Loading...
HomeMy WebLinkAbout88 Mission Blvd- HVACFLORIDA .ENERGY EFFICIENCY, CODE FOR BUILDING CONSTRUCTION FORM 500A•89.SECTION 5 •` BUILDING DESIGN BY COMPONENT PERFORMANCE APPROACH Non Residential Buildings --AD(MINISTERED BY THE DEPARTMENT OF COMMUNITY AFFAIRS Residential Buildings over 3 stories ' ALL CLIMATE ZONES PROJECT NAME: T ZONE: 15 ADDRESS: li Jl tssio'«. u BUILDING CLASSIFICATIONS: CITY ZIPCODE: Say-. 3 27"1 V BUILDING PERMIT NO.: 4510 BUILDER::: KtQ -;,c,: a PERMITTING OFFICE:' %1 OWNER: • ( n/ > I S/ ' JURISDICTION NO.:' " BUILDING INFORMATION WALLS ROOF/CEILING FLOORS DOORS GLASS TYPE: U AREA TYPE U AREA TYPE U AREA TYPE U AREA TYPE U AREA Concrete ( CBS),., Wood frame ` Metal frame.', Insulation , R-value Under attic r '' Single Assembly Other: Insulation R-value Slab - on -grade Raised Wood Raised concrete . Insulation R-value Wood„ Metal Insulated Other y, Single, wall Double, wall Single, roof Double, roof O . dS 3d SYSTEMS INFORMATION AIR CONDITIONER HEATING SYSTEM HOT .WATER - TYPE'., EFFICIENCY TONS .,:+ TYPE EFFICIENCY BTUIH TYPE Unitary & Heat Pump Central Heat Pump Electric 65, 000 Btu Ih SEER 65,000 Btu I h HSPF Resistance : ` 65, 000 Btu l h EER 65,000 Btu/ h COP Dedicated Heat Pump El Water cooled EER Water cooled COP Gas Evaporatively cooled EER Evaporatively cooled COP Natural PTAC EER Electric resistance COP LPG Chillers COP Gas/Oil (circle one) Oil Other: 1. 225,000/300,000 Btu/h AFUE HRU 225, 000I300,OOQ Btu lh _ El Other: 4 . LIGHTING Lighting Budget (from Table 5 13): • Total Lighting Wattage a74_lso: 00 - Total Conditioned Floor Area /5lG'03:& Watts/sq. it'° PRESCRIPTIVE MEASURES (Must be met or exceeded by all buildings.) COMPONENTS - SECTION REQUIREMENTS CHECK' Windows 502.4 Maximum of 0.5 cfm per linear loot of operable sash crack. Doors 502.4 Maximum of 11.0 cfm per linear foot of operable sash crack. Joints/ Cracks 502.4 To be caulked, gasketed, weatherstripped, or otherwise sealed. Reheat - 503.3 Supply air restricted to set cold/hot deck temperature to meet load of worst case zone. Ventilation 503.4 Supplied with readily accessible switch for shut-off and/or volume reduction when ventilation is not required. HVAC Efficiency 503.4 Minimum efficiencies - Heating: Tables 5-5, 5-6; Cooling: Tables 5-7, 5-8, 5-9. Transport Energy 503.5 Minimum of 8.0 1/ Balancing 503.6 Provide means for balancing HVAC air system & water distribution system. t/ HVAC Controls 503.7 Separate readily accessible manual or automatic thermostat for each system. HVAC Duct Construction 503. 9 Constructed in accordance with industry standards & local mechanical codes. Ducts must be insulated to minimum R = A I/15IN °F It s / Btu). Piping Insulation 503.10 In accordance with Table 5-10. Water Heaters 504.2 Must bear ASHRAE label indicating compliance with ASHRAE Standard 90 or comply with efficiency and standby loss requirements. Switch or clearly marked circuit breaker (electric) or cut-off (gas) must be provided. Heat traps required. Must meet minimum water heating equipment efficiencies in Table 5-11 after 1 / 1190. Swimming Pools Spas 504. 