Loading...
HomeMy WebLinkAbout951 Red Cleveland Blvd 16-1010; ALUMIMUM CANOPYPERMIT APPLICATIO7 Application No: z Jv T Z7w Documented Construction Value: A dress: v Historic District: YesEl Na ID: = zo e") el o L) ResidentialEl Commercial 9 Type of Work: New 19 AdditionEl Alteration 0 RepairEl DemoEl Change of UseEl Move 0 Description of Work: Plan Review Contact Person: Dif-AIAJ Title: 4!1,e_ Phone: Email: 3-3 (e - ,5 - _- OFax: 6b"LProperty Owner Information Name. 10 'One: S`t eet: Resident of property? State Zip: I _-)_22 Contractor Information Name Phone: Street: M_ 4r141e-J1rA_ City, State Zip: State License No.: C16-C7 Arc Engineer Information Name: Se) 1) P C11 Q 0 Phone:-- ? 10-333 Street: Fax: City, St, Zip: E- mail: 4_ 101 Bonding Company: 1114 Mortgage Lender: /f 1114 Address: Address: WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAVING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for electrical work, plumbing, signs, wells, pools, furnaces, boilers, heaters, tanks, and air conditioners, etc. FBC 105.3 Shall be inscribed with the date of application and the code in effect as of that date: 5" Edition (2014) Florida Building Code Revised: June 30, 2015 Pennit Application NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may he additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. Acceptance of permit is verification that I will notify the owner of the property of the requirements of Florida Lien Law, FS 713, The City of Sanford requires payment of a plan review fee at the time of permit submittal. A copy of the executed contract is required in order to calculate a plan review charge and will be considered the estimated construction value of the job at the time of submittal. The actual construction value will be figured based on the current ICC Valuation Table in effect at the time the permit is issued, in accordance with local ordinance. Should calculated charges figured off the executed contract exceed the actual construction value, credit will be applied to your permit fees when the permit is issued. OWNER'S AFFIDAVIT: I certify that all of the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. gf Signature of Owner/Agent Date Tc-,-, r) i irint Owncr/Agent1XAMe M game Lim, T y public a Mycornm, Experts 7, 2017 Commission # EE 62643 n AsrondedThroughNationaliiotaryAssn. Owner/ Agent is,, Person y. Kaowa-,to Me or Produced ID Type of ID 2 Y, Signature of Contractor/Agent Date Print Contractor/Agent's Name Kr a 0M KIyr, M, Expirc"i 7 Commission # EE 662643 Through National NvWy Assn. Contractor/ Agent is Persona! nqn to ywntoMe or 1, Ty of ID COL ProducedID - Type L BELOW IS FOR OFFICE USE ONLY Permits Required: BuildingF] ElectricaIE] Mcchanicaln Plumbing[] Gas[:] Roof[] Construction Type: Occupancy Use: Flood Zone: Total Sq Ft of Bldg: Min. Occupancy Load: New Construction: Electric - # of Amps Fire Sprinkler Permit: YesEl No R # of Heads APPROVALS: ZONING: UTILITIES: ENGINEERING: COMMENTS: FIRE: of Stories: Plumbing - # of Fixtures Fire Alarm Permit: Yes [] No WASTE WATER: BUILDING: colj C-i Revised: June 30, 2015 Permit Application INYDILL The attached invoice will be signed by both parties as acceptance of the agreed upon price for materials and services. Any modifications will be confirmed in writing (new invoice) and also signed by both parties Description of the Scope of Work: 121 x 20' two post entrance canopy, locations entrance of Value lot per BMH drawings Price of Project: $47,200.00 or discounted to S 39,648 if purchased with same PO as Economy lot entrance Ms rce includes: ITEM Company C@Popy M31 Footer/foundations MS1 Structural Engineering M31 Architectural Services BHM/ Bob Hogue Site Plan/Due diligent BHM Electrical plans and engineering BHM General conditions/Subcontracts Management of project M31 Electrical Lighting/controls K&K Misc allowance for reimbursement fees, travel BHM Permitting fees est City Of Sanford Flectric,st] is—assumin '„availalfle Ozi'np line I 2(,"t volt vvilh in 20' Thank you for your business!! Payment details: 50% down of $23,100.00 Remaining 50% of due upon completion of project Amount 33, 165 INCL INCL 6, 700 INCL INCL 2, 725 2, 470 The prices, specifications, terms and cone ions as stated above are satisfactory and hereby accepted. PURCHASER Signature: bate..///- Print Name: Date: TBI Incorporated) SELLER Signature: Date: Mobile Specialties Inc. Representative) Mobile Specialties Inc. Quote with Terms and Conditions The terms and conditions oudined on this preprinted page have been reviewed and agreed to kv both parties prior to signing the contract Both parties understand and agree to the bound by each and evert paragraph herein. The parties to this agreement are PURCHASER (TB1 Incorporated) and SELLF',R (Mobile Specialties Ine.) Purchaser represents that he/she, has the legal authority and right to enter into this contract and that he/she agrees to keep the property and improvement free from any obstructive or conflicting claims that would interface with SELLER's work or performance under this contract. PURCHASER agrees to make all payments in accordance with the terms and conditions of this contract. PURCHASER further agrees that any payments not made timely, will be subject to interest rate of 1.5% per month until paid in full. PURCHASER also agrees that non-payment of all or any part of the agreed upon amount shall render all SELLER's warranties null and void. If a dispute arises from or relates to this contract or the breach thereof and if the dispute cannot be settled through direct discussion within 30 days, the parties agree to solve the matter through the mediation and Smal I Claims/Special Civil court system in Seminole County Florida, PURCHASER also agrees not to contact