Loading...
HomeMy WebLinkAbout200 N Towne Rd 17-3179; PLUMBINGGENERAL PROX�CT INFORMATION JURISDICTION: CITY OF ORLANDO, FLORIDA BUILDING CODE: 2014 FLORIDA BUILDING CODE, FIFTH EDITION LIFE SAFETY: 2014 FLORIDA BUILDING CODE (FBC) 2014 FLORIDA FIRE PERVENTION CODE ACCESSIBILITY: 2014 FLORIDA ACCESSIBILITY CODE (FAC) FLORIDA BUILDING CODE 2014 EXISTING BUILDING, BUILT IN 1999, OCCUPANCY: EXISTING BUILDING OCCUPANCY IS UNAFFECTED BY THIS WORK. THE CHANGES HEREIN DO NOT INCREASE BUILDING SQUARE FOOTAGE, NOR DOES IT CHANGE EXISTING OCCUPANCY SPATIAL CLASSIFICATION(S). CONSTRUCTION TYPE: THE EXISTING BUILDING CONSTRUCTION TYPE IS NON COMBUSTIBLE. EXISTING BUILDING APPEARS TO BE CONCRETE BLOCK STRUCTURE. PROPOSED CONSTRUCTION CONSISTS OF NON-STRUCTURAL ALTERATION AND MAINTENANCE TYPE UPGRADES. THERE IS NO ROOFING WORK ASSOCIATED WITH THIS PROJECT. LIFE SAFETY: EXISTING BUILDING LIFE SAFETY COMPONENTS AND MEANS OF EGRESS IS UNAFFECTED BY THIS WORK. SEE BELOW FOR GENERAL SCOPE OF WORK PROJECT TEAM PLUMBING ENGINEER N I M ENGINEERING, INC DALRIO LEWIS, P.E. 925 S SEMORAN BLVD, SUITE 100 WINTER PARK, FL 32792 1407-678-2055 .;'Ao oFriCE PERMR #_ — 3/ Ji 1,-2-17 SpringHill Suites Sanford Domestic Water Pipe Replacement and Upgrades 201 N. Towne Road, Sanford, FL 32771 GENERAL SCOPE OF WORK 1. THESE DRAWINGS ARE ISSUED FOR DESIGN -BUILD SCOPE OUTLINE FOR THE PROPOSED PLUMBING WORK. 2. THE INTENT OF THIS JOB IS TO REPLACE ALL EXISTING DOMESTIC WATER SYSTEMS (COLD WATER, HOT WATER, AND HOT WATER RETURN) WITH NEW PEX-A SYSTEM. REPLACEMENT TO INCLUDE ALL EXISTING CPVC PIPE, PIPE HANGERS, AND ACCESSORIES. 3. CONTRACTOR IS TO REMOVE AND REPLACE EXISTING HOT WATER RETICULATION PUMP AS SCHEDULED. 4. CONTRACTOR IS TO REMOVE AND REPLACE EXISTING BOOSTER PUMP SYSTEM AS SCHEDULED. 5. PLUMBING CONTRACTOR IS RESPONSIBLE FOR DELIVERING FINAL FUNCTIONING SYSTEM. THIS SYSTEM SHALL BE CONSTRUCTED PER MANUFACTURER'S REQUIREMENTS AND RECOMMENDATIONS, ANY AND ALL FIELD CONSTRAINTS, AND ALL APPLICABLE CODE REQUIREMENTS. THIS WILL INCLUDE FINAL ROUTING, SIZING, ETC. MECHANICAL CONTRACTOR SHALL COORDINATE WITH FIELD CONDITIONS AND EQUIPMENT MANUFACTURERS TO ENSURE CONTRACTIBILITY AND FINAL PERFORMANCE OF SYSTEM. PROJECT 1 I-% /1 A T I r'1 A I PROJECT LOCATION 1 t M engineering consultants 925 S. Samoran Blvd I Suite 100 1 Winter Park, FL 32792 T: 407.678.2055 vnvw.rlmassadates.axn Client: Consultants: EOR Stamp: Engineer of Record ``1tJ11 111/11 p,RTNE4 '�'�,� Q 0 7 5 1 cn _ `rq TATE OF ORID ,3/ON AL �, `���`� X11111101 10/24/2017 Datrio Lewis, PE 77571 (FL) Project: Orlando Sanford Spring Hill Suites - Pipe Replacement and Modification Location: H 201 N Towne Road, Sanford FL 32771 a INDEX OF DRAWINGS Issuance: Permit Set W V T001 TITLE SHEET un Lim0 P001 GENERAL PLUMBING INFORMATION PD101 PLUMBING FIRST FLOOR DEMO PLAN P101 PLUMBING FIRST FLOOR NEW PLAN P102 PLUMBING SECOND THRU FIFTH FLOORS NEW PLAN P301 PLUMBING ENLARGED MECHANICAL ROOM PLANS P302 PLUMBING ENLARGED TYPICAL ROOM PLANS P401 PLUMBING DETAILS AND RISERS P402 PLUMBING SCHEDULES P403 PLUMBING DETAILS, PEX-A Sa�F�R gr1A1 i. SF GO WORK S UpGSPF1S.NUF�FN�rMErNOAl1��`ROYOsI1T5RYS tST1ANEODA VCC I,SOPOCR� OWOF�1GSIS1IAOI'OttP H.NNF� SGR�OCF AUOF MARATPRLEOZSEREFRR ERS(�1rPC1.1�RHSPP rH�.tLlR"r,A , Np,LsUHWconpF GO0u IU�Jo�Ns O OORP(� CSIONR RSQ+T BoraR S tT. PFRMIT # (21- 3r7 Revisions: Date: October 11, 2017 Project Number: 17.AHR.001 Drawn By: I Checked By: SE I MJ TITLE SHEET Sheet No.: T001 1 I i engineering consultants 925 S. Semoran Blvd I Suite 1001 Winter Park, FL 32782 T: 407.878.2055 : www:rtmassoclates.wrn Client: Consultants: EOR Stamp:' Engineer of Record `, PRT NF<,'����i s Q' .• \GENS �G��i -meq :, 7 71= cnS rS-rATE-OF-; e 4f /ON Ak- .%N 1111r1111110'� 10/24/2017 Daldo Lewis, PE 77571 (FL) Project: Orlando Sanford Spring Hill Suites - Pipe Replacement and Modification Location: 201 N Towne Road, Sanford, FL 32771 Issuance: Permit Set Revisions: # Date Description Date: October 11, 2017 Project Number: i 17.AHR.001 i Drawn By: Checked By: SE MJ Plumbing General i Information Sheet No.: Pool COPE OF WORK PLUMBING ABBREVIATIONS Number Sheet Name SYMBOLS P001 DEMO NOTES o PLUMBING X GENERAL NU [E - PLUMbINU PLUMBING OVERALL FLOOR PLAN X 1.THESE DRAWINGS ARE ISSUED FOR DESIGN -BUILD SCOPE THESE DRAWINGS NE ARCHITECT/ENGINEER SYMBOL ----- 1. ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORK MAN 1. CONTRACTOR SHALL BE RLSPONSIBLETO PERFORM ALL WORK_ P302 PLUMBING TYPICAL ROOM PLANS X P401 THE PROPOSED PLUMBING WORK. OUTLIADA ACW AUTOMATIC CLOTHES WASHER _ - - -� COLD WATER P403 LIKE MANNER. X IN STRICT ACCORDANCE WITH THE `2014 FLORIDA BUILDING CODE AMERICANS WITH DISABILITIES ACT AND ALL APPLICABLE LOCAL CODES AND ORDINANCES. S OB IS TO REPLACE ALL EXISTING. DOMESTIC 2. THE INTENT OF THIS J E ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS - -�"i HOT WATER SUPPLY 2. T SHUTDOWNS SHALL BE ALL UTILITY AND/UR PLUMBING SYSTEM TER SYSTEMS(COLD WATER HOT WATER AND HOT WATER AST AUTOMATIC SPRAY TAN UNIT-�--�" COORDINATED WITH OWNER AND ENGINEER. NO SHUTDOWNS 2. CONTRACTOR SHALL VERIFY AND CORRECT AS REQUIRED TO RETURN) WITH NEW PEX-A SYSTEM. REPLACEMENT TO INCLUDE RE ASTM AMERICAN S OCIETY FOR TESTING &MATERIALS - - - 2 HOT WATER RETURN CAN OCCUR WITHOUT PRIOR PERMISSION FROM THE OWNER.. MEET ALL CODES AND REGULATIONS ANY POSSIBLE � ., I ALL EXISTING CPVC PIPE, P IPE HANGERS AND ACCESSORIES BHP BRAKE HORSEPOWER c-- � DISCREPANCIES BETWEEN TYPE AND SIZE OF CONNECTION ' BTU BRITISH THERMAL UNIT 3. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND SPECIFIED IN THE PLUMBING FIXTURE SCHEDULE AND FIXTURES 3. CONTRACTOR IS TO REMOVE AND REPLACE EXISTING HOT BWV BACKWATER VALVE PW ' PURIFIED WATER FIELD CONDITIONS PRIOR TO PROCEEDING WITH ANY WORK. ' ACTUALLY INSTALLED ON THE SITE. WATER RETICULATION PUMP AS SCHEDULED. C/1 CONTRACTOR INSTALLEDDISCREPANCIES EER ANY S ALLBEREPORTED f0 THE ENGINEER CD CONDENSATE SS WASTE OR SANITARY FOR RESOLUTION. 3. CONTRACTOR SHALL EXAMINE ALL DRAWINGS AND VISIT THE 4. - CONTRACTOR IS TO REMOVE AND REPLACE EXISTING BOOSTER CONN CONNECTION SITE 7.0 DETERMINE THE FULL EXTENT OF THE WORK AND PUMP SYSTEM AS SCHEDULED. CONT CONTINUOUS �""•"'m°°'�""" SSS ___ - WASTE OR SANITARY BELOW GRADE 4. THE EXISTING CONDITIONS ARE BASED ON "AS -BUILT DRAWINGS FACILITY LOCATIONS. CONTRACTOR SHALL VERIFY THE CV CHECK VALVE AND/OR LIMITED FIELD VERIFICATIONS. THE CONTRACTOR SHALL REQUIREMENTS OF LOCAL GOVERNING BODIES. THE DELIVERING FINAL 5. PLUMBING CONTRACTOR IS RESPONSIBLE FOR L CW COLD WATER- -- - - -V- - - --- --- -� VENT ADJUST TO ACTUAL FIELD CONDITIONS AT NO ADDITIONAL SUBMISSION OF ARID SHALL BE CONSTRUCTED AS CONCLUSIVE FUNCTIONING SYSTEM. THIS SYSTEM SHALL BE CONSTRUCTED DFU DRAINAGE FIXTURE UNIT EXPENSE TO THE PROJECT. NO ADDITIONAL COMPENSATION EVIDENCE THAT THE BIDDER HAS COMPLIED WITH THE ABOVE. PER MANUFACTURER'S REQUIREMENTS AND DIA DIAMETER �� -- ST-- - i STORM PIPE WILL BE PROVIDED FOR ANY EXTRAS DUETO THE RECOMMENDATIONS, ANY AND ALL FIELD CONSTRAINTS, AND ALL DN DOWN CONTRACTOR'S FAILURE TO VISIT TO PROJECT SITE AND/OR 4. CONTRACTOR TO VERIFY FINAL TYPE, MODEL, AND QUANTITY OF APPLICABLE CODE REQUIREMENTS. THIS WILL INCLUDE FINAL DSB DOWN SPOUT BOOT ST - --? STORK PIPE. BELOW GRADE PREDETERMINATION OF EXISTING CONDITIONS PRIOR TO ALL PLUMBING EQUIPMENT PRIOR TO BID. ROUTING, SIZING, ETC. MECHANICAL CONTRACTOR SHALL DWG DRAWING SUBMITTING THE BID. ANY DISCREPANCIES SHALL BE COORDINATE WITH FIELD CONDITIONS AND EQUIPMENT ECO EXTERIOR CLEAN OUT ��--- STO STORM OVERFLOW/ PIPE IMMEDIATELY REPORTED TO THE ENGINEER FOR RESOLUTION. 5. WORK SCHEDULE WILL BE COORDINATED WITH OWNER AND MANUFACTURERS TO ENSURE CONTRACTIBILITY AND FINAL F DEGREES FAHRENHEIT FACILITY REPRESENTATIVES PRIOR TO COMMENCEMENT. PERFORMANCE OF SYSTEM. FBC FLORIDA BUILDING CODE �' - -' - CD-- - - - 2 CONDENSATE DRAIN 5. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING FCO FLOOR CLEAN OUT THEIR PORTION OF THE WORK WITH OTHER PORTIONS OF WORK 6. ALL PERMITS, LICENSES, APPROVALS AND OTHER FD FLOOR DRAIN - - BALANCING VALVE BY OTHER TRADES. ARRANGEMENTS FOR WORK SHALL BE OBTAINED BY THE GAL GALLONS CONTRACTOR AT HIS OWN EXPENSE. GPM GALLONS PER MINUTE CHECK VALVE 6. CONTRACTOR SHALL BE RESPONSIBLE FOR MEANS, METHODS, HB HOSE BIBB TECHNIQUES, AND SAFETY TO THE PUBLIC AND TO PROPERTY 7. CONTRACTOR SHALL PROVIDE AND INSTALL ALL PLUMBING HR HOUR -+ HB WHY HOSE BIBB/WWALL HYDRANT BOTH PRIVATE AND PUBLIC. FIXTURES AND EQUIPMENT AS NOTED. REFER TO SPECIFICATION HW HOT WATER FOR APPROVED FIXTURES. CONTRACTOR SHALL RECEIVE, IR INDIRECT RECEPTORPRESSURE 2---- - --�- - -----� REDUCING VALVE 7. CONTRACTOR SHALL BE RESPONSIBLE FOR'THE COMPLETE STORE, AND INSTALL OWNER FURNISHED FIXTURES. MAX MAXIMUM REMOVAL OF ALL EXISTING PLUMBING PIPING AND DEVICES NOT MIN MINIMUM - - - ISOLATION VALVE REQUIRED FOR THE WORK AND NOT SHOWN AS EXISTING "TO 8. FURNISH AND INSTALL A COMPLETE AND OPERABLE SYSTEM OF MX MIXING VALVE REMAIN AS INDICATED ON PLUMBING DRAWINGS. DRAWINGS ARE DOMESTIC HOT AND COLD WATER TO EACH AND EVERY NFPA NATIONAL FIRE PROTECTION ASSOCIATION-.--- - ---�-- ------,� DIRECTION OF FLOW NOT SCHEMATIC IN NATURE AND INDICATE MAJOR ITEMS OF PLUMBING FIXTURE, APPLICANCE AND OUTLET WITH THE FINAL NTS NOT TO SCALE EXISTING EQUIPMENT AND SYSTEMS. THE CONTRACTOR SHALL CONNECTIONS THERETO. CONNECTIONS TO WATER SERVICES, O/F OWNER FURNISHED REDUCER OR INCREASER VISIT THE SITE TO DETERMINE THE EXTENT OF EXISTING PIPE FITTINGS, VALVES, WATER HAMMER SHOCK ARRESTORS, PD PUMP DISCHARGE EQUIPMENT, PIPING AND DEVICES TO BE REMOVED. ALL INSULATION, DI -ELECTRIC UNIONS, HANGERS, AND SUPPORT PDI PLUMBING DRAINAGE INSTITUTE -- - TOP CONNECTION, 45 OR 90 DEGREES SHUTDOWNS AND DEMOLITION SHALL BE PHASED AND MEMBERS SHALL BE PROVIDED. POC POINT OF CONNECTION COORDINATED WITH NEW WORK. DEMOLITION CONTRACTOR POD POINT OF DEMOLITION SHALL BE RESPONSIBLE FOR COORDINATING SHUTDOWNS AND 9. VALVES AND FITTINGS SHALL BE OF THE SAME SIZE OF LINE ON PSIG POUNDS PER SQUARE INCH, BOTTOM CONNECTION, 45 OR 90 DEGREES REMOVAL OF ITEMS WITH THE OWNER'S REPRESENTATIVE AND WHICH THEY ARE LOCATED. RM ROOM THE OWNERS PHASING REQUIREMENTS. RCP RE -CIRCULATING PUMP Z-- - ---�- - - -� SIDE CONNECTION 10. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER SPC STANDARD PLUMBING CODE I -I 8. ALL WORK SHALL CONFORM TO FLORIDA BUILDING CODE FIFTH TRADES. T & P TEMPERATURE &PRESSURE - ---'-� CAPPED OUTLET EDITION. TPV TRAP PRIMER VALVE 11. CONTRACTOR SHALL INSTALL CIRCUIT SOLVER FOR ALL HOT TYP TYPICAL - - - DROP IN PIPING 9. THE INTENT OF THE DEMOLITION IS TO REMOVE THE ITEMS IN WATER RETURN LINES PER MANUFACTURER SUGGESTED U/G UNDERGROUND THEIR ENTIRETY TO INCLUDE ALL ASSOCIATED SUPPORT BASES, INSTALLATION. W/ WITH - -� RISE IN PIPING ANCHORAGE, HANGERS, CONTROLS, PIPING, ETC. AND WCO WALL CLEAN OUT RECONNECT EXISTING SYSTEM TO REMAIN AT MAINS OR OTHER 12. INSTALL WATER HAMMER SHOCK ARRESTORS AT EACH FIXTURE WFU WATER FIXTURE UNITS - -� UNION ACTIVE BRANCH LINES. MINIMIZE DEAD-END LENGTHS. OR BATTERY OF FIXTURES WHERE REQUIRED. ARRESTORS SHALL BE FACTORY FABRICATED. INSTALL ARRESTORS AND SIZE 10. EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE PER PLUMBING AND DRAINAGE INSTITUTE STANDARD P.D.I. - -� SOLENOID VALVE REUSED IN NEW SYSTEMS. WH -201. - -2 WATER FLOW MEASURING DEVICE 11. ITEMS REMOVED SHALL BE LEGALLY DISPOSED OF OFF SITE. 13. AIR CHAMBERS SHALL NOT BE CONSIDERED AN EQUAL TO COORDINATED WITH OWNER, AND DIVISION 1 REQUIREMENTS, WATER ARRESTORS AS SPECIFIED. �- - PRESSURE GAUGE LIMITS, ETC. ON ON-SITE DUMPSTER. USE OF OWNER'S TRASH DUMPSTER(S) FOR DISPOSAL OF DEMOLISHED MATERIALS WILL 14. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING FIRE NOT BE PERMITTED. RATING AND WEATHERPROOFING INTEGRITY OF ALL PIPE VALVE IN RISER PENETRATIONS. 15. ALL WATER SUPPLY LINES SHALL BE RUN AS CLOSE TO PLANS / EXISTING LOCATIONS AS POSSIBLE. 