Loading...
HomeMy WebLinkAbout2424 Vineyard CirCITY OF SANFORD BUILDING & FIRE PREVENTION PERMIT APPLICATION Application No: Documented Construction Value: $ a 11051 - Job Address: 2424 Vineyard Cir Historic District: Yes ❑ No ❑ Parcel ID: 32-I q - 3I -S-ZI `( 000- nc2o Residential ® Commercial ❑ Type of Work: New ❑ Addition ❑ Alteration W Repair ❑ Demo ❑ Change of Use ❑ Move ❑ Description of Work: Roof Mounted PV System J21] -PS10 PnW,- 11A)� Plan ReviewContactPerson: E:',r1 ca " G'Cu l d'-Q Title: n 17� Phone: ��(YL I o 024 Fax: Email: t Property Owner Information Name Joseph Wilder Phone: Street: 2424 Vineyard Cir City, State Zip: Sanford, FL 32771 Name Resident of property? : OA Contractor Inrormation yule -I �J VJ2 - esla Energy Operations, Inc. Street: 8500 Parkline Blvd Ste 100 City, State Zip: Orlando, FL 32809 Name: Street: City, St, Zip: Bonding Company: Address: Phone: 702-716-0084 Fax: State License No.: Architect/Engineer Information Phone: Fax: E-mail: Mortgage Lender: Address: EC13006226 WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for electrical work, plumbing, signs, wells, pools, furnaces, boilers, heaters, tanks, and air conditioners, etc. FBC 1053 Shall be inscribed with the date of application and the code in effect as of that date: 5", Edition (2014) Florida Building Code Revised: June 30, 2015 Permit Application NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. Acceptance of permit is verification that I will notify the owner ofthe property of the requirements of Florida Lien Law, FS 713. The City of Sanford requires payment of a plan review fee at the time of permit submittal. A copy of the executed contract is required in order to calculate a plan review charge and will be considered the estimated construction value of the job at the time of submittal. The actual construction value will be figured based on the current ICC Valuation Table in effect at the time the permit is issued, in accordance with local ordinance. Should calculated charges figured off the executed contract exceed the actual construction value, credit will be applied to your permit fees when the permit is issued. OWNER'S AFFIDAVIT: I certify that all of the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. Sign o Ow r Agent Date Joseph Wilder Name Rkm s nth M'� Print Contractor/Agent's Name l\t.i'a.ytar- a Date —� Signaft CLIFF J. CHIN �.ra "4 Notary Public State of Florida * MY COMMISSION # FF 101449 Ashley N Taylor EXPIRES: July 8, 2018 ; p• My Comminion GG 149324 Bonded Thru Budget Notary Services �a� Expiresl0/08ML021 Owner/Agent is Personally Kn wn tome o J Contractor/Agent is Personally Known to Me or Produced ID � Type of ID '%f L Produced ID Type of ID BELOW IS FOR OFFICE USE ONLY Permits Required: Building ❑ Electrical ❑ Mechanical ❑ Plumbing❑ Gas ❑ Roof ❑ Construction Type: Occupancy Use: Total Sq Ft of Bldg: Min. Occupancy Load: New Construction: Electric - # of Amps Fire Sprinkler Permit: Yes ❑ No ❑ APPROVALS: ZONING: ENGINEERING: COMMENTS: # of Heads UTILITIES: FIRE: Flood Zone: # of Stories: Plumbing - # of Fixtures Fire Alarm Permit: Yes ❑ No ❑ WASTE WATER: BUILDING: W S •Z3-1g Revised: Dime 30, 201 5 Permit Application REQUMED PTSPECTION'SEQUENCE. Bl?ff- Min Max. fus eflom Descrk2d6m. Footer / Setback Remwall Foundation / Form Board.. Survey Slab [Mono Slab Pre pour Lintel / Tie Beam / Fill Down Cell Sheathing— WaUs- S -heathing— Roof Roof Dry in Frame Insulation Rough In Firewall Screw Pattern Drywall / Sheetrock Lath Inspection Final Solar Final Roof Final Stucco. / Siding Insulation Final - Final UtilitBuilding- y Final Door Final. Window - Final Screen.Room Final. Pool Screen Enclosure. Mobile Home Building Final Pre -Demo Final Demo. Final Sing -le Family -Residence - Final. Building (Other) I max Ins ection Description Meade. Underground Footer [Slab Steel Bond Electric Rough T.U.G. Pre -Power Final /t Electric Final Aru k A m k. IMIS min Mkx IM Inspection 11Desc>rn�Fr�u'®n Plumbing Underground Plumbing Sewer Plumbing Tub. Set Plumbing Final i.. . .......... = . ........ ... Mechanical -Ro-ugh- Mechanical. Final )EVA -AM --mu ......... .... .... Gas Underground MORRIS .......... REWSED: June 2614 THIS INSTRUMENT PREPARED BY: Name: c/o Erica McCurdy Address: 8500 Parkline Blvd Ste 100 Orlando, FL 32809 NOTICE OF COMMENCEMENT' State of Florida County of Seminole Permit Number: ;;t..t.t. l... .. �1 f}ill..11`t'r=!_.il�hlUi_L (:IsiJ!!..(...i. :L.EFv: OF G:IR'CU):?' COURT .: C+Ji'!F`TFOLLEF: CLERK'S 2019055 373 i;.L-t•L�I.L!!_. I", 1.+�1,�'..` ll_I RECORDING' "EEC;iul+lp Parcel ID Number: The undersigned hereby gives notice that improvement will be made to certain real property, and in accordance with Chapter 713, Florida Statutes, the following information is provided in this Notice of Commencement. DESCRIPTION OF PROP RTY: (Legal description of the property and street address if available) 1a� 7-. �usCa lace Sc)uAh �25 -77 2GS -il - -7z 2424 Vinevard Cir GENERAL DESCRIPTION OF IMPROVEMENT: OWNER INFORMATION: Name: Joseph Wilder Address: 2424 Vineyard Cir Sanford, FL 32771 Fee Simple Title Holder (if other than owner) Na CONTRACTOR: Name: Tesla Energy Operations, Inc Address: 8500 Parkline Blvd Ste 100 Orlando, FL 32809 Persons within the State of Florida Designated by Owner upon whom notice or other documents may be served as provided by Section 713.13(1)(b), Florida Statutes. Name: Address: In addition to himself, Owner Designates of To receive a copy of the Lienor's Notice as Provided in Section 713.13(1)(b), Florida Statutes. Expiration Date of Notice of Commencement (The expiration date is 1 year from date of recording unless a different date is specified) WARNING TO OWNER: ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713, PART I, SECTION 713.13, FLORIDA STATUTES, AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT .,WITH YOUR LENDER OR. AN, ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Under penalties of perjury, I declare that I have read the foregoing and that the facts stated in it are true to th0b-esLQf, my kno ne and belief. Joseph Wilder Owner's Signature Owner's Printed Name rid. Statute 713.13(1)(g): " The owner must sign the notice of commencement and no one else may be permitted to sign in his or her stead." State of County of cc O The foregoing i strument was acknowledged before me thi day of ` 2 O a4: by L) �J () I / ! �_!