the Better Business Bureau, Consumer Affairs or any other agency without first notifying the SELLER of his/her intention to do so and allowing 60 days for satisfactory resolution by the SELLER. Both parties agree NO modification or change orders shall be enforceable unless it is in writing and signed by both parties or email whereas both parties agree by acknowledging said changes or modifications. FORCE MA SURE. delays caused by floods, strikes, illness, tabor disputes, backordered material, accidents, acts of God or other causes beyond the reasonable control of the SELLER shall excuse or extend the time for performance of the contract. PURCHASER has provided for such property damage insurance as he/she feels adequate, PURCHASER understands that if any portion of this contract is illegal or unenforceable it will not render the contract null or void and all other terms will remain in effect, P"T"Xiv, A deposit of 50% of the total order is required at the time of purchase; the remaining 50% of the total order is due at the completion of installation of product, A 11 prices are based on plans or measurements approved upon. PURCHASER understands that any changes which are to be made to the agreed upon plans and specifications, may result in additional costs for tabor or materials or both. PURCHASER agrees to pay such additional costs agreed upon and signed off by both parties, 5 year construction / manufacturing warrantee on labor and installation of canopy 20 year Standard Supplier manufacturer Warranty on Aluminum Seller is responsible for any leaks or defects of material for 5 years from installation completion. SELLER must he notified of any pre-existing damage within 24 hours of delivery or pick-up; otherwise, no exchanges will be allowed. 0 SELLER will not be responsible for any necessary adjustments to product without prior notification Mobile Specialties Inc. Quote with Terms and Conditions The terms and conditions outlined on this pre-printed page have been reviewed and agreed to by both parties prior to signing the contract. Both parties understand and agree to the bound by each and even, paragraph herein, 0 The parties to this agreement are PURCHASER (TBI Incorporated) and SELLER (Mobile Specialties Inc.) Purchaser represents that he/she has the legal authority and right to enter into this contract and that he/she agrees to keep the property and improvement free from any obstructive or conflicting claims that would interface with SELLER's work or perron-nance under this contract, PURCHASER agrees to make all payments in accordance with the terms and conditions of this contract. PURCHASER further agrees that any payments not made timely, will be subject to interest rate of 1.5% per month until paid in full. PURCHASER also agrees that non-payment of all or any part of the agreed upon amount shall render all SELLER's warranties null and void. 0 If a dispute arises from or relates to this contract or the breach thereof and if the dispute cannot be settled through direct discussion within 30 days, the parties agree to solve the matter through the mediation and Small Claims/Special Civil court system in Seminole County Florida. PURCHASER also agrees not to contact the Better Business Bureau, Consumer Affairs or any other agency without first notifying the SELLER of hist%cr intention to do so and allowing 60 days for satisfactory resolution by the SELLER. Both parties agree NO modification or change orders shall be enforceable unless it is in writing and signed by both parties or email whereas both parties agree by acknowledging said changes or modifications, FORCE MAJEURE: delays caused by foods, strikes, illness, labor disputes, backordered material, accidents, acts of God or other causes beyond the reasonable control of the SELLER shall excuse or extend the time for performance of the contract. PURCHASER has provided for such property daniage insurance as he/she feels: adequate. PURCHASER understands that if any portion of this contract is illegal or unenforceable it will not render the contract null or void and all other terms will remain in effect. A deposit of 50% of the total order is required at the time of purchase; the remaining 50% of the total order is due at the completion of installation of product, A I I prices are based on plans or measurements approved upon, PURCHASER understands that any changes which are to be made to the agreed upon plans and specifications, may result in additional costs for labor or materials or both. PURCHASER agrees to pay such additional costs agreed upon and signed off by both parties. 5 year construction / manufacturing warrantee on labor and installation of canopy 20 year Standard Supplier manufacturer Warranty on Aluminum Seller is responsible for any leaks or defects of material for 5 years from installation completion. SELLER must be notified of any pre-existing damage within 24 hours of delivery or pick-up; otherwise, no exchanges will be allowed. SELLER will not be responsible for any necessary adjustments to product without prior notification TRANSMITTAL TO Dennis Towell/Matt Towell Mobile Specialties, Inc. Phone ft VIA Pick Up FROM Bob Hogue DATE March 17, 2016 PROJECT OSIA Value Lot Ent [y Canopy PROJECT # 2015.051 For Your Use For Your Approval For Your Action As Requested For Your Information COPIES DATE DESCRIPTION j I 6 100% Construction Documents -Signed & Sealed BHM Architecture, Inc. 478 East Altamonte Drive Suite 108 PMB 264 Altamonte Springs, FL 32701-4622 PHONE 407.3312005 REMARKS CC: file The attached invoice will be signed by both parties as acceptance of the agreed upon price for materials and services. Any modifications will be confirmed in writing (new invoice) and also signed by both parties Description