ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: gdanforthPteamefa.com; jpeck@ teamgfa. com ;dpilarski @teamgfa.com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL Southgate Apartments PLUMBING Sanford, Florida '�rFANAT���P INSPECTION REQUEST Footing Date: 12 -19 -13 Permit No: 13 -149 0-_ Facility: Bldg 9 Project: Southgate Inspection Location: 9000 Solstice LP When will work be ready? Date: 12 -20 -13 Time: 9Am Requestor: Gunnar Jacobsen Phone No: 352 -585 -6851 Check one: ® Regular Inspection: ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: gdanforthPteamefa.com; jpeck@ teamgfa. com ;dpilarski @teamgfa.com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough-in Water Piping & Test CHW Piping & Test Framing Panel/ Feeder Gas Piping & Test Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing X Lighting Protection Equipment Equipment Re- inspection Re- inspection Re- inspection Re-inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Roof in progress Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Signature `����,(fBILLED TIME hrs Date 12 -20 -2013 OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489 -9989 - (772) 489 -2989 (fax) - www.teamgfa.com Inspection Location: 9000 Solstice LP When will work be ready? Date: 1 -21 -14 Time: 9Am Requestor: Gunnar Jacobsen Phone No: 352 -585 -6851 Check one: ® Regular Inspection: ❑ Re inspection: Date of Initial inspection: 1 -20 -14 This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth a(),,teamda.com; jpeck@ teamgfa. com; dpilarski@ teamgfa .com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL Southgate Apartments PLUMBING Sanford, Florida 'yTEHNAT��P INSPECTION REQUEST Footing Date: 1 -20 -14 Permit No: 13 -145 Facility: Bldg 9 Project: Southgate Inspection Location: 9000 Solstice LP When will work be ready? Date: 1 -21 -14 Time: 9Am Requestor: Gunnar Jacobsen Phone No: 352 -585 -6851 Check one: ® Regular Inspection: ❑ Re inspection: Date of Initial inspection: 1 -20 -14 This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth a(),,teamda.com; jpeck@ teamgfa. com; dpilarski@ teamgfa .com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Pi ing& Test HW Piping & Test Wall/ Ceiling X Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder I Gas Piping & Test Cond. Piping & Test Structural Service/ Ground Storm Piping & Test I Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment E ui ment Re- inspection Re- inspection Re- inspection Re- inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Pre rock insulation Area Inspected: Inspection Results: AP-Approved AE—Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments I . Contractor to install insulation in one stud bay which is missing insulation 2. 3. 4. 5. 6. 7. Inspector's Signature / 4,/,GBILLED TIME hrs Date 01 -21 -2014 OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489.9989 - (772) 489 -2989 (fax) - www.teamgfa.com : -G 'ryrFRNAT10�Pv Date: 1 -23 -14 Facility: Bldg 9 Inspection Location: 9000Solstice LP When will work be ready? Date: 1 -24 -14 Requestor: Gunnar Jacobsen Check one: ® Regular Inspection: Southgate Apartments Sanford, Florida INSPECTION REQUEST Permit No: 13 -149 Project: Southgate Time: 9Am Phone No: 352 -585 -6851 ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth(iNeamgfa.com; jpeck@ teamgfa. com ;dpilarski @teamgfa.com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In X Rough -In Steam Piping & Test Masonry Wall Rough -In X Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough -In X Water Piping & Test CHW Piping & Test Framing Panel/ Feeder Gas Piping & Test I Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment E ui ment Re- inspection Re4nspection Re-inspection Re-inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Electrical rough Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments 1. 2. 3. 4. 5. 6. 7. Inspector's TIME hrs Date 01 -24 -2014 OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489.9989 - (772) 489 -2989 (fax) • www.teamgfa.com 04�,R Date: 1 -29 -14 Facility: Bldg 9 Inspection Location: 9000 Solstice LP When will work be ready? Date: 1 -30 -14 Requestor: Gunnar Jacobsen Check one: ® Regular Inspection: Southgate Apartments Sanford, Florida INSPECTION REQUEST Permit No: 13 -149 Project: Southgate Time: 9Am Phone No: 352 -585 -6851 ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth(&teamafa.com; ipeck@ teamgfa. com; dpilarski@ teamgfa .com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough-in X Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough-In Water Piping & Test CHW Piping & Test Framing I Panel/ Feeder Gas Piping & Test I Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re-inspection Re-inspection Re- inspection Re- inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Mechanical Rough Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ ❑ with Exceptions Disallowed Disapproved ❑ ❑ X Conditions/ Comments 1. FBC -B 107.4 — Not per approved documents: clothes dryer duct not supported and secured at maximum 4ft 2. spacing between supports; flexible duct has sag in various locations which exceeds 1/2" sag per foot between 3. supports ; clothes dryer duct `Duct Box' boxes are installed upside down at various locations; hole in Dryer 4. Box is slightly undersized, however, if tab is fully bent up and out of the way the duct is very close to the 5. minimum diameter of 4 ", otherwise duct is too out -of -round at approximately 3 -1/2 "; 6. 