ROSS #1421 REMODEL
MARKETPLACE @ SEMINOLE TOWNE CENTER
Sanford, Florida
CP: 209517
Q
I -
August 30, 2010
N
ARCHITECT:
Cuhaci & Peterson, Architects
1925 Prospect Avenue
Orlando, Florida 32814
407/661-9100
407/661 -9101 fax
BULLETIN NO. I -
Ross #1421,Sanford, Florida
CP. 209517
August 30,2O10 PAGE 2OF4
THIS BULLETIN IS COMPRISED OF 4 PAGES OF REVISIONS AND/OR ADDITIONS WITH PARTIAL
SECTIONS OF THE PROJECT MANUAL INDICATED AS APPLICABLE.
THE FOLLOWING CHANGES BECOME EFFECTIVE IMMEDIATELY AND WILL FORM AN INTEGRAL
PART OF THE CONSTRUCTION DOCUMENTS.
A. Construction Specifications
Deletions in spec idenfifM by strikethrough, additions by hold text.
B. Construction Drawings
Sheet AQD:
Added Store Number
Sheet ASI:
Added Uumpaherdetails.
Sheet DI:
Added minordemolition notes per tenant review.
Sheet A1.0:
Added hurricane shutters per tenant review.
Adjusted various minor notes per tenant review.
Sheet A2.0:
Minor lighting adjustments per tenant review.
Revised lighting schedule per tenant review.
ShoetA30:
Revised sign panel and color per tenant review.
Added detail 1O.
Revised detail 1 F per tenant review.
SheetA3.i:
Added R20insulation tounderside ofdeck per tenant review.
Added hurricane shutters per tenant review.
Revised framing to coordinate with atmdum| details.
Sheet A3.2:
Added Section 8for supplemental information.
Added Detail 0for supplemental information.
Sheet A4.0:
Revised Detail 8per tenant comments.
Added \dear'toapplicable dimensions per tenant review.
Revised diaper changing station mkper tenant review,
ShaetA41:
BULLETIN NO. i'
Ross #l421'Sanford, Florida
CP: 209517
August J8'2Q1O
Sheet A5O-
Ravised|nhahorElevabonaendoolomporhmantcommonta.
Sheet A6.1:
Revised Detail 5per tenant comments.
Sheet A4.0:
Revised Door Schedule per tenant comments.
Revised voomfinish notes per tenant comments.
Sheet SIA:
Added structural notes toadjacent tenant wall for oupp|ementa|information.
Sheet S2.1:
Added structural notes tuadjacent tenant wall for supplemental information.
Sheet S3.2:
Added Detail 14for supplemental information.
Sheet S4.2:
Added Details 13&14for uupp|emenhy|information.
Sheet S4.4-:
Added Details 3&4for supplemental information.
Added hurricane shutter per tenant comments.
Sheet POA:
Added hose bibbper tenant comments.
Sheet P1.0:
Added hose bibbper tenant comments.
Added uumppump for mupp|ementu|coordination.
Sheet MOA:
Revised RTU Schedule notes per tenant oomments.
Revised Fan Schedule per tenant comments.
Sheet M1,0:
Revised air balance per tenant comments.
Sheet. MIA:
Revised exhaust fans per tenant commanb.
Sheet E1.0:
Revised lighting and circuiting per tenant comments.
PAGE 3 OF 4
Sheet E1.1:
Revised electrical panels hncoordination withhynantuomments.
Revised electrical service & switchgear to new components per tenant requirements.
Sheet E2.0:
Revised EMS diagram per tenant comments.
Sheet E3.0:
BULLETIN NO. 1'
Ross #142i,Sanford, Florida
CP: 209517
August %Q,201O PAGE 4 O 4
Sheet EM:
Revised Enlarged Plan per tenant cmnmenta.
Sheet E4.0:
Revised exhaust fans per tenant nomments.
C. Other Documents and Instructions
Documentadonfor ochange ofEngineer ofRecord (Boctrica0iabeing oubm0edwith these
revisions.
