Loading...
HomeMy WebLinkAbout300-310 Northstar Ct 91-798ly \J CERTIFICATE OF OCCUPANCY This is to certify that the building located at _ 300 310 NORTHSTAR GT for which. permit _X91-- 000007PS has heretofore been issued on 2/26/91 has been completed according to plans and specifications filed in the office of the Building �Official -'raor to the issuance of said building permit, to wit as comAlies with all the building, plumbing, electrical, zoning and subdivision regulations ordinances of the City of Sanford and with the provisions of these regulations - UTAFT' APPROVAL W&T.E APPROVAL DATA. APPROVAL BUILDING: FIRE: Fi naled - '/ � m F Inspected / -�-6 Co. /� �'' � a.,' V1, Yom, ZONING": Inspected i r UTILITIES: Mater Lines In �J Sewer Lines In Meter ti Set (, ID 3 1 `) I / S eer ca Tap Reclaimed Water ENGINEERING: Street Drainage Paved ✓ L, %�%� ;- Maintenance Bond PUBLIC WORKS: Street G Name Street Signs Lights Storm Sewer 2S Mbr iveway , Street FEES PAID DESCRIPTION APPLICATION FEE - BUILDING FIRE IMPACT - NONRESIDENT POLICE IMPACT - NONRESDNT RADON GAS TAX FEE ROAD IMPACT FEES 5C_WF_R.. Gi.6c��H t�jATEP G�ow-sr� I 'V, `to-b-, / 4 C p DA'C'E AMOUNT 2/26/91 10.00 2/26/91 542.50 2/26/91 1382.50 2/26/91 175.00 6/28/91 12600.00 4,2_S0.0-6 P.2 C -+J 1 Wf 3 S 1 C0 2. (31 cv to G -b OWNER BCTILDINGvOF ��I1�L G ,� STOLLER PROPERTIES I N C O R P O R A T E D June 28, 1991 City of Sanford Engineering Department Attn: Mr. Rick Holloway Dear Rick: Pursuant to our meetings on site, Lot 5 Phase III, Northstar Business Park, on Thursday June 27 and Friday June 29, 1991, I agree to the following: Correct the Lot 5 retention, pond, and dzzigg drainage structure. Sewer service shall be maintained on a daily basis by The Briar Corp. as per agreement between Mike Good and Paul Moore, until the Lift Station is fully operational. The Briar Corp. shall adjust all water line gate valves to City Standards. The street lights for Northstar Business Park shall be installed according to thexNxi existing agreement with the City of Sanford. All FDER and SJR1%?MD certifications shall be copied to the City of Sanford as available. The items outlined above shall be completed within thirty days mfx from this letter. Sincerely, NSTAR #3, LTD. Stoller Northstar, Inc. General Partner William S. Stoller, resident LICENSED REAL ESTATE BROKER NORTHSTAR BUSINESS PARK 3821 WEST STATE ROAD 46 SANFORD, FLORIDA 32771 4 0 7 3 3 0 2 3 2 2 F A X 3 3 0 3 4 3 3 STOLLER PROPERTIES I N C O R P O R A T E D June 28, 1991 City of Sanford Engineering Department Attn: Mr. Rick Holloway Dear Rick: Pursuant to our meetings on site, Lot 5 Phase III, Northstar Business Park, on Thursday June 27 and Friday June 29, 1991, I agree to the following: Correct the Lot 5 retention, pond, and dxxagg drainage structure. Sewer service shall be maintained on a daily basis by The Briar Corp. as per agreement between Mike Good and Paul Moore, until the Lift Station is fully operational. The Briar Corp. shall adjust all water line gate valves to City Standards. The street lights for Northstar Business Park shall be installed according to thexxxg existing agreement with the City of Sanford. All FDER and SJR1 %ND certifications shall be copied to the City of Sanford as available. The items outlined above shall be completed within thirty days ofx from this letter. Sincerely, ITSTAR #3, LTD. Stoller Northstar, Inc. General Partner William S. Stoller, resident LICENSED REAL ESTATE BROKER NORTHSTAR BUSINESS PARK 3821 WEST STATE ROAD 46 SANFORD, FLORIDA 32771 4 0 7 3 3 0 2 3 2 2 F A X 3 3 0 3 4 3 3