7. Inspector's Signature ` BILLED TIME hrs Date_01 -30 -2014_ eery ecl ' OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489 -9989 - (772) 489 -2989 (fax) - www.teamgfa.com =G ,ryTFRNAitO�P.. Date: 2 -13 -14 Facility: Bldg Inspection Location: 9000 Solstice LP Southgate Apartments Sanford, Florida INSPECTION REQUEST Permit No: 13 -149 Project: Southgate When will work be ready? Date: 2 -14 -14 Time: 9Am Requestor: Gunnar Jacobsen Phone No: 352 -585 -6851 Check one: ® Regular Inspection: ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth i ,teamafa.com; jpeck@ teamgfa. com; dpilarski@ teamgfa .com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough-In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test X HW Piping & Test Wall/ Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder I Gas Piping & Test I Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance / Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment E ui ment Re- inspection Re- inspection Re- inspection Re-inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Plumbing Sanitary Test Area Inspected: Inspection Results: Conditions/ Comments 1. 2. 3. 4. 5. 6. 7. - Inspector's Signature AP - Approved AE — Approved ❑ with Exceptions X Except Tub and Shower Setting DA- DP - Not Ready ❑ Disallowed Disapproved ❑ ❑ BILLED TIME hrs Date-02-14-2014— OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489 -9989 • (772) 489 -2989 (fax) • www.teamgfa.com Date: 2 -13 -14 Facility: Bldg 9 Inspection Location: 9000 Solstice LP When will work be ready? Date: 2 -14 -14 Requestor: Gunnar Jacobsen Check one: ® Regular Inspection: Southgate Apartments Sanford, Florida INSPECTION REQUEST Permit No: 13 -149 Project: Southgate Time: 9Am Phone No: 352 -585 -6851 ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth a,teamefa.com; jpeck@ teamgfa. com ;dpilarski @teamgfa.com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In X Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder I Gas Piping & Test Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance / Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re-inspection Re-inspection Re-inspection Re-inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Mechanical Rough Area Inspected: Inspection Results: AP - Approved AE — Approved DA- . DP - Not Ready ❑ ❑ with Exceptions Disallowed Disapproved ❑ ❑ X Conditions/ Comments 1. FBC -B 107.4 — Not per approved documents — at least two sections of dryer duct are damaged/bent/crimped 2. 3. 4. 5. 6. 7. Inspector's Signature TIME hrs Date-02-14-2014— OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 • (772) 489 -9989 • (772) 489.2989 (fax) • www.teamgfa.com Southgate Apartments �. Sanford, Florida i,=,T�gN^71o�Pv INSPECTION REQUEST Date: 3 -09 -14 Permit No: 13 -149 Facility: Bldg 9 Project: Southgate Inspection Location: 9000 Solstice LP When will work be ready? Date: 3 -11 -14 Time: 9Am Requestor: Gunnar Jacobsen Phone No: 352 -585 -6851 Check one: ® Regular Inspection: ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: adanforth(a@eamsfa.com; jpeck@ teamgfa. com ;dpilarski @teamgfa.com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough-in Water Piping & Test CHW Piping & Test Framing Panel/ Feeder Gas Piping & Test I Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures X Wall & Ceiling Roofing Lighting Protection Equipment E ui ment Re- inspection Re- inspection Re- inspection Re- inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Tub and Shower Sets Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments Rolled over from yesterday by contractor 1. 2. 3. 4. 5. 6. 7. Inspector's Signature BILLED TIME hrs Date_03-11-2014— —5 erry eck . OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489.9989 - (772) 489 -2989 (fax) - www.teamgfa.com •G t� �TFRNAS���P Date: 3 -20 -14 Facility: Bldg 9 Inspection Location: 9000 Solstice LP When will work be ready? Date: 3 -21 -14 Requestor: Gunnar Jacobsen Check one: ® Regular Inspection: Southgate Apartments Sanford, Florida INSPECTION REQUEST Permit No: 13 -149 Project: Southgate Time: 9Am Phone No: 352 -585 -6851 ® Re inspection: Date of Initial inspection: 03 -20 -14 This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: udanforth rr.teamafa.com; jpeck@ teamgfa. com ;dpilarski @teamgfa.com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder Gas Piping & Test I Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock X Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment E ui ment Re-inspection Re- inspection Re- inspection Re- inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Draft stopping Area Inspected: Inspection Results: AP - Approved AE —Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments 1. 