HomeMy WebLinkAbout1310-1360 Windsor Lake Cir 12-2233 - 12-2238 (rev)e .r
RF,CF,IVF,D
NOV 13 2012
EKY;
REVISION
Project Address: �3z(,(2 — r3 to U
Contact:
Ph: (10:: -� (16-�36a.
Email: S v o 04
Trades encompassed in revision:
BuildingZ-
❑ Plumbing
❑ Electrical
❑ Mechanical
❑ Life Safety
fl)
Fax:
General description of revision:
ROUTING INFORMATION
Approvals
Department
❑
Utilities
❑
Waste Water
❑
Planning
❑
Engineering
❑
Fire Prevention
fl)
Fax:
General description of revision:
ROUTING INFORMATION
Approvals
••
1. Hi �� M -
Lindemann
B e n t z a n
w . Bo a c k
.1 INIGCUM MG DISI_N IN! FU71014 -
October 30, 2012
DR Horton, Inc- Orlando
5850 T.G. Lee Blvd.
Suite 600
Orlando, FL 32822
Attention: Steven R. Young
Reference:
15' Townhomes
A21012904
Windsor Lakes
Lot: 55-60
FL -City of Sanford
Dear Mr. Young,
\31,0 ' �'3l d W mAor LAI(o
Skil✓
This is in reference to your recent communication regarding conditions that require our review and
recommendation. Specifically, clarification of where the fire retardant plywood is to be placed.
The code required limits of the fire retardant plywood, as it is applied to the roof membrane, will be on the
roof sheathing for a distance of (4) feet from the face of the UL rated wall assembly immediately below it.
There is no need to place the same rated material on the vertical walls adjacent to the CMU block walls.
The above information is based on the assumption that all construction not specifically noted above is
installed as per the Engineered plans. Please be advised that our representative did not perform a
comprehensive audit at the site. The recommendations and remedial action described in this response
apply to this building only. The same or similar conditions at other buildings shall not be remedied based
on these requirements.
We trust that this will adequately address these conditions. Please call if you have any questions or require
any additional information.
Very_'t,o s
• r
-Ge W. sharp AIA
'Aori,d'a License No. AF91-93'1'«
Page I of I
v v,,,v. bbe.con-i - RO. Box 121.550 Clermont. Florida 34712
Phone: (352) 242-0100 - Fax: (352) 242-0332
1:.E .: 0()(''16S7I
�> MIEEEAMME Us= jgar <�C
November 13, 2012
DR Horton, Inc- Orlando
5850 T.G. Lee Blvd.
Suite 600
Orlando, FL 32822
Attention: Steven Young
Reference:
15' Townhomes
A21012905
Windsor Lakes
Lot: 55-60
FL -City of Sanford
TBD
Dear Sir:
V
U)"A01" %AL'15
G,!,► -d &
This is in reference to your recent correspondence regarding as -built conditions at the above referenced site that
require our review and recommendation. We were informed that there are a number of framing issues that were
questioned by the Building Department. At your request, our representative Larry Schmidt visited the site on
November 9, 2012, to observe the conditions. We enclose a copy of Larry's report and numerous site photographs
that were taken during his visit.
There are a number of as -built conditions that will need to be addressed as follows.
Grout in bond beam not flush with top of CMU: In all areas where the grout is not within 1/8" of the top of the
CMU, a pourable, non -shrink grout of at least 3000psi should be placed, to restore the integrity of the separation
walls and to provide adequate truss bearing.
Trusses bearing on furring strips: Although this is neither standard nor recommended practice, the furring strips are
made of SP material, and are acceptable for providing truss bearing in this case. No remedial work is required.
Roof truss connectors not completely installed: The Simpson HM9 connectors require (5) - Titen screws into the
CMU as per the manufacturer's requirements, and a number of them do not and cannot have all the fasteners installed,
due to the CMU/framing height discrepancy. In each case where all of the required fasteners cannot be installed, add
one Simpson MTSM 16 connector to the point.
The floor truss ledger attachments were not made with 1/2" x 6" screw anchors as perlap n requirements: 1/2" wedge
anchors of an undetermined length were used. The wedge anchor substitution is acceptable, provided that the
substitutions are on a "one for one" basis as per plan specification, and that the wedge anchors have at least a 2-1/2"
embedment into the CMU.
Page 1 of 2
www.lbbe.com - P.O. Box 121550 Clermont, Florida 34712
Phone: (352) 242-0100 - Fax: (352) 242-0302
E A,s" 00068' 1
Undemann
Bentzen
sack
November 12, 2012 (continued)
Front and rear walls not balloon framed per plan: To eliminate the "hinge point" due to the vaulted ceilings, the
existing "flat" double top plate in the walls must be cut to allow a 2x4" scab on each lower stud to run up to the
underside of the top "raked" double top plate. Each scab should have at least a 4'-0" "lap" on the lower stud, and be
attached to it with 8d nails at 4" on center in a staggered pattern.
There are a number of roof and floor trusses that have been reworked (ends cut off, plMood_gussets added etc.):
These repairs should be completed as per the prescribed repairs from the truss engineer. We did not verify this work.