/(� 1 Who is per Ily known to meUh Name of person making slat ment � ' i %ilY \J Lam[ O zt � OR who has produced identification type of identification pr u d: ( �i� p u., Q Otp,RY Po"/ CLIFF J. CHIN .3 o cry O 2 C MY COMMISSION # FF 101449 - cr soP EXPIRES: July 8, 2018 9tFCr }, p7-` Bonded Thni Budget Notary Services r-'Nolgry S np7tur Cc c� C® LIMITED POWER OF ATTORNEY Date: I hereby name and appoint: Fly lflTrfl,►i17.�17'i7'i to be my lawful attorney -in -fact to act for me to apply for, receipt for, sign for and do all things necessary to this appointment for (check only one option): 0 Expiration Date for This Limited Power of Attorney: 01/2019 License Holder Name: Nicholas Armstrong State 1.icence Nnrnher• EC13006226 Signature of License H STATE OF FAMMM OREGON COUNTY OF MULTNOMAH The foregoing instrument was acknowledged before me this 6TH day of NOVEMBER 20017 by NICK ARMSTRONG who is a personally known to me or o who has produced as identification and who did (did not) take an oath \ AA S ignature W COtOFFICIAL STA�IlPrSA- MELISSA BENTLEY FARIAS NOT 4MISSPUBLIC - Or_GON print Or type name iOPr Nv^. 65tr►5 i ! MY COMMISSION EXPIRES FEBRUARY 13. 2021 ` Notary Public - State of OREGON Commission No. MULTNOMAH My (Rev.08.12) RECORD COPY ABBREVIATIONS I ELECTRICAL NOTES I JURISDICTION NOTES A AMPERE AC ALTERNATING CURRENT BLDG BUILDING CONC CONCRETE DC DIRECT CURRENT EGC EQUIPMENT GROUNDING CONDUCTOR (E) EXISTING EMT ELECTRICAL METALLIC TUBING FSB FIRE SET —BACK GALV GALVANIZED GEC GROUNDING ELECTRODE CONDUCTOR GND GROUND HDG HOT DIPPED GALVANIZED I CURRENT Imp CURRENT AT MAX POWER Isc SHORT CIRCUIT CURRENT kVA KILOVOLT AMPERE kW KILOWATT LBW LOAD BEARING WALL MIN MINIMUM (N) NEW NEUT NEUTRAL NTS NOT TO SCALE OC ON CENTER PL PROPERTY LINE P01 POINT OF INTERCONNECTION PV PHOTOVOLTAIC SCH SCHEDULE S STAINLESS STEEL STC STANDARD TESTING CONDITIONS TYP TYPICAL UPS UNINTERRUPTIBLE POWER SUPPLY V VOLT Vmp VOLTAGE AT MAX POWER Voc VOLTAGE AT OPEN CIRCUIT W WATT 3R NEMA 3R, RAINTIGHT LICENSE REVIEWED Foq CODE COMPLIANCE PLANS EXAMINER MODULE GROUNDING METHOD: ZEP SOLAR I AHJ: City of Sanford UTILITY: Florida Power and Light CONRDENTIAL — THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT TESLA INC., NOR SHALL IT BE DISCLOSED IN MOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE TESLA EQUIPMENT, WTHOUT THE WRITTEN PERMISSION OF TESLA INC. 1. THIS SYSTEM IS GRID—INTERTIED VIA A UL—LISTED POWER —CONDITIONING INVERTER. 2. A NATIONALLY — RECOGNIZED TESTING LABORATORY SHALL LIST ALL EQUIPMENT IN COMPLIANCE WITH ART, 110.3. 3. WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, A SIGN WILL BE PROVIDED WARNING OF THE HAZARDS PER ART. 690.17. 4. EACH UNGROUNDED CONDUCTOR OF THE MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED BY PHASE AND SYSTEM PER ART. 210.5. 5. CIRCUITS OVER 250V TO GROUND SHALL COMPLY WITH ART. 250.97, 250.92(B). 6. DC CONDUCTORS EITHER DO NOT ENTER BUILDING OR ARE RUN IN METALLIC RACEWAYS OR ENCLOSURES TO THE FIRST ACCESSIBLE DC DISCONNECTING MEANS PER ART. 690.31(E). 7. ALL WIRES SHALL BE PROVIDED WITH STRAIN RELIEF AT ALL ENTRY INTO BOXES AS REQUIRED BY UL LISTING. 8, MODULE FRAMES SHALL BE GROUNDED AT THE UL — LISTED LOCATION PROVIDED BY THE MANUFACTURER USING UL LISTED GROUNDING HARDWARE. 9. MODULE FRAMES, RAIL, AND POSTS SHALL BE BONDED WITH EQUIPMENT GROUND CONDUCTORS. SANFORD BUILDING UIVISION A PERMIT ISSUED SHALL BE CONSTRUED TO BE A LICENSE TO PROCEED WITH THE WORK AND NOT AS AUTHORITY TO VIOLATE, CANCEL. ALTER OR SET ASIDE ANY OF THE PROVISIONS OF THE TECHNICAL ;ODES, NOR SHALL ISSUANCE OF A PERMIT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING A CORRECTION OF ERRORS IN PLANS. CONSTRUCTION OR VIOLATIONS OF THIS CODE GENERAL NOTES 1. ALL WORK SHALL COMPLY WITH THE 2017 FLORIDA BUILDING CODE (6TH EDITION). 2. ALL ELECTRICAL WORK SHALL COMPLY WITH THE 2014 NATIONAL ELECTRIC CODE. gVILDlNC g- 2 2 8 5 SANFORD 4RTIA' � JOB NUMBER: JB-327473 00 MOUNTING SYSTEM: ZS Comp V4 w Flashing —Insert MODULES: (58) Hanwho Q—Cells # Q.Peak—G4.1/ INVERTER: SOLAREDGE # SE7600H—USOOOSNU2 WILDER, DREW 2424 VINEYARD CIR SANFORD, FL 32771 415 VICINITY MAP I DESCRIPTION: 17.69 KW PV ARRAY PAGE NAME -- COVER SHEET INDEX Sheet 1 COVER SHEET Sheet 2 SITE PLAN 415 Sheet 3 STRUCTURAL VIEWS Sheet 4 THREE LINE DIAGRAM Cutsheets Attached REV BY DATE COMMENTS REV A NAME DATE COMMENTS REV B KL 3/27/18 TLD Updated REV C TI 4-24-18 Removed powerwalls REV D r KC r 5/11/18 Removed ACPW rough in Ryan Gonzales SKU.. REV: DATE 1 d 5/11/2018 T=SLn \��tiltlflll��/! KANj � Z : Nu 8120 =_ 0�- , STATE OF i '•.F�ORlDP.' ���If11111L STAMPED & SIC FOR STRUCTURA' SITE PLAN Scale: 1/8" = 1' 0 1' 8' 16' CONnDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT TESLA INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE TESLA EQUIPMENT, WITHOUT THE WPoTTEN PERMISSION OF TESLA INC. Digitally signed by Humphrey Kariuki Date: 2018.05.14 15:16:02-04'00' N w E S imNumw: JB-327473 00 MOUNTING SYSTEM: ZS Comp V4 w Flashinq—Insert Hanwho Q—Cells # Q.Peak—G4.1 SOLAREDGE # SE760OH—USOOOSNU2 WILDER, DREW 2424 VINEYARD CIR SANFORD, FL 32771 PAGE NAME SITE PLAN MP1 PITCH: 28 ARRAY PITCH:28 AZIMUTH: 179 ARRAY AZIMUTH: 179 MATERIAL: Comp Shinqle STORY: 1 Sto LEGEND 0 (E) UTILITY METER & WARNING LABEL INVERTER W/ INTEGRATED DC DISCO & WARNING LABELS AUTOMATIC RELAY © DC DISCONNECT & WARNING LABELS AC DISCONNECT & WARNING LABELS 0 DC JUNCTION/COMBINER BOX & LABELS r-, --I ItNi L - 'J DESGN: Ryan Gonzales DISTRIBUTION PANEL & LABELS LOAD CENTER & WARNING LABELS DEDICATED PV SYSTEM METER RAPID SHUTDOWN STANDOFF LOCATIONS CONDUIT RUN ON EXTERIOR CONDUIT RUN ON INTERIOR GATE/FENCE HEAT PRODUCING VENTS ARE RED INTERIOR EQUIPMENT IS DASHED SHEET:. REV: DATE 2 d 5/11/2018 T=SLn (N) P� CSv I i F'1l.HL r'V J1UC V1CVV NTS CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT TESLA INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENT'S ORGANIZATION, EXCEPT IN CONNECTION NTH THE SALE AND USE OF THE RESPECTIVE TESLA EQUIPMENT, VATHOUT THE NRITTEN PERMISSION OF TESLA INC. JOB NUMBER: JB-327473 00 MOUNTING SYSTDt ZS Comp V4 w Flashing —Insert MOOUES: (58) Hanwha Q—Cells # Q.Peak—G4.1, INVERTER: SOLAREDGE # SE760OH—US000SNU2 WILDER, DREW 2424 VINEYARD CIR SANFORD, FL 32771 PV MODULE 5/16"x1.5° BOLT WTI 5/16" FLAT WASHEF ZEP LEVELING FOOT ZEP ARRAY SKIRT ZEP MOUNTING BLOCI ZEP FLASHING INSER (E) COMP. SHINGLI (E) ROOF DECKING 5/16° DIA STAINLESS STEEL LAG SCREW (2-1 /2" EMBED, MIN) (E) RAFTEI. 17.69 KW PV ARRAY PAGE NAME STRUCTURAL VIEWS S1 STANDOFF INSTALLATION ORDER LOCATE RAFTER, MARK HOLE (1) LOCATION, AND DRILL PILOT HOLE. ATTACH FLASHING INSERT TO (2) MOUNTING BLOCK AND ATTACH TO RAFTER USING LAG SCREW. INJECT SEALANT INTO FLASHING (3) INSERT PORT, WHICH SPREADS SEALANT EVENLY OVER THE ROOF PENETRATION. C(4) INSTALL LEVELING FOOT ON TOP OF MOUNTING BLOCK & SECURELY FASTEN WITH BOLT. KANiq -t No. 8120 Q STATE OF (V T � �� 'C�ORTDP`. •' GN /0NA1- E�.�`• STAMPED & SIGNED FOR STRUCTURAL ONLY Ryan Gonzales SHEET: REV. DATE 3 d 5/11/2018 T=SLn BOND (N) /8 GEC TO (N) GROUND ROD Panel Number: NoMatch AT PANEL WITH IRREVERSIBLE CRIMP Meter Number: ACD6522 Underground Service Entrance �E; 1 OA/2P I MA NRVICE CIR IT BREAKER (E) Inv I: uu ungrounaeo INV 1-(1)SOIAREDGE / SE7600H-uS000SNu2 LIBEL: Inv 2: DC Ungrounded Inverter 76�,240V/208V,9974HD W�av�e 'Anifed Disco and ZB,AFC1 HNV-(1) ISOI�EDG�/ SE2 2UUSSVOOOAHD Wave w/Unifed Disco and ZB,AFC7 600W 4OA/2P ------------------------------------- A E I I I I N � _J o EGC/GEC_ GEC � z 40A/2P I ' I � /T\ A i TO 120/240V SINGLE PHASE UTILITY SERVICE Voc* = MAX VOC AT MIN TEMP ------ - - - - - - - - I I I I I I I PP(1)SQUARE 0 }H 240 PV BACKFEED BREAKER Breaker, 4'OA/2, 2 Spaces - (I) Bar RE %HA M SpacesPV BACKFFED BREAKER - (1) Rq 5 flid x 8 Copper CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT TESLA INC., NOR SHALL IT BE DISCLOSED IN MOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENT'S ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE TESLA EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF TESLA INC. JOB NUMBER J B-3 2 7 47 3 MOUNTING SYSIEY: ZS COMD V4 w Flashina-Insert EGCI GEC Ll N _ EGCI GEC AC Inverter 1 SOLAREDGE SE760OH-USOOOSNU2 Inverter 2 SOLAREDGE SE760OH-USOOOSNU2 240V - - GND ---1N - 08) Honwho Q-Cells # Q.Peak-G4.1 //SC305 PV Module; 305W,279.2PTC, 4NM, Black Frame, MC4, ZEP, 1000V Voc: 40.05 Vpmax: 32.62 Isc AND Imp ARE SHOWN IN THE DC STRINGS IDENTIFIER SolorCity A (1) SUNFra (ROUNSTRING, i UNCTION BOX PV N) SOLAREDGE P400-5NM4MzM / PowerElox timizer,40OW, ZEP MP 1: 1x15 ----------�---�-fir MP 1: lxi4 MP 1: 1x14Th -------------j MP 1: 1x15 ------------pj DC 1 AWC ja, 1HVIN-2, Black _ O (1) 00 A THWN-2, Red O 1 AVG #10. THWN-$ Rod Voc* = 500 VDC Isc =15 ADC � (1) AWG j10, 1HWN-2, Red VmP = 350 VDC Imp=12.04 ADC T (2)AWG �10, PV Wire, 60OV, Black O ISM (1) AWG #10. Solid Bare Copper EGC Voc* = 500 VmP = 35U VDC VDC Isc =15 ADC IMP=12.9 ADC LLL��� (1 ) AWG /10, THNN-2, White - (1 ) AWG 08, THWN-2, Green . _ _ (1 ) AWG je, THWN-2, Black ® (1 ) AWG j8, THWN-2, Red (1) AWG j10, THIN-2, White - (1)AWG je, THWN-2, Green NEI11RAL VmP =240 VAC Imp= 32 AAC EGC/GEC - (1)Candulk Kit:. 3/4' ENT.......... NEUTRAL VmP =240 VAC Imp= 32 AAC EGC/GEC - (1) CWWR. Kit;, 3/47 W.......... ©� O (1 AWG j10, TH N/THWN-2, Grew (1 (1) AWG 110, TWIN-2, Black (1 ) AWG j10, THWN-2, Red III��� (1 ) AWG j10, THHN/THWN-2, Green (1) AWG j10, THWN-2, Black (1) AWG j10, THWN-2, Red EGC - (1 ) Conduit Kit; 3/47 EMT ... , Voc* = 500 VDC Isc = 15 Vmp = 350 VDC IMP=12.9 EGC - (i )Condglt. Kit;. 