Loading...
HomeMy WebLinkAbout1000 Rinehart Rd 18-4635 ElectricalREV' APP' NO, REVISIONS DME D D INITIAL RELEASE 11/12/18 REV'D APP'D - - DES 2 REVISION 1 12/20/18 REV'D APP'D CH THOMAS BE RTO N A Tm Building Value ENGY FAWZY ABM ELECTRICAL POWER SERVICES 14201 FRANKLIN AVE. VAN WILKIN5- TUSTIN, CA 92780 (D CPF25-18 SHEET INDEX: 1. TITLE SHEET WITH SCOPE AND AREA MAP 2. SINGLE LINE 3. CPFE 25 SPEC 4. CPFE25 DETAILS 5. STANDARDS 57 JAN 0 2019 PERMIT 3S- -22 TA 1-61 ?A- t DACE 12/20/18 AUTONATION HONDA OF SANFORD T' S, 2 6 7 -5CALE NTS ZB# NTS 12 1000 Rinehart Road, STATE OF SHEET Sanford, FL 32771 N. SHEET # 5 /0 1 - POLE MOUNTED UTULiTY TRANSFORMER M ) UTLILITY METER SERVICE PANEL SP304W 1600A -480/277V MAIN SERVICE DISCONNECT 1600 AMP ORCUIT MAIN LUG ONLY ®— -" BREAKER WITH GROUND FAULT PROTECTION IN ONEMA 311 LOCKABLE ENCLOSURE ( EXISTING) 1 (3) #500kCMIL AND (1)#3GND IN 3'EMT [300 KVA TRANSFORMER(XMFR T-1) ,480:120/208V( EXISTING) 1200 A -30-4W ` PANEL DPA IS FEEDING PANEL LSD AND 208/20IS 1000 1000 OTHER SHOP PANELS (LB,LSA,LSB,LSC) VIA A BREAKER A) 800 AMP 3 POLE ( DPA -4) ( EXISTING) Panel LSD 225 A/3P-120/208V n ( EXISTING) O J.gLevel II (1) hLevel — (2) #6AND # 1000PPER THHN GROUND IN A 3/4" EMT CONDUIT FOR EACH WALLMOUNTCHARGER NO. REVISIONS DATE REV' APP' D D 1 INITIAL RELEASE 11/12/18 REV'D APP'D 2 REVISION 1 12/20/18 REV'D APP'D NOTES: O 400 AMP 3POLE 480 VOLT CIRCUIT BREAKER- (SP -2 ).(EXISTING) O 40AMP 2POLE 240VOLT CIRCUIT BREAKERS. 0 (4) # 6AND # 10 COPPER THHN GROUND INA 1" EMT CONDUIT FROM LSD PANELTO JUNCTION BOX(CONDUCTOR UPSIZED DUETOVOLTAGE DROP). O (2) #6 AND # 10 COPPER THHN GROUND IN A 3/4" EMT CONDUIT FROM JB TO CHARGERS (CONDUCTOR UPSIZED DUE. TO VOLTAGE DROP). AM ANNift AM Alk Awl& EL_ff Im )ESIGNE THOMAS BERTON ,M ENGY FAWZY Building Value ABM ELECTRICAL POWER SERVICES 14201 FRANKLIN AVE. CHECKS AN WILKINS TUSTIN, CA 92780 _._ ELECTRICAL PANEL SCHEDULE EN�`r''. �j r 12/20/18 DATE �6LE AUTONATION HONDA OF SANFORD�r2y7 , PANELLSD NTS 12 12 tY jjf _10B# c'/"' 1000 Rinehart Road, -ti' GTiiiE OF '• v \ SHEET Sanford, FL 32771 �s,� •• • 120/208 VOLT (225) AMP (3) PH (4) W M.B. qr'� "0�� SHEET# 5 CK LOAD OUTLET BRKR PHASE (Load iin KW) PHASE (Lead in KW) BRKR OUTLET LOAD CK L-C.L LTG REC MIS C POLE AMP A B C A B C AM OL IS REC LTG 1 Receptacle -Bay X 3 30 2 2 30 3 X Receptacle -Bey 2 3 h4El�tA 15-30R X 3 30 2 2 30 3 X NEMA 15.-30R 4 5 X 3 30 2 2 30 3 X 6 7 Receptacle -Bay X 3 30 2 2 30 3 X Receptacle -Bay 8 9 NENIA 15-30R X 3 30 2 2 30 3 X NEhIA 15-30R 10 11 X 30 2 2 30 a X 12 13` =, i :'-1 2 30 3 X Receptacle -Bay 14 15 1_.I 2 30 3 X NEMA 15-30R 16 17 SPARE X 3 30 2 30 a X 18 19 Receptacle -Bay X 3 30 2 2 30 a X Receptacle -Bay 20 21 NEMA 15-30R X 3 30 2 2 30 3 X NEh1A 15-30R 22 23 X 3 30 22 2 30 X 24 25 SPARE 1 20 1.8 30 3 BA FAN 26 27 1 20 1 1.8 30 ? 28 29 SPARE 1 20 1.8 30 3 30 31 2 25 1 1 25 2 32 33 2 25 1 1 25 2 34 35 2 25 1 1 25 2 36 37 2 25 1 1 25 2 38 39 a 1 25, 2 401 41 l=_; 1 25 2 42 PER PHASE 8 TOTAL LOAD A B C TOTAL OF PHASE, LOADS 23.4 27.0 22.4 72.8 Actual Load AMPS : X202.3 TOTAL LOAD L.C.L L.C.L Q 100%72.8 L.C.L. WATTS (Additional) 707AL LOAD TOTAL AMPS 72.8 kW 72.8 0.0 72.8 224.78 AM ANNift AM Alk Awl& EL_ff Im )ESIGNE THOMAS BERTON ,M ENGY FAWZY Building Value ABM ELECTRICAL POWER SERVICES 14201 FRANKLIN AVE. CHECKS AN WILKINS TUSTIN, CA 92780 EN�`r''. �j r 12/20/18 DATE �6LE AUTONATION HONDA OF SANFORD�r2y7 , NTS NTS 12 12 tY jjf _10B# c'/"' 1000 Rinehart Road, -ti' GTiiiE OF '• v \ SHEET Sanford, FL 32771 �s,� •• • qr'� "0�� SHEET# 5 Connector Type Cable Length -1.8 m (6) Cable Management Cable Length - 2,4 m (8') Cable Management Overhead Cable Management System Card Reader Ground Fault Detection Open Safety Ground Detection Plu-Out Detection Power Management Accuracy Power Report/Store Interval Local Area Network Wide Area Network NO. REV51ONS 1 INITIAL RELEASE 2 REVISION 1 SAE J1772 TM 5.4 m (18') 7.0 m (23') Yes ISO 