HomeMy WebLinkAboutSeminole Station (2)TIPTON ASSOCIATES INCORPORATED TRAFFIC/TRANSPORTATION/CIVIL ENGINEERING January 8, 1996 Mr. Russ L. Gibson Land Development Coordinator Dept. of Engineering and Planning City of Sanford P.O. Box 1778 Sanford, FL 32772-1776 RE: ACI Income Fund P.D. Site and Engineering Plans Dear Russ: we have received your list of comments and insufficiencies and offer the following responses. 1. Authorization from Seminole County•abandoning all rights of ownership and maintenance of all utilities for this site must be demonstrated. RESPONSE 1• Abandonment of all utilities has been demonstrated and granted by Seminole County except for those utility lines within the 100' Florida Power easement as discussed. 2. Place 8" water main in North Towne Road right-of-way. RESPONSE 2• The 8" water main has now been placed within the North Towne Road right-of-way in between the sidewalk and curb locations. See Sheet D-4. 3. All water meters shall be located in rights -of -way. RESPONSE 3• All water meters have been located within the right-of- way. See Sheet D-4. 1 760 MAGUIRE BOULEVARD ORLANDO, FL 32803-3751 407) 894-2055 - 1-800-447-9836 - FAX (407) 896-9949 Mr. Russ L. Gibson January 8, 1996 4. Lateral from CO-4 can not enter S-8. RESPONSE 4• Structure S-8 is a conflict structure and as discussed we shall enlarge this box to a Type D inlet in order that the sanitary line encased in steel can be maintained. 5. Easements are to be dedicated to the City of Sanford. RESPONSE 5: As per our discussions with Mike Crumpton at the City of Sanford and Hugh Sipes at Seminole County, the easement shall be dedicated to Seminole County. Any interlocal agreements that are signed after these permits are issued will dedicate this easement to the City of Sanford. 6. Utility Plan Notes: Remove all references to Seminole County. RESPONSE 6• References to Seminole County shall remain on the plans pertaining to sewer construction. 7. Mobil Oil Station's water and sewer connections need to be shown. RESPONSE 7• Mobil Oil's water and sewer connections are now shown on Sheet D-4. S. What force main and water main adjustment are to be made? RESPONSE 8• As discussed, due to the lack of information on the existing water and force mains in that area from both the City of Sanford and Seminole County, these adjustments are shown on the plans to indicate that a possible adjustment will be made. This will not be known until the site contractor has uncovered the existing utilities. 2 TI PTON ASSOCIATES INCORPORATED Mr. Russ L. Gibson January 8, 1996 9. Correct "existing vacant commercial" where existing Stuckey's site is located. RESPONSE 9• Existing vacant commercial has been modified to say existing Stuckey's. 10. Water and Sewer details shall be submitted. RESPONSE 10• Please see Sheets D-5 and D-5A. 11. Backf low Preventer and Double Check Valve Assembly details shall be revised in accordance with City standards. RESPONSE 11• Backflow prevention and double check valve assembly details are shown on Sheet D-5. 12. Replace DIP sewer main with a PVC line at a maximum slope of 0.32% so that San #3 has minimum required cover. RESPONSE 12• The sewer main line from manholes San #1 to San #3 has been replaced with an ASTM 3034 DR PVC line at a slope of. 0.36% and does meet the minimum cover of 31 above the pipe. See Sheet D-4. 13. A separate shut-off valve shall be provided on owner's side of reclaimed water meter. RESPONSE 13• A separate shut-off valve will be provided on the owner's side of the reclaimed water meter and shall be indicated on the irrigation plan. The revised irrigation plan is not included in this plan set. However as we discussed, upon those revi- sions being finished, they will be transmitted to the City. 3 TI PTON ASSOCIATES INCORPORATED 0 Mr. Russ L. Gibson January 8, 1996 14. Provide general details. RESPONSE 14• General details are provided on Sheets D-5 and D-5A. 15. Denote all traffic controls (stop signs, bars, etc.) on site including internal circulation and cross access areas between lots. Include handicap parking details. RESPONSE 15• Traffic control on site has been indicated on Sheet D-2, Site Plan. Handicap parking details have been provided on Sheet D-5A. 16. Provide streets lights along Oregon Avenue. Submit standard detail including specifications on luminaries. RESPONSE 16• Locations for street lights along Oregon Avenue have been indicated on Sheet D-2, the Site Plan. We propose that the same street lights as exist today along North Towne Road be installed. Shop drawings of those lights shall be submitted prior to construction for approval. 