3/4' E11T. Voc* = 500 VDC Isc = 15 Vmp = 350 VDC Imp=12.9 , . , ADC ADC ADC ADC (2 ) AWG 110, PV Wire, 6DOV, Black r', / 1 (1) AWG EIO, Solid Bare Capper EGC (2) AWG j10, PV Wire, 60OV, Black O (1)AWG j10, Solid Bare Copper EGC Voc* = 500 Vmp = 350 Voc* = 500 VmP = 350 VDC VDC VDC VDC Isc =15 ADC Imp=12.04 ADC Isc =15 ADC Imp=12A4 ADC ®� (1 AWG j10, THHN/THMN-2, Green (1 � AWG 110, THMN-2, Black (1) AWG j10, THWN-2, Red EGC-(1)Cankiuit KIN.3/4' Voc* = 500 Vmp = 350 E11T......... . VDC Isc = 15 ADC VDC Imp=12.04 ADC (-� (2) AWG 110, PV Ore, 60OV, Black ® JF (1) AWG j10, Solid Bare Copper EGC Voc* = 500 Vmp = 350 VDC VDC Isc = 15 ADC Imp=12.9 ADC 00 DUSTMIER: DESCRIPTION: DESK . WILDER, DREW 242E VINEYARD CID 17.69 KW PV ARRAY Ryan Gonzales T 5 L n (58) Hanwha Q-Cells # Q.Peak-G4.1 INVERTER: SOLAREDGE # SE760OH-USOOOSNU2 5 SANFORD, FL 32771 PAGE NAME: - THREE LINE DIAGRAM SHEET: REV: DATE- 4 d 5/11/2018 CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: Address: 2424 Vineyard Cir INVERTER AND DC DISCONNECT INVERTER AND DC DISCONNECT UTILITY SERVICE ------------------- -------� SOLAR- PHOTOVOLTAIC ARRAYS) J PHOTOVOLTAIC BACK -FED CIRCUIT BREAKER IN FAIN ELECTRICAL PANEL IS AN A/C DISCONNECT PER NEC 690.17 OPERATING VOLTAGE = 240V JB-327473-00 CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT USED FOR THE BENE}lT OF ANYONE EXCEPT TESTA INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE TESTA EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF TESTA INC. JOB NUMB: J B-3 2 7 4 7 3 00 CUSTOMER DESCRIPTION' WILDER, DREW 17.69 KW PV ARRAY 2424 VINEYARD CIR SANFORD FL 32771 , PAGE NAME I SITE PLAN PLACARD DESIGN. Ryan Gonzales TES L n M0UN11NG SYSTEM: ZS Comp V4 w Flashing —Insert (58) Hanwha Q—Cells # Q.Peak—G4.1/SC305 SHEET: REY DATE 5 d 5/11/2018 INYBTER: SOLAREDGE # SE7600H—USOOOSNU2 SolarCity ®pSolar Next -Level PV Mounting Technology `'ir,SolarCity ®pSolar Next -Level PV Mounting Technology .ZS Comp for composition shingle roofs Components Mounting Block Array Skirt Part No. 850-1633 Part No. 850-1608 or 500-0113 Listed to UL 2703 Listed to UL 2703 C;� h Interlock Part No. 850.1388 or 850-1613 Listed to UL 2703 - e � Flashing Insert Grip Ground Zep V2 Part No. 850-1628 Part No. 850-1606 or 850-1421 Part No. 850-1511 Listed to UL 2703 Listed to UL 2703 Listed to UL 467 and UL 2703 �onvgr% e�F Description PV mounting solution for composition shingle roofs Works with all Zep Compatible Modules °pMant� Auto bonding UL-listed hardware creates structural and electrical bond ZS Comp has a UL 1703 Class "A" Fire Rating when installed using modules from any manufacturer certified as 'Type 1" or "Type 2" Captured Washer Lag End Cap &LISTED Part No. 850-1631-001 Part No. Specifications 850-1631-002 (L) 850-1586 or 850-1460 850-1631-003 (R)850-1588 or850-1467 Designed for pitched roofs 850-1631-004 Installs in portrait and landscape orientations ZS Comp supports module wind uplift and snow load pressures to 50 psf per UL 2703 Wind tunnel report to ASCE 7-05 and 7-10 standards ZS Comp grounding products are UL listed to UL 2703 and UL 467 ZS Comp bonding products are UL listed to UL 2703 Engineered for spans up to 72" and cantilevers up to 24" Zep wire management products listed to UL 1565 for wire positioning devices Leveling Foot Part No.850-1397 zepsolar.com zepsolar.com Listed to UL 2703 This document does not create any express warranty by Zep Solar or about its products or services. Zep Solar's sole warranty is contained in the written product warranty for each product. The end -user documentation shipped with Zep Solar's products constitutes the sole specifications referred to in the product warranty. The customer is solely responsible for verifying the suitability of ZepSolar's products for each use. Specifications are subject to change without notice. Patents and Apps zspats.com. Document # 800-1 a39-001 Rev D Date last exported: April 29, 2016 11:22 AM V* DC Wire Clip Part No. 850-1509 Listed to UL 1565 This document does not create any express warranty by Zap Solar or about its products or services. Zep Solar's sole warranty is contained in the written product warranty for each product. The end -user documentation shipped with Zep Solar's products constitutes the sole specifications referred to in the product warranty. The customer is solely responsible for verifying the suitability of ZepSolar's products for each use. Specifications are subject to change without notice. Patents and Apps. zspats.com. Document # 800-1839-001 Rev D Date last exported: April 29, 2016 11:22 AM solar SolarEdge Power Optimizer - Zep Compatiblelm Module Add -On For North America P300-ZER P400-ZEP Compatible with Zep Groove framed modules - Certified Zep Compatible' bracket - Attaches to module frame without screws - reduces on -roof labor and mounting costs - Power optimizer equipment grounded through the bracket - Up to 25% more energy - Superior efficiency (99.5%) - Mitigates all types of module mismatch losses, from manufacturing tolerance to partial shading - Flexible system design for maximum space utilization - Next generation maintenance with module -level monitoring - Module -level voltage shutdown for installer and firefighter safety USA CANADA -GERMANY - ITALY- FRANCE -JAPAN -CHINA -AUSTRALIA -THE NETHERLANDS -UK ISRAEL TURKEY -HUNGARY -BELGIUM - ROMANIA- BULGARIA www.solaredge.us solar =e" SollarEdge Power Optimizer - Zep Compatible TM Module Add -On For North America P400-ZEP INPUT Rated Input DC powerM Absolute Maximum Input Voltage (Voc at lowest temperature) ........... MPPT Operating Range ............ Maximum Short Circuit Current (Isc) Maximum DC Input Current Maximum Efficiency Weighted Efficiency P300-ZEP (for 60-cell PV modules) P400-ZEP (for 72 & 9&cd modules) 00 .....................3......................... ......................4....00 ..................... 48 so ...... _......I ....... ............. ........... 8:.48 ...................... .... .... ..... ...... .. 81�.. . ...... .......... 10 ................................. ...... 10.1 .............. ...... 12.5 ............... 12:63 ......... ...... 99.5 ----------- ........... 