16. ROUTE ALL PIPING CONCEALED ABOVE CEILINGS, WITHIN WALLS, OR IN CHASES AS POSSIBLE. PIPING EXPOSED SHALL BE SLOPED AND PAINTED TO MATCH ARCHITECTURAL FINISHES. PIPING IN MECHANICAL ROOMS MAY BE EXPOSED. 17. MOUNT ALL NEW PLUMBING EQUIPMENT TO MATCH EXISTING CONDITIONS AS REQUIRED. 18. CONTRACTOR SHALL INSTALL DI -ELECTRIC UNIONS AT CONNECTIONS OF DISSIMILAR METALS. 19. CONTRACTOR SHALL ROUGH -IN ALL SUPPLIES TO SPECIAL EQUIPMENT ACCORDING TO MANUFACTURER'S SHOP DRAWINGS AND MAKE FINAL CONNECTIONS. ALL SUPPLIES SHALL BE VALVED. INSTALL VACUUM BREAKERS WHERE REQUIRED BY CODE. 20. HOT AND COLD WATER SUPPLY PIPES AND DRAIN PIPES UNDER HANDICAPPED LAVATORIES SHALL BE INSULATED PER AMERICANS WITH DISABILITIES ACT, WITH FACTOR PREFABRICATED MICROBIAL PVC RESIN SEAMLESS INSULATION. BASIS OF DESIGN: ZURN INDUSTRIES INC. 21. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY SUPPORTING DEVICES FOR ALL FIXTURES INCLUDED IN CONTRACTOR OR HEREIN SPECIFIED OTHERWISE. 22. ALL PIPING SHALL BE SUSPENDED FROM STRUCTURAL MEMBERS OF THE BUILDING, OR AS APPROVED BY THE OWNERS REPRESENTATIVE. FOR PIPES 1 INCH IN DIAMETER OR LESS, UTILIZE EITHER SOLID OR SPLIT RING TYPE HANGERS. FOR LARGER PIPES, UTILIZE A STANDARD WEIGHT CLEVIS TYPE HANGER. ALL HANGERS SHALL BE A MAXIMUM OF 8'4" ON CENTER. 23. PROVIDE POLISHED CHROME PLATED ESCUTCHEONS WHERE PIPES PASS THROUGH WALLS AT FIXTURES. WHERE OTHER EXPOSED PIPES PASS THROUGH WALLS, FLOORS, CEILINGS, AND PARTITIONS, PROVIDE POLISHED DULL CHROME PLATED CAST BRASS SET SCREW FLANGES. 24. ALL CUTTING AND PATCHING FOR PLUMBING TRADES WORK SHALL BE BY THE PLUMBING CONTRACTOR OR BY OTHERS AS DIRECTED BY THE GENERAL CONTRACTOR. 25. PRIOR TO FINAL ACCEPTANCE BY OWNER, CONTRACTOR SHALL CLEAN ALL FIXTURES AND REMOVE ALL LABELS. 26. CONTRACTOR SHALL GUARANTEE ALL WORK, MATERIALS, EQUIPMENTS, ETC., FURNISHED BY HIM FOR A PERIOD OF ONE (1) YEAR AFTER FINAL ACCEPTANCE AND TRANSFER OF THE BUILDING. 27. CONTRACTOR TO PROVIDE BACK-FLOW PREVENTION DEVICE (CHECK VALVE) FOR DISHWASHERS, REFRIGERATORS, COFFEE -MAKERS, ICE -MAKERS, AND TRAP PRIMERS AS REQUIRED BY CODE. 28. THE CONTRACTOR SHALL KEEP THE SITE AND AREAS UNDER CONSTRUCTION IN AN ORDERLY CONDITION AT ALL TIMES AND FREE OF ANY ACCUMULATION OF RUBBISH, DEBRIS, AND WASTE. CARE SHOULD BE TAKEN WHEN WORKING AROUND FINISHED SURFACES AND INSTALLATIONS. ALL EFFORTS SHALL BE MADE TO ENSURE CONSTRUCTION ACTIVITIES DO NOT EXPOSE AIR CONDITIONING SYSTEMS OR OCCUPIED SPACES TO ANY CONSTRUCTION DUST, DEBRIS, AND/OR CHEMICAL ODORS. CONTRACTOR SHALL SEAL ALL PLENUMS, TRANSFER GRILLES, AND OPENINGS AROUND DUCTWORK AREAS TO ACHIEVE THIS. IF THE, CONTRACTOR FAILS TO CONTAIN CONSTRUCTION DUST, THE CONTRACTOR WILL BE RESPONSIBLE FOR ROUTINE CLEAN-UP OF FIXTURES. CONTRACTOR WOULD ALSO BE RESPONSIBLE FOR ROUTINE FILTER CHANGES DURING CONSTRUCTION. 1 I i engineering consultants 925 S. Semoran Blvd I Suite 1001 Winter Park, FL 32782 T: 407.878.2055 : www:rtmassoclates.wrn Client: Consultants: EOR Stamp:' Engineer of Record `, PRT NF<,'����i s Q' .• \GENS �G��i -meq :, 7 71= cnS rS-rATE-OF-; e 4f /ON Ak- .%N 1111r1111110'� 10/24/2017 Daldo Lewis, PE 77571 (FL) Project: Orlando Sanford Spring Hill Suites - Pipe Replacement and Modification Location: 201 N Towne Road, Sanford, FL 32771 Issuance: Permit Set Revisions: # Date Description Date: October 11, 2017 Project Number: i 17.AHR.001 i Drawn By: Checked By: SE MJ Plumbing General i Information Sheet No.: Pool SANFORD SPRINGHILL SUITES PIPE REPLACEMENT Number Sheet Name PERMIT P001 PLUMBING GENERAL INFORMATION X P002 PLUMBING OVERALL FLOOR PLAN X PD101 PLUMBING FIRST FLOOR DEMO PLAN X P201 PLUMBING FIRST FLOOR NEW PLAN X P301 PLUMBING ENLARGED MECHANICAL ROOM PLANS X P302 PLUMBING TYPICAL ROOM PLANS X P401 PLUMBING DETAILS AND RISERS X P402 PLUMBING SCHEDULES X P403 PLUMBING DETAILS - PEX-A X 1 I i engineering consultants 925 S. Semoran Blvd I Suite 1001 Winter Park, FL 32782 T: 407.878.2055 : www:rtmassoclates.wrn Client: Consultants: EOR Stamp:' Engineer of Record `, PRT NF<,'����i s Q' .• \GENS �G��i -meq :, 7 71= cnS rS-rATE-OF-; e 4f /ON Ak- .%N 1111r1111110'� 10/24/2017 Daldo Lewis, PE 77571 (FL) Project: Orlando Sanford Spring Hill Suites - Pipe Replacement and Modification Location: 201 N Towne Road, Sanford, FL 32771 Issuance: Permit Set Revisions: # Date Description Date: October 11, 2017 Project Number: i 17.AHR.001 i Drawn By: Checked By: SE MJ Plumbing General i Information Sheet No.: Pool i i GENERAL NOTES 1. REMOVAL OF PIPING IN IST FLOOR REQUIRES CEILING REMOVAL. i CONTRACTOR SHALL VERIFY ALL AREAS AND CEILING TYPES AND REPLACE WITH NEW OF SIMILAR TYPE. REMOVAL /DISCONNECTING OF ALL CEILING DEVICES AND TE - TEMPORARY SUSPENSION IS PART OF THIS l CONTRACT & G.G. SHALL COORDINATE BETWEEN TRADES. 2. CONTRACTOR TO FIELD VERIFY ALL EXISTING PIPING ROUTING AND SIZING PRIOR TO CONSTRUCTION. CONTRACTOR TO DOCUMENT _ EXISTING SIZES AND TO REMOVE ALL EXISTING CPVC PIPE, AND PIPING ACCESSORIES AND PREPARE FOR INSTALLATION OF NEW WATER MAINS, 3., CONTRACTOR SHALL PROTECT C ALL EXISTING EQUIPMENT TO REMAIN IN PLACE_ FROM DAMAGE. DEMO NOTES D1 REMOVE ALL EXISTING CPVC MAIN COLD WATER PIPING FROM ROOM. PREPARE EXISTING CW MAIN FOR INSTALLATION OF NEW COPPER MAIN CONNECTION. D2 I GAS PIPING TO REMAIN UNTOUCHED IN PLACE. PROTECT GAS PIPING AS REQUIRED DURING REMOVAL OF EXISTING CW/HW/HWR MAINS. i, D3 REMOVE EXISTING CW/HW/HWR PIPE, PIPE SUPPORT, AND PIPE ACCESSORIES. PREPARE AREA FOR INSTALLATION OF NEW WORK: MINIMIZE. D4 REMOVE PIPING DOWN TO EXISTING FIXTURE. PREPARE AREA FOR INSTALLATION OF NEW STUB OUT AND INSTALLATION OF PEX-A MAIN. REMOVE EXISTING CPVC INTO EXISTING WATER HEATER ROOM. PREPARE D5 FOR INSTALLATION OF NEW PEX-A PIPING APPROX 18" AWAY FROM WALL. REMOVE EXISTING CPVC CW LINE IN WATER HEATER ROOM, PREPARE FOR I r -D-6-1 INSTALLATION OF SAME SIZE COPPER LINE. REMOVE EXISTING PIPE DN WALL FACE. PREPARE FOR INSTALLATION OF D7 NEW CW/HW PIPE DN TO SK. REMOVE CONNECTION TO EXISTING RISER. PREPARE RISER FOR D8 INSTALLATION OF NEW ACCESS DOOR, AND CONNECTION TO NEW MAIN PRIOR TO REPLACEMENT. EXISTING FIRE SPRINKLER LINE TO REMAIN IN PLACE, PROTECT AS b9 REQUIRED. FD -1-0-1 REMOVE EXISTING CPVC ABANDONED LINE. PATCH AND SEAL OPENING TO MATCH EXISTING WALL. C1 JJ 3J �f �'��2 (130 14) 15 (16 I I I I I I I I I I I I I I I I i r—= Tom- � ___-___ _ x _._---_._:,�,,..�.,. =,Iy --� _ r_.__.._..._____,......._ I ""C �..........................._ _. ___ __ _. D8 1 --J D3 I I I I I I I I I I I I I I I I 1> I I I I I I I I I D3 I II I I 1 1 I I I i I � I �-4 ' I I I I( I — I i I D4 ! ..... I! 1 I D4 I D3 Imo'/I I I _ --� POC I—'I D8 —.I- vpi D4 ��"I I _ I_ - D$ I j.:., — _ t— I I I I I I I I D2 I I - _I- I y .- --j - ......... D4 FD -8]--- _ D1 D1®� _..._. ---- I I - D4 I I D3 D3 D4 I I I I D3 _- - 13 -�I I I I J I I D4 ' �. � - - �:� J J —.o — A. ---— — — — — — — �--- - — -- --- D ®.� # ®® ®® ._ D11 D®®®®-------®T®T ®®®®®® D3 ®®®® > — D3 —- I I -------- ---�-- -- D3 --^.,........ ...—.t..-- D3 ®®®-ate D3 ®®®.�®----- �JD2 I Ir ®® ®4-® b3-_i--_......,.........�......L.... I I----- D3 J-----------�------- D3 - I -- L__.--- � D3 ._1- - _� D3 " ' ""9�y � D3 SAS -I �® S G S GAS GAS I I GAS GAS GAS GAS GAS -- GAS GAS fi — A� — I - GAS G S GAS I I -- I I D2 ----I D2 D2 -_ - - D2 - - -1 D2 D2 - J—� I a I I __ pg , LII D4 I D3`� I� 1- Q4 b3 I I I I I I I I IHD3C4/i I D4 ' I-r��...D4 D$ I -_.- b I I --� I I I I D4 II I I D$ I 1 I I �I ( , �(—� D8 �� L.. ................ _ --� D4 I =-- I I I �-�-- - -- D3 D2 I I I D$ I Ds D$ D4 J I i I I_ 11I I %I- ��� I I I I _ _ -- - ' Ds I D4 D8 I >I =1--=1FED-4]-I- I I D8 I I I I I I I I _ I oI D$ -� I D8 I I D8 t� 1 I �w>� C C 1 �. D4 I I -' I � ..I _...._..___.... I- ------- ,� I D4 �I� D1a I I �I I I I { IH I D4 D4 I I I (� 1;--- I' I I I D4 D$ - I --I I �— D8 _-1/ I I - ..--...m_J W - I I D4 �_�_ r_ r_ ... I .LI , i I I I I I I I I I I I �ILD -- - -CF I I I I I I -I - - -I-I - - 1 -I -I_— 14 t I 1 D4 --- , oD3 7 I I I jfD8fl*:=:1J—ID4 I �J D$ 7 GAS I GAS -i - ------�� - - - - I -I I I D8 j ---- - r-- --- I I I I I I I I I I I I I I I I I I .. ........ FLI PLUMBING FIRST FLOOR DEMOLITION PLAN NORTH U 4` 8` 16` 24' 1/8' = V-0" irtm engineering consultants 025 S. Semoran Blvd 1 Suite 100 1 Winter Perk, rL 32702 T:407.67fl.2o55: www.rtmassorlales,cem Client: Consultants: EOR Stamp: Engineer. of Record ``�rrrr 1 rrrrr� . PRT NE< 410♦1 \O rM........�rr F` ♦i ��• .�•�,�G ENS -y o .No. 771 ' �cn b t - •�'� 9T -ATE F ♦ s 10/24/2017 �' Dalrio Lewis, PE 77571 (FL) Project: Orlando Sanford Spring Hill Suites Pipe Replacement and Modification Location: 201 N Towne Road, Sanford, FL 32771 Issuance: Permit Set Revisions: Date Date: October 11, 2017 Project Number: 17.AHR.001 Drawn By: Checked By: SE MJ Plumbing First. Floor Demo Plan Sheet No.: PD101 C4) 1 C I I =R1 H__ FIRE PUMP- l_i _ Ir Pnnm WAT �R_�FE A ER ROM Li—o 5- 1 6 R1 �--- GAS AS GAS . ..... 77 's 4 5 3U' 3U 3U Ioy 30 5- ��' 7 $ C �p d i MR8 R1 ELEV. MACH I 115 ROOM ( I IDINIG AREA ELEVA t I Fl -1-1 F1 1-61 Q_ 4MEETING ROOM "3 R3 CR:3:) VENDING ELEV.2 I I I I AREA F1171 E13 �5 (:R:7:) E12 CORRIDOR 1 -rR4 . I - - i ' I I , 3 3 1 J, trP F3 Y JL r T GAS GAS — GAS GAS GAS GAS — GAS GAS — GAS GAS GAS GAS GAS GAS GAS GA AS GAS GAS GAS R6I I A/C R4 >1 118 4 STOR L PBX R5 R7 125 9 MEN 11291 FRONT DESK LOBBY F1 -1-9 1 C�) 4 R3 = ( � WORK R3 I I( F102] ROOM Ii J, R2 ILE R3 Fl -23-] EMP. 1 STORE RR 122 -i -I- -� - - - --..i-__ - - � _ I ( FTT4 ELE0__ I. 4 r E:q OFFICE a = - - ! OFFICEROOM F1271 R1 I 134 R1 J BUSINESS e ......... .. -CENTER— — - — - — - Fl -2-0] RlA ENTRY VEST. =0 I x > > < x 'A. X > "x, > V X <\ < X x X it, F 13 7 -- — --------- PLUMBING FIRST FLOOR NEW PLAN NORTH 0 2' 4' x 0' tli 16' 3/16" = V-0" f :I GENERAL NOTES 1. REMOVAL OF PIPING IN IST FLOOR REQUIRES CEILING REMOVAL. REMOVAL / DISCONNECTING OF ALL CEILING DEVICES IS PART OF THIS CONTRACT & GENERAL CONTRACTOR. SHALL COORDINATE BETWEEN TRADES. 2. CONTRACTOR SHALL REPAIR EXISTING BUILDING ENVELOPE AS REQUIRED TO MATCH EXISTING BUILDING CONSTRUCTION AND FIRE RATING. KEY NOTES FT] CONNECT NEW COPPER MAIN TO EXISTING COLD WATER MAIN AT ENTRANCE TO BUILDING. F2 1 TRANSITION TO UPONOR PEX-A SYSTEM PRIOR TO EXIT OF MECHANICAL ROOM. USE EXISTING- PIPE PENETRATION. F3 INSTALL NEW ISOLATION VALVES FOR RISER IN ACCESS PANEL PRIOR TO COMPLETION OF FIRST FLOOR CONSTRUCTION. INSTALL ALL ISOLATION VALVES OUTSIDE OF CORRIDOR, INSTALL NON-METALLIC ACCESS PANELS AS REQUIRED IN EXISTING CEILING. FINAL RISER INSTALLATION PHASING TO BE SUBMITTED BY CONTRACTOR AND APPROVED BY OWNER PRIOR TO CONSTRUCTION. RECONNECT EXISTING FIXTURES TO NEW PEX-A SYSTEM FOR ALL FIXTURES IN ROOM / LOCATION INDICATED. FOLLOW MANUFACTURER RECOMMENDED INSTALLATION FOR FIXTURES. INSTALL NEW STOPS AND ANGLE SUPPORT BRACKET FOR ALL FIXTURES. E:E] RUN NEW PEX-A PIPE DN FROM CEILING CAVITY, CONNECT TO PEX-A ABOVE CEILING. INSULATE AND PAINT PIPE TO MATCH WALL. =6 TRANSITION TO PEX APPROX 18" PRIOR TO EXIT OF WATER HEATER ROOM. PROVIDE NEW BALL VALVE AT TRANSITION FROM COPPER TO PEX-A SYSTEM. EXISTING GAS PIPE TO REMAIN IN PLACE. r_87] INSTALL NEW UPONOR PEX-A SYSTEM MAINS IN PLACE OF EXISTING CPVC MAINS PRIOR TO START OF RISER WORK. INSTALL NEW BALL VALVES IN ALL LOCATIONS INDICATED, PROVIDE DROPS TO ALL FIXTURES IN PEX-A WITH COPPER STUB -OUT. INSULATE ALL MAINS. _9] INSTALL NEW REST ROOM PIPING WITH PEX-A UPONOR SYSTEM, CONNECT TO ALL EXISTING FIXTURES. 1-0 CONNECT FIRST LEVEL GUEST ROOM SINK TO RISER PRIOR TO RISER ENTERING SECOND FLOOR. 1-1 RECONNECT KITCHEN SINK PRIOR TO RISER EXIT TO SECOND LEVEL. 1-2 ROUTE CW DN TO EXISTING WATER FOUNTAIN AND RECONNECT. r-1-3-1 INSTALL NEW BOOSTER PUMP PACKAGE AND EXPANSION TANK. PLUMBING CONTRACTOR TO PROVIDE NEW 30A BREAKER FOR CIRCUIT, ELECTRICAL CONTRACTOR TO INSTALL AND CONNECT. Client: Consultants: EOR Stamp: Engineer of Record ,0 p,RT NE< lle 4f 0 '�b •••••...••.