17. Use ring and' cover series 170-F for sanitary or storm lids. RESPONSE 17• Sheet D-SA indicates the standard 170-F sanitary and storm lid. 18. Submit drainage calculations for entire site. RESPONSE 18• As discussed with Rick Holloway of the City of Sanford, a copy of the submittal to St. Johns River Water Management District is attached. 4 TI PTON ASSOCIATES INCORPORATED Mr. ,Russ L. '-Gibson ; January, 8,. 1996. • • .Verify.. the.' location -and spacingSanford.. Fire Department p g Of'fire .'hydrants•.witho RESPONSE i9: ` Discussions with Vince Fearreatti of the,'SanfordDepartment.;have indicated that .the locOfsufficient. and a Sanford Fire pProvable: ions proposed' are Dumpster•16ca,tion-and orientation on Lot•1• warradis.noiation of servicin (Don Pablotsjbusinesshoursdueto'traffic•circulation constra' g- arrangeiient. perhaps afterf' 1 RESPONSE 26 rots'.: .. Discussions With _Jerry. Herman of the -cityindicatethat, servicn of ' Sanfordg;arrangement..limiti the -times of dump pickup' would be . 'impossible'. agree• to a `specific time :frame However•, 'if•'the. City canplans...'.However, at this time no chante "Well be..added'to .ourghas . been madet' We' trust that this has answeredconcerning all ofgthisproject .and will allow your questions:. review in prgcessin our You to.. finish1/8/96, the. • Landsca• a permits. . As 'discussed with. youoon revisedatthis ;time but asas on agation ` plans have be 'transmitted to tHe' City s the not 'been y"are finished the will yforapproval. Y. We request that the utilities..for,both.water a reviewed.as.'soon as possible so that Tipton Associat poratedcanbeginthend • seIncor- Enviroinmenta] Protections fors with ..the-.-'. hand es Incorf the •Florida Department of iyouhave .any questions,; water*permits-.. please' do not hesitate to c a l ,ts. If f . Sincerely," r ' TIPTON SOC:` PORATED pl' 2-467.3 .. ,Wil i .. Encl. 1P n, - Jr., 'P. E. cc :. Frank. Schrimsher, w/o ericl . 5 1" I TO ASSOCIATES INCORPORATED INCORP o Sanford, Flo . G1 y rlddP.O. Box 1778.32772-1778 Telephone (407) 330.5673 Department of Engineering and Planning MEMORANDUM TO: Building Department Fire Department Police Department Public Works Department Utilities Department Florida Power & Light Co. Florida Public Utilities BellSouth Cable Vision of Central Florida Post Office E-9- 1-1 Seminole County Planning Department Seminole County Property Appraisor Supervisor of Election FROM: Russ Gibson, Land Development Coordinator RE` New Addresses (ACI Income Fund P.D.) fie: - - February 1, 1996 The following addresses have been assigned to the ACI Income Fund P.D. subdivision with in the City of Sanford located at the southwest corner of W. First Street (SR 46) and Towne Center Boulevard: Lot 1 ( Don Pablo's Mexican Kitchen) Lot 2 ( Mobil Oil Service Station) Lot 3 ( Angel's Diner) Lot 4 ( Taco Bell) 100 Towne Center Boulevard 101 Oregon Avenue 111 Oregon Avenue 110 Towne Center Boulevard A map below is provided for reference. Please direct inquiries regarding addresses to this department. Thank you. STATE ROAD 040 - The Friendly City" ri I f_ TIPTON ASSOCIATES INCORPORATED TRAFFIC/TRANSPORTATION/CIVIL ENGINEERING December 19, 1995 Mr. Rod Pakzadian St. Johns River Water Management District 618 E. South Street, Suite 200 Orlando, FL 32801 m- RE: Request for General Permit for ACI Income Fund P.D. Compliance with Seminole Towne Center Permit No.4-117-0369M2 Dear Rod: Enclosed for .your review is -a General Permit Application Package for.the'above referenced project., The purpose of'.this application is. to. show compliance with an existing Seminole Towne Center Permit No.- 4-117-0369M2. The ACI Income Fund Planned Development in Sanford, Florida was calculated *.as a contributing area to Seminole Towne Center.Pond No. l.in the above referenced SJRWMD permit.- -The ACI Income Fund.P.D.:includes what was referred to as Seminole Towne Center Tract '13 and the. property". This Planned Development includes 'a.total of 5.0236 acres. The following attachments are included -in order to demonstrate that our acreage has been included in Permit No. 4-117-0369M2. 1. , Copy of.letter sent to Mr. Rod Pakzadian for a request for second permit modification. c 2. Basin summary table submitted in a report by Professional Engineering Consultants with the above letter. 3. PEC Master Drainage. Plan (Exhibit 3) with the ACI Income Fund P.D. highlighted. 