Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
10000 Solstice Lp 13-150
/' —N Q " - V Florida's Leading Engineering Source Environmental - Geotechnlcal -Construction Materials Testing • Threshold and Special Inspections • Plan Review & Code Compliance Building Official City of Sanford P.O. Box 1788 Sanford, FL 32772 -1788 Re: Certificate of Compliance Private Provider Inspections Southgate Garden Apartments — Building No. 10 10000 Soltice Loop Sanford, Florida Dear Sir: June 5, 2014 GFA Project #13- 1469.00 With regard to project listed above, to the best of my knowledge and belief, inspected under my authority, the above - referenced permits have been completed in conformance with the approved plans and the applicable codes.. Our Private Provider Inspections for Florida Statute 553.791 have been conducted in accordance with Section 110 of the Florida Building Code as it relates to the Building systems, as follows: Permit Number Inspection Type Approval Date (MM /DD/YYYY) 13 -150 BUILDING FINAL 06/05/2014 13 -150 MECHANICAL FINAL 06/05/2014 13 -150 ELECTRICAL FINAL 06/05/2014 13 -150 PLUMBING FINAL 06/05/2014 If you have any questions or require additional information, please contact Darcee M. Pilarski at (772) 924 -3575. Resp `t�t'i;!11�i �It;;{�IYu�t,P.d, GFfi; ^?��!FYJ~'r` <,F FBPE CA # 4930 Paul Danforth ��, Jun 5 2014 2:55 PM S. rL7 gin, Proi'e`SCG� {t1,c�`r�#44653 °- SraciallH.Iret!i11'`ir110? State of Florida OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 • (772) 924 -3575' • (772) 924.3580 (fax) www,teamgfa.com 4 X Y �E Date: 6 -3 -14 Southgate Apartments Sanford, Florida INSPECTION REQUEST Permit Not 13 -150 Facility: Bldg 10 Project: Southgate Inspection Location: 1,0000 Solstice LP When will work be ready? Date 6 -05 -14 Time: 9Am Requestor: Gunnar Jacobsen Phonc No: 352 -585 -6351 Check one: 0 Regular Inspection: ❑ Re inspection: Date of Initial inspection: Thus form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanfortM0teamefa.com; jpeckQQ teamgfa. com; dpilarskiQ teamgfo.com;tenglish@teamgfn.com Fax: (772) 489 -2989 Inspection Type Requested (check):. BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough-In Slab Floor Rough-In Rough-In Steam Piping & Test Masonry Wall Rough-In Stack Pi ing& Test HW Piping &.Test Wall/ Ceiling Ceilin Rou h -In Water Piping &Test CHW Piping &Test Framing Panel/ Feeder Gas Piping & Test Cond, Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Wall &• Ceiling Roofing Lighting Protection Equipment Equipment Re- inspection Re-inspection Re- inspection . Re- inspection Final Building R I Final Electrical Final Plumbing Final Mechanical Other Inspection Type. Final Bldg Area Inspected: Inspection Results: AP - Approved AE — Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments 1. Permit sign -off card reviewed for outstanding items from previous inspections — outstanding items from from previous inspections have been addressed previously Building 10 — Building Final is .APPROVED 06 -05 -2014 Building 10 — Electrical Final APPROVED on 06 -05 -2014 Building 10 — Plumbing Final APPROVED on 06 -05 -2014 Building 10 — Mechanical Final APPROVED on 06 -05 -2014 Inspector's Signature <2ej, _ BILLED TIME