2. 3. 4. 5. 6. 7. Inspector's S TIME hrs Date-03-21-2014— OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489 -9989 • (772) 489 -2989 (fax) - www.teamgfa.com iyTFRN^j,oap� Date: 3 -20 -14 Facility: Bldg 9 Inspection Location: 9000 Solstice LP When will work be ready? Date: 03 -2144 Requestor: Gunnar Jacobsen Check one: ® Regular Inspection: Southgate Apartments Sanford, Florida INSPECTION REQUEST Permit No: 13 -149 Project: Southgate Time: 9Am Phone No: 352 -585 -6851 ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth a,teamffa.com; jpeck@ teamgfa. com; dpilarski@ teamgfa .com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough-In Water Piping & Test CHW Piping & Test Framing X Panel/ Feeder Gas Piping & Test I Cond. Pi ing & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment E ui ment Re-inspection Re- inspection Re- inspection Re- inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Framing and CLP Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ ❑ with Exceptions Disallowed Disapproved X ❑ ❑ Conditions/ Comments Except Windows — windows should be ready for inspection next week 1. 2. 3. 4. 5. 6. 7. Inspector's TIME hrs Date- 03- 21 -2014— OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489 -9989 - (772) 489 -2989 (fax) - www.teamgfa.com Southgate Apartments Sanford, Florida . - INSPECTION REQUEST �TERNAT��P Date: 3 -18 -14 Permit No: 13 -149 Facility: Bldg 9 Project: Southgate Inspection Location: 9000 Solstice LP When will work be ready? Date: 3 -21 -14 Requestor: Gunnar Jacobsen Check one: ® Regular Inspection: Time: 9Am Phone No: 352 -585 -6851 ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: adanforth�teamgfa.com; jpeck@ teamgfa. com; dpilarski@ teamgfa .com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough-in Water Piping & Test CHW Piping & Test Framing Panel/ Feeder Gas Piping & Test I Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock X Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment E ui ment Re- inspection Re- inspection Re- inspection Re- inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Pre rock Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments 1. 2. 3. 4. 5. 6. 7. Inspector's erry TUVIE hrs Date-03-21-2014— OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489.9989 - (772) 489 -2989 (fax) - www.teamgfa.com Southgate Apartments Sanford, Florida INSPECTION REQUEST NJfRNAT10�P Date: 3 -20 -14 Permit No: 13 -149 Facility: Bldg 9 Project: Southgate Inspection Location: 9000 Solstice LP When will work be ready? Date: 03 -21 -14 Time: 9Am Requestor: Gunnar Jacobsen Phone No: 352 -585 -6851 Check one: M Regular Inspection: ❑ Re inspection: Date of Initial inspection: This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth a,teamafa.com; jpeck@ teamgfa. com ;dpilarski @teamgfa.com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling X Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder I Gas Piping & Test Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re-inspection Re-inspection Re-inspection Re-inspection Final Building Final Electrical I Final Plumbing Final Mechanical Other Inspection Type: Insulation — Except ceilinglattic 3d floor Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ ❑ with Exceptions Disallowed Disapproved X ❑ ❑ Conditions/ Comments Ceiling/attic blown -in insulation to be done later 1. 2. 3. 4. 5. 6. 7. Inspector's Signature `f i � BILLED TIME hrs Date 03 -21 -2014 OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 - (772) 489 -9989 - (772) 489.2989 (fax) - www.teamgfa.com Southgate Apartments Sanford, Florida INSPECTION REQUEST Date: 3 -18 -14 Permit No: 13 -149 Facility: Bldg 9 Project: Southgate Inspection Location: 9000 Solstice LP When will work be ready`? Date: 3 -20 -14 Time: 9Am Requestor: Gunnar Jacobsen Check one: ® Regular Inspection: ❑ Re inspection: Phone No: 352 -585 -6851 Date of Initial inspection: I- M, This form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforth(@teamgfa.com; jpeck@ teamgfa. com; dpilarski@ teamgfa.com;tenglish @teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder Gas Piping & Test Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock X Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re-inspection Re-inspection Re-inspection Final Building -Re-inspection Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Draft stop Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ ❑ with Exceptions Disallowed Disapproved ❑ ❑ X Conditions/ Comments Rolled over from previous day 1. FBC -B 107.4 — Not per approved documents — there were a number of areas which require draftstopping to be installed to meet the 10 foot maximum horizontal distance between draftstopping in the separation walls 3. 4. 5. 6. 7. Inspector's Signature BILLED TIME hrs Date-03-20-2014— OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 • (772) 489.9989 - (772) 489 -2989 (fax) • www.teamgfa.com