HomeMy WebLinkAbout2538 El Portal Ave (2)CITY OF �0�$
�RAR 2 Building & Fire Prevention Division
Sk-IN"TORD1 PERMITAPPLICATION
FIRE DEPA1tTi1J1EiLT
Application No:
Documented Construction Value: $ 10 0.0 b
Job Address: ?
Parcel ID: //J ".;-I(Y - .6 -
Historic District: Yes ❑ No
Residential❑ Commercial
Type of Work: New[] AdditiongAlteration DRepair Demo ❑ Change of Use[] Move
IMM
Description of Work: ��C� � i�7d� (* %���iG7� ; 0,Z?e5j 04Y6JA'LL iW
AIT
Plan Review Contact Person: Z �-&'zf� Title:
Phone:. 3,'Z/ `,ZaY"— M f Fax: Efff— �Q0 - `77,'f Email:
Property Owner Information
Name 4 )9 .116rIVK 61W- IP .2=
Street: �3l'4 i L� �SLC C_ ,
Phone:
Resident of property? :
City, State Zip:1S�a/''7/�G , /L
j Contractor Information
Name 6) rf ►^ lr,' /S Phone: Z617
Street: �/�. G�., S'%L 1� " _!5 Af �t� .. s l�� Fax: 8 f i'� �O d ` 77 `7
City, State Zip: )-c-c", �� - y7�/ State License No.: � (C
Architect/Engineer Information
Name: Phone:
Street: Fax:
City, St, Zip:
Bonding Company:
Address:
E-mail:
Mortgage Lender:
Address:
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE
RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN
FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF
COMMENCEMENT.
Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has
commenced prior to the issuance of a permit and that all work will be performed to meet standards of all laws regulating construction
in this jurisdiction. I understand that a separate permit must be secured for electrical work, plumbing, -signs, wells, pools,
furnaces, boilers, heaters, tanks, and air conditioners, etc.
FBC 105.3 Shall be inscribed with the date of application and the code in effect as of that date: 6" Edition (2017) Florida Building Code
Revised: January 1, 2018 Permit Application
NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be
found in the public records of this county, and there may be additional permits required from other governmental entities such as water
management districts, state agencies, or federal agencies.
Acceptance of permit is verification that I will notify the owner of the property of the requirements of Florida Lien Law, FS 713.
The City of Sanford requires payment of a plan review fee at the time of permit submittal. A copy of the executed contract is required
in order to calculate a plan review charge and will be considered the estimated construction value of the job at the time of submittal.
The actual construction value will be figured based on the current ICC Valuation Table in effect at the time the permit is issued, in
accordance with local ordinance. Should calculated charges figured off the executed contract exceed the actual construction value,
credit will be applied to your permit fees when the permit is issued.
OWNER'S AFFIDAVIT: I certify that all of the foregoing information is accurate and that all work will
be done in compliance with all applicable laws regulating construction and zoning.
Signature of Owner/Agent
Print Owner/Agent's Name
Date
Signature of Notary -State of Florida Date
Owner/Agent is Personally Known to Me or
Produced ID Type of ID
N
Pria2l�j
Signature of Notary -State of Florida Date
t; E ANNETTE M BLAND
�' `• Notary Comrrissiic —ior State
170900 ida
�"
'. My Corrrr. Expires Jan 16. 2022
Contra '= °4 Al{ n to Me or
Produced ID Type of ID
BELOW IS FOR OFFICE USE ONLY
Permits Required: Building ❑ Electrical ❑ Mechanical ❑ Plumbing[] Gas❑ Roof ❑
Construction Type:
Occupancy Use:
Total Sq Ft of Bldg: Min. Occupancy Load:
New Construction: Electric - # of Amps
Fire Sprinkler Permit: Yes ❑ No ❑
APPROVALS: ZONING:
ENGINEERING:
COMMENTS:
# of Heads
UTILITIES:
FIRE:
Flood Zone:
# of Stories:
Plumbing - # of Fixtures.
Fire Alarm Permit: Yes ❑ No ❑
WASTE WATER:
BUILDING:
Revised: January 1, 2018 Permit Application