of the Scope of Work: 12' x 20' two post entrance canopy , locations entrance of Economy lot per BMH drawings Price of Project., $47,200.00 LFhis4arice includes: ITEM Company Cqn2gy MS1 Footertfoundations M31 Structural Engineering M31 Architectural Services B"M/ Bob Hogue Site PlantDue diligent B"M Electrical plans and engineering B"M General conditions/Subcontracts Management of project MSI Electrical Lighting/controls K&K Misc allowance for reimbursement fees, travel SHM Permitting fees est City Of Sanford Tax on Material Only Jectrical is available I oal'rlp lirw 120 Volt. "'vilh il20' Thank you for your business!! Payment details: 50% down of $23,100.00 Remaining 50% of due upon completion of project Amount 33, 165 INCL INCL 6, 700 INCL INCL Ulm 1, 100.00 The prices, sperifications, terms "d I rdid?!is as'stated above are satisfactory and hereby accepte4t PURCHASER Signature: Date: -A Print Name: Date: TBI Incorporated) SELLER Signature: Date: Mobile Specialties Inc. Representative) THIS INST MENT PREPARED BY•. Name: . -/ f.+..' t/' Address: —_1 It A- I NOTICE OF COMMENCEMENT State of Florida County of Seminole Permit Number: Parcel ID Number: MAR'YF'ii N (" ORSE, SEf INOLE CO[jjl-r'Yt:!_.€i:riK Of'! CCIr L1l:T (:0LJRI* CL.ERK'S t 21.11fti: 1733 RECt*f. ED 03-/*23/2ig6 t 2;ivra;l::i;°, FARECORDINGF*['.'ES RFC(; RDED 8Y hdeval" The undersigned hereby gives notice that improvement will be made to certain real property, and in accordance with Chapter 713, Florida Statutes, the following information is provided in this Notice of Commencement. D r arld0 JOF at1fOiq nt rti e8aI d s ifppt f the property and street address if available) IleR , ItE18ta11 NWGHIIumInUm C:arOlOpyENr: OWNER INFORMATION: Name: Sanford Airport Authority Address: 1200 Red Cleveland Blvd, Sanford, FL 32773 Fee Simple Title Holder (if other than owner) Name: CONTRACTOR: Name: Trinity Roofing & Construction Address: 1902 Alden Dr. Orlando, FL 32803 (407)930-9266 Persons within the State of Florida Designated by Owner upon whom notice or other documents may be served as provided by Section 713.13(1)(b), Florida Statutes. Name: Diane Crews - Sanford Airport Authority Address: 1200 Red Cleveland Blvd, Sanford, FL 32773 In addition to himself, Owner Designates Kenneth Wright of Shutts & Bowen LLP (407)423-3200 f(407)425-8316 To receive a copy of the Lienor's Notice as Provided in Section 713.13(1)(b), Florida Statutes. Expiration Date of Notice of Co mencf ment (The expiration date is 1 year from date of recording unless a different date Is specified) ]ZI J1 ! ILL-1WARNING TO OWNER: ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713, PART I, SECTION 713.13, FLORIDA STATUTES, AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Under, penalties of,perjf, 1 declare that I have read the foregoing and that the facts stated in it are true to the best of Inknowl ge and belief. Jennifer Taylor Owners i tore Owner's Printed Name 713. 13(1)(g): "The owrO Aust sign the notice of commencement and no one else may be permitted to sign in his or her stead. State of County oLlmlook- The f OJ49 tns)trumen k owledged before me tht ay of 2 by Who is personally known to may am" of person makirp statement OR who has produced Identification type of identification produced: JAC o:ELINE A. LAUTERBACH kly CUMMISSION #FF040723 EXPIRES: UCT 17, 2017 f M ` 80111'0104n vh Ist Stao Insurance Note Yigntttcrro 7N)O Aluminum Progerties Joint Boundary Conditions Member Prima iX Data Basic Load Cases Load Combinations Enveloge Joint Reactions RISA-31D Version 10.0.0 [C:\...\Mobile Specialities - Orlando Sanford International Airport - Value Parking try Cano Enveloge Joint Reactions LContingeyl Envel2ge Member Section Forces R|8A'31)Verakm 10.0.0 RCi'VNobi|e 8panie|hiee -Ddando Sanford |nharnationa|Airport-Volum Park in ptqbAEbtryCano Envefo a Member Section Stresses Enveloi2e Member Section Torsion RIBA-31D Version 10.0.0 [C:\... \Mobile Specialities - Orlando Sanford International Airport - Value ParkingDl try Cano Enveloge Member Section Torsion LContingeyl Enveloj2e ADM 05 ASD Aluminum Code Checks x1V^ ] 184 / 14 111 .805 | 0 |v|1|15-152|88D51O743|13,o56/8.O3g|8.74812'1AG4|4Vn|4/1'O x1O^ 184 | 14 11 | .UOS | 0 )v 11 ( 1515218005 1&742 > 13.8561802918.74812-1404/4081411-3 R|SA'3DVersion 1UO.0 [C:\...\Mobile Specialities - Orlando Sanford International Airport - Value Parkin hgleRihtry Cano Envelo a ADM 05 ASD Aluminum Code Checks Continued RISA-31D Version 10.0.0 [C:A...AMobile Specialities - Orlando Sanford International Airport - Value Park incf' entry Cano Orlando Samford Airport Davis Structural NoLes: 1jContractor shall verify all dimensions and conditions on the job site prior to start of fabrication. 2,) All aluminum members shall beconstructed using 8OG3-TGalloy. 3.) All connections are to be welded with a 3/16" all around fillet weld, unless otherwise noted. 4) All welding tobek8|{3welding using 535Gfiller alloy. 5) All bolt holes are tobedrilled orpunched. D,) Concrete bxhave fc =3O0Opsi ( nnin.)@ 28dayu. T) All screws and bolts are bobe3D4Stainless Steel. Design the Canopy per Code Requirements. Design Criteria: Design Code: 2D14F8C-Fifth Edition Note: Design loads were obtained inaccordance with ASCE7-1O American Society ofCivil Engineers Minimum Design Loodahor Buildings and Other Structures)). Design Parameters: Basic Wind Speed = Vw 1SOMPH (3-SecWind Basic Wind Speed =V~ 118/NPH Risk Category: U| Building Type: Commerical Wind Exposure: ^C^ Applicable Internal Pressure Coefficient: 0,00 Roof Pitch = Dimensions ofStructure: Length = VVidth= Leg Height = 612 28. 