• E o No 77571 z V_AMF_-- r W 0 - 0MV W 13 ee,ff /0NM- 'fl"11111101% 10/24/2017 DAtio Lewis, PE 77571 (FL) Project: Orlando Sanford Spring Hill Suites Pipe Replacement and Modification Location: 201 N Towne Road, Sanford, FL 32771 Issuance: Permit Set Revisions: # I Date Description Date: October 11, 2017 Project Number: 17.AHR.001 Drawn By: Checked By: SE mi Plumbing First Floor New Plans Sheet No.: P101 t (27 IF R1 KING 'A' Lx�-0-9 D13J. QUEEN 'A' II r --f -1 '--- --- [7x-71TI- -- — — —M_-...... . . . .......... CF)-- — KING'A' 1—X705 < R1 _ f � I I L (8 10 .11)22� 13 1 1 � � � (9 4 KING 'A' KI . .... R1 NG'A' > KING R1 N Fx34 DBL. QUEEN 7I - r - f� I rI h I F �, _.. _ DBL. QUEEN'ADBL. QUEEN 'A' DBL. QUEEN'A' DBL.QUEE F.\ X32 — - —L� IT . . . ..... F, _ - --- -Fx-36-I . .... . ---- -- ---Fx--29-1- - PLUMBING SECOND THRU FIFTH FLOOR NEW PLANS NORTH 4' 8Y 16, 24' V-0" > KING'A' [L24] $ r Lrtm engineering consultants 925 S. Se"101an 131W I Suite 1001 Winter Park, FL 32192 T: 407.575,2055: www.amjF50ciates.com Client: Consultants: EOR Stamp: Engineer of Record o111111111111e, ,%%' pP, T N ,,-4 \0 -"cEN....... < . S!( °N 7571 = u) � Z. STATE -OF -J; N..."ORIV S) ��ONA1- ``` ,���, ►li list 10/24/2017 D,-drio Lewis, PE 77571 (FL) Project: Orlando Sanford Spring Hill Suites, Pipe Replacement and Modification Location: 201 N Towne Road, Sanford, FL 32771 Issuance: Permit Set Revisions: # Date Description )ate: Ddober 11, 2017 )roject Number: 17.AHR.001 )rawn By: Checked By: 3E MJ 'dumbing Second Fhru, Fifth Floors qew Plans ;heet No.: P 1oZ ENLARGED WATER HEATER COLD WATER DEMO PLAN 7 0 29 4` 8' 15' 3/15" = 1'-0" NORTH ENLARGED WATER HEATER D2 HOT WATER SUPPLY DEMO PLAN 0 2` 4` 8` 15" 3/16" = V-0" NORTH EXISTING' VENT TO �REMAIN _-- I �---------- ----, I I � EXISTING I GASTO...... .... __..._._._....____...__-- j D4 ___....._.... __ __..._.._L...._...._. __ REMAIN ---i - �POD — AS GAS GAS GAS _ — GAS—GAS GAS — I I I I D6 GWH-EXIST J GWH-EXIST J GWH-EXIST rlj'IJ ENLARGED WATER HEATER HOT WATER RETURN DEMO PLAN 0 21 Mfr 8' 15' ---_ ----- _ NORTH i ENLARGED WATER HEATER COLD WATER NEW PLAN U 2' 4° 8' 15` 3/15" = 1 *-0" NORTH GENERAL NOTES 1. ALL COPPER PIPE IS TO REMAIN IN PLACE UNLESS OTHERWISE NOTED. 2. ALL EXISTING COPPER PIPE IN ROOM IS TO BE INSULATED AND JACKETED PER SPECIFICATIONS. _ W l D1 NORTH GENERAL NOTES 1. ALL COPPER PIPE IS TO REMAIN IN PLACE UNLESS OTHERWISE NOTED. 2. ALL EXISTING COPPER PIPE IN ROOM IS TO BE INSULATED AND JACKETED PER SPECIFICATIONS. ENLARUEU WAFER HEATER HOT WATER SUPPLY NEW PLAN 0 2' 4° 82 15` 3/15'° = it—opt NORTH EXISTING VENT TO —^ REMAIN) I I I I � EXISTING I GASTO. ..... .........__..__-._.. s. �? REMAIN PO AS GAS GAS --� LT GAS — GAS — —� —GAS — — — � � RCP -01 I I \ GWH-EXIST J GWH-EXIST J GWH-EXIST ) POC POC ENLARGED WATER HEATER HOT WATER RETURN NEW PLAN 0 2' 4' 8' 15' 3/15" = 1 t-0" i I i engineering consultants 925 S. Semoran Blvd I Suite 1001 Winter Park, FL 92702 'C 401.878.2055: www.rtmassmiales.corn - Client: Consultants: EOR Stamp: Engineer of Record p.RT ••••��GENSF.••��.� �3 SX-PCTE"OF a �• O oo�T •�•.��ORIV�;:••• At- rr��M 10/24/2017 Dalrio Lewis, PE 77571 (FL) Project: Orlando Sanford Spring Hill Suites Pipe Replacement and Modification I I Location: 201 N Towne Road, Sanford, FL 32771 Issuance: Permit Set Revisions: 0m Date: October 11, 2017 Project Number: 17.AHR.001 I Drawn By: Checked By: SE MJ i Plumbing Enlarged Mechanical Room � Plans Sheet No.: P301 DEMO NOTES D1 REMOVE EXISTING CPVC CW SUPPLY IN ROOM TO POINT INDICATED, PREPARE FOR INSTALLATION OF NEW COPPER CW PIPE AT SAME SIZE. - - - D2 'EXISTING SPRINKLER PIPE AND COPPER PIPE TO REMAIN. UNLESS - OTHERWISE INDICATED. D3 REMOVE EXISTING HWR PIPE CONNECTION TO CW SUPPLY. CAP IN PLACE. D4 REMOVE EXISTING MAINS HW/HWR AS INDICATED. PREPARE FOR INSTALLATION OF NEW BALL VALVE AND CONNECTION l-0 NEW PEX-A SYSTEM. D5 REMOVE EXISTING MIXING VALVE. PREPARE FOR INSTALLATION OF NEW EQUIVLANT MIXING VALVE. D6 REMOVE EXISTING HOT WATER PUMP FROM RISER. PREPARE FOR INSTALLATION OF NEW PUMP. D7 REMOVE EXISTING 140° HW PIPING AS INDICATED. CAP AT POINT OF DEMOLITION. FEY NOTES __� FT] RECONNECT NEW COPPER CW SUPPLY LINE AT POINT INDICATED. --- ---`" TRANSITION TO UPONOR PEX-A SYSTEM APPROX 18" PRIOR TO EXIT OF GAS ........ WATER HEATER ROOM. RECONNECT HW SUPPLY SYSTEM (120°) TO NEW UPONOR PEX-A SYSTEM APPROX 18" PRIOR TO EXIT OF ROOM. INSTALL NEW ISOLATION VALVES AT THIS POINT. RECONNECT HWR SYSTEM (120°) TO NEW UPONOR PEX-A SYSTEM APPROX 18" PRIOR TO EXIT OF ROOM. INSTALL NEW ISOLATION VALVES AT THIS POINT. INSTALL NEW RCP IN EXISTING LOCATION VERTICAL. PROVIDE NEW SUPPORTS AS REQUIRED, ROUTE END OF HWR LINE TO EACH WATER HEATER AS INDICATED. FOLLOW MANUFACTURER INSTALLATION BEST PRACTICE FOR STATE SUFl0025ONE 200. SEE DETAIL 1/P401 FOR MORE INFORMATION. INSTALL NEW MIXING VALVE. BASIS OF DESIGN: BRADLEY S59-3130. ADJUST TO MAINTAIN 1200 AT FIXTURES. ENLARUEU WAFER HEATER HOT WATER SUPPLY NEW PLAN 0 2' 4° 82 15` 3/15'° = it—opt NORTH EXISTING VENT TO —^ REMAIN) I I I I � EXISTING I GASTO. ..... .........__..__-._.. s. �? REMAIN PO AS GAS GAS --� LT GAS — GAS — —� —GAS — — — � � RCP -01 I I \ GWH-EXIST J GWH-EXIST J GWH-EXIST ) POC POC ENLARGED WATER HEATER HOT WATER RETURN NEW PLAN 0 2' 4' 8' 15' 3/15" = 1 t-0" i I i engineering consultants 925 S. Semoran Blvd I Suite 1001 Winter Park, FL 92702 'C 401.878.2055: www.rtmassmiales.corn - Client: Consultants: EOR Stamp: Engineer of Record p.RT ••••��GENSF.••��.� �3 SX-PCTE"OF a �• O oo�T •�•.��ORIV�;:••• At- rr��M 10/24/2017 Dalrio Lewis, PE 77571 (FL) Project: Orlando Sanford Spring Hill Suites Pipe Replacement and Modification I I Location: 201 N Towne Road, Sanford, FL 32771 Issuance: Permit Set Revisions: 0m Date: October 11, 2017 Project Number: 17.AHR.001 I Drawn By: Checked By: SE MJ i Plumbing Enlarged Mechanical Room � Plans Sheet No.: P301 DOUBLE QUEEN TYPE D 7 TYPICAL DEMOLITION PLAN O 2° 40 g' 12' 1/4" = 1f—O"" I Q/H/C j)TYPICAL DEMOLITION PLAN O 2$ 4' g' 12' 1/4$1 = 1 *—O" DOUBLE QUEEN TYPE NORTH i PICAL NEW PLAN tA 3 () 2y 4' �' 12' 1/4" = 1'—O°' NORTH I I Q/H/C TYPICAL NEW PLAN O 2* 4' g' 12' 1/4" = 12-0" NORTH NORTH ffilp Me, 1. REPAIR ALL WALLS AS REQUIFED TO MATCH EXISTING. DEMO MOTE 61 REMOVE PIPING DOWN TO EXISTING LAV, SINK, OR WC. PREPARE WALL AND AREA FOR INSTALLATION OF NEW PIPING AND STUB OUT. DZ REMOVE EXISTING PIPING DOWN TO EXISTING SHOWER/TUB EQUIPMENT, PREPARE FOR INSTALLATION OF NEW SHOWER VALVE, HEAD, PIPING, AND CONNECTIONS. KEY NOTE INSTALL NEW UPONOR PEX-A CONNECTION FROM RISER. RECONNECT TO EXISTING LAV, SINK, AND WC. INSTALL NEW STOPS AND ANGLE SUPPORT BRACKET FOR ALL FIXTURES. 2� INSTALL NEW MOEN SHOWER HEAD AND SHOWER VALVE (MARRIOTT APPROVED). CONNECT NEW UPONOR PEX-A CONNECTION FROM RISER. FIFTH FLOOR ONLY: ROUTE SHOWER HOT WATER RISER TO HOT WATER RETURN LOCATED AT LAVATORY RISER ON FIFTH FLOOR. TYPICAL ALL ROOMS. engineering consultants 925 S, Sonioran DNd I Suite 100 1 Winter Park, FL 72792 'r:407.078.2055: www:rnnassoclales.com Client: Consultants: EOR Stamp: Engineer of Record ,ti,1111111i110 � �� p,RT NE4ee N 7,5711 (P �J . W pF P, .•' <V 10/24/2017 Dalrio Lewis, PE 77571 (FL) Project: Orlando Sanford Spring Hill Suites Pipe Replacement and Modification 201 N Towne Road, Sanford, FL 32771 Issuance: Permit Set Revisions: # I Date Description Date: October 11, 2017 Project Number: 17.AHR.001 Drawn By: Checked By: SE MJ Plumbing 9 Enlar ec: Typical Room Plans Sheet No.: P302 F1F ITI FLOOR F00 M FLOOR 1 i IIRD FLOOR �FCOND FLOOR f=all`;(( FLOOR ........ _. CONNECT TO HWR ON R1/R7. SEE ENLARGED ROOM PLANS FOR MORE INFORMATION R1 R2 R3 r- _...._......----I LAV -1 LAV -1 .LAV -1 LAV -1 WC -1 WC -1 SH -1 SH -1 I LAV -1 LAV -1 LAV -1 LAV -1 Ell WG1 SH -1 SH -1 J LAV -1 LAV -1 LAV -1 LAV -1 WC -1 WC -1 SH -1 SH -1 I LAV -1 LAV -1 LAV -1 LAV -1 WG1 WG -1 SH -1 SH -1 _........... LAV -1 LAV -1 LAV -1 I LAV -1 WC -1 WG1 SH -1 SH -1 ........... _. <� CIRCUIT SOLVER 5 DOMESTIC WATER RISER DIAGRAMS NOT TO SCALE 1401 HW CW TEMPERATURE GAGE 120° HW-- THERMOSTATIC MIXING VALVE DETAIL NOT TO SCALE HOT WATER SHEETMETAL SHIELD(GALVANIZED) 16 GA. SHIELD LENGTH SHALL BE 15" GALV. METAL SADDLE - MIN. 12" LONG TYPICAL CLEVIS PIPE HANGER DETAIL NOT TO SCALE �1 PIPE SUPPORT FOR INSULATED PIPE NOTES: 1. Preferred piping method. 2. The temperature and pressure relief valve setting shall not exceed pressure rating of any component in the system. 3. Service valves are shown for servicing unit. However, local codes shall govern their usage. HOT WATER RETURN \TER LEGEND TEMPERATURE & CHECK VALVE PRESSURE RELIEF VALVE PRESSURE RELIEF VALVE DRAIN TEMPERATURE GAGE CIRCULATING PUMP FULL PORT BALL VALVE WATER FLOW SWITCH 4 WATER HEATER RETURN CONNECTION DIAGRAM NOT TO SCALE R5 R6 R7 r----------- - — — — — — — — — — — _..---------------- I SK -1 SK -1 SK -1 SK -1 SK -1 WC -1 LAV -1 LAV -1 LAV -1 SH -1 ISK -1 SK -1 SK -1 SK -1 SK -1 WC -1 LAV -1 LAV -1 LAV -1 SH -1 _.._......._. ....... SK -1 SK -1 SK -1 SK -1 SK -1 WC -1 LAV -1 LAV -1 LAV -1 SH -1 II I I SK -1 I SK -1 SK -1 SK -1 SK -1 WC -1 LAV -1 LAV -1 LAV -1 SH -1 SK -1 SK -1 SK -1 SK -1 SK -1 WC -1 LAV -1 LAV -1 LAV -1 SH -1 CIRCUIT CIRCUIT SOLVER SOLVER f engineering consultants 925 S. Se"'Oran Blvd I Suilo 1001 Wlnler Park, FL 32792 7:407.078.2055: www.rtnias6ociates.coni Client: Consultants: I EOR Stamp: Engineer of Record `,`��►r r r r trill i `O p,RT NF4 � � .. �.�GENSF.•• � _1N_ 47 1 V • ZAT E"o .UJ�0 �••'cLo R 1P'••'�; � 9/ON AU `; %S'%' v111111� 10/24/2017 Dalrio Lewis, PE 77571 (FL) Orlando Sanford Spring Hill Suites - Pipe Replacement and Modification Location: 201 N Towne Road, Sanford, FL 32771 Issuance: Permit Set Revisions: // Date Description Date: October 11, 2017 Project Number: 17.AHR.001 I Drawn By: Checked By: i SE mJ Plumbing Details And Risers Sheet No.: P401 EXISTING DECK , EXISTING L4x3x1/4 x 8" LONG (LI - V) STRUCTURE W/(5) #10 TEK SCREWS AT JOIST NUT (TOP & BOTTOM) . WASHER (TOP & BOTTOM) 3/8" DIA A36 ALL -THREAD ROD WITH DOUBLE NUT 3/8" ALL-THREr�0.� AT END. SPACE PER SPECIFICATIONS. CLEVIS HANGER HEAVY DUTY LOCKING NUT CLEVIS HANGER INSULATION ----SUPPORT NUT VAPOR PIPE BARRIER A—\ INSULATION—,,,"PERMATHERM INSULATION INSULATION PROTECTIVE SHEETMETAL SHIELD(GALVANIZED) 16 GA. SHIELD LENGTH SHALL BE 15" GALV. METAL SADDLE - MIN. 12" LONG TYPICAL CLEVIS PIPE HANGER DETAIL NOT TO SCALE �1 PIPE SUPPORT FOR INSULATED PIPE NOTES: 1. Preferred piping method. 2. The temperature and pressure relief valve setting shall not exceed pressure rating of any component in the system. 3. Service valves are shown for servicing unit. However, local codes shall govern their usage. HOT WATER RETURN \TER LEGEND TEMPERATURE & CHECK VALVE PRESSURE RELIEF VALVE PRESSURE RELIEF VALVE DRAIN TEMPERATURE GAGE CIRCULATING PUMP FULL PORT BALL VALVE WATER FLOW SWITCH 4 WATER HEATER RETURN CONNECTION DIAGRAM NOT TO SCALE R5 R6 R7 r----------- - — — — — — — — — — — _..---------------- I SK -1 SK -1 SK -1 SK -1 SK -1 WC -1 LAV -1 LAV -1 LAV -1 SH -1 ISK -1 SK -1 SK -1 SK -1 SK -1 WC -1 LAV -1 LAV -1 LAV -1 SH -1 _.._......._. ....... SK -1 SK -1 SK -1 SK -1 SK -1 WC -1 LAV -1 LAV -1 LAV -1 SH -1 II I I SK -1 I SK -1 SK -1 SK -1 SK -1 WC -1 LAV -1 LAV -1 LAV -1 SH -1 SK -1 SK -1 SK -1 SK -1 SK -1 WC -1 LAV -1 LAV -1 LAV -1 SH -1 CIRCUIT CIRCUIT SOLVER SOLVER f engineering consultants 925 S. Se"'Oran Blvd I Suilo 1001 Wlnler Park, FL 32792 7:407.078.2055: www.rtnias6ociates.coni Client: Consultants: I EOR Stamp: Engineer of Record `,`��►r r r r trill i `O p,RT NF4 � � .. �.�GENSF.