HomeMy WebLinkAbout1905 French Ave 17432 Sign and energy calcrid _... ,. __:.. .. .:.. ...... .. .... ... .... _.. ..
LORIDA MODEL ENERGY E F t Ii,IENCY CODE
FOR BUILDING CONSTRUCTION
BOB GRA !AM SECTION B GOVERNOR'S ENERGY OFFICE
GOVERN LEX NESTER DIRECTOR
TABULAR METHOD -
SOD rv[J44 ._ .. ...• ......• .,. .. .,, :..
PREPARED BY' BRABHAM KUHNS DEBAY- CONSULTING ENGINEERS
E"]
RECIPE-,RES.TAURAN
PROJECT NAME I
SANFORD, FLORIDA
AND NUMBER
BUILDER
OWNER
I
JURISDICTION ZONE: __5 -
BUDDING INFORMATION
COMPONENT R -VALUE AREA
WALLS CBS 0 FRAME OTHER e e it 6.7 1833
GROSS AREA CBS FRAME OTHER
GLASS CLEAR Q TINTED S C 91 154
ROOF/CEILING I WOOD CONCRETE OTHER 20.8 2295
FLOOR OVER UNCOND. SPACE WOOD CONC.OTHER,
THIS DATA TO BE SENT TO THE GOVERNOJtS ENERGY OFFICE
SYSTEM INFORMATION . .
AIR CONDITIONER EFFICIENCY - EER/COP=
I HEATING SYSTEM TYPE STRIP; [} HT. PUMA'; GAS = OIL: I SOLAR
HEATING SYSTEM EFFICIENCY EER/COP=
HOT WATER SYSTEM TYPE JELECTRICUl HT. REC: GAS - OIL : QFSOLAR:
ENERGY TOTAL
BUDGET BUILDING
30.3
ENERGY
from Appendix E MBTU/YR/SF, MBTU/YR/SF
C-pTj 1 1D YPE W-JFDATE- 6 24 82
T,O BE FILtD WITHBUILDING PERMIT APPLICATION
TYPICAL WALL AND CEILING SECTIONS SHALL SUPPLEMENT
THIS FORM.
i
1
THIS CODE COMPLIANCE]
BUILDING VALUES
BUILDING INFORMATION
GROSS SQUARE FEET CONDITIONED/HEATED FLOOR SPACE'
WALL AREAS: TOTAL OPAQUE AREA - AWV 33 I
TOTAL GLASS AREA - Ag ', SIA.
TOTAL DOOR. AREA - Ad
GROSS WALL AREA (TOTAL OF ABOVE) A 2 F
ROOF AREAS: TOTAL OPAQUE AREA - AW •
i TOTAL SKYLIGHT AREA - A o
U VALUE CALCULATION
j Uw= AREA = ®+is Sx 133UOFOPAQUE
Ug= U OF GLASS AREA
I Ud= U OF DOOR AREA
2 3• Uo= U OF OVERALL WALL/GLASS/DOOR ="Z 3 37* —
i Uw= U OF CEILING/ROOF AREA < Q4C9 46 over 3 s for
Ug= U OF SKYLIGHT AREA = —
64kUo= U OF OVERALL CEILING/ROOF = 1.
Uo= U OF FLOOR OVER UNHEATED SPACE= 34
NOTE: SUPPLEMENTAL INFORMATION IS NECESSARY TO SHOW iTRADE-OFF BETWEEN CEILING/ROOF ASSEMBLY AND WALL/ i
GLASS/DOOR ASSEMBLY OVERALL U VALUES.
OTTV CALCULATIONS
UWAWTDeq.
WALL CONDUCTION COMPONENT = A = f
UfAfat =
GLASS CONDUCTION COMPONENT = A I
t = SUMMER DESIGN DRY BULB - 780) I
From SECTION 302.1(b)
A f SF SC
GLASS RADIATION COMPONENT • _— _ +
NOTE: FOR GLASS, NOT EQUAL WALL
I SIDES, SUBSTITUTE FOR RADIATION COMPONENT
ABOVE, THE ORIENTATION RADIATION COMPONENTS.
GLASS ORIENTATION IN 30
RADIATION COMPONENT NW/NE _ '•
FOR EACH DIRECTION E/W = _
SE/SW =
A f OSF SC S
OVERALL OTTV (SUM OF COMPONENTS)
GLASS MFR. & MODEL #
INTERIOR SHADING DEVICE
EXTERIOR SHADING DEVICE
Is I.S 30.3
Wage 1
COMMERCIAL
CONTINUED:
WIND014 AND DOOR INFILTRATION -
WINDOW INFILTRATION RATES •5
WINDOW MFR. & MODEL
E DOOR INFILTRATION RATES"- Table 5-3
DOOR MFR. & MODEL
MECHANICAL SYSTEMS
REHEAT COMPLIANCE WITH CODE (503.3) F_%
HVAC EQUIPMENT PERFORMANCEQ , . Tables _t 5_5
EER OR COP (UNDER 65,000 BTU/1IR.)
5-6,5-1.
EER OR COP (65,000 BTU/1-L.R. AND OVER) ,
1`IFR. & MODEL
y _
AIR TRANSPORT FACTOR 8.0
CHECK .HVAC-CONTROES FOR COMPLIANCE Sect, 503.7
DUCT SYSTEM. INSULATION R_VALUES R = -At/15
PIPING INSULATION THICKNESS Table 5_8
1 SERVICE WATER HEATING
CHECK PERFORMANCE EFFICIENCY /—% 504.2.
47
c; SWIMMING POOL CONTROL'COMPLIANCE /—]' 504.2(b)3 ,
CONSERVATION OF HOT WATER
SH014ER FLOW RATE 3 GPM
LAVATORIES (PUBLIC)
FLOW LIMITED TO 0,5 GPM
OUTLET TEMPERATURE 100 F
pELECTRICAL POWER AND LIGHTING (NON RESIDENTIAL) _
CI-IECK COMPLIANCE OF:
POWER FACTOR CORRECTION Sect, 505.2
VOLTAGE DROP
LICHTING SWITCHING ---
METERING (INDIVIDUAL) f-7
i
LIGHTING BUDGET
NOTE: FIXTURE SCHEDULE SMALL INCLUDE NUMBER
AND WATTAGE OF EACH FIXTURE WITH TOTAL WAT-TAGE
OF THE BUILDING.
FACADE LIGHTING AS PERCENT OF BLDG. 2%.
I CERTIFY THAT THIS BUILDING COMPLIES WITH THE ENERGY" CODE / ° (4 p Jet ;,
ice i0 •
I
a e
ivory
MLA -Md SIigN'
DCJNDlActi" l T
i
J14-
U
T
ANDREW KUTZ,; ARCHITECT
133 AIRPORT; BLVD{ SANFORD^
17, C, 323. 8748
o'