4. Letter to Rod Pakzadian addressing 100 year flood plain storage calculations for the ACI Income Fund P.D. dated f 12/13/95. a 760 MAGUIRE BOULEVARD ORLANDO, FL 32803-3751 407) 894-2055 - 1-800-447-9836 - FAX (407) 896-9949 Mr. Rod Pakzadian December 19, 1995 As indicated in the basin summary table, both Tract 13 and the -Rife property have been calculated for 80 percent imper- vious totaling 4.02 acres of impervious permitted. As long as the ACI Income Fund P.D. has an impervious percentage.equal to or less than 80 percent of the total site area, it will be in compliance with Permit No. 4-117-0369M2. We have enclosed a set of site plans for your review. As can be seen on Sheet D-2, Site Plan, under landscape areas, the open space provided is 1.057-acres or 21 percent open space. This would equate to 79 percent impervious cover (3.97 acres). This -.site therefore complies with`the individual MSSW permit. We trust that upon your review of the information pro- vided, you will. be able to issue our General Permit. If 'you . have any questions or comments, please do not hesitate to. call. S3 T] W. p12-467.3 Encl. cc.: Frank Schrimsher, w/o plans i TI PTON ASSOCIATES INCORPORATED Iv Wr FOR AGENCY USE ONLY ACOE Application# ' SJR Application # Date Application Received Date Application Received Pcoposed'.Projecf Lat. Fee Received $ proposed'Project'Long. Fee Receipt # Date Received Project Use Codes Assigned Reviewers Reviewer# 's SECTION A Are any of the activities described in this application proposed to occur in, on, or over wetlands or other surface waters? yes _ no A. Type of Environmental Resource Permit Requested (check at least one) Noticed General - include information requested in Section B. Standard General (Single Family Dwelling) - include information requested in Sections C and D. Standard General (all other projects) - include information requested in Sections C and E. Individual (Single Family Dwelling) - include information requested in Sections C and D. Individual (all other projects) - include information requested in Sections C and E.' Conceptual - include information requested in Sections C and E. Mitigation Bank Permit (construction) - include information requested in Sections C and F. If the proposed mitigation bank involves the construction of a surface water management system requiring another permit defined above, check the appropriate box and submit the information requested by the applicable section. ) Mitigation Bank (conceptual) - include information requested in Sections C and F. Standard General Stormwater - include information requested in Sections C and H Individual Stormwater - include information requested in Sections C and H B. Type of activity for which you are applying (check at least one) Construction and operation of a new system including dredging or filling in, on or over wetlands and other surface waters. Alteration and operation of an existing system which was not previously permitted by a WMD or DEP. Modification of a system previously permitted by a WMD or DEP. Provide previous permit number 9 M 140 Alteration and operation of a system _ Extension of permit duration I . t ' T Abandonment of a system X Construction and operation of additional phases of Removal of a system a system C. Are you requesting authorization to use State Owned Submerged Lands? _ yes no If yes, include the information requested in Section G.) D. For activities in, on or over wetlands or other surface waters, check type of federal dredge and fill permit requested: AJIA Individual Programmatic General General Nationwide E. Are you claiming to qualify for an exemption? _ yes _X no If yes provide rule number if known FORM NUMBER 40C-4.900(I) Pg I of 4 OWNERS) OF LAND ENTITY TO RECEIVE PERMIT (IF OTHER THAN OWNER) NAME _ NAME CAL ' ce m e , `1" uK6 L ADDRESS ADDRESS Ca0 c V CITY, STATE, ZIP CITY, STATE, ZIP COMPANY AND TITLE COMPANY AND TITLE TELEPHONE ('e%0%) Ya3 %(oOO TELEPHONE ( ) FAX (,{d%) &o 6 9Q30 FAX ( ) AGENT AUTHORIZED TO SECURE PERMIT (IF AN CONSULTANT (IF DIFFERENT FROM AGENT) AGENT IS USED) NAME NAME, T COMPANY AND TITLE COMPANY AND TITLE r ADDRESS ADDRESS 1 o - c a$o CITY, STATE, ZIP CITY, STATE, ZIP TELEPHONE ( ) TELEPHONE FAX ( ) FAX Name of project, including phase if applicable Is this application for part of a multi -phase project? _ yet no Total applicant -owned area contiguous to the project -0a3Co ac Total project area for which a permit is sought o ac Impervious area for which a permit is sought ac What is the total ar a (metric equivalent for federally funded projects) of work in, on, or over wetlands or other surface waters? 