57Deon»as 1&5FL 12 Ft 14FL (Max.) Mean Height 15.5 Ft Det2rmine Design Pressures for Open Building: Determine Design Loads; Design Pressures on Roof: Dead Load = SPSF Live Load = 20P8F Wind Pressures: Positive = 26.62 PSF Nogadive= 20 07 PSF Snow Load = 000PSF 8eianlio Load = 0.00 PSF Design Pressures mmRoof: Positive = 39.96P8F Design Criteria: K8eteha[ All aluminum members shall be constructed using RO83-T0alloy. Concrete b/have fo =3OOOpsi (min.)@28days. All bolts are tobe3O4Stainless Steel, All welding to be K8|Gvve|d|ng using 5358filler alloy. All bolts are bobe|ncompliance with A8TK4A325Specifications. Allowable Stresses for 8063- TGalloy: Welded: Compression = Fo=,= 8 KG| Page 2 of 11 Unvvelded: Tension =F.= 25KS| Compression =Fvv= 25N8| Allowable 8tnsosen for 535Ofiller alloy: Check Size mVGufterBeam: Design Loads pnGutter Beam from R|GAAnalysis: Shear = 822. 00Lbm. Gnavity= 917. 00 Lbo. Uplift = 507. 00Lbo. K8omnent= 3. 783.19 FL-Lbs, Check Capacity ofGutter Beam (9"xdO"xO.188"Aluminum (6UO3-T8Alloy) Tube): Size= 8"x1O^xO. 188^Tube Material: Aluminum (8083-T0/ A|ny) Length = 234.00 In. = 19.5 Ft. Flange Thickness =4= 0. 188|n. Web Thickness =L°= 0. 188|n. Area = 5.405 |n.» Moment nfInertia = |, = 68.308 | n.' Section Modulus =8,= 12, 539|n." Radius of Gyration =r,= 3.557 In, Section yNodu|ua= SL= 12,553 |n" Page 3 of 11 Radius of Gyration =ry= 2,641n. J= 0.064 |n.` Determine Flexural Compression (Section F.2'1): Allowable Compressive Stress = F«= 5 20 K81 Maximum Allowable Compressive Force = Fx= 28.418.18 Lba. > 989.18 Lba, O.K Actual Load = 989.18 Lbo. Maximum Allowable rWonnent= K8,= 5.493.92 FL'Lbs. > 4.11U 88 FL-Lbn. O.K Actual Moment = 4.110.68 Ft. -Lb& Therefore, 10°x$~x 0.188" Aluminum (6063-T6 Alloy) Gutter Beam is Acceptable, Check Size of Roof Hip Rafter: Design Loads for Hip Rafters from R|8AAnalysis: Ghear= 1.629.26Lbm Gnavity= 479.00Lbu. Uplift = 287.00Lba. K8omnent= 1.366,53Ft.-Lba Check Capacity ofRoof Hip Rafter (4"x8''xO.188"Aluminum (GOG3-TGAlloy) Tube): Size= 4^ x8''xD.188^Tube Material: Aluminum ( 8083-T8AUoy) Length = L= 108.00 In. = g Ft. Flange Thickness = 4= 0,188|n, Web Thickness = t*= 0.188 In. Area = 4. 360 In.' Moment ufInertia = |, = 367 |»,* Section Modulus = 8x= g18 |».~ Page 4 of 11 Radius of Gyration = r,,= 2,90 In. Moment ofInertia = | v = 12.4 |n.° Section Modulus= S'= 0.20 |n.^ Radius ofGyration =r,= 1.88|n. J = 28.6 |n.4 Determine Flexural Compression (Section F'3.1): Allowable Compressive Stress =F,= 141 NS| Maximum Allowable Moment =N>,= 1.762.88FL-Lba. > 1.418.47Ft.-Lbe O. K. Actual Moment = 1.418.47 FL-Lbm, Maximum Allowable Compressive Force = F,= 14.878.48 Lbo > 1.852.34 Lbs. C)X. Actual Force = 1.052.34 Lbo. Therefore, 4" x 8"x 0.188°Aluminum (6063-T6 Alloy) Roof Hip Rafters are Aceptable. Check Size of Ridge Beam: Design Loads for Ridge Beam from R|SAAnalysis: Ghear= 2.088.00Lbs Gravity = 343.00Lbe. Uplift = 205.00Lba. K8ument= 407.00Fl,Lbs, Check Capacity ofRoof Ridge Beam (4^x8"xU]8M"Aluminum K5083-TGAlloy) Tube): Gize= 4^x8" xO.188^Tube Material: Aluminum (6063' T6AUoy) Determine Flexural Compression ( Section F.3.1): Page 5 of 11 1 *rAF*J7MiT#5WT7 Mi taWly M-ArsTAW I A - I -•0 # AfQhi& Aaeaia Allowable Compressive Stress = F, 3.73 KSI Maximum Allowable Moment = Mx = 1,925.46 Ft.-Lbs. > 443.07 Ft.-Lbs. Q.K. Actual Moment = 443.07 Ft.-Lbs. Maximum Allowable Compressive Force = Fx = 16,248.39 Lbs. > 2,107.24 Lbs. 0. K Actual Force = 2,107,24 Lbs. Therefore, 4" x 8" x 0.188" Aluminum (6063-T6 Alloy) Roof Ridge Beam Is Aceptable. Check Size of End Run Beams: Design Criteria: Design Loads for End Run Beams: Shear = 973.67 Lbs. Gravity = 2,192.00 Lbs. Uplift = -2,192.00 Lbs, Moment = 10,217.18 Ft.-Lbs. Check Capacity of Roof End Run Beams (6"x10"x0.188" Aluminum (6063-T6 Alloy) Tube): Size = 6" x 10" x 0. 188" Tube Material.- Aluminum (6063-T6 Alloy) Length = L = 144.00 In. 12 Ft Determine Flexural Compression (Section F.3.11): Allowable Compressive Stress = F, = 15.63 KSI Maximum Allowable Moment = M,, = 16,148.93 Ft,-Lbs, > Actual Moment = 10,341.20 Ft-Lbs. Maximum Allowable Compressive Force = F, = 91,580.04 Lbs. > Actual Force = 2,233,34 Lbs. 10,341.20 Ft.-Lbs. 0. K. 2,233.34 Lbs. 0. K. Page 6 of 11 Therefore, 6" x 10" x 0.188" Aluminum (6063-T6 Alloy) Roof End Run Beams Are Acceptable. Check Size of Transfer Tube: Design Loads for Transfer Tube: Shear = 1,629.26 Lbs. Gravity = 479,00 Lbs. Uplift = -287.00 Lbs. Moment = 1,366.53 Ft.-Lbs. Check Capacity of Transfer Tube (6"x10"xO. 188" Aluminum (6063-T6 Alloy) Tube): Size= 6"x1O"xO.188"Tube Material: Aluminum (6063-T6 Alloy) Length = L = 10.00 In. = 0.83333333 Ft. Determine Flexural Compression (Section F.3.1): Allowable Compressive Stress = F = 5.18 KSI Maximum Allowable Moment = M, = 5,350.44 Ft.-Lbs. > 1,367.13 Ft.-Lbs. O.K. Actual Moment = 1,367.13 Ft.-Lbs. Maximum Allowable Compressive Force = F), = 30,342.19 Lbs. > 481.87 Lbs. Q.K. Actual Force = 481,87 Lbs. Therefore, 6" x 10" x 0.188" Aluminum (6063-T6 Alloy) Transfer Beam is Aceptable. Scope: Check Size of Tube Columns: Design Loads for Columns from RISA Analysis: Shear = 89.96 Lbs. Gravity = 4,320.00 Lbs, Page 7 of 11 Uplift = 3,464.00 Lbs. Moment = 4,798.25 Ft.-Lbs. Check Capacity of Columns: Size = 6" x 10" x 0, 188" Tube Material: Aluminum (6063-T6 Alloy) Length = L = 164.00 In. = 1167 Ft. Determine the Allowable Compressive Stress in 6063-T6 Alloy: (Spec. E.3) Allowable Compressive Stress = F, = 3.46 KSI Maximum Allowable Compressive Force = F, = 20,268.16 Lbs. > 4,320.00 Lbs, O.K. Determine Flexural Compression (Section F.3.11): Allowable Compressive Stress = F, = 15,56 KSI Maximum Allowable Moment = Mx = 16,074.50 Ft.-Lbs. > 4,798.25 Ft.-Lbs. 0, K. Actual Moment = 4,798.25 Ft.-Lbs. Therefore, 6" x 10" x 0.188" Aluminum (6063-T6 Alloy) Column is Aceptable. Determine stresses at connections: Check Connection of 4" x 8" Hip Rafters to 10" x 6" Ridge Beam: Design Loads on Weld from RISA Analysis: Shear = 3,777.86 Lbs. Gravity = 630.00 Lbs, Uplift = -684.00 Lbs. Moment = 1,574.22 Ft.