15693 and ISO 14443 20 mA CCID with auto retry Continuously monitors presence of safety (green wire) ground connection Power termi nated per SAE J1772 TM specifications +/- 2% from 2% to full scale (32A) 15 minute, aligned to hour 2.4/5 GHz Wi-Fi (802.11 a/b/g/n) 3G GSM, 3G CDMA provided by the ChargePoiint Gateway CPGWx DATE REV' APP' 0 n%.; Model Sin le Wa(78') Cord �54 �M-.nt L C F2> -L1 5 Single Pedestal Mount, 5.4 m (181) Cord kipll'. A,It 'LYVIk ' '�'rit1:rEc, e�;fv;ct [lu�tl( I I r r'r,.Ct Single Wall Mount, 5.4 m (181) Cord CPF25-I-18-CMK6 and Cord Management Kit Single Pedestal Mount, 5.4 m (181) Cord and Cord Management Kit CPF25-L18-CMK6-PD � . �tard'�i CPF25-L18-CMK6-PD-Dual �D� A branch 32 A 40 A dual alp Two In pencent. 32' A X 2 A hl�r�n �Ci A dial pre Two Stations with Dual Pedestal Mount, 7.0 m (23') Cord CPF25-L23-PD-Dua1 circuit (nom GFCI tyy e3 �il�lts (ncn-GFCt tyt i y 2 Standzrd Dow& Share Wa real nAt 32A e 40 AVO -10 40 A dwil ptie Two Stations with Dual Pedestal Mount, 7.0 m (23') Cord and Cord Management Kit CPF25-L23-CMK8-PD-Dua1 _i"exalt (n'a9!i-i��Ci ty;s 1300091' S�lea:�t (6 � Dere 20 � aran.l 2i3 A do ai ale l� A � T" inwPeno"t 1`5 R � 2f3 di r�lnctl til A dual {fie orcW nr GFCI tyV*) .� (nc>n-GFCt type) x 2 urcl�rr � Seth E Par3e i (1 _ , ;P06 .a it r �' r l �3 it r f r�+rltir f Britt? _ tQr tar t �I e�4L") witir'xj - �tarrdaa=o s rW0e -'_;1, L.2 j)ljs Earlt'r (F1 Aeuiral) � irir pew -r Share n a 3 -wiry "J.1-2. Lam stat -"011 €'m;; wal 2.S iA" t Li[ al :' Varicb, - 4 % nI axi X'IrJm (/Jt't2lc ucn) "3 W tvVical (gam )• 8 l maxirilln (ope-' a Ilion) ,�.ieC"i:rlCai OUtPs, Standard 7.7 KW (240 V AC @ 32 A) Connector Type Cable Length -1.8 m (6) Cable Management Cable Length - 2,4 m (8') Cable Management Overhead Cable Management System Card Reader Ground Fault Detection Open Safety Ground Detection Plu-Out Detection Power Management Accuracy Power Report/Store Interval Local Area Network Wide Area Network NO. REV51ONS 1 INITIAL RELEASE 2 REVISION 1 SAE J1772 TM 5.4 m (18') 7.0 m (23') Yes ISO 15693 and ISO 14443 20 mA CCID with auto retry Continuously monitors presence of safety (green wire) ground connection Power termi nated per SAE J1772 TM specifications +/- 2% from 2% to full scale (32A) 15 minute, aligned to hour 2.4/5 GHz Wi-Fi (802.11 a/b/g/n) 3G GSM, 3G CDMA provided by the ChargePoiint Gateway CPGWx DATE REV' APP' D D 11/12/18 REV'D APP'D AB M TM DesicNE�-THOMAS BERTON 12/20/18 REV'D APP'D ENGY FAWZY Building Value -- DRAWN ABM ELECTRICAL POWER SERVICES UW - - 14201 FRANKLIN AVE. 10XVID"l' CHECKE'JAN wl KIN TUSTIN, CA 92780 ,J AUTONATION HONDA OF SANFORD DATE �N- o 2617 s`GntE 4 1000 Rinehart Road, 5 TATE OF Sanford, FL 32771©}R�IDP . N' `SHEET /ONP•1L � '\ SHEET# 12/20/18 NTS NTS 3 5 Model Sin le Wa(78') Cord �54 �M-.nt L C F2> -L1 5 Single Pedestal Mount, 5.4 m (181) Cord CPF25-L18-F)D Two Stations with Dual Pedestal Mount, 5.4 m (18') Cord CPF25-L18-PD-Dual Single Wall Mount, 5.4 m (181) Cord CPF25-I-18-CMK6 and Cord Management Kit Single Pedestal Mount, 5.4 m (181) Cord and Cord Management Kit CPF25-L18-CMK6-PD Two Stations with Dual Pedestal Mount, S.4 m (18') Cord and Cord Management Kit CPF25-L18-CMK6-PD-Dual Single Wail Mount, 7.0 m (23') Cord CPF25-1-23 Single Pedestal Mount. 7,0 m (23') Cord CPF25-L23-PD Two Stations with Dual Pedestal Mount, 7.0 m (23') Cord CPF25-L23-PD-Dua1 Single Wall Mount, 7.0 m (23') Cord CPF25-L23-CM K8 and Cord Management Kit Single Pedestal Mount, 7,0 m (23') Cord CPF25-L23-CMK8-PD and Cord Management Kit Two Stations with Dual Pedestal Mount, 7.0 m (23') Cord and Cord Management Kit CPF25-L23-CMK8-PD-Dua1 D D 11/12/18 REV'D APP'D AB M TM DesicNE�-THOMAS BERTON 12/20/18 REV'D APP'D ENGY FAWZY Building Value -- DRAWN ABM ELECTRICAL POWER SERVICES UW - - 14201 FRANKLIN AVE. 10XVID"l' CHECKE'JAN wl KIN TUSTIN, CA 92780 ,J AUTONATION HONDA OF SANFORD DATE �N- o 2617 s`GntE 4 1000 Rinehart Road, 