4pr acres square feet hectares square meters If a docking facility, the number of proposed new slips Project location (use additional sheets, if needed) County(ies) e3le, Section(s) Township(s) 12 Ranges) 30 _ Sections) Township(s) Range(s) Land Grant name, if applicable Tax Parcel Identification Number Street address, road, or other location 5 , Z.-4 (D i 05*- aST M - S —{ City, Zip Code if applicable -c)c:1 FORM NUMBER 40C-4.900(i) Pg 2 of 4 Describe, in general terms, the proposed project, system or activity. con•rec 5c 5 1 fro r' O` L PL r 1 m55w a M d- y- 7- o3ro q M ae i h t Ij& C w l\b-rr O_, wig If there have been any pre -application meetings, including at the project site, with regulatory staff, please list the date{s), location(s), and names of key staff and project representatives. AJn n&-, Please identify by number any MSSW/Wetland Resource/ERP/ACOE permits pending, issued or denied for projects at the location and any related enforcement actions. Agency Date No.\Type of Application Action Taken(Pending/Issued/Denied) S wMD t g5'AocaJaQ 0Sr perM\V -0XOj(MV, Notelhe following information is required for prolects proposed to occur in on or over wetlands or other surface waters that need a federal dredge and fill permit and/or authorization to use state owned submerged lands. Please provide the names ,addresses and zip codes of property owners whose property directly adjoins the project (excluding applicant). Please attach a plan view showing the owner's names and adjoining property lines. Attach additional sheets if necessary. 3 2. 4. FORM NUMBER 40C-4.900(l) Pg 3 of 4 By signing and submitting this application form, I am applying, or I am applying on behalf of the applicant, for the permit and any proprietary authorizations Identified above, according to the supporting data and other Incidental information filed with this application. I am familier with the Information contained In this application, and represent that such Information Is true complete and accurate. I understand this is an application and not a permit, and work prior to approval Is a violation. I understand that this application and any permit issued or proprietary authorization Issued pursuant thereto, does not relieve me of any obligation for obtaining any other required federal, state, water management district or local permit prior to commencement of construction. I agree, or I agree on behalf of my corporation, to operate and maintain the permitted system unless the permitting agency authorizes transfer of the permit to a responsible operation entity. I understand that knowingly making any false statement or representation in this application is a violation of Section 373.430, F.S., and 18 U.S.C. Section 1001. Typed/Printed a of Applicant of no Agent Is used) or Agent (If one is so authorized below) Signature of Applicant/Agent Date Corporate Title if applicable) AN AGENT MAY SIGN ABOVE ONLY IF THE APPLICANT COMPLETES THE FOLLOWING: I hereby designate and authorize the agent listed above to act on my behalf, or on behalf of my corporation, as the agent In the processing of this application for the permit and/or proprietary authorization Indicated above; and to furnish, on request, supplemental Information In support of the application. In addition, I designate and authorize the above -listed agent to bind me, or my corporation, to perform any requirement which may be necessary to procure the permit or authorization Indicated above. I understand that knowingly making any false statement or representation in this application Is a violation of Section 373.430, F.S., and 18 U.S.C. Section 1001. Typed/Printed Name of Applicant Signature of Applicant Date Corporate Title If applicable) Please note: The applicant's original signature (not a copy) Is reaulred above. PERSON AUTHORIZING ACCESS TO THE PROPERTY MUST COMPLETE THE FOLLOWING: I either own the property described in this application or I have legal authority to allow access to the property, and I consent, after receiving prior notification, to any site visit on the property by agents or personnel from the Department of Environmental Protection, the Water Management District and the U.S. Army Corps of Engineers necessary for the review and inspection of the proposed project specified in this application. I authorize these agents or personnel to enter the property as many times as may be necessary to make such review and inspection. Further, I agree to provide entry to the proj t site for such