•• � _1N_ 47 1 V • ZAT E"o .UJ�0 �••'cLo R 1P'••'�; � 9/ON AU `; %S'%' v111111� 10/24/2017 Dalrio Lewis, PE 77571 (FL) Orlando Sanford Spring Hill Suites - Pipe Replacement and Modification Location: 201 N Towne Road, Sanford, FL 32771 Issuance: Permit Set Revisions: // Date Description Date: October 11, 2017 Project Number: 17.AHR.001 I Drawn By: Checked By: i SE mJ Plumbing Details And Risers Sheet No.: P401 tlel milGil111 Design Envelope Be : Series: 6800 GIE Design r_HV1Jlops I'ViLIdel. IgIOU/-V/-,-D I1p City Mains or Tank Service: - - Suction (supply) pressure: 4_6.2 ft _ I I• . � �,, I Cl, USgpm f System boost pressure rating: 40.0 psi Series: 6800 GIE Design r_HV1Jlops I'ViLIdel. IgIOU/-V/-,-D I1p City Mains or Tank Service: - - Suction (supply) pressure: 4_6.2 ft _ I I• . � �,, I Cl, USgpm f System boost pressure rating: 40.0 psi Power Supply: 208/3/60 s Discharge pressure: ti 0.75 (19) 410 (186,0) A600 -L 158 (600) 158 (600) c 1.50 (38) Project name: RTM Booster Pump & Tank 430 (195.0) A800 -L 211 (800) 211 (800) 30,00 (762) 82.44 (2094) 1,50 (38) 0.75 (19) 525 (238,1) AIOoo-L A1200 -L - 36.00 (914) 73,90 (1877) 36,00 (914) 86.00 (2184) Location: Representative: Hobbs and Associates -Tampa 0.75 (19) 680 (308,4) A1[}oo-L 1600-L 370 (1400) 370 (1400) 422 (1600) 422 (1600) 3600 (914) 98,50 (2502) 48.00 (1219) 71.00 (1803) 1.50 (38) 1.50 (38) 0.75 (19) 0.75 (19) 750 (340.2) 1183 (538) Date submitted: 10/4/2017 3:4 8:06 PM Phone number. 48,00 (1219) 85,00 (2159) 48,00 (1219) 102.00 (2591) 48.00 (1219) 122,00 (3099) 60.00 (1524) 102,00 (2591) 1.50 (38) 2.00 (51) 2,00 (51) 2.00 (51) 0.75 (19) 0.75 (19) 0.75 (19) 0.75 (19) 1264 (575) 1435 (652) 1550 (705) 2638 (1199) 5000-L 1320 (4997) 1320 (4997) C 2,00 (51) 1.00 (25) 3246 (1472) Engineer: RTM e-mail: om Irnalphurs@hobbsassociates.com I Contractor ` Submitted by: Logan Malphurs .. ... ,. ,., ... L ,;. ' }} Application design data Im k p lr t uu- Tag number: Water Supply:! City Mains or Tank Service: - - Suction (supply) pressure: 4_6.2 ft _ Location., � _._.__..�..-� Total flow capacity: ---�-~100.0 USgpm Quantity: 1 System boost pressure rating: 40.0 psi Power Supply: 208/3/60 s Discharge pressure: 138.6 ft T�JTAL F1,C DSgpnm Dimensional data (not for construction) D15CHARG! System construction data 07,50 Piping [ 1191 ] j System description: Duplex P 9 material: Stainless Steel 304 Header size: 3 in Valve type Check valve only .._.._.._,......__.._ .. _ _ _ ... _ -_�_ _ __....- _ . m._. - -..------------.._._....__..._......._..................................._-._.. _.._._._ -_.__.._W_ fi Header connections: Grooved Maximum working pressure: 536.0 ft I - Suctian orientation: Right* Discharge orientation: Right* _�- 3 -770 16.68 61.42 __... _ _ _ ._. _._ ............. . .... _... _ .. -... _ ._ _ . ......._.. _ .... __._�__. `.._.._._..._.._...__......_.._.._......_...._...._.._ ..._............. _ _ _ .......... [ 7 [ 4241 [ 15601 "when facing booster controller Low lead certificatlan: NSF 372 I ., 6,19 M Lma Pump dataIT,= T ---SUCTION 157 Number of pumps - 2._ _ _Duty flow per pump -' - -- -. .....:.... 100 USgpm - 07-50 A - R - ._......_._ ----- ._ ..._... .. -- _ __. - .._. - - -- Operation: 1 Duty/1 Standby Duty head: 40 psig `1�- 2.3`1 [1911 [ 10751 Series: 4700 Motor size: 5 hp 1.97 Size: VMS -15:028 Motor speed: _360_0 rpm ^F- [57] _2i.65 Construction: Stainless Steel 304 Motor efficiency: - NEMA Premium (-12,12) [ 5501 _.. _ 43.31 Standby Pump Yes Motor enclosure: TEFL [11001 Booster control panel data Enclosure_ Selected features: NEMA 12 Painted steel Human Machine interf HMI: Touch Screen 4" Standard Touch Screen 4" Standard IVS-102 variable frequency control data Quantity: 2 (integrated with motors) EMI/RFI control: Integrated filter to meet EN61800-3 T pp Type Fan cooled through back channel Harmonic suppression: Integrated --�-� raced DC link reactor Ambient -10C temperature: -.------.��---�� p to +45C(upto 1000m elevation) Drawdown tank data Size and rating: No Tank and Controls Mounting: Remote Mounted Note: This booster is 'Buy American' compliant. .._--............... ... WEIGHTS (lb) NOT for CONSTRUCTION Weights' ....... _ . _....._.. 587 ..................... www. armstrongfluidtechnology. corn 1012412017, Ref. ,# 635727.1 rev 1 Page 2 of 5 www.atinstlongfluldtechnology.com L SerieS SUBMITTAL Pre -charged (ASME) expansion tank 2 10124120/7, Ref. /# 635727,1 rev/ Page 3 of 5 A200 -L A300 -L gal.(L) ............. 53 (200) 53 (200) 80 (300) 80 (300) inches (mm) .............................................. ..-...... ...,,,....,.,,.............. 24.00 (610) 38.40 (1475) 24.00 (610) 52,27 (1328) inches (mm) ... ,,................... 1,50 (38) 0.75 (19) 1.50 (38) 0.75 (19) Ibs.(kg) ...,......... ,..,,....... ... 225 (102.1) 285 (129,3) A400 -L 106 (400) 106 (400) 24,00 (610) 66,-1_4 (1680) 1,50 (38) 0.75 (19) 350 (158,8) A500 -L 132 (500) 132 (500) 24.00 (610) 80.14 (2036) 1.50 (38) 0.75 (19) 410 (186,0) A600 -L 158 (600) 158 (600) 30.00 (762) 6475 (1645) 1.50 (38) 0,75 (19) 430 (195.0) A800 -L 211 (800) 211 (800) 30,00 (762) 82.44 (2094) 1,50 (38) 0.75 (19) 525 (238,1) AIOoo-L A1200 -L 264 (1000) 264 (1000) 317 (1200) 317 (1200) 36.00 (914) 73,90 (1877) 36,00 (914) 86.00 (2184) 1,50 (38) 1.50 (38) 0.75 (19) 565 (256,3) 0.75 (19) 680 (308,4) A1[}oo-L 1600-L 370 (1400) 370 (1400) 422 (1600) 422 (1600) 3600 (914) 98,50 (2502) 48.00 (1219) 71.00 (1803) 1.50 (38) 1.50 (38) 0.75 (19) 0.75 (19) 750 (340.2) 1183 (538) 2000-L 2500-L 3000-L 4000-L 528 (2000) 528 (2000) 660 (2495) 660 (2495) 792 (2994) 792 (2994) 1056 (3992) 1056 (3992) 48,00 (1219) 85,00 (2159) 48,00 (1219) 102.00 (2591) 48.00 (1219) 122,00 (3099) 60.00 (1524) 102,00 (2591) 1.50 (38) 2.00 (51) 2,00 (51) 2.00 (51) 0.75 (19) 0.75 (19) 0.75 (19) 0.75 (19) 1264 (575) 1435 (652) 1550 (705) 2638 (1199) 5000-L 1320 (4997) 1320 (4997) 60,00 (1524) 125,00 (3175) 2,00 (51) 1.00 (25) 3246 (1472) TORONTO +1 416 755 2291 BUFFALO 1-11716 693 8813 BIRMINGHAM r44 (0) 8444 145 145 MANCHESTER +44 (0) 8444145 145 BANGAL0RE 1.91 (0) 80 4906 3555 5 H A N G H A I -1.86 213756 6696 SYSTEM cc LIFTING RING DRAIN PLUG CHARGING SYSTEM CONNECTION LIFTING RING MODELS A200 -L TO 2.500-L B LIFTING GING (ALVE TING RING .AIN LUG MODELS 3000-L TO 5000-L ARMSTRONG FLUID TECHNOLOGY ESTABLISHED 1934 ARMSTRONGFLUIDTECHNOLOGY.COM t M engineering consultants 925 S, Sauiotdul Bl4'd l 5�it� Iri91 VJ4nl�r Perk, FL 3279:2 T: 4p7,Bili,2Qa5 ;'htiVlv,ltilleS'SgCI3t98,C17frl Client: Consultants: EOR Stamp: Engineer of Record PRT NFC i, �1 \O , ¢ •.•*GENS•.' �` � a -1 77571:: u� • STAT OF w Z v :�oT��OR0P.�' 10/24/2017 Daltio C_.ewis, PE 77571 (FL) Project: Orlando Sanford Spring Hill Suites Pipe Replacement and Modification Location: i 201 N Towne Road, Sanford FL 32771. Issuance: Permit Set Revisions: Date Date: October 11, 2017 Project Number: 17.AHR.o01 Drawn By: Checked By: SE MJ I Plumbing Schedules Sheet No.: PUMP SCHEDULE MECHANICAL DATA ELECTRICAL DATA GENERAL PUMP HEAD PRESSURE NUMBER OF PUMP ftPPA PUMP ��i IDENTIFICATION QUANTITY TYPE GPM (FT.) (F_1_)_ F'IINIPS -1_._.3250 HP (EA) - V MGA MOCP MAKE ! tr10DEL NO. REMARKS -'1,2 - RCF'-01 1 IN-LINE T 3.5 15 1/8 120.0 1.4 15.0 TACO 009-SF5 GENERAL NOTES 1, ALrEFNWnVE NWNUFAC,rIJRER WITH ENGINEER APPROVAL. 2. INSTALL ALL PUMPS IN ACCORDANCE WI•rH MANUFACTURER RECOf INIENDED GUIDELINES. t M engineering consultants 925 S, Sauiotdul Bl4'd l 5�it� Iri91 VJ4nl�r Perk, FL 3279:2 T: 4p7,Bili,2Qa5 ;'htiVlv,ltilleS'SgCI3t98,C17frl Client: Consultants: EOR Stamp: Engineer of Record PRT NFC i, �1 \O , ¢ •.•*GENS•.' �` � a -1 77571:: u� • STAT OF w Z v :�oT��OR0P.�' 10/24/2017 Daltio C_.ewis, PE 77571 (FL) Project: Orlando Sanford Spring Hill Suites Pipe Replacement and Modification Location: i 201 N Towne Road, Sanford FL 32771. Issuance: Permit Set Revisions: Date Date: October 11, 2017 Project Number: 17.AHR.o01 Drawn By: Checked By: SE MJ I Plumbing Schedules Sheet No.: � I - '_7____ __ I - ____ - . I . I I I . I __ � � __ � - I , __ - - � __ ­ - _____ __ " . i- ''. ' �" I . I . - I i I ______ ­_ .- _____ ­ . . � __ . , - __.- I . I- � . � � - I ---I- ­ �' , � ­ � 71�� - - �, I , . .- - -- . I I � -- --- 11, . I I . . - - , . I � I . . . - -,-- 7 , , �� , . '. - � � I � I . . . I , - - � . - - - - I I . . . . � . � I � I . I I . I I I - I'� � - , � , - I � I . � i I I I I I . � � i I I I . I . I . I . � I I . I � I I I . I � I . I � � . � . : . I � I � . . I . . � I I I I . . I I . � I I iI � . . , , I I I I . . � . . I . I or! -grade Fittings I I ..! ,. . . .. _________­__­__' :1 , � Strapping Requirements for PEX-a Pipe Support I Please refer to the Uponor Professional Installation Guide located on www.uponorpro.coin Recommended Number of Expansions for %". to 31' Thermal Expansion and Contraction Supportin upotior PEX Pipe, Fittin's, and � Vertical Support Requirements Cont ... . Und.er-slab/ Bel ' � . I : � � . 9 I 9 . . . ., and LF brass fittings are all approved for I � r . . Term Abbr. for Uponor's manufacturer installatiorl )ristructions. . . Piping at 73.40 F (230 C) Horizontal Tubing Runs Uponor requires PEX-a Pipe Support be strapped with a miniihum I . Uponor AquaPEX, & I � -.-1___._.._-__._'___' - 1-1 ------------- ___ . Valves 300 -lb., tensile -rated, stainless-ste.el strap that is suitable fgi� the I I I I use in direct-buriai ,applications. � I I I .­._­_____ __.___.____"'_ I - Thermal expansion forces on suspended horizontal runs of PEX-a Suspended runs of upofipr PEX pipe can be supported by the Sam . I . �": .. '?'..'�� ". :: - .­.: --y-1 I .!,:, I I . I . Above . . I—- e application (i.e. UV, high temperature). . .1� I . I ". . � . � I Finished Floor AFF � . . Milwaukee . Uponor I tubing. that can experience a 22 OC (400F) or greater rise in conventional means as i-lietallic pipe, using copper tube size (CTS) I I I I I I I I , "% IN \ . . . . � ed for direct burial in soil per I . . I . I 11 Uponor AquaPEX UV Resii§�ance Ratings I I 1% Uponor's LF brass ig approv . . . 4 ' . I � - - - .__­______ . ProPEX Tool ProPEX Tool ,temperature shall be controlled by a means of mitigating . I engineering consultants A � . . �___._­_..­.­_ - ­_.__._­__­_...­ . Piping . __ - 1-1.1- --- ------- __ ___ __'__.__'____._'__ ...... I I hangers and supports. �Jowever, support spacing will vary Strapping'Requirem I � . '--Floor , . � � : I . Backflow --".--r ------ _­­...­­­­­ ------- -..___-__1' . � * __'_ . temperature -induced stresses to other parts of the water I I ents for Clamps and Hangers . I � NSF/ANSI Standard 14 testing which ,established minimum 1 925 S. Semoran Blvd I Suite 100 I Winter ParK FL 32792 � I BFP I I UV I Size , I I I . . � depending on local codo requirements. � � � I __�� v- ­�_ _­ . performance criteria for clezincification resistance (DZR) and . T: 407,07U.2065: wwwatru"ixydattrsxorri ! Product Markirig I I M12 FORCELOGIC Manual 100/150 � 201 I I . I . . . � � I I I I Penetration I . Preventer Resistance 1 M18 distribution system. Means for controlling thermal expansion, I - I ----,.-.--.- . I . . I . I I I I .... : - ___­ ________.___'_' ________ , _____ ___.' ­­­ - , I I . . � . . stress -corrosion cracking (SCC) resistance for PEX fittings . .'I , � . Balancing Valve BLV Uponor AquaPEX white: Uponor ... 5106 1 month __.__.....-_.-_-1-1-.__. __ . � include: � � . . Note: Uponor recommends using hangers and supports designed I I Maximum I I . I � . . � � --------.-�-�,--------,-,.�,�---.,-�l.--�.-�I -11- -­ ----.-.---- . I __ 7 __ , . Support . I . . I I . . I intended for potable water. . . . : -.- _'_____.._.__ 3/8" 8 9 5 a Supporting the tubing with continuous runs of Uponor PEX-a Pipe . for use with plastic piping. � I I ,Distance I I I I AquaPEX Blue Uponor 5206 3 month . I __ __.- _'. "_"_._'______' '__._'_"'____ -.-.-. ___._________.__ __________._ I I I I I . I � . I - .Ball Valve BV -"'-'--'-'.- __ - - � I I I 1 1/2" 5 6 __ .4 4 . __ . Support . I I ------ ____-_..___1.__ .... . ..... -----�-,--.-.......-..--.---..---�-�.,-.,"-,---,-�-1.1---,-.�---.--,.��l.,.-.-."�-..--�.111-�-.-I ------ --- - --- ­_­___­­­____ ­ ­­ _­__­'___.__ ­­­ -�--�----�-..---,-�-.--..-.--.----�.---- � . I Pre -insulated Uponor AquaPEX Piping Pre -insulated Uponor -'-- ------"' ­­­ - I AquaPEX Red 3 monU � . I I I I I Bathtub BT - � -_1_"-__' "" ---.-.-,-.-d .________-._-1_. ­­­ .. ....... __ _­__­­__­_ I I I . ..... - Rigid anchor points installed every 20 m (65 ft.) I Spacing w/ PEX-a Pipe Clamps Greater than 48" = I tie mid -span >� I I I . . Spacing for Bare PEX-Dimension. "A" --.-------.---.--- _____.__ fu AquaPEX piping is approved for use in direct burial applications. I ---1-11 ­­­­ - ------- ­.- Note: Uponor AquaPEX Purple Reclaimed Water pipe has not been 3/4" 9 8 __ . 