5 TATE OF Sanford, FL 32771©}R�IDP . N' `SHEET /ONP•1L � '\ SHEET# 12/20/18 NTS NTS 3 5 Enclosure Ratings Type 3R per UL 50E ; UL and C -UL listed product per UL2594, UL2231-1, UL2231-2. NEC Article 625 compliant safety and Compliance UL and C -UL listed per UL916 Energy Management Equipment 6 kV 4 3000 A. in geographic areas subject to frequent thunder storms, supplemental surge Surge Protection protection at the service panel is recommended. EMC Compliance FCC Part 15 Class B Storage Temperature -40°C to +60°C (-40°F to 140°F) Operating Temperature -30°C to +50'C (-22°F to 122°F) Operating Humidity Up to 85% @a t5D'C (122°F) non -condensing Non Operating Humidity Up to 95°k a +50°C (1220F) non -condensing Maximum Charging Stations per 802.11 Radio Group 9 maximum, Each station must be located within 46 m 059) "ilne of sight" of a CPGWx gateway. ;J tato s WR LED Yes Fault Indicator per UL Yes Status LED Yes Sh-7�lie Wail Mount ISO,— (7 ") Single SO,— Single Wall Mount With Cord Management Kit CPF25-L18-CB IS 5. n 018,' CPF25-L23-CMK Single Pedestal Mount with Cord Management t Kit _> 18o mm ._..._. C F2_5-L1z8NC K -P0 .: .... tom+ 233 mm (9.2") — REV' APP' NO. REVISIONS DATE D D 1 INITIAL RELEASE 11/12/18 REV'D APP'D 2 REVISION 1 12/20/18 REV'D APP'D BE ENGY FAWZY 308 mm EM ABMTM Building Value ABM ELECTRICAL POWER SERVICES 14201 FRANKLIN AVE. TUSTIN, CA 92780 Two Stations with Dual, tai "Dunt CPF25.1,18-PD-i)UAL CPF25-L23-PD-DUAL Single Pedestal Mount CPF25-Ll8-PD 5.4 m (18') CPF25-L23-PD 7.0 m (23') 1277 mm (50.3') 225 mm (8.9") 280 mm (11") }wo StatiottC with Dual .'z.desa �,, , ;•. and Cord Management Kit C PF25A1S-Cts i(6 -Pi) -DUAL i' 440 mm (17.3") '` I) / t Ji AUTO NATION HONDA OF,ISAN FORD a ,�;.• 9 +� 1000 Rinehart Road, Sanford, FL 32771 302 mm DATE 12/20/18 ;SCALE NTS -toe# NTS SHEEP Q .�j�SHEET# 5 ELECTRICAL- BASIC REQUIREMENTS 1. Provide all labor, materials, necessary equipment and services to complete all required Electrical Work including a 11 additional items required for a complete and proper installation as indicated on the Drawings or as required. Work includes but is not limited to the following. A. Service entrance system, B. All wiring and components to the charging systems 2. Installation shall be in accordancewith the latest edition ofthe National Electrical Code and all applicable regulations ofgoverning Local, State, Countyand Federal Codes including Utility Companies special requirements. 3. In the event of a conflict between equipment as drawn and these Specifications, the more stringent requirements will be applicable. 4. Coordinate delivery and installation of equipment required under this Section with the construction schedule. 5. Coordinate work with other trades and drawings 6. All materials shall be new, free ofdefects and shall be U.L. listed, bearing U. L. label or be labeled or listed with an approved, nationally recognized Electrical Testing Agency. 7. Makefinal connections between all equipment furnished under this Contract. 8. The Contractor shall check all dimensions and verify all conditions pertaining to these Drawings at the building and site and shall report anydiscrepandes orconditions that are detrimental to proper completion of work to the Engineer at once. 9. Carefully examine all Project Drawings included for this Contract and those included under other contracts and report any discrepancies to Engineer and Architect. 10. Due to small scale of Drawings, it is not possible to indicate all offsets, fittings, access panels and similar parts which may be required. Drawings are generally indicative of work to be installed. Carefully examine structural and finish conditions affecting work and arrange all work accordingly, furnishing necessary parts and equipment as maybe required to meet actual field conditions. 