Please be advised that our representative did not perform a comprehensive framing audit at the site. As per your
request, Larry's observations were limited to the specific problem areas described above. This letter should not be
considered tc.be verification that any existing framing, truss repairs, or other construction is acceptable as is. We
defer to" ibe.Raiad;ng' Department for verification and acceptance of the framing and remedial work.
We,trustthat this will proVi,de you with the information required to incorporate the required remedial work. Please
contact us if you. haye any giiestions or require any additional information.
Very• (7ru yo s,
George,VV. Sharff AIA
Florida License No. AR91987
Page 2 of 2
www.lbbe.com - P.O. Box 121550 Clermont, Florida 34712
Phone: (352) 242-0100 -Fax: (352) 242-0302
I'.13.9 0006V 1
Insp. Type: Framing
Date: 11/9/2012
Project: 15' Townhomes
Windsor Lakes
Lot: 55-60
FL -City of Sanford
To: DR Horton, Inc- Orlando
5850 T.G. Lee Blvd.
Suite 600
Orlando, FL32822
4
>> 101011111 018= aASW= <{
>> SITE VISIT REPORT >>
Project #: A21012905
Task #: 005
Permit #:
Inspected By: Lawrence Schmidt
Scheduled Insp. Date: 11/9/2012
Insp. Date: 11/9/2012
Insp. Status: Pending
Comp. Date: 11/9/2012
Attention: Jonathan G. Andree
Scope: Provide a site visit to inspect framing issues in all units. Trusses have been cut and repaired. Truss
bearing points on the party wall cmu walls have bearing issues. Site visit by Larry Schmidt on 11-09-12.
Comment:
Unit 55 — (Left end unit) According to Steven Young the project manager for DR Horton the truss repair issues were
caused by truss company confusion thinking that the cmu party walls were 10" block instead of the normal 8" cmu.
The height of the cmu wall from the floor sheathing to the top of the bond beam is 8' '/a" tall. The frame walls built
by the framers are 8' 1 '/4" tall causing the need to shim the trusses on the cmu party wall. According to Steve, the
framer refused to cut the pre-cut studs to the proper size to match the cmu wall height. All of the trusses on the party
wall have been shimmed at the bearing point using a 1x2 furring strip running the length of the party wall. The truss
end distance between the Densglass varies between 3/8" and 1". The HM9 truss clips are installed using 5 '/4" tap
cons and 4 SDS screws into the truss. All of the roof trusses in this unit have the same condition. The floor trusses in
this unit have not been altered however the exterior end of the floor trusses have been padded out at the bearing point
using two 2x4's vertically. See picture # 1778 and 1777. The front and rear walls are not balloon framed as required
on the construction documents. Titen HD screw anchors have not been used for the floor truss double ledger board as
required on the plans. Picture #'s 1752-1779.
Unit 56 — The party wall trusses in this unit are bearing on a continuous 1 x 2 furring strip. The floor trusses in this
unit have not been altered. Picture #'s 1780 — 1794.
Unit 57 — All floor trusses in this unit have been altered with the exception of the six trusses bearing on the stair wall.
All others have gusset plates on both sides of the floor trusses. The party wall roof trusses are bearing on a continuous
1 x 2 furring strip. Picture #'s 1795-1802
Unit 58 — All of the floor trusses in this unit have been altered on the left end. The second floor party wall trusses are
bearing on a continuous 1 x 2 furring strip similar to the other interior units. Picture #'s 1803-1808.
Unit 59 — The floor trusses in this unit have not been altered. The party wall roof trusses are bearing on a continuous
1 x 2 furring strip. Picture #'s 1809-1810
Page 1 of 2
www.lbbe.com - P.O. Box 121550 Clermont, Florida 34712
Phone: (352) 242-0100 -Fax: (352) 242-0302
F.13." 00068''1
» SITE VISIT REPORT >>
Unit 60 — (Right end unit) The floor trusses in this unit have not been altered. All of the roof trusses bearing on the
cmu party wall are bearing on a PT 2 x 4 block 2.5" long. The bond beam grout is between ''/2" and 1/4" low the entire
bond beam resulting in the truss block bearing on the face shell of the cmu only. The HM9 truss anchors have 3 '/4"
tap cons attached to the bond beam. Due to the height of the shim all 5 tap cons could not be installed. The lower sds
screw in the clip to truss is barely engaging the truss bottom chord and is of no value. The distance from the end of
the truss to the Densglass is 1" plus throughout. Picture #'s 1811-1826.
SITE VISIT PENDING ENGINEER'S REVIEW
At this time, this site visit has been completed.
Thank -you.
Failure to identify specific deficiencies does not relieve the contractor from full compliance with the requirements of
the Contract Documents.
Page 2 of 2
www.lbbe.com - P.O. Box 121550 Clermont, Florida 34712
Phone: (352) 242-0100 -Fax: (352) 242-0302
F.B. 0006871
OTT
°?�\�®�\
r" eye
ve/
b �\
►W -
�4
_� „o Y �R►t..5� v a } .,
4 9
R
77-:�\x
�P
a
s,m
11" 9
1 TA' qwr"-v
E