1 9 9H __ 0 Proper strapping (e.g. 27 kg (60 lb.) straps or equivalent) spaced Support -Dimension "B" 2: However, due to the static load exerted by the soil, Uponor Client: . . Bathtub/shower TB/SH tested for UV resistance and therefore retains a 5006 rating. _._ . ........... _ _'-, ''_ _ _.___...___ --- -------- ____ ___ __ I . I m (3 ft.) and rated for the maximum temperature and UV I ' Less than 48" - 2 ties equally spaced Greater than = . I I '�' . - .____­_.­__.' . In 12 5 __ 14 7H _� exposure of the PEX-a tubing application. Hangers 48" = 3 ties (I mid -span and I on each end placed 0 - I recommends the use of Pre -insulated AquaPEX featuring J." thick . ; . ['__7_______ 1 ____' -I---------,--- . . I -1 - -_ Stud I � I . British Thermal � _-.1-1-1. - ­-, - " ___ . .... ........ __... - . . ---------- - . I � . 2" from end of support) I insulation. � � Unit BTU Hydrostatic Temperature and Pressure Rating 1 1/4�. __ 7 __ __ 7H __ % Loops . . Nominal . Inter- National Inter- � National _­_­_'__.._._.___ ­__________­_­.._­_ U71 I . --------..-. - __'_____ I -, - ----.- - -------- - __ ...... ___._ _______..'____'___.___ 0 Offsets Pipe Size national Uniform Plumbing national Uniform Plumbing I 1___' -ough a concrete slab, it must be � . Check Valve CV for Uponor AquaPEX Piping. . 1 1/2" -- 6 __ . __ 8H __ 9 Arms with rigid anchor points Plumbing Plumbing Code of Plumbing Plumbing Code of Uponor PEX-a When piping will pass tht � . .­__..­'_­_.____ _________'_ - - -- ---------- . ", _­­­-­­­­--_­ I -.-- ----,----�-.----.-,,.---�---�,.� .... . .. _'__ Code (IPQ Code (UPC) Canada Code (IPC) Code (UPC) Canada Strapping PEX-a Pipe Support In -wall Piping-,--," � protected and allowed to move including expansion and ''.� � Chilled Drinking ASTM F876 Temperature and Pressure Rating for SDR9 PEX 2" __ __ 4 .-- __ 5H . (NPCQ (NPCC) - . >---- Strap at Mid -Span . contraction of piping. Minimum wall thickness of protective I I � Water CDWR _­­ ... ... 1.11- ­ ,.-.,-----�,�-,-.�,.-.--�.,--.-.----- I - _..__..._.­ .... _ _____._­ ­- - -- ­­­­ I— i __'____.___-_--_-1_. __1___...-___' Vertical Tubing Runs � . I Strut Clamp _47 .. V *..Ibm a 7 N material shall be 0.025 inch (.064rrim). Approved protective I I I . Recirculating Hydrostatic , �. . Pressure 21/2" -- __ 1 5 . I __ __ __ . Thermal expansion forces on vertical runs of PEX-a tubing that - I-- - I... I 1.1-1- �... ­­ ­­ ... ­­.­ ----- -- ­_._....'..­___ .... -1. � I ___­_._­__. __._____.___­ I . ... I ..... ­­­ . .. .... � ...... - -1-1 I � .1. _. I... - -----..---.------- I .PEX-a Pipe Support / . . 0 0 I.. r ... ... I-- ... r- ............. :-----.---.- -­­ --------- ­­ Rated Design I Rating for ____.._.__'_-.-1-_______ ­ . __._ -_____. ­­'__­­__­­_ -"-.r, -- '--I'--"-'- passes through more than one floor and can experience a 220C 1/2" . 32" 32" 32" 6-0" 6'-O" 61-011 . . I 1� . material includes HDPE wrapping, closed -cell pipe insulation, PVC I . 91 I I 1.''', � I � � Chilled Drinking Temperature Stress (HDS) psi Water psi .. 1 3" __ __ 7 _� -- __ _' I . __ I cont . rolled by ­--­­­-­­­­ ­.-I.-I..'' ­ I'-.-"'--- -r-.---...-- � ... ........... ­-'­'_­.'_.'. -1 � ­ 11- ... 1-I.- 11 -.I.,-1-1. I-- ­.­______ _ I -..-,, f, Support / .1 I \_ Mid -story elbows, and sleeves, or equivalent. Ensure proper placement I � � __ ....... .. (400F) or greater rise in temperature shall be � I CDWS �-,---,--�,-�---��---.--.��--,-..-... ­_­.___­_­'___.____ � -,-------"-- -.--��,-.-�..---�------�---�.�-- --.----..---.- 1 3/4" 3241 32" 32" 6-0" 6'-0" 6'-O" 1 . . where piping exits the slab. These products are described as slab I ' : Water Supply 73.40F/23('C 630 160 � I Note: "H" in the table refers to Uponor H -series expander- heads. . installing: . -�Imi I Bracket _/ . Guide , ... 1-1 _-1---1-1--__.__- ---- - - ­.__­­_ 1-1-1111--1--.1 __-_-__-__.1-- --- 11 __­ -._---1--..--____- ­­­ - I I- - -.---.- ---.-- -- . I .. . . ­­ C - h - i . lied W . ate . r ..-...--- - .... . ­­ ........ . ...... ... . - ... . I ___ I . I I � I a A riser clamp at the top of every other floor; and V, 32" 3211 32" 8-0" 8-W 8-o" 1 rg3 X penetration protection devices, . � ; I CWR 180OF/820C 400 too __ � * Mid -story guides to maintain the alignment of the vertical tubing. ----------. ---.-------, ------------- ------- .--------.---...-......----.---.---.-----.--. ­­­ ­­ - - -­---­.--­-­-------- Strapping for Systems using Strut -clamps or Equivalent � (U � � Return -----. ____________._.__ . __ - Fire Stopping Solutions , � � 1 1/4" 3211 48" 32" 8-01, 8-01. 8-0.1 2- Pre sleeved Uponor AquaPEX Piping 11 I � . .- 11 I ,� 11.1.1 ­­­ - 315 80 - ....... -.1---- ........ - ............... ,-.--------..---....�..-.,-.,��..-�....�.--..�....-.��'...-....-..,-,-�-.��..'.�.. ­ -1-1-1 ­.. ­­­.. r. _­.. ____________­ ...... _____ I - = A Cold Water CW ­__________­_­____ _-J.- .'_____'____ ------ - �---�.-------�---.--.-,--",-,---,----,--, __ There is a wide range of fire Stopping solutions that have been Note: Installing riser clamps isolates expansion to two -floor 8 - . t", .Strap within I" of Hanger (D Uponor When using pre -sleeved Uponor AquaPEX piping or a protection .1 _011 8-01, . I . ___'___ ....... _'. ". - --------- __ -- - ----- - ___-, These listings are published in PPI TR -4, a culmination report of the tested and listed with PEX pipe; including intumescent caulks, wrap 1 1/2" 32" 4811 32" 8-0" I Strap at Mid -Span LO PEX-a sleeve, an annular gap between these protection devices and the _. i I Deionized Water DE listings that are maintained with PPI. strips, pass-through devices, collars and cast -in-place sleeves. intervals allowing the PEX-a tubing to naturally compensate ________ I _'_____"..__ 8 -_ I I-,"-- Riser I ; � . - for the expansion. 211 32" 48" 32" 8-0" 8-0" -on I Clevis Hanger I PEX piping will exist. In such installations, the annular gap I � . Diameter DIA Some fire stop manufacturers include, but are not limited . PEX-a Pipe Support between the protection device and the PEX piping at the exposed -_ - , , � �. 1-11---l-1-1 .... ­ ___________1 Standards, Codes, and Ustings . t I o, 3M1m, Hilti@, RectorSeal(0, Passive Fire Protection Above -ground and Sus ended Applications 2 1/2" 32" 48" 32" 8-01, _____'8_-_-_0'"__ � 8-0- 1 � ends must be filled to help prevent pathways for pests and the p� ________1 ---.-. _'_____'__ I ---- I - n .1 s � i .. d - e - Dia I me r t � e I r - 11 1-1-1- I . D .­­ - tandards: Partners, Specified Technologies Inc., Holdrite@ and ProSet - It 1 321, 0" 8 , Riser mistaken application of harmful chemicals into the space between I I—, .1. -1 .- -,. � � � � .." - -0" I "I ;1 4' I I _ - s I SystemsOR. Smaller diameter (I." to 1") pipe runs require an extra J" to J1n of 3 32" 48't - ----.-. I � I _.- - I— 8 --- _W 0 0 'k Consultants: Uponor AquaPEX piping, ProPEX EP fittings, ProPEX LF brass longitudinal clearance per foot of run. Do not allow piping to dip __1 r- . __ I—— __---.'-.1 ­­­­ _,_.,_---- I—- � ... .. .. I __ I _ - - 3 t _TY 11 Clamp the PEX piping and the protection device. Use only sealants that . 'I I I Outside Diameter OD fittings, EP multiport products, EP valves and copper valved Uponor Spacing Requirements - 1 1 i i are compatible with PEX piping. I t .. __­_­_­__­_ - manifolds are manufactured and tested to meet the following Fire assembly documentation and listings shall be obtained from excessively between supports and do not pull piping tight during , / . / I 11'''', . Difference or the selected fire stop solution manufacturer. Most of the fires stop installation. Strapping for Systems using Cleviis-type Hangers or Equivalent / ,/- Floor Note: The following products can be used when sealing PEX I I requirements: Horizontal Support Spacing Requirements for Uponor PEX __T__ . .1 - . . � Penetration 1, Delta in DELTA T I ... ...' I I .. .. ----1 ...' -1 - _­ ­­ -1 _­­ I I - .. I --I__..11___.___________ __ manufacturers have system selector tools or navigators on their ,. ­ I ..' . . ., .. .I , I I ..:. Pipe: I . I ... " . ­ I piping and slab -penetration protection devices: Larger suspended commercial systems are often designed to -1. -� I , I I I -11 . . �' Temperature � .. I .. , I � I . Standard Specification websites to easily research and find a listing that matches the " . � , 1.1 I 'll 11, � 0 Latex caulk � . ! ____ __ � _ . - _ _-, - specified construction. I include a number of changes in direction. These directional changes I ­ �� 4- -� . L I. .. , I �' I : - , I if, " � ' 0 Latex foam . � Distilled Water DI -1 ..... . - I. -I-11- .... . 1-�-.-�....�-..-�-..--.....��-..���-..-----� ... .. ..... ­­ ...... . ­­­ ... ­.._­___­­ ..... � ... �.-...--------------�----.-------- - I- - .__ - _ can be a beneficial aspect in the piping system by creating a I I - I . I . - ___ ASTM F876 Standard Specification for Cross-linked Polyethylene (PEX) - spring-like effect, which safely absorbs and controls thermal . - I In -wall versus Riser Piping a Silicone sealant � - �' . Double Check DCV I Piping ASTM E84 - Surface Burning Characteristics expansion and contraction. I 0 / / / / / / I . 0 Polyurethane expanding foam � . Valve .1-1 .... " ..... 11 .. ...... -.1 ...... .....-I ...... I ... I . ... .... .11 .... 11, .11�.''....,..,..��''.."-"�'....'I .. . ..... ­_­­ .... I ...... . - ........ � ....... ___..' I - ". . - I � - , "", I I ­., - I I I I I - I / � / I . I ! - . I . 1. � ,. r ... __1 ___­ I ____.­­ -11 (Return -air Plenums ASTM E84) - -� / / / / � ! Down DN ASTM F877 � Standard Specification for Cross-linked Polyethylene (PEX) Uponor PEX-a piping systems comprised of Uponor PEX-a pipe, Controlling Expansion in Hot-water Systems i _____ r 11 �1: IE/ - - _.___ - . '__._ i - Drawing ._____.____. -"..--- DWG -...--.. Plastic Hot and Cold Water Distribution Systems Uponor ProPEX rings, Uponor EP fittings, Uponor LF brass fittings Best practice for controlling expansion forces is to continuously ITI I :,I F�- A I Uponor PEX Pipe 4 � I Uponor i � I -1 ­­ I .1 � .11 11 I ...... ­.­­.._­_.­ ....... ... _..__­_.'__.­­­._.___..' ..... . I ... 1-1 ... I.., ..... ... 1. ... ... I . I I I . ­..... .1. ! . I .­. �. I..'" ....... I.I.I.....- . . . .. .. .............. ........ ....... and Uponor PEX-a Pipe Support products are listed for installation in restrain the pipe by installing Uponor PEX-a Pipe Support. Install Maximum Allowable Support Spacing Maximum Allowable Support Spacing ProPEX Fitting : Drinking Fountain DF Standard Specification for Cold Expansion FIttings with PEX - return -air plenums as -tested in accordance with -ASTM E84.-------- ----------I PEX-a Pipe Support in accordance with the installation guidelines in for Bare-PEX Pipe for PEX Pipe with PEX-a Pipe Support Rated insulation pipe risers Y2" Water Service Requirements ! . I.... .. - . - . ­ � - - ­ --- ASTM F1960 Reinforcing Rings for Use with Cross-linked Polyethylene (PEX) Classified as to.Surface Burning Characteristics I Ch. 6 of the PDAM. For best results, terminate PEX-a Pipe Support . Uponor PEX-a Pipe Support . through 3" _ Uponor AquaPEX piping and associated fittings meet the . . : Piping _'_____________._ - 11 _­_.______ I ­__­­'.­­__­_'______ ------- _­' . segments only at fitting locations. PEX-a Pipe Support Installations in ASTM E84 Applications I -­:,::­ requirements of American Water Works Association (AWWA) ­­­�. I : ­­ ­­ .­_­._­­_­­_­_­­­ ------- - -- -..-----�.-----.-���.--,�--...--,.-,..'I .... . ... --- ____ -_ Flame Smok �� ==�­ -=L--- . � I I— '' . - I . .I ... - - I—. !Standard Test Method for Evaluating the Oxidative Resistance of ASTM E84 Developed Limitations =1 . C904, Cross-linked Polyethylene (PEX) Pressure Pipe, 112" Elevation ELEV � - 1- I B B (12mm) through 3" (76mm) for Water Service. -.1- E . xpansio'n Joint - EJ , ASTM F2023 I Cross-linked Polyethylene (PEX) Piping and Systems to Hot __ __ - - I � Spread __ Proper use of strapping is critical when using this technique. k � ..... 4 ASTM E84 Requirements for PEX-a Pipe Support �___ I... I � . .1 I -_ --- - - ---------------------- - --------- .