11. Lay out work from dimensions of Architectural and Structural Drawings and actual dimensions of equipment being installed. Layouts in congested areas shall not be scaled from Mechanical and Electrical Drawings. Do not make final layouts until Shop or Equipment Drawings are approved and job conditions verified. 12. The right is reserved to makeany reasonable change in locations of equipment and similar itemswithin the building and at building exterior prior to installation without involving additional compensation. 13. All concrete saw cutting, removal and patching to be included. 14. All work shown on Drawings shall be supplemented by all Laws, Ordinances and Codes governing the work of these Divisions, which Laws, Ordinances or Codes shall take precedence 1n the event of any conflict between same, except where methods or materials shown are superior to the legal requirements. 15, Obtain all required certificates from Governing Agency and turnover to the Owner at completion of Work Obtain exact charges for fees, permits and other costs required and include such amounts in Bid Price. 16. Contractor shall provide a warra my substantiating that all materials are as herein specified, and that he shall repair or replace a ny defective materials or workmanship in an acceptable manner, without cost to the Owner. Warranty period shall befor one (1) year unless specified longer for specific equipment. Date of warra my start shall be from substantial completion and beneflcia I use. 17. Contractor will obtain a building permit for his portion of the work. 18. Contractor to provide pitch pans and penetrations required for electrical items which pierce roof whether or not shown on Drawings. 19. Contractor to Furnish and install reinforced concrete pads for equipment as required. 20. In general, all similar equipment is to be supplied and manufactured by same Manufacturer, but must be submitted and approved equal to that specified. 21. Locate all openings required for work performed under this section. Provide sleeves, guards or other approved methods to allow passage of items installed underthis section. 22. Provide switched supply with -in 36" ofequipment supplied and installed by other contractors. Motor starters and controls will be provided by others (except where noted) to be installed by the Electrica I Contractor. 23. Wherever the Contractor provides power consuming equipment which differsfrom Contract Documents, the wiring and associated circuit components for such equipment shall be changed to proper sizes to match at additional expenseto Owner. 24. It is the Contractor's responsibility to coordinate the exact required location offloor outlets, floor ducts, floor stub -ups, etc., with Owner and Architect and receive approval priorto rough in. Locations shown on plans are only approximate locations. ELECTRICAL - GENERAL REQUIREMENTS 1. Wire sizes are #12 THWN unless noted otherwise on Drawings or Schedules or if larger size is required for equipment furnished. 2. Code sized green grounding conductor is to be provided for all branch circuits. 3. Provide cablestrain relief for feeders in risers. Install access panels where required. 4. Coordinate power locations with owner. S. Coordinate with other subs if required for complete, proper operation and installation of all equipment. 6. Multi -section branch circuit panelboards areshown as individual panels on panel schedules. Circuit numbering indicated on drawings reflect consecutive numbering for single panel. ELECTRICAL - GENERAL CONSTRUCTION NOTES 1. Electrical Contractor shall coordinate his work with othertrades in order to avoid conflicts. 2. The minimum conduitsize shall be 1/2". 3. Voltage drop minimum wire sizing (20A circuit) use - 1. 120V circuit over 10Y use#10 minimum 2. 208V circuit over 200' use#10 minimum 3. 277V circuit over 200' use#10 minimum Minimum branch circuit wire size shall be #12. 4. All openings in fire rated walls, floor and partitions for conduits shall be sealed with fire resistant foam or UL approved "Fire Stop" system to maintain the fire rating. 