D, Attachments
Construction Drawings (Revisions A, 1 & 2)
End of BULLETIN NO. I
dy 4nj
Architects Engineers Planners
Lonnic C. Monson, ATA
Chairman
LP.faWAP
James I. Downs, AIA 12 August 2010
Pi csidurat
Michael F.. Lynch, RA
G'l' - Prochrcaiura
MD AP
Norberto O. Campos
I' 0-i)=, City of Sanford Building Division
Greg N. Simpson, AIA 300 N. Park Avenue
d' )peru fiva.e
Samford TL 32711BrettC. Rylands
VP - str-uclund ls'ngmeerhj'5r
LfJD-All
ROSS SE1 IN®Ji..lE 7['OWNE CENTERKJosephF. Keene
VP M(whanical Engin cring 121 TOWN CENTER
HID All
Jay R. Adkinson SANFORD, FLORIDA
Oin" for of 7i" hnofi gl' PERMIT NO. 10-1596
CP: 2095117
Betsy D. Englert.
Din ('tor of1%inancr To Whom It May Concern: Tina Kennedy
Dircoor raf11R
Steven A. Blevins,AIA In regard to the above referenced pr(ject., enclosed is a letter from our- company that shall serve asArch3imho :M(nager
m),AP notice that Timothy Nash, PE 1167d66 shall be released of his duties as Electrical Engineer of
Amin S. Fikry Record for Cuhaci & Peterson, Architects Engineers Planners. Timothy will be replaced byLrhSirrdic, Mnnazrer
Eugenio E. De Alba, PE #6461 1.
Chris D. Renegar, RA
Yrch. Sfmfio Umwgcr
MI) AP
Please review this document: and update your records accordingly to reflect. this change. Should
Professional R egisiralions:
Ilahama 1tou have ail}t questions or concerns, please feel free to contact Eugenio De Alba or the Project
Ari,.ona
rrrlmnsas manager here at: our office.
C.'alf/orrria
co orado
Connecticut 'Sincerely, Delaware,
Oisn-ic°t of C'olumbia
Florida
Ccor s, is
Iima'aii
Illinois
110017
loin
K nt,ares — ----
eranwekz. Michael I,. Lynch, P'I.#10661Lasisiann
Maine Viee Preurderlt
Maryland
Miarsaclirrsetl'ti' d(EL Sr"III
Michigan
Minnesota MiC.
Mis iSA1-ppi
tilis.vDalri
Nc'hraska
Nevada
Ncry 1 /cunpshh e
NewJersey
New Mexica
New York
North Carolina
North Dakota
Maio
Oklahoma
Oregon
I'erntaylvania
IUuudc Lrlarac(
Snaith ('arolina
South Dalcota
Tennessee
kk'a.v
Utah
Fer'Pnow
lrlavldngton
Mew Yia;a irria
Wisconsin
Florida Corporals; Certificate:
41AA C0005A,
1925 Prospect Avenue
Orlando, FI, 32814
Ph. 407-661-9100
Fax 407-661-9101
209517EOR.cloc.
Architects Engineers Planners
Lonnie G. PeterSODi, AJA
f.'ltc'tt`rrnart
ROSS DRESS FOR LESS x#1421 CP: 209517
f_GED''Ail
August 201JamesE. Downs, ATAt
THE MARKETPLACE SEMINOLE 71 OWNS CENTER
r`e:sirle:at
SA]®TIIF' ®RD, FLORIDA
Micliael E. Lynch, RA
d %' - l'roriucPian
Dear Mr. Tuggle:
LIED/rP
1 of-berto 0. Campos mr. Steve Tuggle
VP - C1u.riiyn
Ross Stores, Tile.
