Loading...
HomeMy WebLinkAbout1 #204CERT`I FS CAT "°`OCCUPANCY l COMPLETION , - �, •�(� This.. is_ _to -reify that the building loPated at FuF3j/AND BL, 2QA _ for which permit 96- 000011.E-16 has heretofore been issued on _2.//22/96 has been completed according to plans and specifications filed in the office of the _;I3uildinJg Offic' 1 prier to the �jssuance of said building permit, -to wit as = P 7�n�i^fi M/P..(_ complies with all the building, plumbing, electrical, zoning and subdivision ?regulations ordinances of the City of Sanford and with the provisions of these regulations. S'T'AFF APPR017AL Subdivision Regulations Apply: Yes No DATE APPROVAL. DATE APPROVAL, BUILDING: � 11/ , f- ? FIRE: 111 Finaled ' /`NCO --_ Inspected jJ� � % ZONING. Inspected4z.qc, UTILITIES: Water Sewer Lines In A,!// n Lines In. kZ Meter rV117 Sewer Set Tap Reclaimed Water _ ENGINEERING: n Streit urainage �1 !� I G, Paved Maintenance'' ,Bond to Bond PUBLIC WORKS: Street Name / Street Signs % i Lights Storm Sewer �� Driveway _ Street Work DESCRIPTION DATE AMOUNT WATER -SEWER IMPACT FEES 01- APPLCTN FEE - BUILDING 2/22/96 01 -FIRE INSPECT- ALTER /RPR 2/22/96 01 -RADON GAS TAX FEE 2/22/96 01- RECOVERY FD /CERT. PGM_ 2/22/96 10.00 40.00 10.00 10.00 OWNER BUILDINJx;�IbFFICIAL / / /DALE esrr�c � Y.4EAfRUiT 44ElEiY - �'O itco PoOHiDpl�t� City of Sanford Certificate of Occupancy This is to certify that the building located at 1 Red Cleveland Blvd 204 for which permit number 04 -1486 was issued has been completed according to the plans and specifications filed in the permit, to wit as Interior Commercial Remodel complies with all the building, plumbing, electrical, mechanical, as well as City of Sanford codes and ordinances and with the provisions of these regulations. Staff Approval Date Conditions (if blank, no conditions apply) Building: D. Florian Engineering: D. Roberts Public Works: P. Simmons Utilities: R. Blake Fire Department: M. James Zoning: D. Richards Mark Construction Property Owner 05/18/04 05/19/04 05/18/04 05/24/04 05/24/04 05/19/04 C3, )rV-� . 05/25/04 Building Official Date