5. All wiringwill be in "MC" cable as by code. Underground conduit will be Sched 40 PVC with fittings, conduit above grade installed isto be EMT. 6. Electrical Contractorshall have the option of grouping homeruns in one conduit, perthe requirements of Section 310 of the National Electrical Code. ELECTRICAL - GENERAL REQUIREMENTS 8. Utility company fees by others. 9. All circuits indicated on these drawings are 20A, 1P circuit breakers in panels unless otherwise noted. 10. No conduit shall be installed exposed in area open to the public. 11. Outlet boxes for receptacles shall be mounted 18" above finish slab, unless noted otherwise. 12. All dimensions indicated areto centerline of junction boxes, floor boxes, etc., unless otherwise noted. Refer to Interior Drawings for all dimensions. 13. The work "provide" shall mean "to furnish and install'. 16. A.F.F. = Above Finished Floor U.N.O. = Unless Noted Otherwise B.E.C. = Building Electrical Contractor F.C. = Fixture Contractor 1�1t11lt// NO. REVISIONS DATE REV' APP' \\ A. D D \\" " ° Vq ,�� DATE 12/20/18 AUTO NATION HONDA OF SANFORD \\\ �\�''' ���"NSF •'•�.{/� io 1 lo INITIAL RELEASE 11/12/18 REV'D APPDM ••� r•SCALE NTS DESIGNER THOMAS BERTON rM yJ/ No. 7i;?_ 2 REVISION 1 12/20/18 REV'D APP'D yl ►V' �7 Bu(Iding Vellue =Jos# NTS ENIS Y FAWZY_~ DRAWN ABM ELECTRICAL POWER SERVICES„. 1000 Rinehart Road, ~ is,?L, ,:°� `SNEEr 5 14201 FRANKLIN AVE. OF J CHECKED- VAN WILKINS TUSTIN, CA 92780 Sanford, FL 32771 �`��� .• �ZOP1`J�••.•�`•� SHEET# S v AUTONATION HONDA !SCOPE: INSTALL TWO -CPF25-L18'S IN G) CPF25-18 SHEET INDEX: 1. TITLE SHEET WITH SCOPE AND AREA MAP 2. SINGLE LINE 3. CPFE 25 SPEC 4. CPFE2S DETAILS 5. STANDARDS JAN 0 3 2017 NO. REVISIONS DATE RD DP. \°°°° %� JE ., 1/, DATE 12/20/18 1 INITIAL RELEASE 11/ells REV'D APP'D AUTONATION HONDA OF SANFORD `��''•' CEN // THOMAS BERTONZ� f • ; •' �- SF c� DESIGNED TM / "� " p NoSCALE NTS ABM 2 REVISION 1 12/20/18 REV'D APP'D kS ,� 7%26f ENGYFAWZY Building Value- Jos# NTS DRAWN^ ABM ELECTRICAL POWER SERVICES 1000 Rinehart Road, 14201 FRANKLIN AVE. , �T, SHEET 1 CHECK AN WtLKiNS Sanford, FL 32771 ®�.� T_ OF 1(�` TUSTIN, CA 92780 �� ,<<►D� "��'�� __ __ _ _ _ J���t•1 „S' ..... •, �' ,� SHEEP# 5 t1 Standard Funr Tonal llntprf re� Connector Type Cable Length -1.8 m (6') Cable Management Cable Length - 2.4 m (8') Cable Management Overhead Cable Management System Card Reader Ground Fault Detection Open Safety Ground Detection Piu-Out Detection Power Management Accuracy Power Report/Store Interval Local Area Network Wide Area Network NO. REV 51ONS 1 INITIAL RELEASE 2 REVISION 1 -- 1 -- 7.7 KW (240 V AC @ 32 A) SAE J1772 TM 5.4 m (18') 7.0 m (23') Yes ISO 15693 and ISO 14443 20 mA CCID with auto retry Continuously monitors presence of safety (green wire) ground connection Power terminated per SAE J1772 TM specifications +/- 2% from 2% to full scale (32A) 15 minute, aligned to hour 2.4/5 GHz WI-Fi (802.11 a/b/g/n) 3G GSM, 3G CDMA provided by the ChargePoiint Gateway CPGWx DATE REV I APP' - p D 1112/18 REV'D APP D B M TM DESIGNEE) THOMAS BERTON 12/20/18 REV'D APP'D ENGY FAWZY Building Value - - - DPAWN ABM ELECTRICAL POWER SERVICES - - -- 14201 FRANKLIN AVE. - - CHECK °1 vaN wli_I<IN TUSTIN, CA 92780 AUTONATION HONDA OF SANFORD i„-CENV`C r .0 DATE I� NTS Model Singic Wfll Mount, 5.4 nT (18') Cord CPF25-L18 NTS 1000 Rinehart Road, =°'C',"If".1'" OF Single Pedestal Mount, S.4 m (181) Cord CPF2S-L18-PD ��i�4Q�tiD� ,. �•�` \ 3 Two Stations with Duel Pedestal Mount. CPF25-1-18-PD-Dina! rNSHEET ®NAL tib,\ SHEE S _ . 