HomeMy WebLinkAbout08.02.79MINUTES
Planning and Zoning Commission
August 2, 1979
8:00 P.M.
Members Present:
J. Q. Galloway, Chairman- -
Bill Royster ✓
George Willis—"
Bart Gallagher-
Members Absent:
Jack Bridges ✓
Rudy S loan -- -°..
C.B. Franklin
Cliff Miller--'
Sheila Roberts
Others Present:
Al Payne, Zoning Director
Mack LaZenby,fiCity Engineer /Utility Director
The meeting was called to order by the Chairman, J.Q. Galloway.
The first item for discussi
Baptist Church Educational
at 1401 Oak Ave., represent
Rev. Freddie Smith was also
changed regarding paving of
Engineer's suggestion,, the
Mr. Rot's er moved to approv
Motion carried.
The next item for d scussio
from a_f rniture store to a
zoned district at 1001 E. 2
Crenshaw Mr. Crenshaw exp
business and stated there w,
painting with the greater
installation and not at the
to approve the change of usi
There was discussion on fur
Plan and it was generally a
be held on a different date
order to devote ample time
ductive. A date and time f
a later date.
n was a site plan for the Central
uilding in the MR -1 zoned district.
d by the Architect, John Leroy.
present and Said the plan had been
the driveway, and following the City
aving of the drive has been deleted.
the site plan. Mr. Willis seconded.
was a *request for a change of use
sembly of metal stairways in the RI -1
th St.,lrepresented by John and Frederick
ained t e procedure of his intended
uld not :ssembly be any outside storage or spray
art of done at the site of
25th St address. Mr. Gallagher moved
Mr. Royster seconded. Motion carried.
her study of the Comprehensive Land Use
reed that the Workshop sessions should
than regular scheduled meetings, in
or the work needed in order to be pro -
r the Workshop sessions will be set at
The minutes of the previous mmeting were approved as mailed. There
being no further business, the meeting was adjourned.
. Q. Galloway, Ch an