agents or personnel to monitor permitted work if a permit is granted. - w / rr-anl L . sc hrrr she, / - l0-6— Typed/Printed Name Signature Corporate Title if applicable) FORM NUMBER 40C-4.900(i) Pg 4 of 4 SECTION C ENVIRONMENTAL RESOURCE PERMIT NOTICE OF RECEIPT OF APPLICATION This information is required in addition to that required In other sections of the application. Please submit five copies of this notice of receipt of application and all attachments. Please submit all information on 8 1 /2" x 11" paper. Project Name: /'N Owner: AC- Applicant: r Applicant's Address: Indicate the project boundaries on a USGS quadrangle map reduced or enlarged as necessary to legibly show the entire project. If not apparent from the quad map, attach a location map showing a north arrow and a graphic scale: Section(s), Township(s), and Range(s): and sufficient detail to allow a person unfamiliar with the site to find it. 2. Provide the names of all wetlands, or other surface waters that would be dredged, filled, impounded, diverted, drained, or would receive discharge (either directly or indirectly), or would otherwise be impacted by the proposed activity, and specify if they are in an Outstanding Florida Water or Aquatic Preserve: C,I113- 3. Attach a depiction (plan and section views), which clearly shows the works or other facilities proposed to be constructed. Use a scale sufficient to show the location and type of works. Use multiple sheets, if necessary. 4. Briefly describe the proposed project (such as "construct a deck with boatshelter", "replace two existing culverts", " construct surface water management system to serve 150 acre residential developmenfD: Cc^-) ST Q-T oN v e i t=OQ_ i c R 7 -Ir ti ed) h1ro mew v ol C _ `To,.n GennlrP t-' c7N l 5. Specify the acreage of wetlands or other surface waters, if any, that are proposed to be disturbed, filled, excavated, or otherwise impacted by the proposed activity: A)/ A 6. Provide a brief statement describing any proposed mitigation for impacts to wetlands and other surface waters ( attach additional sheets if necessary, : 11 FOR AGENCY USE O0. NLY+ .y10icatior Name Appfiafion'Nurribe f Office wtiere the application can be; Inspected D'ateo beposted Date fo. 6e removed: FORM NUMBER 40C-4.900(l) Pg 1 of 1 16 i 1 a %• rid, 'o amp 0 — I—•, p-- i`CJ .. y ^ \ — = mot to /F's . .o° ° \0 i /.• -r. `` R San II )G 1 Sanfo Farms ,4 •' Bool grto OR-04G..; i 1r: Lake I 2a J ! -- — s i i Monroe '• 19 1 20 J ! : •b Rand f J.• St Josep ' 1'.•'='•.'!5 '•mod ;'i.:°' p: 0%P..( Ci; i` /:'• ;.' i °ea. I •4 , yM.•- .tJ'ZQQ d ' —'O. I' 2 rr : •F ' .SITEtr• i f•- :rra:::• vo 00 Jo e f °- race .\ 'J •o . so I .', 11 (. . i ' - - - - ? 11 ... i l - i. 0..,ice\ .\ a''+ r....:.L.. 01 o; o Trues `as r — n ' n,r r%. ,. • : Y\ Rio 4•'-.. t SANFORD, FLA. ROAD CLASSIFICATION N2845—W8115/7.5 Heavy-duty Light -duty . 1965 Medium -duty Unimproved dirt ......... AMS 474I Iv SE —SERIES V847 U Interstate Route O U. S. Route O State Route SITE LOCATION MAP TI PTO N ASSOCIATES INCORPORATED R w 4 w r F C a i Water Quality Treatment For Sub -basin 1 o ect Seminole Towne Center Sanford. Florida P.N. SOC-0112. 2 L13y Professional Engineering Consultants. Inc PONDS-3. WK 1) Date 09/20/95 Drainage Structure/ Basin I.D. Drainage Area ac) Impervious Area ac) Pervious Area ac) Percent Impervious One Inch Of Runoff ac-ft) 2.5 Inches On Impervious Areas I ac-ft Wall ie 32.15 (3) 29.39 (3) 2.76 91.4% Tract 8 2.34 1.99 0.35 85.0% 0.20 0.41 Tract 9 5.15 (3) 3.66 (3) 1.49 71.1% 0.43 0.76 Tract 10 2.18 1.90 0.28 87.2% 0.18 0.40 ! Tract 13 2.03 1.62 0.41 80.0% 0.17 0.34 North Conn. 0.79 0.45 0.34 57.0% 0.07 0.09 T.C. Blvd. 7.48 5.71 (1) 1.77 (1) 76.3% 0.62 1.19 Rife Property 2.99 (2) 2.39 0.60 80.0% 0.25 0.50 Holiday Inn 6.90(2) 5.86 1.04 85.0% 0.57 1.22 Pond 1 Tract 7.32 4.38 2.94 59.8% 0.00 0.00 Total 69.33 57.36 11.97 82.7% 5.17 11.04 Required Water Quality Volume = 11.04 ac-ft Adjusted Rainfall Depth on Impervious Area = 3.15 in Adjusted Water Quality Volume = 13.91 ac- Notes: 1. Within the Towne Center Boulevard right -of --way, the driveway connections and turn lanes for the Faison Property" east of Towne Center Boulevard resulted in an increase of 0.40 acres of impervious area. 2. A total of 9.89 acres of additional area will be directed to Pond 1. This area consists of the 6.90 acre Holiday Inn Property' to the west of Pond 1 and the 2.99 acre "Rife Property" north of Tract 13. 