5.4 m (18') Cord Single Wall Mount, 5.4 m (18') Cord CPF25-L18-CMK6 Bund yi 4 J' A ne 40 A bran& i 40 A dual pot-, P Two In+ Pe3omt 4th A dual po e '� and Cord Management Kit Circuit [n GFC1 ty J 3� x 2 0 A brat ri {f7t b�GFCt x 2 1YPe. Single Pedestal Mount, 5.4 rn (18') Cord CPF25-L18-CMK6-PD {ir'�1:i1;5 and Cord Management kit Standard Dower Share tl`� n1a I n/-3 ��,� �� '����� �C}fiU�lei ��� Two Stations with Dual Pedestal Mount, 5.4 m (18') Cord and Cord Management CPF25-L18-CMK6-PD-Dual ciuit (nOr;�FCi C`fJ¢l� Kit Single Wall Mount, 7.0 m (23') Cord CPF25-1-23 P>a r Sal yt t6 A 16 A Ci1 A Dram l° 2 A 3 l pale y T'N4 inoeperl t 20 A dual pole ; � 20 A'bmach Single Pedestal Mount, 7.0 m (23') Cord CPF25-L23-PD circuit In GF0 type) (ncn FC1 type) x 2 tirxuits Two Stations with Dual Pedestal Mount, CPF25-L23-PD-Dual 7.0 m (23') Cord Sew kirie4 eFtj 00 notprovule exterml G40 as it cor.fii:t vaitf Mt it -nail 6FCl (CCI Single Wall Mount. 7.0 m (23') Cord WitiN - surdatb s Vlfite- _i. L2 oi< s Lirth (Mr jwuiraf) en 54* (U. L1, L2, Li, Eaft) and Cord Management Kit CPF25-L23-CMKB Single Pedestal Mount. 7.0 m (23') Cord CPF25-L23-CMKB-PD i %til - P00AW S!lar 9/3 it (Lt. ' FSI tl '? and Cord Management Kit stat 011 P€JWW 25W typiCill (Starldb7}). rl A nl aximum (01130raticxl) 5W ty0ceall1wain iy),8 `A, rna+t inurr-, (opofatlm) Two Stations with Dual Pedestal Mount, 7.0 m (23') Cord and Cord Management Kit CPF25-1-23-CMK8-PD-Dual Standard Funr Tonal llntprf re� Connector Type Cable Length -1.8 m (6') Cable Management Cable Length - 2.4 m (8') Cable Management Overhead Cable Management System Card Reader Ground Fault Detection Open Safety Ground Detection Piu-Out Detection Power Management Accuracy Power Report/Store Interval Local Area Network Wide Area Network NO. REV 51ONS 1 INITIAL RELEASE 2 REVISION 1 -- 1 -- 7.7 KW (240 V AC @ 32 A) SAE J1772 TM 5.4 m (18') 7.0 m (23') Yes ISO 15693 and ISO 14443 20 mA CCID with auto retry Continuously monitors presence of safety (green wire) ground connection Power terminated per SAE J1772 TM specifications +/- 2% from 2% to full scale (32A) 15 minute, aligned to hour 2.4/5 GHz WI-Fi (802.11 a/b/g/n) 3G GSM, 3G CDMA provided by the ChargePoiint Gateway CPGWx DATE REV I APP' - p D 1112/18 REV'D APP D B M TM DESIGNEE) THOMAS BERTON 12/20/18 REV'D APP'D ENGY FAWZY Building Value - - - DPAWN ABM ELECTRICAL POWER SERVICES - - -- 14201 FRANKLIN AVE. - - CHECK °1 vaN wli_I<IN TUSTIN, CA 92780 AUTONATION HONDA OF SANFORD i„-CENV`C r .0 DATE 12/20/18 NTS I' l SeALE �# NTS 1000 Rinehart Road, =°'C',"If".1'" OF Sanford, FL 32771 ��i�4Q�tiD� ,. �•�` \ 3 rNSHEET ®NAL tib,\ SHEE S Enclosure Ratings Type 3R per UL 50E Safety and Compliance UL and C -UL listed product per UL2594, UL2231-1, UL2231-2, NEC Article 625 compliant UL and C -UL listed per LIL916 Energy Management Equipment Surge Protection 6 kV 3000 A. In geographic areas subject to frequent thunder storms, supplemental surge i;a) protection at the service panel is recommended. EMC Compliance FCC Part 15 Class B Storage Temperature 1-40'C to +60°C (-401F to 1401F) Operating Temperature -30°C to +501C (-22°F to 122°F) operating Humidity Up to 85% Cq� +50°C (122°F) non -condensing Non -Operating Humidity up to 95% a, +501C (122°F) non -condensing Maximum Charging Stations per 802.11 Radio Group 9 maximum, Each station must be located within 46 m (159) "line of sight" of a CPGWx gateway. WiFi LED Fault Indicator per UL Status LED Yes Yes Yes 0 f4 + I With Single WallMount "'9 1= %� c'A M^""f CPF25-L18 08- Cord Management Kit CPF25-1-23 7,0 rn {2,? 180 4___ ITIM CPF25-L}8-CMK6-PD '5.4,ni 081­ CPF2S-L23-CMK8-PD 233 mm (9,2") REVISIONS INITIAL RELEASE REVISION 1 ■ ■ ■ DATE REV' I APP' D D 11/12/18 REV'D APP DESIGNE^ THOMAS 12/20/18 REV'D APP'D ENGY FAWZY DRAWN Single Wall Mount with Cord Management Kit CPF2S-L18-CMK6 CIPF25-1,23-CM1<8 T - I woStatiom with Dual Pedestal Mount CPF25-08-PD-DUAL 5,im CPP25_L23-PD-DUAL 7.0'51'f`3'? 