hrs Date 06 -05 -2014 OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port St. Lucie, Florida 34986 a (772) 489.9989 0 (772) 489.2989 (fax) o www.teamgfa.com �c�iiII�04 a Q ' r�V Date: 5 -30 -14 Facility: Building 10 Inspection Location: 10000 Solstice LP When wiltwork be ready? Date. 6 -05 -14 Requestor: Gunnariacabsen Check one: ® Regular Inspection: Southgate Apartments Sanford, Florida INSPECTION REQUEST Permit No: 13 -150 Project; Southgate Time: 9Am Phone No: 352 - 585 -6851 ❑ Re inspection: Date of Initial inspection_ This farm must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanfortlipteamafa.com; jpeck@teamgfa.com;dpilarski@teamgfa.com;tenglish@teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough In Rough -In Steam Piping & Test Masonry Wall Rough-In Stack Pi in & Test HW Piping & Test Wall/ Ceiling Ceiling Rough-In Water Pi in &Test CHW Piping &Test Framing Panel/ Feeder GasPiping & Test Cond. Pi in & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment E ui ment Re-inspection Re- inspection Re- inspection Re-inspection Final Building Final Electrical X Final Plumbing Final Mechanical Other Inspection Type: Final electric Area Inspected: Inspection Results: "- Approved AE — Approved DA- DP - Not Ready ❑ X with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments 1. Permit sign -off card reviewed for outstanding'itetr►s from previous inspections — outstanding items from from previous inspections have been addressed previously Electrical Final is APPROVED 4. 5. 6. 7. Inspector's S erry D TIME, hrs Date 06 -05 -2014 OFFICES THROIIGHOur FLORIDA 621 NW Enterprlse Drive, Port St. Lucie, Florida 24986 a (772) 489,9989 a (772) 489.2989 (fox) - www.teamgfa.com t. Southgate Apartments Sanford, Florida �1 , IIdSPEC')i'I ®lsi IaEQ[]]CST rfRNA'n��P Date: 5 -30 -14 Permit No: 13 -150 Facility: Bldg 10 Project: Southgate Inspection Location: 10000 Solstice LP When will work be ready? Date: 6 -05 -14 Titne. 9Am Requestor: Gunnar Jacobsen Phone No: 352- 585 -6851 Check one: Regular Inspection: ❑ Re inspection: Date of Initial inspection:. 'Phis form must be faxed or emailed and received by 2:00 p.m. for next day inspection Email To: pdanforthnteamefa.com; jpeck@ teamgfa. com; dpilarskiQ teamgfa .com,;tenglish ©teamgfa.com Fax: (772) 489 -2989 Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough-In Slab Floor Rough-In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping& Test HW Piping & Test Wall/ Ceiling Ceilin Rough -In Water Pipin& & Test CRW Piping & Test Framing Panel/ Feeder Gas Piping & Test Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall. &Ceiling Roofing Lighting Protection Equipment Re-inspection. Re-inspection -Equipment Re-inspection Re- inspection Final Building Final Etectrical Final Plumbing Final Mechanical X Other Inspection Type: Final Mechanical Area Inspected: inspection Results: AP - Approved AE — Approved DA- DP - -Not Ready ❑ X With Exceptions Disallo}ved Disapproved ❑ ❑ ❑ Conditions/ Comments 1. Permit sign -off card reviewed for outstanding items from previous inspections — outstanding items frotn from previous inspections have been addressed previously Mechanical Final is APPROVED 4. 5. 6. 