3. The drainage areas and imperviousness of Tract 9 and the Mall Site have been adjusted to reflect the most up to date information. O A ` HOL/DA Y /NN PROPERTY m CONTROL STRUCTURE 60 RCN - 66' RCP 200' R/W HICKMAN ROAD mOUMALLSTORMS£WFR SYSTEM a 66' RCP NOWALL I1 LOCKHART SM/TH CANAL ..._....__.... .. _ ... .. C C .. EXHIBIT 3 MASTER DRAINAGE PLAN SDC07EX-RSE - 9/ 2%/ 95 NOT FOP' CONSTRUCTION JOB No. SDC01 UNLESS SIGNED HERE DATE 04/19/95 PROJECT ENGINEER SHEET 1 OF 1 r PEC . PROFESSIONAL ENGINEERING CONSULTANTS, INC. October 2, 1995 Mr. Rod Pakzadian St. Johns River Water Management District 618 East South Street, Suite 200 Orlando, Florida 32801 Re: Seminole Towne Center Permit No. 4-117-0369 Request for Second Permit Modification Dear Mr. Pakzadian: SDC-07 1-1.0 1-5.1.18 Enclosed for your review is a permit application package for the above referenced project. The purpose of the application is two -fold: 1. To allow for modifications to Stormwater Pond No. 1 to accommodate additional off -site areas; and 2. To provide for off -site mitigation for construction related impacts to on -site wetlands. The following items are enclosed to facilitate your review: 1. MSSW Application (original and 2 copies), including Supplemental Sheet A. 2. Notice of Receipt of Application and attachments thereto (5 copies). 3. Check in the amount of $2000 to cover the permit application/processing fee. 4. Drainage Calculations (3 copies, signed and sealed). 5. Master Drainage Plan -- Exhibit 3 (3 copies, signed and sealed). 6. Stormwater Pond No. 1 Detail Sheet (Sheet 24 of 43) (3 copies, signed and sealed). 7. Legal Description for additional off -site preservation area (2.18 acres) (3 copies). 8. Proposed language concerning Baseline Monitoring/Survey for possible inclusion in the permit "Conditions of Approval" (3 copies). The first aspect of this submittal, i.e., Modifications to Stormwater Pond No. 1, involves modifications that will allow the pond to accommodate stormwater runoff from the off -site Holiday Inn Property" and the "Rife Property," which are contiguous to the Seminole Towne Center Project Boundary. The attached Master Drainage Plan for the Seminole Towne Center Project has been revised to depict the location of the subject properties. Although this application submittal provides for the modification of the Seminole Towne Center Master Drainage Facilities 200 East Rob;nsen Street • Suile 1560 • Orlando. F!crida 32801 • 407.422-8062 - FAX 07 843 ?aJt I Rod Pakzadian October 2, 1995 Page 2 to accommodate the stormwater runoff from the subject off -site properties, it is our understanding that prior to development of either of these properties, separate General Permit Applications for their proposed specific site improvements must be submitted to and approved by SJRWMD. The proposed modifications include lowering the Control Water Level of Pond No. 1 from elevation 27.3 to 26.7 in order to provide the required additional water quality treatment and detention volume, and revising the Outfall Control Structure to effectuate peak stage elevations similar to that previously permitted. Proposed pond modifications also include an adjustment to the pond's west maintenance berm elevation which will provide for containment of the 100 year- 24 hour storm event within the pond. These modifications are depicted on the attached Stormwater Pond No. l Detail Sheet. At the time of development of the Holiday Inn Property, Stormwater runoff will be conveyed to Pond No. 1 by means of a new pipe connection to the pond, which will need to be constructed in conjunction with other development improvements. Stormwater runoff from the Rife Property will be conveyed to the Pond either by means of a new pipe, upsizing of the existing pipe which was constructed to serve Tract 13, or a combined use of the existing pipe and a new pipe, when the property is developed. The enclosed Drainage Calculations have assumed 85 percent impervious surfaces on the 6.90- acre Holiday Inn Property and 80 percent impervious surfaces on the 2.99-acre Rife Property. Also, the enclosed Drainage Calculations have been updated to incorporate the most current data regarding impervious/pervious areas for development tracts within Drainage Basin No. I which have been submitted to, or have obtained a General Permit from the District. Specifically, this relates to "Tract 9" which encompasses the Darden Restaurants site and the Steak 'n Shake site which together total 5.15 acres and provide for placement of 3.66 acres (71 %) impervious surface area. The attached drainage calculations address the additional contributory area to