2 Spas & heated pools must have covers. Non-commercial pools must have pump timer. Gas spa & pool heaters must have minimum thermal efficiency of 75% (78% after 111190). Hot Water f Pipes 504. 4 Insulation is.required for recirculating systems. Piping heat loss is limited to 17.5 Btulhllinear foot of, pipe; see Table 5-12. J Water fixtures 504.5 Water flow restricted to maximum of 3 gpm at 80 psig; Toilets maximum 3.5 gallon flush. Public lavatory fixture maximum flow of .5 gpm or .5 gallon if has self -closing valve. r% Lighting 505.1 Lighting ower budgets are listed in Table 5-13; Ballast efficacy factors are listed in Table 5-14. Uo wall Allowable ."37 Uo wall Actual - . /S If complying under the provisions of S. 502.1, enter the combined Uo values for the entire envelope Uo roof/ceiling Allowable Uo roof/ceiling Actual . n Uo floor Allowable floor Actual in this section. Uo Allowable /J A UoenvelopeUo envelope Actual OTTV wall Allowable OTTV wall Actual OTTV roof/ceiling Allowable OTTV roof/ceiling Actual All plans and specifications shall be signed and sealed by a Florida registered engineer or architect Review of the plans and specifications covered by this calculation indicates compliance with with the exceptions provided for in Section 481,229, F.S. and Section 471.003, F.S. I hereby certify the Florida Energy Code. Before construction is completed, this building will be ' acted for that the plans and specifications covered by this calculation are in compliance with the Florida compliance in accordance wit Section 553.90 F.S. Energy Code. SIGNATURE: BUILDING FICI /J DATE: ` 7 DATE: PERMIT NO. FORM 50OA-89 wall Type Type 1 Type.2 Type 3 Type 4 Type 5 Total Awall Door Type Type 1 Type 2 Type 3 Total CHECKED by SECTION 5 WORKSHEET FOR ENERGY CALCULATIONS BUILDING DESIGN BY COMPONENT PERFORMANCE APPROACH Florida Energy Efficiency Code for Building Construction HEATING DESIGN Uo - WALLS Surface Winter Area, ft2 U-Value 3 0 9,g . x 3 ,. _ 39 a4-/7 x 0s - G7S.ai x a - x x Surface Winter Area, ft2 U-Value 9q.03 x 33 = 06. 6S x x Adoor 3. / • 0 Glazing Surface Winter Type Area, ft2 U-Value Type 1 y35.d8 x G(/ _ Type 2 x Type 3 x Total Aglazing 5.35• D Total 14 7Aow7. ft2 line 1+3+5 line 8 line 7 Totals Total 2. 441& -93 a7.73 Total 4. 67. 75 Total 6. 91 D . t10 Total Heating 8. line 2+4+6 9. UoW Actual From Table 5-2: . 37 Uow Allowed COOLING DESIGN OTTV - WALLS Wall Surface Summer TDeq Totals Type Area, ft2 U-Value See Table 5. 2B) Type 1 J V ..9, x 3 x Type 2 3 994 . i7 x 05 x 3.0, = S-739,;Z6 Type 3 L75.2/ x 7- x 30 = aV3Q.714 " Type 4 x x = Type 5 x x = Total Awall 10. SSS/V. 36 Total 11. /a/ PJ•S3 Door Surface Summer TDeq Type Area, ft2 U-Value Type 1 811,03 x , 3a- x Type 2 00•6S x .37 x = /7/4•a(. Type 3 x x = Total Adoor 12• A, Total Glazing Orient. Surface OSF Shading N, S, E, etc.) Area, ft2 Coefficient E A00 x ( ! x .99 ) = S? SV VO L 20,,4 61) x ( 3?.7 x .99 j = /yy4a.g0 176- 60 x ( Sa X. . Rf8 ) = 1aa47.a 0 oS I 7S-00 x ( Asf x gS > _ 9SV33.4.01) x( IS 5? x x ( x j= Total Aglazing 14. Total15A. 7G797.G0 735, O0 Summer U Value A T x ( , 0-7 x /5 ) = Total 15B. 7 75 line 14 Total Aow 16. Total Cooling 17. 