7, Inspector's S erry TIME hrs Date 06 -05 -2014_ OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port 5t. Lucie, Florida 34986 6 (772) 489.9989 . (772) 489.2989 (fax) a www.teamgfa.com City of Sanford GFA International, Inc. - Private Provider Inspection Summary Listed below is summary of inspections performed. SHELL INSPECTIONS PERFORMED BUILDING/ STRUCTURAL Footing PERMIT BLDGtl� LOTH ADDRESS I'll I NumberofUnits -). ' hough Plulnbtni Underground :S;nlital_V Line 13 -150 10000 NA 10000 Solstice LP 1 24 Wall Framing (ext) L_vel _' 09- 111 -111 -;,-p SHELL INSPECTIONS PERFORMED BUILDING/ STRUCTURAL Footing DATE APPROVED/ INITIALS ELECTRICAL UndurL round Slab Clecirical 1 ooLerAimund Te111110rary Pole V DATE APPROVED! INITIALS_ 0' ?01.13 (COS) / q i17 PLUMBING DATE APPROVED/ INITIALS -). ' hough Plulnbtni Underground :S;nlital_V Line 06137 U 1C•0S) 511th Wall hannng(ext) l.evcl I l)7'08' 13 (COS) j!v-1gf ? - Wall Shealhlm= (exo Level 1 Wall Framing (ext) L_vel _' 09- 111 -111 -;,-p Wall Shcalhimg (ext) l,c\•cl ? Dx'2L ! TAI I Frame — LI 01-lo-k, 7P - lb - /Y7' PIoDr f=raming Level ? IZ-i0=(^ Se��'er I.1 ,lV I Rousli =ln ( -I � - Sheathing Leve13 _Floor_ Wall framing (ext) Le\e13 3 -!G -11 -T Wall Sheathing (ext) - Level 3 aI-V-Q TO Roof' rralmng (ntlxscs and uusscnstuteerrn`_!) //- - ZY 1 Roof Shealhme Roofing; (In )irogrus. Dry- -1n) i! -'L7 - a}- , S Z I _ Finalildhi) rinatBulldina 106 -0 -IC � U off; -t{;TP ! Drywall - Ll INTERIOR INSPECTIONS PERFORMED BUILDING/ DATE APPROVED/ DATE APPROVED/ _ DATE APPROVED / I DATE i APPROVED! STRUCTURAL TRUCTURAL INITIALS ELECTRICAL pLUMBIN� INITIALS MECHANICAL INITIALS INITIALS I Frame — LI 01-lo-k, 7P - lb - /Y7' Ruuall -In — l..l Ceiliug. Roil gll IZ-i0=(^ Se��'er I.1 ,lV I Rousli =ln ( -I Tji Insulation LI 5eeolld Windmk, Dnars a}- , S Z Lnw Voltage Ratwh - Ll � 15cwcr U, 7� 3U -rj � -' Rowdi -lo L- ! Drywall - Ll Low Voltage I�_,y�.f,,�lt<- Final - L ul Second Lough -hl -- } I ry Smer L3 ! - IZiIIL'd / \V�('niEIIV 1-IrC \ \'alI! r [Wugh-ln - L2 I !� Second I -rame I-? �7.�(�I� �� I Ccilinu Rough L? �1 Z 3(r � Rough-hi I II5lli;lll(Uj I ' t� l��I LO \5' VoliBgf: L3 �/�'> _- lZ�rl� j[p Q ' P Window D i r, -III Lnw l'ollaec �}I 12 �1't�/ 'j Final I—) Drywall - T.' _2S--,I -1 { a Rough -In 13 D, 7) - Ratrd A;selnl 6- jj,Lj ,. Cciliil , Rough fire�ti a li t 0S -(3 -Its -' r Frame • U, Gr3-1 l'l I' o\% vollagc ltnut {i 1.3 111,;olutinn -1.3 d(j- dS_(iG�� Lima Volt;tyr G3 I 1 Final L3 -7S'IV, 1Vindnw, Hoots vsZ 7f? - L3 Drvwall =L3 — 65-3- -y flawd Assembly Fas(cnin, = l.3 Final 13uilJiitr �jFinal Electrical Final Pipe) _ tnechtuut:ail INSPECTION REQUEST LINE - X407.603.5151 PERMIT P rk 5 °�S 6 ADDRESS Q0 000 c c,, fi L CONTRACTOR QAli,�- its .t1'° &Ilaln u b PROPERTY OWNER IP�'� `15' � %� OP TENANT DESCRIPTION OFWORIC � Wr`is► k' � ►f?