-Lbs. Check Weld Connecting Hip Rafters to Ridge Beam: Page 8 of 11 r 77M- 76 'ffmjAFr#Mrr;,T My/ TC mphi& S• OGIAN" Size 0.188 In. Fillet Modulus Area = A,, = Allowable Stresses for 5356 filler alloy: Allowable Stress of Weld Shear Capacity of Weld = Moment Capacity of Weld 24.000 In. 962.40 Lbs./In. 23,097.69 Lbs. > 3,777.86 Lbs, O.K. 35,929.74 In.-Lbs, > 18,890.63 In.- Lbs. Q.K. Therefore, it is Acceptable to Weld Each Hip Rafter to the Ridge Beam with All -Around 3/16" Fillet Weld (5366 Filler Alloy). Check Connection of 4" x 8" Hip Rafters to 10" x 6" Transfer Tube: Design Loads on Connection from RISA Analysis: Shear = 1,698.21 Lbs. Gravity = 287.00 Lbs. Uplift = -479.00 Lbs. Moment = 1,366.53 Ft.-Lbs. Check Weld Connecting Hip Rafters to Ridge Beam: Weld Size = 0.188 In. Fillet Section Modulus = Sx = 34,667 In." Area = A,, = 20.000 In. Allowable Stresses for 5356 filler alloy: Allowable Stress of Weld = 962.40 Lbs./In. Shear Capacity of Weld = 19,248.08 Lbs. > 1,698.21 Lbs, Q.K. Moment Capacity of Weld = 33,363.33 In.-Lbs, > 16,398,35 In,- Lbs. Q.K. 12saign CALcula0as & QdandQ santOrd Ain2aa Mult k2t EaWc Cangay in SanfQrA EL Nr MQbi& S21trUANIN Therefore, It is Acceptable to Weld Each Hip Rafter to the Transfer Tube with Three -Sided 3/16" Fillet Weld (5356 Filler Alloy). Check Connection of 6" x 10" Columns to 6" x 10" End Run Beam: Design Loads for Connections from RISA Analysis: Shear = 4,537.12 Lbs. Determine Capacity of Each Fastener: Type Fastener: Thru-Bolts Size fastener: 0.750 In. Capacities of Fastener: Shear = 5,000 Lbs, 4,53712 Lbs, 0. K. Therefore, it is Acceptable to Use 3/4" Diameter 304 Stainless Steel Thru-Bolts to Attach Columns to End Run Beams @ Top. Determine Reguired Size of Foundation: Design Loads for Foundation from RISA Analysis: Shear = 490.11 Lbs. Gravity = 8,616,00 Lbs. Uplift = -6,108.00 Lbs, Moment = 3,776.80 Ft.-Lbs. Req'd. Depth of 6"x10"x0.188" Column Into Concrete: Thickness of 6" x 10" Column = t = 0.188 In. Moment @ Base of Col. = M = 3,776,796 Ft-Lbs. d = (M-12/MR) 112 = 7.42 In. < 24 In. Q.K. Therefore, the 6" x 10" column must be embedded a minimum of 24" into the concrete. Size of Rectangular Footer Required: Page 10 of 11 9017 - 0 -F.,Yr;.T.r&Avi.7M:19.TAF--rTFAM. m9hue Amwuka Moment @Each Column Base 3,776.80 Ft.-Lbs. < 40,320.00 Ft.-Lbs.O.K. W = 4.00 Ft. D = 4.00 Ft. L = 4.00 Ft. Soil Bearing Capacity = 21,333.33 Lbs, > 8,616.00 Lbs. Weight of Footer = 9,280.00 Lbs. > -6,108.00 Lbs. Determine Required Footer Reinforcement: Area of Steel Required = 4.1472 In.2 Size Bar = #7 Area of Bar = 0.6 In.2 Number Bars Required = 6.912 Number Rows = 2 Number Bars Each Row = 3.456 Use: 4 1610 Therefore, 4'-0" x 4'-0" x 4'-0" Square Footer with (2) Rows of (4) #7 Bars Each Way is Acceptable. Page 11 of 11 INSPECTION SEQUENCE BP# 16-1010 ADDRESS: 951 Red eleavland BUILDING PERMIT Min Max Inspection Description to Footer / Setback Stemwall Slab / Mono Slab Lintel / Tie Beam / Fill / Down Cell Sheathing — Walls Sheathing — Roof Roof Dry In 20 Frame Insulation Rough Firewall Screw Pattern Drywall / Sheetrock Lath Inspection Building Ceiling Air Barrier Insulation Roof (Com'l) Building Ceiling Grid Final Roof Final Stucco / Siding Final Insulation Final Firewall Final Door Final Window Final Utility Building Final Screen Structure Final Pool Screen Enclosure Pre -Demo Final Demo Final Single Family Residence Final Commercial — Final Commercial — Addition / Alteration Final Commercial — Change of Use 1000 Final Building (Other) Canopy ELECTRICAL PERMIT Min Max Inspection Description Electric Underground Footer / Slab Steel Bond Electric Ceiling Rough Electric Wall Rough 10 Electric Rough Pre -Power Final Temporary Pole 1000 Electric Final Min Max Inspection Description Rough Plumb Plumbing Underground Plumbing 2"d Rough Plumbing Tubset Plumbing Sewer Plumbing Grease Trap Rough Plumbing Steam / Chili Water Rough Plumbing Final MECHANICAL PERMIT Min Max Inspection Description Mechanical Rough Mechanical Fire Damper Framing Mechanical Ceiling Rough Mechanical Fire Damper Annular Space Mechanical Insulation Wrap Mechanical Fire Damper Angle Light / Water Test Ck Welds Mechanical Grease Duct Wrap Mechanical Final REVISED: June 2014 Orlando Sanford Airport Sanford, FL This structure has been designed in accordance with the requirements of the 2014 Florida Building Code, Fifth Edition - Building, Chapter 16, Structural Design. The following wind load requirements, in accordance with Section 1609, and ASCE '7-10 were employed in the design of the structure: Ultimate Design Wind Speed (Vuit): 150 MPH 3-Second Gust Wind Speed (V,,,,d): 116MPII Risk Category: III Wind Exposure Category: C Applicable Internal Pressure Coefficient: +/- 0.00 Design Pressure for Exterior Components & Cladding: Walls = N/A Roof = +26.62/-20.07 PSF j Tr. Sal Davis & Cleaton Engineering Inc, 260 Wekiva Springs Road, Suite 1060 Longwood, FL 32779 Ph. # 40 7-539-2353 Lic, #35816 CA #8689 VICINITY MAP 0 D.ew, fb lv w•r L1 LPROJECT SITE DAVIS & CLEAT ON ENGINEERING; INC. 260 WEKIVA SPRINGS ROAD, SUITE 1060 LONGWOOD, FLORIDA 32779 PH. #407-539-2353 LIC. #35816 CERTIFICATE OF AUTHORIZATION 4M89 Orlando Sanford International Airport 951 Red Cleveland Blvd. Sanford, FL 32773 Value Parking Lot Entry Canopy INDEX OF DRAWINGS Q ISSUE DATE SHEET SHEET DESCRIPTION A0.0 COVER SHEET AD.1 SHEET INDEX, LEGENDS, SITE PLAN, CODE DATA ARCHITECTURAL AD2.1 DEMOLITION FLOOR PLAN/ NEW FOUNDATION PLAN A2.1 DIMENSIONREFERENCE FLOOR PLAN B ROOF PLAN A6A CANOPY ELEVATIONS, SECTIONS, CANOPY DETAILS A7.1 COLUMN FOOTING DETAILS EIECTRrAL E1.0 ELECTRICAL