Loading...
HomeMy WebLinkAbout08.02.79MINUTES Planning and Zoning Commission August 2, 1979 8:00 P.M. Members Present: J. Q. Galloway, Chairman- - Bill Royster ✓ George Willis—" Bart Gallagher- Members Absent: Jack Bridges ✓ Rudy S loan -- -°.. C.B. Franklin Cliff Miller--' Sheila Roberts Others Present: Al Payne, Zoning Director Mack LaZenby,fiCity Engineer /Utility Director The meeting was called to order by the Chairman, J.Q. Galloway. The first item for discussi Baptist Church Educational at 1401 Oak Ave., represent Rev. Freddie Smith was also changed regarding paving of Engineer's suggestion,, the Mr. Rot's er moved to approv Motion carried. The next item for d scussio from a_f rniture store to a zoned district at 1001 E. 2 Crenshaw Mr. Crenshaw exp business and stated there w, painting with the greater installation and not at the to approve the change of usi There was discussion on fur Plan and it was generally a be held on a different date order to devote ample time ductive. A date and time f a later date. n was a site plan for the Central uilding in the MR -1 zoned district. d by the Architect, John Leroy. present and Said the plan had been the driveway, and following the City aving of the drive has been deleted. the site plan. Mr. Willis seconded. was a *request for a change of use sembly of metal stairways in the RI -1 th St.,lrepresented by John and Frederick ained t e procedure of his intended uld not :ssembly be any outside storage or spray art of done at the site of 25th St address. Mr. Gallagher moved Mr. Royster seconded. Motion carried. her study of the Comprehensive Land Use reed that the Workshop sessions should than regular scheduled meetings, in or the work needed in order to be pro - r the Workshop sessions will be set at The minutes of the previous mmeting were approved as mailed. There being no further business, the meeting was adjourned. . Q. Galloway, Ch an