HomeMy WebLinkAbout06.03.82MINUTES
Planning and Zoning Commission
June 3, 1982
7 :30 P.M.
Members Present:
J. Q. Galloway, Chairman
James Barks
Darrell Grieme
John Morris
Sheila Roberts
George Willis
Members Absent:
C. B. Franklin
Cliff Miller
Frank Whigham
Others Present:
Leah Rogers, Zoning Inspector
Leslie Kemp, Orlando Sentinel
The meeting was called to order at 7:30 P.M. by the Chairman, J. Q. Galloway.
The first agenda item was postponed to the next regular scheduled meeting by
the proponent, Mike Kaney, representative for F1 Mining & Materials Corp.
The next item for discussion was a request for a variance on the side yard
setback requirement of a single - family dwelling located at 135 Wildwood Drive
in Ramblewood, (PUD) represented by Stanley I. Meadows.
After discussion Mr. Willis moved to grant the 2' ft. variance needed. Mrs.
Roberts seconded. Motion carried.
The next item for consideration was a request from the floor, for a sewing
machine repair business conducted in the customer's home, and telephone service
only, at 2528 S. Palmetto Ave. in the MR-1 zoned district, represented by
James Mattison. He said there would be no repair done at his home and no
equipment stored there. After discussion, Mr. Morris moved to approve. Mr.
Grieme seconded. Motion carried.
Mr. Meadows requested from the floor, consideration of a 3 1 1 ft. variance between
two houses for the construction of a house at 129 Wildwood Drive. After dis-
cussion, he agreed to get something in writing from adjacent property owners and
come back to P & Z with the request.
The Minutes of the previous meeting were approved as mailed. There being no
further business, the meeting was adjourned.
P - J.Q.Galloway, airman