- .1 Appropriate firestop � Fahrenheit *F Chlorinated Water I Adjacent pipe runs Strapping shall be: I Uponor PEX-a Pipe Support has been tested and approved for use in --- material (must be Nominal 1/2" to 3/4" 25 or less 50 or less shall be located at . - � . I ____..__'_­ . ... 1-11-- I—- ---- ­_­_.__­_­_ - -, ____ - � , , ­__­__­­­_ � . � � . I - � I -- ----- ---.------ least 18" apart a Nylon coated stainless-steel with a minimum tensile rating of I 11 ASTM E84 applications. To meet the requirements, PEX-a Pipe � - Uponor AquaPEX Only use SDR9 compression fittings listed in compliance with I Feet Per Second FPS Standard Test Method for Outdoor Weathering Exposure of .. � I - - ____1- ­­­­ -- - --- I .... .... 11 ­__.._'__.__ __ ---.-.-. ­­­ � "..' ... .--r ---l- ... .. ..... ­­­­ 1-1.--1. t . - ________ - ___ _ � - _ I- . ASTIM F2657 3" maximum 300 -lbs. a I Support must be installed per the following requirements: compatible) AWWA C800 as referenced in AWWA C904 in water service . ! . Cross-linked Polyethylene (PEX) Piping applications when transferring from PEX to a corporation or ! nominal size Uponor Pipe or fitting sections without e Rated for operating temperature ranges, including high PEX-a Pipe Support without Fittings * Pipe or fittings without PEX-a Pipe Support shall be covered i Fixture Unit FU 1. I � I I 11 - . - 1-11.11. -.1.11. ­__ � ­ I � - � I - - - - ___ - - _ . �. � - ___ --..---, EOR Stamp: i . : -.------.--...-,�-.-...--�.--." __ ___.___ PEX-a Supported _�_ Use appropriate floor curb stop. Be sure to use insert stiffeners when assembling a : .. Flow Switch FS ASTM E84 Standard Test Method for Surface Burning Characteristics of 25 or less 50 or less PEX-a Pipe Support must be temperatures. B I � A B with a minimum �" thick insulation. ---- �_ . . Building Materials with Uponor PEX-a covered a rated insulation. There is e UV -resistant to withstand expected life of the piping system. � � - I 0 There is no minimum segment length of PEX-a Pipe Support ____ assembly per code compression fitting with PEX. Commonly available SDR9 Engineer of Record I . I-. ­­­­­­­­­­.­ ... ­­­­­­­ . .............. . ....... . ......... If e or I __ ------- ______ � - -, _______ ________ - -------- ______ --- Pipe Support no minimum length of PEX-a Pipe 9 11� a I compression fitting manufacturers include: : Foot Head FT HD Standard Test Method for Fire Tests of Building Construction and Support Segments To account for expansion, fixed anchor points shall be used to ' � . . . -- Use appropriate wall e Ford Meter Box Company, Inc.@ I � I - -1 � _­ _.._­_­_..'..__­__­_ ­­ . ..... � ... � .... � ..... . ....... - ... � ... ASTM E119 ll I I I I When installed per the above requirements, there are no spacing %% I I � Materials I assembly per code RTM�4 'f!,, : Foot or Feet FT ____­­'_"_­__'­ '' 11 -.1- 1. � ­.." - I.I....1-11"..... � . - I I _'� . ­.­ - I restrict piping movement. Fixed anchor points shall be: I 11 I I 9 Mueller CompanyOR s%'% P� �, � ... 1. I I � I � I . ........ . ___ - � ------ _. ______._.__._____ . ... ..­­­ .......... � . ..... _­_­.._.'.__.______' .......... ___._'.___._.­__._ . . . ........... � .' , limitations between parallel piping runs. I 4 , : 3" maximum nominal' W' minimum '-% , r-ftlll� �� \0 .� ....... < �e.' � 2 � e A.Y. McDonald Mfg. Co.@ % <�' ;.. . -* 4�Z- ..4" vN / Foot -Pound FT-LI3 ASTM E814 Standard Test Method for Fire Tests of Through -Penetration size Uponor PEX-a 25 or less 50 or less thickness I 9 Installed every 65 ft. PEX-a Pipe Support with Fittings Notes: "I 1% . \0 E N **"- 700 1 ________.__'_____ -, - - __.- - . Firestop Systems *Constructed with materials that provide rigidity. 0 Philmac@ -% ­/ .. V - 1I with W' insulation I insulation The above requirements also apply to PEX-a Pipe Support installed I , �U- '� % �- 0* : Gallons GAL --.-------.--- . - 2 ____ .___ ..... .... _ - ... � .. . . ....... ........... ............ _.......__ .... .... .. .. ... ... . ..... � ..... . .... . .. ......... ... r- ....... ­­­ ... ................... � ........... . . ....... . . -.-.-- � - - -ft N . .. a . ! Utilize a pipe clamp that will restrain piping material. in a vertical position for ASTM E84 applications. "'� Mid -story guide : = i - 11 - - - - - . . 1.1--....1. ­­­ - I ---- - ------ ­­....­.. Uponor AquaPEX ASTM E84 Requirements A k A/2 ,P = o77,571 ' % u) ' I 1. I- CAN/CSA Crosslinked Polyethylene (PEX) Piping Systems for Pressure I : Installed within 18" of a fire -rated wall penetration. olle 41� . Water System Disinfection - * i � K�&(4 * = . .1 Gallons Per GPM B137.5 Applications . I I Exposed sections of �" and J" Upclnor PEX pipe can be installed required between .0 -U 0 - 11� .. I . - GO I -, I Uponor recommends flushing an AquaPEX plumbing system I . TATE OF ..- W -- Minute -----l- ­­­ - __._ I _'_.... ­....' ... 11.1 ..... ­­ ... � ­­ � _'_ " '' . .111. � � .. . __ - 0 -L ___ _3 L___ un -insulated if the pipe runs are separated by a rninimum of 18" each floor .0 % I ­­­' ­_­ � ­ - I I I I CAN/csA Installation Code for Hydronic Heating Systems Controlling Expansion in Cold -water Systems I I- I ,I;- I;;- - . � .01 .. .� !41 -% , � . E -1 . with clean, potable water. When system disinfection is .0 a .. 'i'_ N �% Head HD - I-- ­­­­ ... n13.2.14- � r... -_-r n----"-"- I I-'"'-"-- -1111-1 ­­­­ Best practice for controlling expansion forces is to continuously "10 : � � . ________ ___ __ ,- . - , _ _ ------------- _____ ___ ______ _'_ ___ - ­ _'_ __ - _____ . N . Expansion and Contraction Control with PEX-a Pipe Support � � .... ,. �. '' �, ` ,. Riser clamp required, Uponor AquaPEX piping should be disinfected in -.of.*""*" 0 4% " Heater HTR Standard Method of Test for Surface Burning Characteristics of Min. 18" restrain the pipe by installing Uponor PEX-a Pipe Support. Domestic < i 1" 1= __ required at the accordance with AWWA C651-86, Standard for Disinfecting A / �� %%*' CAN/ULC-S102.2 Flooring, Floor Covering and Miscellaneous Materials and �� When properly installed, Uponor PEX-a Pipe Support can reduce 1, � " AL -,N** i I - Assemblies __ Clamp cold water systems do not typically experience the temperature -4- linear expansion and contraction by up to 93% when compared to I base of each floor Water Mains, or local codes. 41-11, 11111110 0 . " Hose Bibb FIB __ _____ __ ____..______._____ 1.1-1 - differentials seen in domestic hot water systems, therefore � i - - -.1-11 11 ... ­­­ ­­.. ­­­ ... - 1/2" or 3/4" requiring fewer fixed anchor points. PEX-a Pipe Support shall be ,I;- __�� % _. __ bare-PEX pipe. Refer to the following requirements. 1 10/24/2017 ! Hot Water HW Standard Method of Fire Endurance Tests of Building; Important: To prevent reduced service life of system ! CAN/ULC-SI01 . 0 300 -lb, tensile -rated, stainless-steel straps I I .. .... I. .... ........... .. I r . . Construction and Materials Uponor PEX-a Pipe installed in accordance with the installation guidelines in the PDAM. - ! components, disinfection solutions should not stand in the ! Hot Water Return HWR I I 11 .1 11 111- ''. I " is - (uninsulated) Support Requirements for Fittings Fixed anchor points installed every 65 ft. for domestic hot I system longer than 24 hours. Flush the system with potable , . Dalrio' Lewis, PE 77571 (FL) : CAN/ULC-S115 Standard Method of Fire Tests of Firestop Systems W Strapping shall be: ]a - water applications. - Wall -framing water after disinfection. Use a chlorine solution of 50 parts per Project: I _____________.____ __ __ - _ - - __ - - - __ - ... � .......... I ...... ­­­ ...... � ........ -.1---1 . ..... -11.1 1-1-1-1 - 1-1-1 I ....1-111-1- ...... 1-1-1-1 ............. .. I I - � - -_ -,-- I _A� 0 Fixed anchor points installed every 150 ft. for domestic Hot Water Supply HWS CAN/ULC/ORD- Combustible Piping for Sprinkler Systems QA1 P321-1 a Nylon coated stainless-steel with a minimum tensile rating of 40 Support Requirements for Fittings cold -water applications. ' member, million (ppm) for 24 hours or 200 ppm for three hours for C199P . Guidelines: 1/2" through 3/4" (uninsulated) 300 -lbs. . at Corners I ""111111111111110 disinfection. --.-------------..�-�....-------,---- ,------- .._ ............................. ...... ... . ..... - ....... � Limitations: Adjacent runs shall be located at least 18" apart I Orlando Sanfoi � Inches IN ANSI/NSF -I - - - ' -_ ________'__­_­_______­__ - -_ a Rated for operating temperature ranges. - I Piping Supports: General Guidelines 4%P111111111111111111111 rd � , "'''. Plastics Piping System Components and Related Materials a UV -resistant to withstand expected life of the piping system. I ____.____.._'.___ ... ____ .... - .... ____ Standard 14 . . - 9 Uponor recommends using plastic or metal piping supports Refer to Pressure -testing Procedures . ! - -_ ____ _______ , -, , - - -, - - - ___.________ __ To account for expansion, fixed anchor points shall be used to I I - International IPC ANSI/NSF Is '�_ - - - - - I 1-- designed for use with plastic piping. appropriate fire It is important to properly pressure test an Uponor plumbing Spring Hill Suites � Plumbing Code Drinking Water System Components - Health Effects restrict piping movement. Fixed anchor points shall be; 7- I- I 0 Allow for the linear expansion rate of Uponor AquaPEX piping - assembly listing system in accordance with local code. If testing with air, it is � I - I I - I '�� 1. - "I'll ­­­ ­­­­ .. I - I � � Standard 61 .- Clamp *Installed every 150 ft. Q . --- Iron Pipe Size --,.-�--��--.-,----�..��..-..--�-� ---- -- _.__..­­ ... � .. ..... _...'_.____._.' I I I I I ­..... I . .. ... ...... _.._ . . .. ............. __ No Limita ion approximately 1.1" (28 mm) per 10OF (5.60C) temperature I ......... ! Q . � important that the system pressure not exceed 120 psi. : � ..' .... ....... I .... .... 1. ...... .. . ''. . IPS ANSIMSF Valves for Crosslinked Polyethylene (PEX) Water Distribution . ­ Min. 1/2" 25/50 a Constructed with materials that provide rigidity. " lz� �' .. - H change for every 100' of piping. ! I I., "_11_ ... _" for penetra I tion Pipe Replacement Kitchen Sink KS . Standard 359 Systems Rated Insulation . I e Utilize a pipe clamp that will restrain piping material. __ . * When installing piping runs, thermal expansion calls for an extra requirements I Importance of Conditioning PEX-a Pipe � _­­­_­__­­__ __________­­ . .- - I � 1-1 - ­ . . Laundry Tray LT Cross-linked Polyethylene (PEX) Pressure Pipe, 1/2" (12mm) I e Installed within 18" of a fire -rated wall penetration. Additional Supporti-IM30 1/8" to 3/16" of longitudinal clearance per foot of run. Do not ---For HW a riser Uponor recommends conditioning the system at 1.5 times the and Modification 'I ­­ � - __ - - - _ ___ __ AWWA C904 through 3" (76mm) for Water Service I � 1 1/2" through 3" 1 allow piping to dip excessively between supports. Do not pull to clamp required at test pressure, or 120 psi. See Uponor Installation Manual for . I Lavatory LAV - ____ - ,.. . __._'______ ... . ..... ... -.". , ". , . ,. ..' . , I I I "I Uponor PEX-a Pipe V, . '� . �' .1 I . .1 0 �. I . . ", ' A % __L___ piping tight during installation. - the top of every- proper conditioning procedure. i .. I 4 . , � I .' I I _­ ---. ­­ - __._.­_­____­­____ . � ��' � , Linear Feet LF ANSI/UL 263 Standard for Safety for Fire Tests of Building Construction and [W_ __WJ 1.'. I . ­ � � . . ". I I . , .. ..I - Corner Support Example - - - - I * Allow adequate clearance between PEX piping and the structure I other floor to limit I Materials � . . '� " � I I . I I - .­._­.­­ ..... .. - ­­­ - _____ _____ ___ -------- ­ ­ . I I I .. . - . , . - I -.1 -,-..,.----. QA1 P321-1 , . .'� I Distance G = 16" Additional Support equirements for Fittings (bored holes or sleeves) to allow piping to move freely due to - the expansion and Print Stream Identification Material Safety MSDS Guidelines: 1/2" through 3" (insulated) - - :fwo hole )pen short angle Total distance for G = 32" (16 + 16) at Corners thermal expansion and contraction. contraction to 20 ft. .. I. �.. 