NOTES, LEGENDS, SYMBOLS E21 ELECTRICAL PLAN, FIXTURE SCHEDULE, PANEL SCHEDULE, NOTES ARCHITECT BHM Architecture, Inc. Coopany License p AAC000233 Camala McCarter Hogue 47e E AaianoYe OT SW toe PL1e 264 Vem(107)3332X6 AW—SPNq. Fb 32701 F. N— uCdn ELECTRICAL ENGINEER Joseph, Lawrence 8 Co. LLC Consulting Engineers Company License #28730 Blake Suddeth, P.E. Sae I3]Si vote (32119t2a1fi6 ManarYa Smr Fir 32i 1e II"— OMkea Nll111mgcon PERMIT# l6-1-a<o OFFICE MOBILE 1683 Ilcardall Ave. Suite 101 Sanford FL 32771 877-321-5493 Orlando Sanford International Airport Value Lot Entry Canopy Sanford, Florida PERMIT SET 2015.051 0308-16 RMH RMH Issue data drawn by approved by project number REVLSION SCHEDULE DATE DESCRIPTION COVER SHEET AO 0 0 Meet n,.,.mr ARC7111ECiURE INC NAILONLYQBEALTAMONTEDrt,SURE103 P11e261.ALTAM KSPRINGSFL32701-S2 BONE•0T333= LICENSE 1 AACOOMM _ W W W e H M u S C 0 M VALUE PARKING LOT ENTRY CANOPY SITE PLAN NTS DAVIS & CLEAION ENGINEERING, INC. 260 WEKIVA SPRINGS ROAD, SUITE 1060 LONGWOOD, FLORIDA 32779 PH. #407-539-2353 LIC. #35816 CERTIFICATE OF AUTHORIZATION #8689 SYMBOL LEGEND SYMBOL DESCRIPTION ROOM NAME 1 ROOM TAG - INDICATES ROOM NAME, ROOM ROOM NAME 2 NUMBER (FIRST DIGIT INDICATES FLOOR LEVEL. REMAINING DIGITS INDICATE ROOM NUMBER 01 N.S.F. THRU 99) AND NET SQUARE FOOTAGE (N.S.F.) DOOR NUMBER TAG- FIRST DIGIT INDICATES cm LEVEL. MIDDLE DIGITS INDICATE ROOM NUMBER 01 THRU 999. LAST DIGIT INDICATESNUMBER NUMBER OF DOORS IN THE ROOM A, B, C. sto... ELEVATION TAG - TOP NUMBER S DETAIL LOCATION AND BOTTOMINDICATES NUMBER INDICATES PAGE NUMBER INDICATES DETAIL NUMBER, NAME, AND SCALE OF ow DETAIL COLUMN GRID LINE TAG- A B. C, ETC. IN ONE DIRECTION & 1,2,3 ETC. IN THE OPPOSITE LOCATION OF GRID NOTED AZ 4.7, ETC. X INTERIOR ELEVATION TAG - TOP NUMBER INDICATES DETAIL NUMBER, BOTTOM NUMBER XeX INDICATES PAGE NUMBER AND A,8,C,D INDICATE DIRECTION OF ELEVATION X REFERENCE TAG INDICATES LOCATION OF sM ENLARGED PLANS, ELEVATIONS, AND DETAILS - TOP NUMBER INDICATES DETAIL NUMBER AND BOTTOM NUMBER INDICATES PAGE DETAIL IS FOUND ON WALL TAG INDICATES WALL TYPE - REFER TO 11111111 WALL LEGEND FOR DETAILS OF WALL COMPONENTS mcrA HEIGHT TAG INDICATES ELEVATION HEIGHTS SECTION MARK -TOP NUMBER INDICATES SECTION NUMBER AND BOTTOM NUMBERJ INDICATES PAGE SECTION IS FOUND ON WINDOW TAG INDICATES WINDOW TYPE REVISION TAG INDICATES REVISION NUMBER 0 PHOTO TAG - TOP NUMBER INDICATES SECTION NUMBER AND BOTTOM NUMBER INDICATES PAGE SECTION IS FOUND ON PROJECT CRITERIA THIS PROJECT COMPLIES WITH THE FOLLOWING CODES AS WELL AS ANY AMENDMENTS AS SET FORTH BY: CITY OF SANFORD BUILDING DEPARTMENT ORIANDO SANFORD INTERNATIONAL AIRPORT AVIATION AUTHORITY THE FOLLOWING CODES REGULATE THIS PROJECT: FLORIDA BUILDING CODE, 5TH EDITION FLORIDA ACCESSIBILITY CODE, 5TH EDITION FLORIDA FIRE PREVENTION CODE, 5TH EDITION NATIONAL ELECTRICAL CODE, CURRENT ADOPTED EDITION PROJECT ADDRESS: ORLANDO SANFORD INTERNATIONAL AIRPORT 1200 RED CLEVELAND BOULEVARD SANFORD, FL 32773 OCCUPANCY TYPE: GROUP U - UTILITY & MISCELLANEOUS. OPEN CANOPY CONSTRUCTION TYPE. TYPE II-B, NON-COMBUSTIBLE, NOWSPRINKLERED AREA (CANOPY ROOF). 234 SQUARE FEET BUILDING HEIGHT (CANOPY ROOF PEAK): 1T-W d- TABLE 601 — FIRE RESISTIVE RATINGS TYPE II-B PRIMARY STRUCTURAL FRAME: OHR BEARING WALLS: EXTERIOR: WA INTERIOR: WA NOWBEARING WALLS AND PARTITIONS: EXTERIOR: WA INTERIOR: WA FLOOR CONSTRUCTION & SECONDARY MEMBERS: WA ROOF CONSTRUCTION & SECONDARY MEMBERS: 0 HR LOADS IN ACCORDANCE WITH CHAPTER 16 OF THE FLORIDA BUILDING CODE, 5TH EDITION 8 ASCE7-10, AS FOLLOWS: WIND VELOCITY = 144 MPH BUILDING RISK CATEGORY = III ENCLOSURE FACTOR = OPEN BUILDING TYPE = OPEN CANOPY jo ? MOBILE F 1"31 BsardaN Ave. Suns 101 Sanford, FL 32771 877-321-S493 Orlando Sanford International Airport Value Lot Entry Canopy Sanford, Florida PERMIT SET 2015.051 Wsue date drawn by approved by project number I.a\m COVER SHEET AO.1 sheet number TIT RECTURE. NC MAIL ONLY 476E ALTAWNTE DR, SUITE 10o PMB 254. ALTAIIONTE SPRWOS. FL 32701 by2 Fn00W 407333E06 LICENSE# AFLODMIG =_ W W W 8 N M U 5 C 0 M GENERAL DEMOLITION NOTES: T. PfEDEMOLITIOM PHOTOGRAPHSr SHOW EXISTING CONDITIONS OF ADJONNG CONSTRUCTION. INCLUDING FLASHED SURFACES THAT MIGHT BE MISCONSTRUED AS DAMAGE CAUSED BY SELECTIVE DEMOLITION OPERATIONS. SUBMIT TO OWERS REPRESENTATIVE PRIOR TO BEGINNING DENAOUTION( WOW, IF REOLWIED- 2. DEMOLITION WOW PERFORM DEMOLITION ACTIVITIES IN ACCQRDANCE MIEN APPLICABLE AUTHORITIES HAVING JURISDICTK)N. 0E40IS14 IN A W INOMCAL APO CAREFUL MANNER AS REQUIRED TO ACCOMMODATE NEW WORK SPEOFIEM PERFORM DEMOLITION WORK IN A MANNER AS TO MINIMIZE DAMAGE, EXCESSIVE NOISE OR VIBRATION. ANY OPERATION THAT IS ANTICIPATED TO CAUSE DISTURBANCE TO THE OWNER. SHALL BE COORDINATED WIN THE OSIA PROJECT MANAGER A MINIMUM OF THREE (3) DAYS PRIOR TO EXMTOM OF WORK- 3. `REMOVE- SHALL MEAN TO DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY IXSPOSE OF TEN. t. NEATLY CUT OPENINGS AND HOLES PLUMS. SOtARE. AND TRUE TO plENS10NS REQUIRED, USE CUTTING METHODS LEAST LIKELY TO DAMAGE CONSTRUCTION TO REMAIN OR ADJOINING CONSTRUCTION. USE HAND TOOLS OR SMALL POWER TOOLS DESIGNED FOR DRILLING SAWING OR GRINDING. HOT HAMYEWFIG AND CHOPPING. TO M IZE DtSTURBAHCE OF ADJACENT SURFACES. TEMPORARILY COVER OPi71NG5 TO REMAIN. 5. CLEAN AREAS OF OEMOIT1pN DAILY, INCLUDING ADJACENT AREAS OF DUST. DIRT. AND DEBRIS CAUSED BY SELECTIVE DEMOLITION OPERATIONS. SCHEMING, SCHEME DEMOLITION WORK VATH THE OSIA PROJECT MANAGER PRIOR TO START OF WORK TO MINIMIZE DISRUPTION OF SERVICES AND PROVIDE FOR THE UNINTERRUPTED OPERATION OF THE FACILITY. T. PROTECTION: EXERCISE CARE DURING WORK TO PROTECT EXISTING CONSTR 11014 TO REMAIN. REPAIR TO. OR REPLACEMENT OF, EMSTING CONSTRUCTION DUE TO DAMAGE BY DEMOLITION ACTIVITIES STALL. BE PERFORMED AT NO COST TO THE GONER. HAZARDOUS MATERIALS. THE CONTRACTOR SHALL. IMMEDIATELY REPORT ANY HAZARDOUS OR TOXIC MATERIALS ENCOUNTERED TO THE OSIA PROJECT MANAGER. 