�d'lf'[NL�'G+�ib' N& i BUILDING cum POOL PLUMBING \ GAS FOOTING v1g1/ M11AINi�RAiNPIPINu^ U -Z'S' / PIPINGJ9R V$EIC� B r 3 STEEL &ROUND RvOrUG -INS PR SSSURETE.SI T F� 1/- /��� \-`` LINTE IEBEAM UIG POOL PI\M1G Eft TEST pr F /r FIRE WALL SHEATHING I STRAPPING LIGHT NIC� B 1DIt�G CEILING COVER- COWL FIRE ALARM 564- C f _G r(� dZ�LI IV 71� _ > ROUGH IN FINAL FRAMING Q'.1Q- 14 a7r DECK IRRIGATION / c�E 6(c� �rn� '��1 -�� ��{/� FIRE SPRINKLER INSULLggT 1 S[s%ffl >� AL FINAL - RATED ASSEMBLY i ASTW LNG I UNDERGROUND OVERHEAD CEILINJ�T''' R -C'L ELECTRICAL (-]VAC HOOD - WELD TEST STUCC 1LAT TEMP f(�_�JU'I -} fit? ROUGH IN HOOD •SUPPRESSION FINAL -zre TUG-POWER 6S -Olvn P CEILING COVER - COM'L FIRE - PREPOWET - s -r - ROOF UNIIEP.GR W, � FINAL 6_05.1� s� FIRE - FINAL ROOFSHEATHINGIDECKING Il-jq-13 ROUGHIN - 1'L- �v ^ ^ -13 -P UTILITIES PUBLIC WORDS INSULA ON tl J PRE -POWER ,A r Tp J GREASETRAP DRIVEWAY MITIGATI N FFID 1 CEIUNGCOVEP -CCOM'L r_f - i CROSS CONNECTION CONTROL DRY-IN ) i sl FINAL D 6�ds �Q I SEWER CONNECTION Fir NN ! & flll� M1'CELLANE U MISCELLANEOUS MISCELLANEOUS 1- 4—LY -F..: Jt INSPECTION CARD SHALL BE DISPLAYED ON STREET SIDE OF LOT DO NOT REMOVE CARD UNTIL FINAL INSPECTION IS APPROVED SANITARY FACILITIES REQUIRED ON SITE "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." NOTICE OF COMMENCEMENT RE.Q,�+UIRED: Ltd YES NO BUILDING OFFICIAL, f1� [a6 DATE ISSUED Issued permits must have an approved inspection within ti months of the date of Issuanco or they will expire. Ar+ extension must be requested in writing, approved and pain for prior to expiration. ADDITIOMAL RESULTS SAND INSPECTOR COMMENTS 5ewe(7 71 --- 1,41 lo- 0- 0.- (-,� 12 P-)�;he81,bv Fig t-5 ;;rP aPpA-6v6 -0 wi7-t4 EKC� d F✓ -rowEn -,M)5;- ,tyaP-rlq/A--(- Pff&FPIWVC -P 12 -13 -1� 7f !tea F rr fPrc- -1-P t' «P (z Op ye -)zM1R1 0 I -01 -ref -jp fEtyG -p- -rl Styr x/'24 = I y 3.P ,APP ROy Ep -ci) - 's V <W WC- -p- Y PP � ,,y wlTt} EGG D rvS cco� X 5 sc�rr� ML L-� CGtlT}�c� DR�C -R �OX�f 1/0'r .r�2f�Sl� � � -21- -t � p -t'ftE C> k/AS (53 -1(- 201 Y PrPP(/C -b� �E$ 8atc�5a -�,Ss Uatt�et� ffl {/v% a 3 -10 -SL) 1 y 3WPf W4 :-o � CP cIe N 46+ a.2al �i✓ v+-�io N I, n f�- T7tc -� 13 b-r}S -2u1 tj � �" ��V"C�► f Southgate Apartments �. Sanford, Florida , WSPECTIQN REQUEST yr�auat�oar Date. 5 30 -14 Permit No: 13 -150 Facility: Bldg 10 Project: Southgate Inspection Location: 10000 Solstice LP When will work be ready? Date: 6 -05 -14 Requestor: Gunnar Jacobsen Check one: © Regular Inspection: Time; 9Am Phone No. 352- 585 -6851 ❑ Re inspection:: Date of Initial inspection: This form must be faxed or entailed and received by 2:00 p.m. for next day inspection Email To: ndanforthna.tcamgfa.com; jpecic @teatngfa. cam;dpilarslci@ to amgfa.com;tenglish@tenmgfs.cont Fax: (772) 489 -2989 Inspection 'Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Pi ing& Test HW Piping & Test Wall/ Ceiling X Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder Gas Piping & Test I Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Nall & Ceiling- Roofing Lighting Protection Equipment E uipment Re-.inspection Re-inspection Re -ins ection Re-inspection Final Building Final Electrical Final Plumbing Final Mechanical 01her Inspection Type: Attic blown insulation Area Inspected: Inspection Results: AP - Approved AE — Approved X with Exceptions Conditions/ Comments I . 2. 3. 4. 5. 6. 7. Inspector's Signature erry DA- DP - Not Ready ❑ Disallowed Disapproved ❑ ❑ TIME his Date OG -05 -20141 OFFICES THROUGHOUT FLORIDA 521 NW Enterprise Drive, Port. St. Lucie, Florida 34986 • (772) 489.9989 , (772) 489.2989 (fax) • www.teamgfa.com