308 Mm Single Pedestal Mount CPF25-L18-PD 5.4 M (18') CPF25-L23-PD 7.0 m (237 TM Building Value ABM ELECTRICAL POWER SERVICES 14201 FRANKLIN AV E TUSTIN, CA 92780 1277 mm (50.3") —w- 225 mm 280 mm (iv) 2426 mm (95.511) AUTONATION HONDA OF SANFORD Z71 1000 Rinehart Road Sanford, FL 32771 two Stations with Dual Pedestai Mount and Cord Management Kit CPF25-1.18-CMK6-PD-DUAL s4froEn 1rPr25-L23X;MK8-PD-DUAL 440 MM (173") 7 II ! Y It ll i 11 Ij 10 ' E NS� ool DATE 267 !:!SALE Ct ZJOB# C S'rt-..T_P OF•SHEEP • 1.910N AL SHEEF# 302 mm 12/20/18 NTS NTS 4 5 ELECTRICAL- BASIC REQUIREMENTS 1. Provide all labor, materials, necessary equipment and services to complete all required Electrical Work includingall additional items required for a complete and proper installation as indicated on the Drawings or as required. Work includes but isnot limited to the following. A. Service entrance system. B. All wiring and components to the charging systems 2. Installation shall be in accordancewith the latest edition ofthe National Electrical Code and all applicable regulations ofgoverning Local, State, County and Federal Codes including Utility Companies special requirements. 3. In the event ofa conflict between equipment as drawn and these Specifications, the more stringent requirements will be applicable. 4. Coordinate delivery and installation of equipment required under this Section with the construction schedule. 5. Coordinate work with other trades and drawings 6. All materials shall be new, free of defects and shall be U.L. listed, bearing U.L. label or be labeled or listed with an approved, nationally recognized Electrical Testing Agency. 7. Makefinal connections between all equipment furnished under this Contract. 8. The Contractor shall check all dimensions and verify a II conditions pertainingto these Drawings at the building and site and shall report any discrepancies or conditions that are detrimental to proper completion ofwork to the Engineer at once. 9. Carefully examine all Project Drawings included for this Contract and those included under other contracts and report any discrepancies to Engineer and Architect. 10. Due to small scale of Drawings, it is not possible to indicate all offsets, fittings, access panels and similar parts which may be required. Drawings are generally indicative of work to be installed. Careful ly examine structural and finish conditions affecting work and arrange all work accordingly, furnishing necessary parts and equipment as maybe required to meet actual field conditions. 11. Lay out work from dimensions of Architectu ral and Structural Drawings and actual dimensions of equipment being installed. Layouts in congested areas shall not be scaled from Mechanical and Electrical Drawings. Do not make final layouts until Shop or Equipment Drawings are approved and job conditions verified. 12. The right is reserved to make a ny reasonable change in locations of equipment and similar items within the building and at building exterior priorto installation without involving additional compensation. 13. All concrete saw cutting, removal and patching to be included. 14. All work shown on Drawings shall be supplemented by all Laws, Ordinances a nd Codes gove mi ng the work of these Divisions, which Laws, Ordina nces or Codes shall take precedence in the event of any conflict between same, except where methods or materials shown are superior to the legal requirements. 15. Obtain all required certificates from Governing Agency and turnover to the Owner at completion of Work Obtain exact charges for fees, permits and other costs required and include such amounts in Bid Price. 16. Contractor shall provide a warranty substantiating that all materials are as herein specified, and that he shall repair or replace any defective materials or workmanship in an acceptable manner, without cost to the Owner. Warranty period shall befor one (1) year unless specified longer for speciflc equipment. Date of warra my start shall be from substantial completion and benefi cia I use. 17. Contractor will obtain a building permit for his portion of the work. 18. Contractor to provide pitch pans and penetrations required for electrical items which pierce roof whether or not shown on Drawings. 