9. OPENNNCS: WHERE OPENINGS ARE CREATED IN EXISTING CONSTRUCTION TO REMAIN, PROVIDE NEW CONSTRUCTION OF TYPE AND THICKNESSES TO MATCH ADJACENT. MATERIALS USED TO FILL TWSE OPENINGS AND FNSIES INSTALLED SHALL MATON EISTWW UA,O.. 10. EXISTING SERVICES: WHERE EMSTItG SERVICES SUCH AS ELECTRICAL ARE AFFECTED BY DEMOLITION WORK, THE SERVICES SHALL BE TEMPORARILY SHUT DOWN MINING THE SPECIFIED HOURS AS APPROVED BY OSIA. AND BROUGHT BACK INTO SERVICE BEFORE THE END OF EACH WORK DAY. I1, ALL MATERIALS USED FOR PROTECTION OF EXISTING SURFACES, SHALL BE REMOVED AND STORED AT THE END OF EACH WORK DAY, TO ALLOW USE OF THE AREA FOR NORMAL. BUSINESS ACTIVITIES. 12. SEE GENERA, NEW CONSTRUCTION NOTES FOR ADDITIONAL INFORMATION. INDICATES APPROX. LOCATION OF EXISTING SIDEWALK EXISTING SOD & _ Z LANDSCAPE AREA EXISTING STREET LIGHTING BOX EXISRNG CONCRETE CURB & GUTTER EXISTING ELECTRICAL & DATA PANEL - IF POWER IS NOT AVAILABLE AT PANEL, USE ALTERNATE LOCATION OF POWER ACCESS FROM THE EXISTING PARKING CONTROL EQUIPMENT EXISTING CONCRETE CURB & GUTTER S EXISTING ELECTRICAL DATA PAtRL EXISTING CONCRETE CURSABOVE GUTTER ABOVE COORDINATE FINAL J EXISTING SIDEWALK ' \ ABOVE \ EXISTING FIBER OPTIC BOXES ABOVE t iCK-0llT SIZE Wl YMFG, l t} iEXISTINGSTREETLIGHT— BOX ABOVE \ q, j =3 EXISTING CONCRETE - ISLAND ABOVE NEW O;ROtti NFILL AT BLOCK-DUN I-)" U MiNUM- EXISTINi CONCRETE - CURB & GUTTER S f ABOVE 2 REMOTE CANOPY FOUNDATION PLAN NEW C.I.P. CONCRETE FOOTING - SEE DETAILS ANTI & AJ72 NEW ALUMINUM COLUMNS I EXISTING PARKING 1# EQUIPMENT ABOVE 3 I( EXISTING CONCRETE CURB & GUTTER ABOVE i 1 EXISTING PARKINGi 1 n, EQUIPMENT ABOVE 1 EXI TPAR Ili EQ1 RPMEN'EXISTING ASPHALT j — PAVEMENT GENERAL DEMOLITI(N! VOTES: E,, NS,T,,.It ETE ' (CAREFULLY ISLAriJ I 1 AND HAND EXCAVATE SOIL TO DEPTHS & WIDTHS TO GPROPERLY INSTALL NEW COLUMN 1 EXI I, CC. FILLED FOOTINGS, if UdOE UTgXTiES ARE DISCOVEREDWITHIN THE BOUNDARIES OF t - > 4 T'P THE NEW FOOTING, IMMEDIATELY NOTIFY THE OSIA PROJECT MANAGER, ANY THE 1 I fa XRSTING CONCRET DESIGN TEAM. I rJ-R-IR- & GUTTER (2 j Y SA'CUT & REMOVE SECTIONS OF EXMSTING ASPHALT PAVEMENT, AND IST P NG ° I v HAND EXCAVATE SOIL TO DEPTHS & WIDTHS TO PROPERLY INSTAL NEW COLUMN E € 1 \ FOOTINGS. IF UNDERGROUND UTILITIES ARE D WTHIN THE BRRNDAIES OF 1 1 \\ THE NEW FOOTING, IMMEDIATELY NOTIFY THE OSiA PROJECT AIR AND THE DESIGN TEAM. I ( CAREFULLY HAND EXCAVATE SOIL TO DEPTHS &WIDTHS TO PROPERLY INSTALL. NEW v COLUMN FOOTINGS- CAREFULLY SAWCUT & REMOVE SECTIONS OF EXISTING Y CONCRETE CURB & GUTTER IF REQUIRED, IF UNDERGROUND UTLITES ARE DISCOVERED WITHIN THE BDUNDARIES OF THE NEW FOOTING, IMMEDIATELY NOTIFY THE OSIA PROJECT MANAGER AND THE DESIGN TEAM. T 4•&• \_WDICATES LINE OF :l AT LOCATIONS WHERE THE NEW FOOTING EXCAVATION OVERLAPS AREAS OF FISTING l. CANOPY ABOVE CONCRETE BAB MOM CONCRETE CURB & GUTTER THE GENERAL CONTRACTOR HAS EXISTING SOD & THE OPTION TO EXCAVATE UNDER THESE AREAS WITHOUT REMOVING THEM, AS LONG f LANDSCAPE AREA AS NO DAMAGE, DISPLACEMENT, ETC, OCCURS. 5 CAREFULLY RAND EXCAVATE SOW TO DEPTHS & MOTHS TO PROPERLY INSTALL NEW y UNDERGROUND CONDUITS AS NOTED ON THE ELECTRUM DRAWINGS, IF UNDE UTILITIES ARE DISCOVERED WITHIN THE BOUNDARIES OF THE NEW EXCAVATION, IMNMEMATELY NOTIFY THE OSIA PROJECT MANAGER, AND THE DESIGN TEAM. EXISTING ASPHALT it Q ALL DTMENS40K MUST BE HIND VERIFIED AND FULLY COORDINATED WITH FINAL CANOPY i _PAVEMENT --, ` SHOP DRAWINGS. INCLUDING COLUMN SCES. SPACM G, BLOCK -OUT SIZES. ETC. NEW CI P, CONCRETE FOOTING - SEE DETAILS ARTS & ANT 2 iDCAREFULLY SAWCUT & REMOVE SECTIONS OF EXISTING CONCRETE S EWALK SU6. AND RAWEXCAVATESMTODEPTHS & WIDTHS TO PROPERLY INSTALL NEW COU M N FOOTINGS. IF UNDERGROUND UTILITIES ARE DWOVERED WITHIN THE BOUNDARIES OF 1 THE NEW FOOTING, Mt.EMATE Y NOTIFY THE OSIA PROJECT MANAGER AND THE N DESIGN TEAM REMOTE CANOPY PLAW DEMOLITION n 6;'X M3 Be=" Am Suke 101 SWWfwd Ft 32771 M- 321- 503 Orlando Sanford International Airport Value Lot Entry Canopy Sanford, Florida PERMIT SET 2015.051 tT.a7 DEMOLITION FLtt• PLAN/ AD2ml NEW FOUNDATIONbATIRCHtTELT{ IE. IAA. ONLY ll8 E Af.TH1tiNTE fXR., SWTE Xib PlB 16/, N.FeAfiXNTE SPAMGS. fi 3XAXk-la'22 PNONE: 437333. 2M5 LICENSE F AACOMM rrrcr w GENERAL NEW CONSTRUCTION NOTES: T. DUE TO THE NATURE OF THE BUSINESS ACTIVITIES THAT MUST OCCUR AT TFMS AREA, THE PROPOSED WORIONG DAYS 4 HOURS FOR DEMOUTION, NEW CONSTRUCTION, ETC-. MUST BE CLOSELY COORDINATED NTH THE OSA PROJECT MANAGER. Z ALL. CONSTRttCTK7N PERSONNEL. 94ALL RESTRICT THEIR ACCESS TO THE GENERAL AREA OF THE NEW PROTECT, AND SHALL NOT VENTURE BEYOND THE LUIS OF THE WORK SCOPE ARE& i i 3. ALL MATERIALS USED FOR PROTECTION OF EXISTING SURFACES, MUIPMEHT, ETC., SHALL. BE REMOVED AND STORED AT THE END OF EACH WORK DAY, TO ALLOW USE OF THE AREA FOR NORMAL BUSINESS ACTIVtDES AS FEOUIED. t. ACCESS TO DIE EXISTING ELECTRIZAL. i POWER SUPPLY TO THE NEW CANOPY SHALL BE COORDINATED NTH THE OSA PROTECT MANAGER.. 5. CLEAN AREAS OF NEW CONSTRUCTION DAEY. INCLUDING ADJACENT AREAS OF DUST, DIRT, AND DEBRIS CAUSED BY THE CONSTRUCTION ACTIVITIES. 6. EXER(7SE CARE DUI NC WORK TD PROTECT EXISTING CONSTRUCTION TO REMAIN. REPAIR TO, OR REPLACEMENT OF, EXISTING CONSTRUCTION DIE TO DAMAGE BY CONSTRUCTION ACTIVITIES SHALL SE PERFORMED AT NO COST TO THE OWwE.R. i GENERAL NOTES: 0 PROVIDE NEW CONCRETE SLAB WILL AS REQUIRED TO MATCH EXISTING SURROUNDING SLAB N HEIGHT & FINISH. 02 PROVIDE NEW ASPHALT PAVEMENT AND BASE COURSE MATERIAL TO MATCH EXISTING SURROUNDING G PAVEMENT IF REQUIRED. l.",! PROVIDE NEW CLEAN COMPACTED FILL NEW TOP SOQ AND SOD AS REWRED AT DISTURBED AREAS. 