11 -I I I I ­...___­__­____."_'.' 1-1 - � I I I - _ __________...__ � and Data Sheet UL 1821 Standard for Safety for Thermoplastic Sprinkler Pipe and Fittings Limitations: 1/2" minimun thickness insulation as specified I Steel strut Distance H = > 16" 9 To ensure limited movement of multi -port tees due to flowing For CW a riser Print Stream on Explanation I I I—_ i . I-. .1. I . . - - _ -,.---.-.-.,-. ___ for Fire Protection Service (NFPA 13D applications only) . �All-threaclecl rod Total distance for H = > 32" water, install a pipe support within 6 inches of the multi -port tee Riser Support clamp required at Tubing Mechanical Room MECH ----�-.�---..-��..,-..���..'���,-�....-.-.-..---.--.--��..........'.�--...- - . ...' ..... .. ........�.,-...-.--.---------,-.----..-.---...--.--.---,-- . Two hole open short angle . _­­ , on the supply pipe run. the top of every- I . 11 - I ''I.- .... .... -1 __.______­­­.. .1- . - -1 - � � ­­­_...­­_ _.____'_'__.'_'__ " ''. , - I --- ____ � I UPONOR AquaPEX Brand Name Standard for Safety for Fire Test of Plastic Water Distribution . I J �� trut Clamp . . fourth floor to limit National Pipe NPT UL 2846 Plumbing Pipe for Visible Flame and Smoke Characteristics . r , + I I ' the expansion and .. . ... � I -.1 __­..­_.______ I I . _­_­­­__.'_'..___ _____...___._ . " I ­.­ I I Th I r � ead ­ � - . I I Dimension Supporting Uponor Multiport Tees ontraction to 40 ft. . PEX 5006 ASTM F2023 -resting I/A/W ASTM F876 � - � . I .. . . I I . ... - - � I - - -, - , . . 1. - '' . - _. - ...... ­. - 11- � � No Limita ion . Uponor AquaPEX Nominal 11C91 C I I I National Pipe Flanges and Flanged Fittings: NPS 12 through NPS 24 - Clamp V7"� ;'. ...' , " , ... 1. �:. I Storing and Handling PEX ____ __ _-, --..-- ___.___ -, _ - � ___ ---------- . � Plumbing Code of NPC ASME B16.5 � Fixed Anchor Point Steel strut or other Pipe Size � I - �.%. , '. � 1 2 IN Tubing Size (Example: 2") . * �' . � , I .1 � � � ! . Metric/Inch Standard 1/2" through 2" approved device :1, . ' - " i 11� I " i. � '.�. _ "'. . I , I I . 1. . Although not comprehensive, the following highlights the most ------ - ____ - 11 I I � I .1 I -.1 ...... -.1 .... I .... --.1-1......' ... ­­­.. ­­­­ � . ... . .... .......... ........ . ...... -.1 .1, � I Canada ­­ . �.-.,-.,-.-.--------�-�l---,-,..,- - ­­­­ - I - ­­ "I -1111 I ­­­­ ­­­_________­­­­_'­. Uponor PEX-a Pipe I flh I �� �� f, -.1--....' -1 - - - __ � - -.- I.- . .*. I I . I . "'� - " .' -. 1. ;' I '.I common guidelines when storing and handling Uponor AquaPEX: SDR9 Standard Dimensional Ratio of 9 Location: . ��...�-------�--.,-�.--.��-�.,-.. �- � . Ell -111-111-11''. ''I.I..--�-.-----.....,--,,.,..I .­­_'.__.__­­__ i National Codes .- Uponor PEX-a Pipe . . . � � I I 11 .� .1 .� �� . Ir I + � �:: I All Codes - f ­J -6" Max. . * Do not store PEX piping outdoors. 201 N Towne Road, Sanford, : -_ Standard NSPC ICC, IPC, IMC, IRC, UPC, UMC, NSPC, HUD, UFGS, NPC of 11 ell .1 Support 1. . I A, , � �' '* , " ". - , . I I �'/.. * - � e Keep PEX piping in the original packaging until time of installation. B137.5 POTABLE Potable Water Listings by CSA ) I I . " . I 1, � � ' I . ' 2 _____ __ _ _ _ _ _ _ __ _ ­_.­­.____.___ . . ... . . . ......... . ­­­ ..... - .. I __ _________­ ... ...... I ..... . ..... . .. . .... I ......... � . ... - ­­­ ..... � ..... - .... ­.__­­.­­ - I I " . .1 - . �' � -_ Plumbing Code Canada, NBC of Canada W W I I � " " . I I �_ C __� * Install Uponor systems according to the installation instructions, FL 32771 � _­ .... . I.- I _...... -1 ... ..... � ............. - - ... I .... � ..... - ..... I .... I .......... I-. .1 - I., .'. 11 I - cNSFus-pw Potable Water Listings by NSF QA1 P321-2 �1411 Failure to follow the instructions and installation guidelines in this - .... .. .. - - 1-1-1-1-1-- - - ------- - __ ... .... ­­ ... - ........ . . I ...... . ... ­.- ....... ­..____­ . ...... . - - - � - Nominal Pipe NPS Listings Guidelines: 1/2" through 3" (PEX-a Pipe Support) I I'll . ' I . . � - I .1 11. - ­­­ I ...... ..... ___ - __.________. I Multiport Tee manual can result in the failure of Uponor systems. Listings by UL Size �'. - wl*)�. - . . .1 ........ . I— ._______...._­ ...... I cNSFus-fs, cNSFus-rfh, cNSFus-pw, cQAlus, UL, CSA, WH, Pipe or fitting sections without PEX-a Pipe Support must be covered with a rated -Fixed Point Based on I J" to 2" ProPEX Ball Valve or similar CTS Hanger * Do not use Uponor AquaPEX piping where temperatures and . I.......'.'' ... r . ...... 1.1 .......... ­.__.__­­ ­­ . ... - ... ...... -----------.-..�.---.----..--.--....I .. ....... ­......' � ­....­ - I _­ - ­­­_ . insulation. There is no minimum length of PEX-a Pipe Support segments. I 1/., ,(DO U.P. Code Uniform Plumbing Code Marking 11'''', Nonpotable Cold NPCW ETL, PPI -TR -4, ICC-ES-PMG, IAPMO, BMEC, CCMC I_<----,_ Fire -penetration 74 _ 18" pressures exceed ratings. - _ ------ ___________ . � - ---,--,-- Issuance: � Water . Butterfly Valve-, - ___ - 9 Do not use or store Uponor AquaPEX White piping where it will be � i �'­' Canadian Construction Materials Centre Evaluation Report ______ . - � � 1 2 �_ _____1811 ______ CCMC 13529-R � .� � I �Nonpotable Hot NPHW Uponor ProPEX Fittings Uponor AquaPEX Design Parameters - .1 + ProPEX Flange i t exposed to direct sunlight for more than 30 days. I .__­_____­­__­____ '"' __ __ � 1 I � -_ - .. .--- -_ Permit Set I ­... - I � Wat � er . Uponor ProPEX fittings are available in both Engineered Polymer Domestic Cold -water Piping . � , I I I Adapter ­_ --- 2" _ _ 111" 9 Do not use or store Uponor AquaPEX Red and Blue piping where it I � '_ � � (EP) and Lead-free (LF) brass and are tested and listed to ASTM 0 Maximum velocity of 12 ft/sec. through pipe OF I 11 11 �' ... I / _1� I-1- __ _____ ____ ___ will be exposed to direct sunlight for more than 90 days. ASTM F876/F877 Nonpotable Hot I b I 21 7" ASTM Pipe Standards . i Water Return NPHWR F1960 and CAN/CSA B137.5. 0 Recommended velocity of 10 ft/sec. through pipe I I � I ProPEX Ring � - a Do not weld, glue or use adhesives or adhesive tape with Uponor F2023 I . - - . __ - __ - - -_ _____­_ --.--------- Domestic Hot-water Piping I . , I . � Y � 7" AquaPEX piping. -_ . � - - --- ______ � . - _.___________.__' . - Normal Uponor ProPEX Lead -Free (LF) Brass Fittings 0 Maximum velocity of 12 ft/sec. through pipe _'_� - � ­ ASTM F1960/1720801 Temperature and NTP All Uponor LF brass products comply with NSF/ANSI 61 Annex a Recommended velocity of 8 ft/sec. through pipe A q, Note: You may temporarily affix adhesive tape to Uponor AquaPEX I F1807/F2098 ASTM Fitting Standards Pressure G, NSF/ANSI 372 and conform to the lead -content requirements 0 Maximum operating temperature of 200 deg F (93.3 deg C) Fixed Anchor Point - Fire -rated Wall Penetration Based on 2 J" to 3" ductile -iron butterfly val similar piping during installation. However, to protect the integrity of I . ... ... I I.. ....- I I .. ....'' ... . ... ... I...... . - I Not to Scale NTS for "lead-free" plumbing as defined by Domestic Hot-water Return Piping Note: If dimension C cannot be met additional support shall be added. I I the system, the tape should not be permanent. Remove the � - - � - __ - I California, Vermont, Maryland and Louisiana state laws as well as 0 Maximum velocity of 2 ft/sec. through pipe Expansion and Contraction: Risers tape and residual adhesive after completing the installation. � cWHIus FS25/SD50 Warnock Hersey Listing for 25/50 FS/SD Plenum Rating I ; On Center 0C the U.S. Safe Drinking Water Act, effective January 2014. a Vertical piping runs must comply with support spacing as defined by . . . � I ­ - 1. Maximum operating temperature of 140 deg F (60 deg C) � - ______ - -_ � . I � � I - -.-.-.- --- --- - --- 1-1 . - I � I Pipe Anchor - PA code. Best practice is to utilize the floor assembly as an anchor . . * Do not apply open flame to Uponor AquaPEX piping. ICC ESR -1099 ICC Evaluation Services Report ESR -1099 � I 1.''', All Uponor LF brass fittings marked as NSFus-pw-G comply with the Notes: point for controlling expansion and contraction by means of riser Uponor PEX-a Pipe Support S 9 ,Do not install Uponor AquaPEX piping within six inches of any gas . . I .... ­......_.- . ) Pounds LB dezincification resistance (DZR) and stress corrosion cracking (SCC) Uponor allows the dedicated fixture supply pipe to be of the same clamps. Do this by utilizing an additional riser clamp at the top of po-rt\ appliance vents. One exception is double-wall B -vents, which have � ANSI/AWWA C904 - - American Wa � ter Works Association Standard for Water I � PEX-a Pipe Support is a self -gripping, galva n ized -steel channel for - k 6" Max. Service � � ' - ' - - I requirements of Sections S.8.1 and 5.8.2 per the current NSF 14 nominal size as the fixture being supplied, provided the dedicated the floor assembly as listed below: - a- a minimum clearance of one inch. 1. 1. . . .. .. I : ! Pounds Per i pipe is no longer than 25 linear feet from a 0 Domestic hot water: top of every -other floor. PEX piping. It provides continuous, uninterrupted support of PEX-a - � I . PSI I Standard. - * Do not install Uponor AquaPEX piping within 12" of any recessed cQAIus P321 QAI Listing for 25/50 FS/SD Plenum Rating i I Square Inch uniform -friction -loss -sized pipe. - Domestic cold water: top of every fourth floor piping, allowing placement of hangers similar to that of metallic I . piping. � light fixture unless the PEX piping line is protected with suitable .- ________ - , - � -------- � ....... .. __....- .. " I I - I-- . ..... 1-11-- --- --- ------. ..... ..... .1 . . " I Pressure Gauge � PG - � Uponor's LF brass is approved for direct burial in soil per NSF/ANSI . insulation or the can light is Insulation Contact (I.C.) rated. 130 PSI 12OF UL UL Standard for NFPA 13D Fire Protection Service � . I i I Standard 14 testing which established minimum performance Uponor allows the use of �," pipe for domestic hot-water return Thermal Expansion in Underground Applications * Do not install Uponor AquaPEX within 5 ft. of direct view from . 1821 1 1 Pressure . PRV criteria for DZR/SCC resistance for PEX fittings intended for potable piping provided a flow -control device is in place to maintain For direct -burial applications, mitigate the effects of thermal PEX-a Pipe Support may be insulated with typical CTS (copper tube I - ______ - - ­ ­_ -- - -- ­ _____­ . 11 I � � I I Reducing Vavle expansion by incorporating proper installation techniques that size) pipe insulation and is available in 9 -foot (3m) lengths in 1/2" - fluorescent lighting without sleeving the pipe with a UV -blocking ULC/QRD-CI99P ULC Standard for Combustible Sprinkler Piping . .1 water. velocities at or below 2 ft/sec. provide adequate resistance to axial stress. 3" sizes. . I material. I - ­­­ _________.__._'____.. , . I I .. ­­ --- Pressure Relief Pv e Do not use Uponor AquaPEX piping to convey natural gas. Revisions: I Valve Soldering Recirculated Hot-water System Design Uponor PEX-a Pipe support Installation Guidelines Commercial Multiport Tee w/ * Do not solder, braze, weld Or fUsion-weld within 18" of any IAPMO UES 0253 IAPMO Evaluation Services Report ER -0253 I....-..-,�-.1.1.�...,...-..-...� .. . ............... . ....... - _........ ... .... ­­_....' When soldering LF brass fittings, Uponor recommends using a lead Uponor AquaPEX piping is tested and listed to PEX 5106 NSF-pw Per PPI TR -21 Thermal Expansion and Contraction in Plastic Piping Uponor AquaPEX piping in the same water line. Make any - � ____ .. ... ..... ____ ....... ... ... ... � . ..... ...... .. .. ..... .. .. . .. , - "' " # Date Description Pressure Switch PS free flux and solder which meet the requirements of NSF/ANSI 372 (CL5). Per ASTM F876, the CL5 chlorine resistance rating is Systems, a buried or concrete -encased pipe is effectively restrained Mounting Clips (included) heat -related connections prior to making the ProPEX connection. ASTIVI E84 Standard 'rest Method for Surface Burning Characteristics I . I or NSF/ANSI 61 Annex G. Please refer to the solder and flux intended for an end-use condition of 100% at 140OF/60"C. Uponor against both lateral and axial movement by surrounding Open -web Truss o Do not install Uponor AquaPEX piping between the tub/shower - - - ...... __­_.