Stormwater Pond No. 1, the adjustments to the above referenced Tract 9 impervious/pervious area ratios, and the hydraulic flood routings for the 10 year-24 hour, 25 year-24 hour, and 100 year-24 hour storm events. These calculations demonstrate that the new post -development mean annual and 25 year- 24 hour peak discharge rates are still less than the previously approved pre -development peak discharge rates for the same storm events. The second aspect of this permit modification submittal pertains to construction related impacts to Wetland Nos. 2 and 3 (Pond No. 3B and Pond No. 2, respectively) for which off -site mitigation is being proposed. As you may know, the recent permit modification (Permit No. 4- 117-0369M) approved on July 11, 1995, provided for the replacement of the on -site wetland mitigation plan by preservation of an off -site regionally significant wetland parcel. The subject permit modification proposes to increase the approved off -site preservation area by 2.18 acres to offset (A) the 0.47 acre overclearing in Wetland No. 3 and (B) impacts to vegetation within Wetlands No. 2 and 3. A copy of the legal description for the 2.18 acre off -site mitigation area is enclosed. The 2.18 acre mitigation area is located adjacent to, and north of, the 25.07 acre off -site preservation area which was approved in conjunction with the recent permit modification 4-117-0369M). It is our understanding that ECOBANK is currently in the process of finalizing V Rod Pakzadian October 2, 1995 Page 3 the conservation easement language covering the combined 27.25-acre off -site wetland preservation area. Once the conservation easement language is agreed upon, the Conservation Easement will be recorded. To clarify the record regarding the conditions of permit approval pertaining to this project, and in consideration of the recent permit modification (4-117-0369M) to allow offsite wetland preservation in lieu of onsite wetland creation for impacted wetlands, we believe the following existing permit conditions (Permit No. 4-117-0369) should be removed: 12. 13, 14, 26, 27, 28, 29, 30, 31 and 33. Also, please consider the attached proposed permit condition language for inclusion in the subject permit modification regarding monitoring requirements for Wetland No. 2 and Wetland No. 3. We trust this information is sufficient for your review of the proposed project improvements. If you have any questions or need additional information, please contact us. Very truly yours, PROFESSIONAL ENGINEERING CONSULTANTS, INC. J/w Richard D. Merkel, P.E. Associate Principal RDM/rg.001A enclosures cc: Tom Schneider (with attachments) Chuck Schneider (with attachments) Aaron Cohen (with attachments) Joe Cooper (with attachments) 12/14/95 15:21 SCHRIMSHER -+ 407e969949 N0.4i5 PEC PROFESSIONAL ENGINEERING CONSULTANTS, INC. December 13. 1995 1-1.0 1-5.1.18 Mr. Rod Pakzadian St. Johns River Water Management District 618 East South Street, Suite 200 Orlando, Florida 32801 Re: Seminole Towne Center Permit No. 4-117-0369M2 Dear Mr. Pakzadian: Pursuant to our recent telephone conversations concerning the above referenced project, enclosed are calculations and plans which demonstrate that compensating storage for the Rife Property" and "Holiday Inn Property" will be accommodated in Stormwater Pond No. 1 of the Seminole Towne Center stormwater management system. As you know, the proposed improvements to Pond No. 1 were considered and approved at the December 12, 1995 meeting of the SJRWMD Governing Board. The calculations submitted in conjunction with the Pond No. 1 modification did not address the issue of compensating flood storage volume for the subject properties. However. it is our desire to demonstrate at this time, rather than when the subject parcels apply for the required general permits, that compensating storage for the 10-year and 100-year flood events is provided within Stormwater Pond No. I. The following items are enclosed to facilitate your review: 1. 100-year floodplain storage calculations (3 copies. signed and sealed). 2. "Plat of Survey" Boundary and Topographic Survey for Rife Miller. Inc.. red - lined to indicate 100-Year flood elevation (30.2) (3 copies, signed and sealed). 