Date: 08/12/2016
Jwdop ,War C.oi : F
r
Re: Athletic Apex Second Floor
Seminole Town Center
200 Towne Center Circ. Sanford, FL
From: Jeff Gaither, AIA
4101 Woodlynne Ln
Orlando, FL 32812
The following Clarification (s) are provided and intended to become part of the construction documentation for the
above referenced project.
ARCHITECTURAL Revised comment letter
1. Submit documentation of total construction costs.
Response: Contractor to provide with this response package.
STRUCTURAL
1. Sheet A6.00 detail 1. Typical wall framing. Submit two sets of complete framing plans. Must be
site specific.
Response: No structural loaded wall framing being installed. Notations shown are for wall
blocking and general non bearing infill of existing openings in non load bearing walls as
shown on floor plans.
MECHANICAL
1. Submit two sets of complete mechanical plans.
Response: Plans Attached
PLUMBING
1. Sheet A 1.01 Plans call for two bathrooms. Only one indicated on plans. Submit two sets of
complete plumbing plans.
Response: See notations added to AI.01 regarding bathrooms located on first floor as
allowed by FBCP. No plumbing work with this scope.
ELECTRICAL
1. Submit two sets of complete electrical plans.
Response: Plans attached.