Greg N. Simpson AIA
Vr-(,1lre:ratiaaa 4440 Rosewood Drive
E3rett, C. Rylands Mailstop PL4 4.E5
dN-Strncturatl.at;in+trial'
I LLD" Ai' Pleasanton CA 94.588
loseph F. Keme
Gl> Mer]ralYl 'ilr rrl,,llr1't'r'il4t;
At' ROSS DRESS FOR LESS x#1421 CP: 209517I.1 -1) 7
Jay R. Adlcinson THE MARKETPLACE SEMINOLE 71 OWNS CENTER
rl cl,notoh;'' SA]®TIIF' ®RD, FLORIDA
Betsy D. Errglert
1)ircctor "/ I, rvce
Tina Dear Mr. Tuggle:
1(cimedy
biro, for ol7Yht
Steven A. Blevins,AlA Attached, please find the revised Ross plans for final review and approval. Below are narrative
Arcrh 5'Iudio Nhmawr
AI responses to the comments provided:
Amin S. Fikry
1. Comment: ]Boss Store reviews and approves documents only for conformance with the design
Chris U. Ikellegar; RA concepts of the protect and the information and instruction glvell by Ross Stores. RossArch.Stiehl, Mtrrra,ter
Al' disclaims any responsibility for dimension accuracy, quality discrepancies, errors, and
Prttfcersitrnalrtcgist,afions: omissions of information. Further, Ross disclaim-, responsibility for errors in or omissions ofAlabama
Ari7mm prototype requirements except where Ross has given specific written approval for ,luch
Arkansas
r",r,f„r„io alteration or omission. The responsibility for quality assurance as well as errors and omissions
Colorado
c.onnrrti<-trt is entire] that: of the landlord and architect -of -record. This review, including an oversight ofYgYb
Delaware
District ufCalurrrbiaColumbia missing or erroneous information, does not alter that responsibility. if you are or become
Florida aware of any prototype requirements that are missing or have been altered in these documents, t;c-orgia
Flairaii then you are asked to notify us of such as soon as possible. Illinois
hndiana Response: We acknowledge.
lowo
Kansas
Kr rurrclry
L,00i.Yicoa 2. Corrimenl: Additionally, this review and these comments should not substitute for a thorough
Muhm
til,, ,larrrr quality assurance and coordination review by your architect -of -record.
Allasnic"huseas Response: We acknowledge.
Minnesota
d-9i.rs rti sippi
n9tteonri 3. Comnlent: A set of MEP plans should have been forwarded to our energy managementNrhral;u
ntL.r,ea consultants, C & C Building Automation. Approvals of your Mechanical and Electrical
News Hompshin,
New /rrtty docLlnrents are subtect to any red -line comments contained within and the final reviewffi,w Mrwaco
Ncw York comments of C & C. Also, note the production start time For the roof top equipment shall not
North Carolina
North Dakota commence Upon C & C approval notification.
cJi
Olchahnrna wriResponse: We acknowledge. Plans were t for- review.
lr`nH,p}lVIf1U(t
Rhaer Istand 41. Comment: You are also responsible for any comments frorn our lighting consultant, AmericanYouthCarolina
Sarah Dakota Wholesale Ughl:ing. G'rtnessee
kt as Response: We acknowledge. Comments have been addressed in the attached drawings.
Utalr
Nermout
itrt,irda
If4shinvwn 5. Colntllent.: The storefront eleval-ion and colors approval are pending the review by Ross Store
174es1 r,rginia
1'1'iscansin Design. J
Florida Corporate Certific,,ate; Response: We acknowledge,
u,IA coa¢s2t,
1925 Prospecl AmILle
Orlando, Fr, 32814
Ph. 407-661-9100
Fax 407-661-9101
bafWIO' V° ' 491k
Rug 5
uy
k
M . Steve Tuggle
17 August 2010
Page 2
6. Comment: "There are no product substitul:es to all Ross uational vendor products. Attempts to
substitute non -Ross products in either the drawings or specifications are not acceptable without
approval from the Ross Construction Manager. Please review all prototype information and the
Site Specific Plan (AE -1) and incorporate in the construction documents.
Response. We acknowledge.
7. Comment: Provide "clear" fitting room dimensions to ensure proper install of our fitting rooru
modular system.
Response: Please see revised Street A4.0 for `clear" dimensions.
8. Comment: No sales floor walls are to have electrical devices placed on them, they must be
ceiling or column mounted to not interfere with store fixtures.
Response: We acknowledge.
9. Comment: All utilities, metiers and lines to be independent for Ross, no items (fire riser,
sanitary, water, electric, etc.) will be tied into other existing or future tenants.
Response, We acknowledge.
10. Comment: All site lighting to go to Landlord house panel, no site pole lighting to be connected
to Ross electrical panels.
Response- We acknowledge.
H. Comment: Sheet A0.0, add store number (1421) in main block under Ross Dress for Less.
Responnse, Please see revised Street A0.0. Store number has been added.
12. Comment: Sheet S1, coordinate location of the (2) 8 -yard bins, transformer area and stock
room roan exit door to match AEl, dated 02/12/10.