­.­_­­' I ­­..­­­_..._­ I -1 . US . Water ed force is dependent on the nature of the soil and on installation and . valve and tub spout. CAN/ULC- S102.2 1 rd Test Method for Surface Burning Charac 11'''''. I Reverse Osmosis manufacturer for details on properly soldering lead-free brass 2 ft./sec and the system must be balanced properly. See Uponor's embedment material. The magnitude of the frictional restraining Multiport Tee _\ I -d- --- -_ - ---- - RO requires that the velocity of the recirculation piping shall not exce Lan a teristi] materials. � * Do not use Uponor AquaPEX piping for an electrical ground. - i - CA Roof Hydrant RH Plumbing Design Assistance Manual or ASPE Plumbing Engineering operating conditions. For example, the extent of compaction near % e Do not spray on or allow organic chemicals, strong acids or strong - _­__ --- . _. .. ­ --------------. ­___ ____ ­ I - --- - - - - - � I I I Fittings by Others the pipe can affect the quality of contract between the pipe and I I HUD MR1269e HUD Material Release Report 1269e ; I I i Design Handbook Volume 2 for more information. . bases to come into contact with Uponor AquaPEX piping. � -­­­ '__'_ ­ *­' ­ " __"'__­__'­" " ' ­ " ' '' '' - * � . Service Sink SS I Note that Uponor cautions the use of other manufacturer's PEX pipe surrounding soil. The anchoring or restraining effect of surrounding . --- I . I * Do not use petroleum or solvent based paints, greases or sealants . Shower SH � with Uponor ProPEX Rings as well as using other's expansion rings Uponor AquaPEX Velocities and Flow Rates at 2 ft/sec. soil on pipe movement can be significantly augmented by external - . - ­ -_ - - I ­­_ ______� on Uponor AquaPEX piping. 16OPSI 73.4'F � I T -_ ----------- _____' ' (23'C)/I00PSI Hydrostatic Rating from PPI in Accordance with ASTM . __ - --.-- - __ � _-1 -1 - .__ - - - _'___1 with Uponor PEX-a pipe. Because of the lower degree and � � . pipe geometry. Tees, lateral connections and changes in direction - I M. � Use only approved and appropriate firestop materials with Uponor ,180-F (82-C)/80PS F876 Soft Cold Water W I - ­ ­ '*-------'* ­ ­__­ Fric_t_io___nl"_lL6iss__ --- all help to anchor a pipe in the surrounding soil. � - r uniformity of crosslinking in PEX-b and PEX-c pipe, stress cracking Nominal Velocity i Flow Rate i � Nominal I I I _...... ... I I - AquaPEX piping. ! per Foot at I !Max. Suppo Max. Min/ Overla Distance I Min. 1 6" Max. F � 200 -F(93 -C) I i I I i i i SC ' of the PEX-b and PEX-c pipe wall can occur during expansion, Pipe Size (ft/sec) I (gpm) . I i "ti I � Sprinkler SPKR ; 120OF/48,90C I Pipe Size i Spacing i Cantilever I (C) to Fitting I Overhang I 9 Do not allow rodents, insects or other pests to come into contact I I I i .. I Because the friction between the pipe and surrounding material is . ! I . � - -_-__--_-_A____ I—- __._­__­'____­­­. __ . .. ... - .' . -, -, -_ - I � compromising the strength of the fitting connection. Additionally, ______ - 2 1 1 --.._..._.-__ 0.0195 1 1 1 (A) I (B) I I (D) (E) Wood I -joist with Uponor AquaPEX piping. I - - ------I Standard I STD : 1 1/2. .1 I i generally sufficient to arrest axial pipe movement, a buried pipe I ! I I UPONOR PEX-a 1 i I I the 25 -year limited warranty for Uponor PEX-a systems is only valid I ---------- ­ - - � : f - __ ___ : __ - ­ : ­­ � i . i Commercial Multiport Tee 9 Do not subject Uponor AquaPEX piping to blunt impact. I TUBING Type of Crosslinking (PEX-a) ! i I ; i I - -- - r-----. ____­____ ___­___­ ----- ---- I � I I � I I . ! that is subject to typical fluctuations in the temperature of the fluid 1 1/2" � I I / ! i ded) I 1. - - - . - � ­ . . � . � . . � � I � I . � � - ­_ � when both Uponor PEX-a pipe and Uponor ProPEX fittings are used. 1 3/4" ; 2 2.2 ; 0.0126 ! ! � I i 1 1 4" 1 w/ Mounting Clips (inclu * Do not install Uponor AquaPEX piping in soil environments --I � i Standard ! - - . i . I I I - . - ; I I I ! Date: � ; --- ' -_ i it conveys or of the soil that surrounds it is only subject to modest : 6 -on 1 1 1 --- - 11 � I I I i Dimensional Mixing the ProPEX Rings with other manufacturer's PEX pipe or i In i I : t i Multiport Tee:� contaminated with solvents, fuels, organic compounds, pesticides � I r i i 1 2 ; 3.6 1 0.0092 ; 1 3/411 ' i i Manufacturing Code to Audit Material Source (USA, 1 I : i I axial thermal stresses that are well within the strength capabilities I I i : 1 3/4" 1 i � . : ; Ratio i other's expansion rings with Uponor PEX-a pipe will limit the i � i - - -_ --- _; or other detrimental materials that may cause permeation, 950127 I I ! '-_ I ; -- - i I i � October 11 2017 11 '''' : i I : " 1 i -_ - --- --- _! I ;_ -_ --- -- . � � 1 Material Type, Extruder No., Year, Month, Day) I � - � 1. . � � - I � I- - - .1 �- � � ! . : . I i � - . . ! __ __ -1 warranty. For complete warranty details, refer to �_____ I - I - /4 � I _ - 2 i 5.4 .. __J___'_____.___ 0. - 0072 - � ----I of the pipe. . . i I., 21/4" 1 corrosion, degradation or structural failure of the piping. Where I I Temperature and I www.uponorpro.com/warranties. I - I 1, - - - - ____ I I ! - _1 I such conditions are suspected, perform a chemical analysis of the L__ ._._'.._._.___- 1 Pressure Relief 1 1/2" 2 ! 7.5 1 1 1 T____ -_ -_ -- =;�v � xxxxxx Footage Marker in Increments of 5 - feet I ! - I 1 1/4" 1 1 1 � - - -- - - - -- - -.-- -- - � I I : Bending PEX 1 23/4" � I I . soil or groundwater to ascertain the acceptability of Uponor '-_--___1 ___ . . .... ...... . ............. � ... . � ...... ......... . . ........ .... ... ..... .......... � ... �-...--,.--.-.--.'',-..-.......".'I � - I Project Number: � Valve 1 0*0059 1 18.. i : 11. � � 1 211 2 12.9 0.0042 . � Note: Uponor does not permit a press -type fitting to be used with f .. I I I � I - .'!� - -1 � � � _... . - The minimum bend radius of Uponor AquaPEX piping is I- - _____ ! 1 6" � - __ AquaPEX piping for the specific installation. Check local codes for - I I i [ - ' 2., ! i I 1 1/2" i i----- 3 - 11 - * I I Tempered Water TW � ProPEX sweat or fitting sweat adapters. Brass material is not nearly 1 2 I/ _ 2 I 19.8 1 0.0033 1 six (6) times the outside diameter. Bend supports are available I ---"---- __ 81-09, i i- - I - I additional requirements. 17.AHR.001 � i � as malleable as copper material, causing undo stress and affecting 1 Y 2 1 28.1 1 0.0026 1 for 3/8", 1/2", 3/4" and 1" piping and may be used to 1 2" 1 ! i 4-1 L-6" Max. e Do not press ProPEX brass fittings (i.e. copper press). I I ! . . . i I i I � , __ ______ -1 ' ' . : . I the integrity of the connection. . - - I �j . � . I ­ __ � . facilitate 90 degree rigid bends. Large diameter PVC conduit can be i I I 1( . 0 AquaPEX piping passing through drilled or notched metal studs or � I I i Support multiport tees within 6" for all installation applications. 1 Tempered Water I I i ! . Drawn By: Checked By: i TWR i used to facilitate 90 degree bends in larger diameter Uponor 1 2 1/2" 51, i i Recirculating ; I I � i joists or hollow shell masonry walls shall be protected from � - -- i --! P I I � ! Minimum Distance Between i . Reverse Osmosis and De -ionized Water AquaPEX piping. To alleviate stress on ProPEX connections and . I ! I I I- i i abrasion by elastomeric or plastic sleeves or grommets. 1 I 3" i i i Vertical Support Requirements i �I I I i I Nominal Cut Length I i i 6" i i I I ProPEX Fittings � I Systems fittings, do not change direction immediately after a ProPEX - - - ------- ; - - - � � I .1. - _­­ ­_ -_ I. � i __ _j I I .11, I SE M3 � Thermostatic I To ensure a proper ProPEX connection, , Fitting Size � of Pipe . I I ;___ - - i I � � TMV I � Reverse -osmosis systems and systems using cle-ionized water with connection, Uponor recommends a minimum of two times the i i I ! I i ' i � Note: When transitioning from PEX to other piping materials, follow : I I . I d Mixing Valve follow the required minimum distance ­ . . : i .. -_ I I � I - - - , a pH between 5 and 8 and a maximum temperature of 104 deg F outside diameter (O.D.) of the pipe as the minimum distance before i i I I the appropriate installation instructions for that product. i .1. 1. .11 . ..... between fittings chart. ; I . I : I I i 1 1/2" 1 2" � International ; Uniform National � I changing direction. I I Typical Typ : ­ .--.-.-.,. I 1 (40 deg C) are approved for use with Uponor AquaPEX piping. i � Nominal I ! . . .11 - . I I.... . i � I I I ! Plumbing Plumbing Plumbing i � � I i - B s - A - i s _ 1 11 .... � 1 3/4" Y 1 i I Code � Code Code of I Strapping Requirements for Uponor I Uniform Plumbing I � . '. ___ . . Uponor requires the use of engineered polymer (EP) or ' Pipe [ " - - - ' - Bendl : � Plumbing Detail i UPC stainless-steel fittings with these systems. Note: When minimum distance . Pipe � Min. i I Size I � 2 x O.D. 1 - I I i (IPC) (UPC) Canada AquaPEX Pipe Runs i Ill 3 1/2" cannot be achieved with a I I D. (i (in) � I I ..' ... 1. 1. - .1 ..... 1. . '.....'...' _­­­ ; (in) A I I L � I (in) ! I � ... = I I - Steel straps must be coated or have no sharp edges. � Code ' _­ _­ support, use a ProPEX elbow. Size ; radius i I I � � . � Urinal i UR _� Bundling bend i 0. __ n) -1 ------- _____ I ___ I E E 4 i I L PEX-A 1 1/4" 1 4 1/2" 1 1 - I - �- - - 9 Cable ties shall not be used for suspension alone. I i I I � i t I � I Uponor recommends i : I ! i i I � I � .­ - - - ,� Parallel runs of Uponor PEX may be bundled together given the i 0.625" 1 3 3/4" � 1 1/4" � . . � . ! I ' I i 1 1/2" 1 i i � � : Water Closet : WC i 1 1/2" � 4 1/2" 1 the use of elbows in sizes i ; I t - - - . - ; I I - Piping shall be isolated from other MEP systems by means of I i i � . . .. . ­ � � I i I I I i I : I - I .11 ... I .. I.. I . I � following guidelines: � - i : � All Pipe � i ! insulation or stand-off brackets. : i 1 3/4" i I � . � � I I i" and larger for directional . 0.875" �! 5 1/4" ; 1 3/4" I : � . T-0" (1.5m) 5'-O" (1.5m) ! 5-0" (1.51n) �� . � Water Fixture I WFU � ! 2" 6" � e Entire bundle must be supported at the required O.C. distances. i ; I I � i in wall I Sizes - i i . . - - I . I i : e For hot-water applications, Uponor recommends a strapping � Units I ; : I I changes unless adequate ! Ill � - C - D - � : i � : . � : : I I ; � 9 Cable ties may be Used to maintain a tight bundle of PEX. ! 1 1.125" ; 6 3/4" � 2 1/4" � . material suitable for the application (i.e. UV, high I . Water Hammer 2 1/2" 7 1/2" - Cable ties may not be used as the sole means of supporting the space is available for a I I - ' . � i I � temperature) . i WHA ' � pro er n . Vertical . Arrestor I I 31. 91. 1 bundle. . � . 6 1 . I . - E:1 11 . r__T__ Al . I I e Approved strapping materials include: I I . Water Heater � i � WH , Cut Length I I � 9 Keep hot and cold bundles 6" apart if uninsulaLed. N U --- E43 A . 1 �43 / - I ; All Pipe � Base of each Base of each : Base of each � ePipe talons I of Pipe floor, provide I floor, provide;! floor, provide, : � [-- __� X i Risers ' Sizes � I q *Clamps Water Worki � . � � mid -story � mid -story '; mid -story ' Sheet No.: ng rN : ; : oStand-off brackets � WWP � ! guide guide � guide ! I Pressure ; I ! � ! '­''' I . I � I I "'�"' . I I : *Nylon banding and cable ties (50 lb. min.) suited for the s I ktr t M F V r�� . - I I I 1 4 = a I 1= - - ^' -.. i 4:� <�' 4�1 0,3 4�1 If, 0 a t - W T I I f J _� Y_ I V_ � 7W I 't 06 I i t :51==1==[ L -1j'. V I . __::� f 1J t7 ' ' I n' Ae ! �"� ' te r :ik a I I ' RE - CT up SU' I 6 ", M., ax - 6;::� \ \ _;A , W.". - " " Correct Bending Incorrect Bending application i li I . i i . I I . DETAILS AND NOTES TAKEN FROM UPONOR PLUMBING DESIGN ASSISTANCE MANUAL, FOURTH EDITION. www.uponorengineering.com I I I I . . I I