3. "Site Demolition Plan for the Holiday Inn Property, red -lined to indicate the 100-year flood elevation (32.3) (3 copies, signed and sealed). The 100-year flood studies performed by the Federal Emergency Management Agency FEMA) have depicted isolated areas on both the Rife and the Holiday Inn properties as flood prone. However, the FEMA studies have not defined the elevation of the flood prone areas. Also, based on topographic surveys of the subject properties, the FEMA depicted flood prone areas are not consistent -with the ground topography. A flood study prepared by Singhofen and Associates. Inc. (SAI) for Seminole County, entitled "Lockhart -Smith Canal/Monroe Basin", which was completed in September engineers pla u+enz stiveyors 200 East Robinson Street - Suite 1560 • Orlando, Florida 32801 - 407/422.8062 • FAX 407/849-9401 12/14/95 15:09 TX/RX NO.0248 P.002 0 12i14/% 15:21 SCFRIMSFER - 4078%9949 NO. 415 A Mr. Rod Pakzadian December 13. 1995 Page 2 1992, estimates the 100-year flood elevation on the Rife property to be 30.2. and on the Holiday Inn property to be 32.3. This same Singhofen study was utilized to estimate the 100-year flood compensating storage requirements for the Seminole Towne Center project when permitted In July, 1993 (permit No. 4-117-0369). Based on site topography, the existing 100-year floodplain storage on the Rife property is 0.52 acre- feet; on the Holiday Inn property 1.65 acre-feet. The Singhofen study does not address a 10-year flood elevation for the subject property areas. For the purpose of this submittal, it is assumed that all of the available 100-year flood plain storage on the Rife and Holiday Inn properties is to be removed as the properties are developed. Previously approved calculations for Stormwater Pond No. 1 (permit No. 4-117-W69) accounted for 4.41 acre-feet of 100-year compensating storage volume for the Seminole Towne Center project area. Accounting for the proposed flood storage loss on the Rife and Holiday Inn properties, the total required compensating storage to be achieved in Stormwater Pond No. 1 is 6.58 acre feet (4.41 + 0.52 + 1.65). Stormwater Pond No. 1, as demonstrated in previously approved calculations, has storage capacity to detain the 100-year - 24 hour storm event without exceeding the pond top 'of bank elevations. There are approximately 33.1 acre-feet of storage provided in Stormwater Pond No. 1. therefore, compensating storage for displacement of any flood storage on the subject properties is provided in Pond No. 1. If you have any questions concerning this matter, please contact us. We respectfully request that you acknowledge, in writing, that the Rife property and the Holiday Inn property do not need to submit calculations relating to the issue of compensating flood storage when development occurs on these properties. Very truly yours, 1d1W Richard D. Merkel, P.E. Associate Principal RDM/ch.006r enclosures cc: Chuck Schneider (w/attachments) Tom Schneider (w/attachments) Aaron Cohen (w/attachments) Joe Cooper (w/attachments) Frank Schrimsher (w/attachments) 12/14/95 15:09 TX/RX N0.0248 P.003 12/14/95 15:22 SCHRIMSHER 407A969949 NO.415 004 1 T 900-Year Flood lain Store e Enamct Seminole Towne Center Sanford, Florida ge4 SOC-007.02.000 By Professional Engineering Consultants, Inc. FLOOO.WK1) DAM 10131M r is Exlst/ng Floodplain Storage 0.52 eo•R HOLIDAY INN PROPERTY Stagg ; ; ..:: Pap et • : ' :: q .aCew=?'"• Are a u rs fee Aiea": . oros .. orago Ariai.• acres ' ' Voldlne•:.. ec- " : A. a•F. > 31.00 1. 24 0.64 b9 0.59 00 200 34,379 30 2.30 19 0 Existing Floodplain Storage 1.65 a" ICENTER POND lit I of T2 1/t• J, Flood Storage Provided 33. aa-ft 12/14/95 15:09 TX/RX N0.0248 P.004 o Sanford, Flor. ov lddP.O. Box 1788 - 32772-1788 Telephone (407) 330-5601 Fax (407) 330-5666 Sent Via FaxW7)648-9230 & U.S. Mail February 16, 1996 Schrimsher Properties 600 East Colonial Drive Suite 100 Orlando, Florida 32803 ATTN: Frank L Schrimsher Authorized Agent RE: Hold Harmless Agreement, ACI Income.. Fund, Ltd. Dear Mr. Schrimsher: I am pleased to advise you that your letter of February- 12, 1996, which offers a Hold Harmless Agreement to expedite. development- of. the- ACI Income Fund.,. Ltd. property in Sanford has been accepted. I have authorized our Land Development Coordinator to approve site development permits related to this property when all requirements- have been met, other than the final County approval of the Water Service Area Agreement Modification. 1 have. also. authorized our Building Official. to issue "slab only"' building permits. under similar. conditions. A copy of your letter endorsed "Accepted" is attached- herewith.. WAS/acd Attachment cc: Land Development Coordinator Building Official James G. Willard, Esquire a:Ue ttef% Scluimehet.ptp Very truly yours, Simmons; P.E. City Manager A R The Friendly City"