Response- Blease see revised Street ASI (street renamed to clarify conflict: with Structural
street naming). The location of tine 8 -yard buns, as indicated in the AEI, cannot be
accommodated dune to the current location of the transformer for the Ross space. As
indicated, in existing bin is located across the truck drive within camera vision of the rear
mann exit: door. The rear man exit door has been shifted so as to avoid existing wall
mounted electrical meters and equipment for the Ross space. The electrical room was
rot -aced to utilize existing connection locations between interior and exterior electrical
equipment. We received approval of the revised layout, as indicated in the attached
construction drawings, via email 08/17/10.
13. Comment: Sheet D1, show callout for exisl:ing rear door to be removed, clarify what is
happening at condition on rear at this area..
Response: Please see revised Sheet DI.0. Keynotes have been added and/or revised to
indicate removal of bollards, ramp, etc.
14. Comment: Sheet D1, A06 is called out on the plans but says "not used" in the keynote
schedule.
Response: Please see revised Sheet DI.0. Keynote A06 has been added to the Keynote
Sehedurle.
cm-ligust,2010
teve Tuggle
Page 3
15. Comment: Sheet. D1, add a note callout for removing all floor finishes throughout, prep floor
for new floor finish, refer to finish schedule.
Response: Please see revised Sheet R1.0. Keynote A14 has been added to the Keynote
Schedule.
16. Comment: Sheet A1.0, coordinate location of the (2) 8 -yard bins, transformer area and stock
room man exist door to arnatch the AE I, dated 02/12/10.
Response: Please see revised Sheet ALO. The location of the 8 -yard hills, as indicate(,] in
the AE1, cannot be accommodated dare to the current location of the transformer for the
Ross space. As indicated, an existing hien is located across the truck drive withinn camera
vision of the rear man exit door. The rear mann exit door has been shifted so as to avoid
existing wall mounted electrical meters and equipment for the Ross space. The electrical
room was rotated to utilize existing connection locations between interior and exterior
electrical equipment. We received approval of the revised layout, as indicated in the
attached construction drawings, via email 08/17/10.
17. Comment: Sheet: A1.0, remove note regarding Benjamin Moore Timothy Straw, the paints of
the sales floor wall should be Sherwin Williams 6140 Moderate White (modify finish
schedule), refer to initial letter Item 2, dated 02/12/10.
Response: Please see revised Sheet A1.0. Finishes have been revised throughout tine
drawing set to reflect tine new paint colors.
18. Comment: Sheet: A1.0, add hurricane shutter location and information per AE!, dated
02/12/10.
Response: Please see revised Shect A1.0. 1l aan ricanne slautten i aafon enation leas been added.
19. Cornmenl: Sheet A1.0, add (Vl,) to sales floor col unn areas where phone outlets are shown,
this will be finalized on the RAI plan.
Response: Please see revised sheet A1.0. VL notation has been added.
20. Comment: Sheet A2.0, all lighting fixtures need to stay in alignment, move other items to
make this occur, power pole locations will not be finalized until a later date.
Response: Please see revised Sheet A2.0. Lighting has been aligned as requested. Where
stru Aural columns interfere with alignment:, lighting has been shifted left or right (frown
tine front facing the sales Boor) per discussion with Steve Tuggle. Additional lighting has
been added at the front entry per American Wholesale fighting comments.
21. Cour new: Sheet A2.0, Room 116 Janitor Closet change from exposed ceiling to a. 9'-0"
gypsum board painted ceiling, coordinate this change with all plans.
Response: Please see revised Sheet A2.0. Notation has been added for the Janitor Closet
ceilinng.
22. Comment: Sheet: A3.0, include and show all information for hurricane shutters per AE], dated
02/13,/10.
Response: Please scc revised Sheet A3.0. 1jurricane shutter information has been added.
23. Comment.: Sheet A3.0, include new finish detail and information per attached PDF file
regarding Korogard system and painting.
Response: Please see revised Sheet A3.0. Korogard system notes have been added, and
paint colors have been revised.
a.
t Mr. Steve Tuggle
17 August 20110
Page 4
24. Comment: Sheet A3.1, include and show all information for hurricane shutters per AE1, dated
02/12/10.