98.8 . ... ....... . . .. . OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING INVERTER) W Vdc Vdc Adc Adc .......... Maximum Output Current is Adc Maximum Output Voltage 60 Vdc ---- - OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM INVERTER OR INVERTER OFF) Safety Output Voltage per Power Optimizer 1 Vdc STANDARD COMPLIANCE EMC FCC PartIS Class B, IEC61000-6-2, IEC61000-6-3 Safety . fety, . . . .. ..... .. ..... ....... IEC62109-1 (class H . s . afe . t . y), UL 17 . 4 . I .. . .. .... . �... I � I ..... I .............. .... ................. ... ... ... .. . .. . .. .............. RoHS Yes INSTALLATION SPECIFICATIONS Maximum Allowed System Voltage. , ....... .......... ...................3000.... ...... ...... ........ I ........ ................. Vdc .... Dimensions including mounting bracket (WxLxH) 128 x 196 x 27.5 5 x 7.71 x 1.08 128 x 196 x 35 / 5 x 7.71 x 1.37 mm/in .. . .... ... .. ......... I ...... ... I I ..... I ... ... ... ... ­-.1...- Dimensions excluding mounting bracket (WxLxFQ 128 x 152 x 27.5 5 x 5.97 x 1.08 128 x 152 x 35 mm/in 5 x 5.97 x 1.37 . . ...... ............. Weight (including cables and mounting bracket) 720/1.6 840/1.9 kg / lb ............ ............. ............. . ­­ ................. Input Connector MC4 Compatible .................. ......... . .......... .. ......... .. .. ... I ....... ...... Output Connector Double Insulated; MC4 Compatible .......... ....... ............. .. ....... ........ Output Wire Length ................. ...... 0.915./3.0 1.2 / 3.9 Operating Temprerature Range .-0 - +85 -40 - +185 ..... . I.g........ ...........................I...... ........................... Protection RatnIP68 / NEMA 6P ............. ........... 1- ......... Relative Humidity o- 100 I . . .. ....... ............... ... I ......... .. I . .. ...... Rated STC power of the module. Module of up to +5% pomer tolerance allowed PV SYSTEM DESIGN USING A SINGLE PHASE SINGLE PHASE THREE PHASE THREE PHASE SOLAIREDGEINVEIRTER (2) HD -WAVE 208V 480V Minimum String Length (Power Optimizers) 8 10 18 Maximum String Length (Power Optimizers) 25 25 50 S 7 00 6 0 00 with Maximum Power per String 5250 .-US ... ....... ............. I ........ .... SE7600H. ........ ) .. .......... .......... I ...... Parallel Strings of Different Lengths or Yes Orientations .................... For detalled string Mzft Information refer to: http-.//www.solmeop.00WsitWdefautt/ff[Wstrin"izlr4Lm&pdf, 60 DO 12750 M/ft 'F The new high-performance module Q.PEAK-G4.1 /SC is the ideal solution for all applications thanks to its innovative cell technology FI.ANTUM and a black Zep Compatible IM frame design for improved aesthetics, easy installation and increased safety. The world -record cell design was developed to achieve the best performance under real conditions - even with low radiation intensity and on clear, hot summer days. _ LOW ELECTRICITY GENERATION COSTS Higher yield per surface area and lower BOS costs thanks to higher power classes and an efficiency rate of up to 18.6%. #� INNOVATIVE ALL-WEATHER TECHNOLOGY Optimal yields, whatever the weather with excellent low -light and temperature behavior. a ENDURING HIGH PERFORMANCE Long-term yield security with Anti-PID Technology', Hot -Spot -Protect and Traceable Quality Tra.QTM. OA RELIABLE INVESTMENT Inclusive 12-year product warranty and 25-year linear performance guarantee'. THE IDEAL SOLUTION FOR: residential re<_idential buildings Engineered in Germany Q,'OMPATje COMPP�� O CELLS msararar. Phntnn QCEDS Bast polycrystallino la, modute 2014 aaao-r.�z3s APT test conditions: Cells at -1500V against grounded, with conductive me- tal foil covered module surface, 25°C, 168h See data sheet on rear for further information. OCELLS SPECIFICATIONMECHANICAL Format 653m x 39.4 m x 1.57in (including frame) E 0 670 mm x 1000 mm x 40 mm) Weight 44.091bs(20.0kg)^Front Cover 0.13 in (3.2 mm) thermally pre -stressed glass with anti -reflection technologyBack Cover Composite Win.,Frame Black anodized aluminumCell 6 x 10 monocrystalline CLANTUM ULTRA solar cellsJunction box 2.60-3.03 in x 4.37-3.54 in x 0.59-0.75in (66-77mm x 111-90mm x 15-19mm), Protection class IP67, with bypass diodes.• Cable 4 mma Solar cable; (+) 47.24 in (1200 mm), (-) 47.24 in 0200 mm) IaConnector Multi -Contact MC4, IP6$ ,ter„r,-„ T�-T°"''"""' POWER CLASS MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS, STC' (POWER TOLERANCE +5 W / -OW) Power at MPP' PNvr [W] Short Circuit Current' Isr [A) = Open Circuit Voltage' V. IV) E Current at MPP' I- [A) Voltage at MPP' VM„ fill Efficiency' n [%] MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS. NOC' Power at MPP' PRR, IWI E Short Circuit Current' Isr [A] e Open Circuit Voltage' Vec IV] Current at MPP' Ixee [A) Voltage at MPP' VN,e [V1 295 300 305 295 300 305 9.70 9.77 9.84 39.48 39.76 40.05 9.17 9.26 9.35 32.19 32.41 32.62 a 17.7 a 18.0 a 18.3 218.1 7.82 36.92 7.20 30.30 11000 Wi 25'C, spectrum AM 1.5G - Measurement tolerances STC m3 %; NOC z 5 % 1800 W/m2. NOCT, spectrum AM 1.513 Q CELLS PERFORMANCE WARRANTY At least 98% of nominal power during first year. Thereafter max. 0.6% degradation per year. At least 92.6 % of nominal power up to 10 years. At least 83.6% of nominal power up to 25 years. All data within measurement tolerances. Full warranties in accordance with the warranty terms of the Q CELLS sales organization of your respective country. TFMS wn�°x. °4^•+�wa�+e-m .