19. Contractorto Furnish and install reinforced concrete pads for equipment as required. 20. In general, all similar equipment is to be supplied and manufactured by same Manufacturer, but must be submitted and approved equal to that specified. 21. Locate all openings required for work performed underthis section. Provide sleeves, guards or other approved methods to allow passage of items installed under this section. 22. Provide switched supply with -in 36" ofequipment supplied and installed by other contractors. Motor starters and controls will be provided by others (except where noted) to be installed by the Electrical Contractor. 23. Wherever the Contractor provides power consuming equipment which differsfrom Contract Documents, the wiring and associated circuit components for such equipment shall be changed to proper sizes to match at additional expenseto Owner. 24. it is the Contractors responsibility to coordinate the exact required location offlooroutlets, floorducts, floor stub -ups, etc., with Owner and Architect and receive approval prior to rough in. Locations shown on plans are only approximate locations. ELECTRICAL - GENERAL REQUIREMENTS 1. Wire sizes are #12 THWN unless noted otherwise on Drawings or Schedules or if larger size is required for equipment furnished 2. Code sized green grounding conductor is to be provided for all branch circuits. 3. Provide cable strain relieffor feeders in risers, Install access panels where required, 4. Coordinate power locations with owner. S. Coordinate with other subs if required for complete, proper operation and installation of all equipment. 6. Multi -section branch circuit panelboards areshown as individual panels on panel schedules. Circuit numbering indicated on drawings reflect consecutive numbering for single panel. ELECTRICAL - GENERAL CONSTRUCTION NOTES 1. Electrical Contractors hall coordinate his work with other trades in orderto avoid conflicts. 2. The minimum conduitsize shall be 1/2". 3. Voltage drop minimum wire sizing (20A circuit) use - 1. 120V circuit over 100' use#10 minimum 2. 208V circuit over 200' use#10 minimum 3. 277V circuit over200' use#10 minimum Minimum branch circuit wire size shall be #12. 4. All openings in fire rated walls, floor and partitions for conduits shall be sealed with fire resistant foam or UL approved "Fire Stop" system to maintain the fire rating. S. All wiringwill be in "MC" cable as by code. Underground conduit will be Sched 40 PVC with fittings, conduit above grade installed isto be EMT. 6. Electrical Contractor shall have the option of grouping homeruns in one conduit, per the requirements of Section 310 of the National Electrical Code. ELECTRICAL - GENERAL REQUIREMENTS 8. Utility company fees by others. 9. All circuits indicated on these drawings are 20A, 1P circuit breakers in panels unless otherwise noted. 10. No conduit shall be installed exposed in area open to the public. 11. Outlet boxes for receptacles shall be mounted 18" above finish slab, unless noted otherwise. 12. All dimensions indicated areto centerline of junction boxes, floor boxes, etc., unless otherwise noted. Refer to Interior Drawings for all dimensions. 13. The work "provide" shall mean "to furnish and install". 16. A.F.F. = Above Finished Floor U.N.O. = Unless Noted Otherwise B.E.C. = Building Electrical Contractor F. C. = Fixture Contractor NO. REVISIONS DATE REV' APP' �\ R.... D D \� \'" r/�/ s/// DATE 12/20/18 AUTONATION HONDA OF SANFORD ��' \-\CENSE C> 1 INITIAL RELEASE 11/12/18 REV'D APP'D C.� THOMAS BERTON= '` c.782 7 , �,, f SCALE NTS 2 REVISION 1 / / DESIGNEE ABMTNI, 12 20 18 REV'D APP'D ENGY FAWZY Building Value /(/ °B# NTS nw, I '� -- - - -- DRAWN ABM ELECTRICAL POWER SERVICES 14201 FRANKLIN AVE. �"' 1000 Rinehart Road, STATE GE .• �/ `SHEET S CHECKED- -VAN WILKINS TUSTIN, CA 92780 Sanford, FL 32771 ���•, �C�R\DP`, .,''�� . . tS C!' SHEET# 5 in 'f IIIIII%"_