Response. Please see revised Sheet A3.1. Hurricane shutter information has been added.
2.5. Comment: Slaect A4.0, revise Detail 6 to mal.ch AEl, dated 02/12/10.
Response: Blease see revised Sheet A4.0. Detail 6 has been revised per AEE.
26. Comment: Sheet A4.0, see markups on plan and accessories to match initial letter, dated
02/12/10.
Response: Please see revised Sheet: A4.0. Details, sehedules, paint colors, and Korogard
systema informaation has been revised per initial letter and redlines provided.
27. Comment: Sheet A4.1, ,revise stockroom anchor board detail to march initial letter, dated
02/12/10.
Response: Pllcase see revised Slnect A4.f . Detail 7 has been revised per initial letter and
redlines provided.
28. Comment: Sheet 5.0, remove Detail 3, correct: detail is shown on Sheet A3.0.
Response. Blease see revised Sheet ASA Detail 3 has been removed.
29. Comment: Sheets A5.0 and A.5.1, revise sheet to march attached PDF file regarding Korogard
system and painting.
Response: Please see revised Sheets A5.0 and A5.1. Details, schedules, paint colors, and
Korogard systema information has been revised per initial letter and redlines provided.
30. Comment: Sheet A6.0, install exterior hardware for sales floor exit door at frornt/side (Door 3),
this is required by Ross :for location using hurricane shutters. Use Alarm Lock device model
4711 (door cylinder finger pull fon- outside key access).
Response: Please see revised Sheet A6.0. Door information for Door 3 has been revised.
31
32
33
34
Comment: Sheet. A6.0, revise door schedule and finish schedule to match mark ups on plans
and attached TDF file regarding Korogard system and painl:ing.
Response: Please see revised Sheet A6.0. Selnedules have been updated with Korogard
systcnn imforrnation per initial letter and redlines provided.
eat: Sheet S 1.1, include Ross specification 4" minimal offset at dock door area.
apse: Truck doels configuration is existing to remaaim.
eat: Sheet S2.1, include structural information for hurricane shaiti.ers.
Ilse: Please see revised Architectural sheets fon- hurricane shutters- details.
king specifications shall be in accordance with Product Approval documentation
3C 2007.
Conmhent: Sheet E1.0, all lighting fixtures need to stay in alignment, move other items to
make this occur.
Response: please see revised Sheet FAA Lighting has been aligned as requested. Where
structural columns interfere with aligument, lighting has been shifted left or right (from
the front facing the sales floor) per discussion with Steve Tuggle. Additional fighting Inas
been added at: the front entry per American Wholesale Lighting comments. Circuiting
has been revised per American Wholesale fighting comannents.
4 o h
Mr. Steve Tuggle
17 August 2010
Page 5
35. Comment: Sheet El .1, a(ld hur-ricarne shult:er• circuit: information.
Response: Please see revised Street EI.I. Circuiting for hurricane shutters lras been
added.
36. Comment: Sheet ELI, add a dedicated LA home run circuit, Item 7 to match initial letter,
dated 02/12/10.
Response: Please see revised Street ELL ILA. eircuit Inas been added.
37. Commenl:: Sheet E2.0, add either a 4x4 or 6x6 j -box to fit: conduit sizes required for the ar",^;as
iu equipment: closet.
Response: Please see revised Street E2.0. .1 -box sizing Inas beer: added to the EquipmenA
Closet: notation.
38. Comment:: Sheet: E3.0, see added ,PDF file Sheet E30MS for details/nol_es that need to be
included into the set, use this sheet also to show controls/power location on wing wall for
motorized hurricane shutter control, coordinate with manufacturer.
Response: Please see revised Street E3.0. Notation his been added per the details
provided.
39. Comment: Sheet EASI.0, change (1) ofthe j -boxes at 48" to the j -box for the fire annunciator.
Response: Please see revised Sheet EAS1.0. J. -box designation his been revised.
In addition to the comments above, revisions have been incorporated to indicate the structm-al
connection to the adjacent building following demolition and construction of the new Ross wall.
Revisions to the electrical circuiting have been revised per American Wholesale Lighting comments.
Please feel free to contact us should you have any additional questions or concerns.
Sincerer
Joshua E. Inman
Sr. Project Coordinator
JEI/srm
209517st02.doc