�ro,v,�n -'as. 221.8 225.5 7.88 7.94 37.19 37.46 7.27 7.35 30.49 30.67 'typical values, actual values may differ PERFORMANCE AT LOW IRRADIANCE rrs-T----- I----------n------ yj res W i I I , W I I n am wo ses mn loss IRRAnIANCE W/ I Typical module performance under low irradiance conditions in comparison to STC conditions (25'C, 1000W/m'). TEMPERATURE COEFFICIENTS Temperature Coefficient of Isr a [%/K) + 0.04 Temperature Coefficient of Va [%/K] -0.28 Temperature Coefficient of Pee, y [%/K1 -0.39 Normal Operating Cell Temperature NOCT [°fj 113 +5.4 (45 +3°C) PROPERTIES O. SYSTEMDESIGN Maximum System Voltage Vs„ IV] 1000 (IEC) / 1000 (UL) Safety Class II Maximum Series fuse Rating (A DCl 20 fire Rating C (IEC) / TYPE 1 (UL) Design load, push (UL)' [lbs/N'l 75 (3600 Pa) Permitted module temperature -40 °F up to +185°F on continuous duty (-40aC up to +85°C) Design load, pull (UL)' Ilbs/R'I 55.6 (2666Pa) ' see installation manual UL 1703; CE-compliant; Number of Modules per Pallet 26 IEC 61215 (Ed.2); IEC 61730 (Ed.l) application class A Number of Pallets per 53' Cartlainer 32 o+r C/ SP� � � eGr. Number of Pallets per 40' Container 26 (`- c •,,,,,,, us ':O= Pallet Dimensions ( L x W x H ) 69.7 in x 45.3 in x 46.1 in 0 /45mm x 1150mm x 1170mm) + Pallet Weight 12541bs (569kg) NOTE: Installation instructions must be followed. See the Installation and operating manual or contact our technical service department for further information on approved installation and use of this product. HanMia Q CELLS America Inc. 300 Spectrum Center Drive, Suite 1250, Irvine, CA 92618, USA I TEL +l 949 748 59 96 1 EMAIL inquiryOus.q-cells.com I WEB www.q-cells.us solar -•. SolarEdge Single Phasl for North America SE3000H-US / SE380OH-US / SE5000H SE760OH-US Optimized installation with HD-WaVc «.1111LJ1U6Y Record -breaking efficiency Integrated arc fault protection for NEC 2011 690.11 and integrated rapid shutdown for NEC 2014 690.12 Extremely smal High reliability without any electrolytic capacitors 111111111nd I D — Built-in module -level monitoring wave — Outdoor and indoor installation Optional: Revenue grade data, ANSI C12.20 Class 0.5 (0.5% accuracy) Optional: Self -Sustaining Power - produce up to 1.5kW directly from PV during grid failure USA-CANADA-GERMANY-ITALY-FRANCE-JAPAN-CHINA-AUSTRALIA-THE NETHERLANDS-UK-ISRAEL-TURKEY-SOUTH AFRICA-BULGARIA www.solaredge.us solar=@@Single Ph.ase Inverters for North America SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US/ SE760OH-US SE3000H-US SE38WH-US I SESOOOH-US SE6000H-US I SE760OH-US OUTPUT Rated AC Power Output ........... ..... 3000 .............. 3800 ... 5000 ....... 6000 . ....... 7600, VA Max. AC Power Output ................................................ 3000 .. 3800 ....... 5000 ....... 6000 ....... 7600 ........... . .... VA ............. AC Output Voltage Min.-Nom: Max. (183 - 208 - 229) ................... ✓ ....................................................... Vac AC Output Voltage Min'.-240-264) . ........ .•!...... ... .........•!......... .........•!..... Vac AC Frequency (Nominal) ................................. .................... 59.3-60-60.5 ItI .................... .................... .. Hz ..... Maximum Continuous Output Current 208V 24 A Maximum Continuous Output Current 240V 12.5 ....... 16 ........ 21 .................... 25 .................... 32 .................... A ..... I....... GFDI Threshold 1 .........Yes A ............. Utility Monitoring, Islanding Protection, ..................... I ............ ....... Maximum DC Power _........ ............................ 4650 I 5900 7750 9300 11800 W...... Transformer -less, Ungrounded ........................................... Yes ............ .. ......... .... Maximum Input Voltage 480 Vdc Nominal DC Input Voltage ...................... ..._...... 380 .. 400 Vdc Maximum Input Current 208V 15.5 _............. Maximum Input Current 240V 8.5 10.5 ....... 13.5 ....... . 16.5 20 Adc Max. Input Short Circuit Current 45 Adc Reverse -Polarity Protection .................................................................... Yes .... ..... ..I...... ......... ............. ............ Ground -Fault Isolation Detection 600kn Sensitivit Maximum inverter Efficiency .......... . 99 99.2 ( ............................... ............................................. . .......... I . .. . .... .... CEC Weighted Efficiency .. .......... .................................................................................................................. .. 99 ..................... ..... %...... Nighttime Power Consumption < 2.5 W SELF-SUSTAINING POWER OUTLET (OPTIONAL) Nominal Output Voltage 120 V ............. . ..... ................................................................................................................................................. Maximum Output Power ................................................................................................................................................... 1500n W ............. External Outlet with GFDI Yes ADDITIONAL FEATURES Supported Communication Interfaces RS485, Ethernet, ZigBee (optional), Cellular (optional) ........... ............. Internal RGM support ANSI C12.20 class 0.5 compliant ......... ................... ....... ............. Rapid Shutdown - NEC 2014 690.12 Automatic Rapid Shutdown STANDARD COMPLIANCE Safety UL1741, UL1699B, CSA C22.2, Canadian AFCI according to T.I.L. M-07 Connection Standards Grid ............ ............... _................................-.... IEEE1547, Rule 2 Rule14 (HI) .......................................... ....................... Emissions FCC Part 15 Class B AC Output Conduit Size / AWG Range DC Input Conduit Size / # of Strings / AWG Range .... ............................ Dimensions with Safety Switch (HxWxD) ..... Weight..with....Safety..Switch..................................................... Noise .................................................. Cooling.. Operating Temperature Range ................. ...... Protection Rating ......................................... I ............ .......... For other regional settings please contact SolarEdge support Depends on PV availability Power de -rating from 50'C 0.75-1" Conduit / 1476 AWG 0.75-1" Conduit /1-3 strings / 14-6 AWG ..... ....... I ............. I.... . 11 ..._........................ .I .............. ..... 17.7x14.6x6.8 /450x370x174 ..... .................................. .... ......................... I.................... 25.3 / 11.5 ............ ... ............ I.. .............I.............. < 25 .............................. ..... _............................................. Natural Convection -13 to +140 / -25 to +601a1(-40'F / -40'C option) ..... ........................................... NEMA 3R (Inverter with Safety Switch) in / mm I b / kg dBA 'F _C ... 1 April 24, 2018 RE: CERTIFICATION LETTER Project/Job # 327473 Project Address: Wilder Residence 2424 Vineyard Cir Sanford, FL 32771 AHJ City of Sanford SC Office Orlando Design Criteria: - Applicable Codes = 2017 Florida Building Code (6th Edition) / IEBC, ASCE 7-10, and 2012 NDS - Risk Category = II - Wind Speed = 135 mph, Exposure Category C, Partially/Fully Enclosed Method d0 f Version #72.1 - TBD 11111111111" Ci 1. ••2i ��'• No 83022 •' ZZ 04/24/201$ ►-0• * •�► S STA OF Ground/Roof Snow L Note: Per IBC 1613.1; Seismic check is not required because Ss = 0.09945 < 0.4g and Seismic Design Category (SDC) = A < D To Whom It May Concern, A jobsite survey of the existing framing system of the address indicated above was performed by a site survey team from Tesla. Structural evaluation was based on site observations and the design criteria listed above. Based on this evaluation, I certify that the alteration to the existing structure by installation of the PV system meets the requirements of the applicable existing building and/or new building provisions adopted/referenced above. Additionally, I certify that the PV module assembly including all standoffs supporting it have been reviewed to be in accordance with the manufacturer's specifications and to meet and/or exceed all requirements set forth by the referenced codes for loading. The PV assembly hardware specifications are contained in the plans/docs submitted for approval. Digitally signed by Jason Toman Date: 2018.04.24 16:47:06-07'00' Testa, Inc. T = S L n Version #72.1 - TBD HARDWARE DESIGN AND STRUCTURAL ANALYSIS RESULTS SUMMARY TABLES Landscape Hardware Hardware - Landscape Modules' Standoff Specifications X-X Spacing X-X Cantilever Y-Y Spacing Y-Y Cantilever Configuration Uplift DCR MP1 72" 24" 39" NA Staggered 62.7% Portrait Hardware Hardware - Portrait Modules' Standoff Specifications X-X Spacing X-X Cantilever Y-Y Spacing Y-Y Cantilever Configuration Uplift DCR MP1 48" 20" 65" NA Staggered 69.7% Mounting Plane Roof Pitch Qualification Results (Degrees) Member Evaluation Results MP1 28° Member Impact Check OK Refer to the submitted drawings for details of information collected during a site survey. All member analysis and/or evaluation is based on framing information gathered on site. The existing gravity and lateral load carrying members were evaluated in accordance with the IEBC and the IBC. Testa, Inc. T = 5 L n DocuSign Envelope ID: FECB1E50-261C-47EB-ACA5-17A443856FA9 T L This disclosure is designed to help you understand the key terms of your purchase of a solar electric system ("System"). It is not a substitute for your purchase contract ("Contract"), loan or any other documents associated with this transaction. Information presented below is subject to the terms of your Contract. Read all. documents carefully so you fully understand the transaction. For more information on becoming a smart solar consumer please visit www.seia.org/consumers. To better understand the cost of the electricity produced by your System, please refer to the separate form, SETA® Solar Purchase Disclosure Addendum — Estimated Cost Per kWh. Provider: Tesla, Inc. Address: 3500 Deer Creek Road Palo Alto, CA 94304 Tel.: 888-518-3752 License # (if applicable): Not Applicable Email: customercare@tesia.com Installer: Tesla Energy Operations, Inca Address: 3055 Clear -view Way San Mateo, CA 94402 Tel.: 888-765-2489 State/County Contractor License #: FL EC13006226 Email: customercare@tesia.com Customer: Joseph Wilder System Installation Address: 2424 Vineyard Circle, Sanford, FL 32771 Customer Mailing Address: 2424 Vineyard Circle, Sanford, FL 32771 Email: joseph—wilder@hotmaii.com Contract Date: 3/7/2018 Purchase Price Your purchase price, including the cost of the Powerwall(s): $67,539.00 List of any credits, incentives or rebates included in the above purchase price: $0.00 *NOTE: Not everyone is eligible for credits, incentives or rebates or can fully use them. Consult your tax professional or legal professional for further information. Payment Schedule Amount you owe Provider at Contract signing: $0.00 Amount you owe Provider at the commencement of installation: $0.00 Amount, you owe Provider at the completion of installation: $0.00 Your financing partner will make the final payment to the Provider after installation for the following amount: $67,539.00 Financing Your system: WILL be financed NOTE: If your System is financed, carefully read any agreements and/or disclosure forms provided by your lender. This statement does not contain the terms of your financing agreement. If you have any questions