9. $g 10+. 12'+14 OTrVow = 9a6 9. Sk - 11 + 13+'15A+15B G 7L . Ut/ = 18. /(l G g line 17 _ line 16 OTTVow Actual From Table 5-2: 30. 3 OTTV, - Allowed HEATING DESIGN Uo — ROOF Roof - Surface.... Winter Totals - Type Area, ft2 U-Value Type 1 i3 iJ3 • x 03 - 39V130` Type 2 Jy& 0.31-. _ x 8 Type 3 x Type 4 . x Total AopagUe roof 19. / ` (. o 3. 40 Total 20. G 57• / (o Skylight Surface Winter Type Area, ft2 U-Value Type 1 x Type 2 x Type 3 x Total Askylight . 21. Total 22. _ Total Aor 23 /f%G03. LO ft2 Total Heating 24. &57: / 6 line =19 + 21 line 20 + 22 Uor = G 57 /! _ l VG 03 • G O = 25. . Olt line 24 line 23 Uor Actual From Table 5-2: /0 Uor.Allowed HEATING DESIGN Uo — FLOOR Floor Surface Winter Totals Type Area, ft2 U-Value Type 1 x = Type 2 x = Type 3 x - Type .4 x = Total Afloor 33. ft2 Total Heating 34.` Uof — = 35. line 34' line 33 Uof Actual From Table 5-2: . Uof. Allowed M COOLING DESIGN OTTV — ROOF (If skylights used) Roof Surface Summer TDeqr Totals : Type Area; ft2 . U•Value See Fig, 5.1) Type 1 x .. x _ Type.'2 x :: x = Type .3 x .., x = Type, 4 x x = Total _ AopagUe roof 26. Total 27. - Skylight Surface Shading Type Area, ft2 Coefficient Type 1 x 138 x Type 2 x 138 x Type 3 x 138 x Total Askylight 28. Total29A. Summer U-Value A T x ( x Total 29B. line 28 Total Aor 30 Total Cooling 31. line 26. + 28 27 + 29A + 29B OTTVor = 35. line 31 line 30 OTTVor Actual From Table 5-2: OTTVor Allowed HEATING DESIGN Uo AVERAGING* (Sec..502.2(a)) U Envelope Allowable (take U values from Table 5-2).- x )+(_ x )+( x ) Uow Aow (line 7) Uor Aor (line 23) Uof Aof (line 33) AE (line 7 + line 23 + line 33) U Envelope Actual (use actual calculated U values): = UE Allowed x )+( x )+( x ) Wow (line 9) Aow (line 7) Wor (line 25) Aor (line 23) U'of (line 35) Aof.(line 33) AE (line 7 + line 23 + line 33) = UE Actual Cooling OTTVs may not be averaged. WALL. R-VA41PP BUILDING COMPONENT DESCRIPTION WALL TYPE 1 WALL TY WALL TYPE 3 WALL TYPE 4 WALL TYPE 5 Exterior air film OUTS,DE A1 7 7 7 Stucco Block S ' bfoG Stud 3. S S Firring strip Insulation 3. 5 3.85 0 Wall board a Solid Other Other 3. QQ Other Interior air film OUT.51DE AIR o RTOTAL 7, g i 2 U=1/R 05 2 AREA 3 42 . 95 8?2&- /7 G %S•.l Weight (lb/.sq. ft.) Sa./s #/gh 5 9. aq,/o s9. /s IF FRAME: Size 2— x Inches O.C. ROOF/CEILING R-VALUES BUILDING COMPONENT DESCRIPTION ROOF ROOF TYPE 2 ROOF TYPE 3 ROOF. TYPE 4 ROOF TYPE 5 Room air film N Q Wall board n / ry w yS Truss 2 XOy Insulation R_0 Jo.0a Other Other t' 2 Other Other Outside air film Qu7JIDE AIR 7 17 R TOTAL U = 1IR AREA (sq. ft.) l3 //3.f I Vk-36 U=TC IF FRAME: Size L x q Inches O.C. 2-4