about your financing arrangement, contact your finance provider and read all financing disclosures before signing a Contract. Installation Timing Approximate Start Date: 4-6 months from the date the Agreement is signed. Approximate Completion Date: 4-6 months from the date of the Agreement is signed. Interconnection Approval PROVIDER is responsible for submitting a System interconnection application. Solar Purchase Disclosure v. 2017 3143541 DocuSign Envelope ID: FECB1E50-261C-47EB-ACA5-17A443856FA9 4 .t we will send you a refund check equal to the difference between the cumulative Actual kWh and the Guaranteed kWh multiplied by the Guaranteed Energy Price per kWh. Taxes You are responsible for property taxes on property you own. Consult a tax professional to understand any tax liability that may result from entering the Contract. Utility and Electricity Usage/Savings Assumptions You HAVE been provided with a savings estimate based on your purchase. If provided, the savings estimate was calculated based on: Estimates of annual utility rate increases, future utility charges, net metering value, and the design of your system, which can be affected by shading, roof type, compliance with fire codes, location, system size, government rebates and local utility rates. The savings estimate to you assumes the following: Your system will last: 30 years It is important to understand that electricity rates are estimates only. Your actual current and future utility rates and utility rate increases may vary. Provider IS NOT guaranteeing these savings. Cooling Off Period/ Right to Cancel In addition to any rights you have under state or local law, you HAVE the right to terminate this agreement without penalty within three (3) business days of 3/7/2018 by notifying Provider in writing at the above address. SEIA Solar Business Code Provider DOES abide by and agrees to be bound by SEIA's Solar Business Code and its complaint resolution process. For more information about the.SEIA Solar Business Code and complaint resolution process, please visit hftp://www.seia.org/consumers Additional Disclosures or Terms Powerwall .System The Powerwall will draw 100% of its charge from the Solar Array. The Powerwall can provide automatic backup power only to a selected set of circuits, and may not power your entire Home. Final determination of eligible circuits will be made prior to installation. Eligible circuits must be located in the same electrical panel used to connect the Solar Array at the time we install. If we cannot install a Powerwall so as to provide backup energy to at least eight (8) circuits that you request due to access or electrical constraints, you may cancel the Powerwall, and either opt to have a solar -only system installed, or cancel you irreement entirely T� Customer's Initials here This form is designed to help, not replace, the SEIA® Solar Purchase Disclosure. It provides an estimate of the cost of electricity produced by your solar energy system (System) over the life of the System. This addendum is not a substitute for your purchase contract, loan or any other documents associated with this transaction. Information presented below is subject to the terms of your purchase contract. Read all documents carefully so you fully understand the transaction, Solar Purchase Disclosure v. 2017 3143541 1 DocuSign Envelope ID: FECB1E50-261C-47EB-ACA5-17A443856FA9 The pricing in this Solar Home Improvement Agreement Change Order is valid for 30 days after 3/7/2018. If you don't sign this Solar Home Improvement Agreement Change Order and return it to us on or prior to 30 days after 3/7/2018, Tesla reserves the right to reject this Solar Home Improvement Agreement Change Order unless you agree to our then current pricing. This Change Order shall be incorporated into the Agreement and shall become part of the Agreement only if it is in writing and signed by the parties prior to the commencement of any work covered by this Change Order. This Change Order supersedes any prior change order. Customer's WDe4ph Wilder Signature: Date: 3/12/2018 Customer's Name: Signature: Date: Solar Home Improvement Agreement Tesla Approved Cal Lankton VP, Energy Sales and Operations Date: 3/7/2018 Solar Home Improvement Agreement.(Solart-oan) Change Order, version 2.6.0. February 1, 2018 3143541 4 DocuSign Envelope ID: FECB1E50-261C-47EB-ACA5-17A443856FA9 " 4. � • --, T ® S L Fi For more information on becoming a smart solar consumer.pli±ase visit www.seia.org/consumers. Provider: Tesla, Inc. Address: 3500 Deer Creek Road Palo Alto, CA 94304 Tel.: 888-518-3752 License # (if applicable): Not Applicable Email: customercare@tesia.com Installer: Tesla Energy Operations, Inc. Address: 3055 Ciearview Way San Mateo, CA 94402 Tel.: 888-765-2489 State/County Contractor License #: FL EC13006226 Email• customercare@tesla.com System Characteristics System Size: 17.69 kW DC Estimated System Lifetime: 30 years Estimated Production in Year 1: 27,772 kWh Panel Degradation Rate: 0.5% Costs Initial System Cost: $67,539.00 Total Amount Due: $67,539.00 Total Operations & Maintenance' (O&M) Costs: $0.00 Incentives Value of Incentive/Rebates Included: $0:00 Provider Name: Cal Lankton Signature: Title: VP, Energy Sales and Operations Company: Tesla, Inc. Date: 3/7/2018 Customer's Initials here Solar Purchase Disclosure v. 2017 3143541 Customer: Joseph Wilder System Installation Address: 2424 Vi°neyard Circle, Sanford, FL 32771 Customer Mailing Address: 2424 Vineyard Circle, Sanford, FL 32771 Email: joseph_wilder@hotmail.com Contract Date: 3/7/2018