0 PROVIDE NEW ANDIOR REINSTALL EXISTING CONCRETE FILED BOLLARDS AT THEIR PREVIOUS LOCATION'S, AND PANT TRAFFIC YELLOW TO MATCH EXISTING, G) PROVIDE NEW CONCRETE CURB & GUTTER WILL AS REOCIRED TO MATCH EXISTING ADJACENT CURED & GUTTER N HEIGHT & FINISH, PROVIDE NEW CONCRETE SIDEWALK SAS AS REQUIRED TO MATCH EXISTING IN HEIGHT FINISH. PANEL EXISTING FIBER BOXES t EXISTING SOD —! AREA EXIST Al. EXIST. STREET LIGHTLNI"i BOx E7 iIT" PARK C I OL EGU E T4 PARKING 1 SATES UTFOOTING I N ALUMNU f C OPY COLD E6S.- EXIST CONCRETE _ CURB O rel CANOP'COLUMNS- TYP, I qyyST. CONC. i BOLLARDS tN0 ATE$ t1EOF E At ANOPY M J, EXIST. CONC. FILL BOLLARDS Oi EXISTING ASPNW T PAVEMENT EXIST. CONCRETE CURB ALUMINIUM CANOPY EDGE SEMI Wt INTEGRAL GLITTER tL ALUMINUM CANOPY ., ROOF SYSTEM 2 REMOTE CMOPY ROOF PLAN NET 6X GU' 6X SEA 6x GU1 v. 24L SVLii% TO ALUMINUM LUMNS 8ALUMINUM HIP LM 8 ALUMINUM GE BEAM ai/ 1 MOBILE 1" 3 BOW" MNL SAW lot 5ankTd FL 32M 877- 321403 Orlando Sanford International Airport Value Lot Entry Canopy Sanford, Florida PERMIT SET 2015.051 03- 16 RMH RMH Imm date drawn by aooarred by mied nutrW FAN Emmm m FLOOR PLAN / ROOF PLAN A2,1 a` N AK-TECTLNt E MC MAX ONLY H?eE ALTA NORM OR. SWE ReNa 3M1 PHPR , ALTAMCRTE SNGS, FL W01-4W OIA3W 407 333.2M LICENSE 9 AAY.d7IDb -- ALUMINUM CANOPY Ail ROOF SYSTEM ALUMINUM CANOPY 12 ROOF SYSTEM ALUMINUM CANOPY EDGE BEAM WI ALUMINUM CANOPY INTEGRAL GUTTER ghfu EDGE BEAM Wt — INTEGRAL GUTTER IT)VALUMINUM CANOPY COLUMNS WW ALUMINUM TYP, CANOPY COLUMNS TYP EXIST. CONCRETE EXIST CONCRETE EXIST, GRADE ISLAND LIPS ' GUTTERCURB &GUTTER EXIST,CONCRETE EXIST. GRADE L CURB & GUTTER FUTURE SPASPHALTEXISTT-ASPHALT PAVEMENTPAVEMENT EXIST ASPHALT PAVEMENTSIDEWALK) 14L MOW ELEVATION Scale: KITS. CANOPY SYSTEM FRAMING CANOPY ROOF DECK STAINLESS STEEL= BIRD CONTROL NEEDLE STRIPS 7. ALUMINUM CANOPY 2- (rYPj EDGE BEAM W/ INTEGRAL CUTTER CANOPY SYSTEM BEAM I 10'W ALUMINUM CANOPY COLUMNS NEW ASPHALT TYP, PAVEMENT & WE COURSE TO MATCH EXIST. RAISE EXIST IF REOV. NCRETE ISLAND EXIST GRADE CONCRETE FOOTING COORDINATE FINAL SIZE W/CANOPY STRUCTURAL ENGINEER DBUILDING -SECTION3 -7State: WTS NOTE: ROOF SHALL BE ATTACHED PER MANUFACTURER'S SPECIFICATIONS SCREW, 146 x SS Wt 040 RIDGE CAP— NEOPRENE WASHER AT CUSTOM W ANGLE —,\ z EACH DECK BOTTOM IOW ALUMINUM 12 NEW CJP. CONC. "--cm4opy COLUMNS INFILL TO MATCH— TYP, EXIST ISLAND EXIST. CONCRETE I Ifil & GUTTER/+ VEXISTGRADE OF BBW 194 CONCRETE FOOTING COOFVVDfNATE FINAL W/ CANOPY STRUCTURAL EXJST. RAISED ENGINEER CONCRETE ISLAND 2EXISTCONCRETE CURB & GUTTER A71 G)_IE ION EXIST ASPHALT Scale N TS PAVEMENT SIDE ELEVATION Scale: kTS, CANOPY SYSTEM FRAMING ri-N CANOPY ROOF DECK 12 STAINLESS STEEL BIRD CONTROL NEEDLE STRIPS CANOPY SYSTEM— BEAM ALLMINUM CANOPY EDGE BEAM WI 10rX6'ALUMINUM INTEGRAL GLITTER CANOPY COLUMNS TYP NEW C.I.P. CONC. INFILL TO MATCH EXIST, ISLAND NEW C.I.P.CONC. NEW FILL, TOP SOIL & SOD INFILL TO WATCH EXIST. CONCRETE AS REQ`D TO MATCH EXIST FGRADEEXISTISLANDISLAND NEW CONCRETE CURB GUTTER IF REOID. MATCH EXIST, EXIST CONC,rr EXIST. ASPHALT SIDEWALK REPAIR NITVPAVEMENTAND/OR REPLACE SECTIONS AS REDO CAP. CONCRETE FOOTING I CONCRETE FOOTING COORDINATE FINAL 3 All SIZE W/ CANOPY STRUCTURAL ENGINEER Al NOTE: THESE FOOTING ELEVATIONS ARE ONLY APPROXIMATE & MUST BE FIELD VERIFIED, SO THAT TOP OF FOOTING IS MINIMUM 17 BELOW GRADE, AT THE LOWEST ADJACENT GRADE ELEVATION BUILDING SECTION Scale: N TS CUSTOM VT ANGLE 4? DECK FASCIA TIE BACK SIM, TDCCK STRAP 6' FASCIA w- 4} DECK SIM, 3' DECK 48 BEAM — f \-- 46 BEAM 48 RIDGE BEAM IM EDGE BEAM W1 INTEGRAL GUTTER RIDGE DETAIL FASCIA DETAIL 5(Scale: N.TS 0 $Scale N.TS, 2) 3/4- . A325 THRU EACH! EACH C BEAM 10FILM DETAIL0StewKITS. I0x6 COLUMNS x \_ 4xS RIDGE BEAM 48 HIP BEAM _ 0 RIDGE DETAIL9 Scale 0,17S 4 DECK SIM. TDECK 48 RIDGE BEAM 48 HIP BEAM G CUSTOM W ANGLE I0xS GUTTER toIL CONNECTION TO " TRANSFER TUBE WELDED 6FASCtA SEW 164 TUBE x t — 1 n SPIKED BIRD CONTROL DEVICE I0x6 TUBE BOLTED TO 104 COLUMN FASCIA TIE BACK STRAP 10x6 EDGE BEAM WI INTEGRAL GUTTER 1 OX6 BEAM BOLTED TO 104 COLUMN N,2) 34- 0 THRU BOLTS EACH SIDE OF EACH COLUMN PLATE WELDED TO BEAMS V X 7'-6- X IT BELOW 48 HIP BEAW SCUPPER 10* COLUMNS IM BEAM PLAN DFASCIADETAILETAIL Scale: N.TS, Scale: N,TS. P A 77777,-/ 1 j T ON t'8689 GENERAL NOTES: 1. CANOPY COMPONENTS TO BE EXTRUDED ALUMINUM ALLOY 6063- T6, 2, ALUMINUM FILLER METALS TO BE ER 5356 ALUMINUM MAGNESIUM ALLOY 3, ALL SCREWS TO BE STAINLESS STEEL MOBILE svwfwtfi., E- 1683 Bea"Ave. sww lot SwvforA Ft 3ml ITT- m-sm Orlando Sanford International Airport Value Lot Entry Canopy Sanford, Florida PERMIT SET 2015.051 03-% 16 RUH RMH a- by awoved by vDied maber FEWMSC DkTE Descw_," ELEVATIONS A 1 BUILDINGSECTIONSMKx. 1 1111 A11A 11 1$1, 1,)111. 1. 26f, Ai-1 IRE . IL 1110.. PHOW 407333M LCENSE f AACOXM NEW CONCRETE SLAB ISLAND INFILL W/6 X6 W1A X WIA WWF -DEPTH TO MATCH EXIST. NEW ASPHALT PAVEMENT Ek BASE COURSE TO MATCH E)USTINGASPHALT ASREOUIRED — DUSTING ASPHALT PAVEMENT - GC TO VERIFY THICKNESS & ADJUST NEW ASPHALT ACCORDINGLY NEW GROUT TO BE MINIMUM 20O M COMPRESSIVE STRENGTH 4), # 5 VERTICAL STEEL PEINF. . I AT EACH CORNER 4) 07 STEEL RE[NF. EACH WAY, EQUAL SPACING NEW TREATED COMPACTED FILL AS REQUIRED AT NEW FOOTING COLUMN FOOTING DETAIL Scale: NTS, NEW CONCRETE SLAB ISLAND INFILL W1 6 X 6 WI,4 X WIA WWF - DEPTH TO MATCH EXIST NEW ASPHALT PAVEMENT & BASE COURSE TO MATCH EXISTING ASPHALT AS REQUIRED AT -- NEW FOOTINGS - EA SIDE EXISTING ASPHALT PAVEMENT - GC TO VERIFY THICKNESS & ADJUST NEW ASPHALT ACCORDINGLY NEW GROUT TO BE MINIMUM 2000 PSI COMPRESSWE STRENGTH As REQUIRED L I _ AS REQUIRED 4 .- G ALL NEW. CONCRETE TO BE MINIMUM 3000 PSI NEW CONCRETE SLAB ISLAND INFILL N 6 X 6 WI,4 X W1 4 WWF - DEPTH TO MATCH EXIST, PROVIDE BLOCK -OUT AS REQUIRED AS REQUIRED AS REQUIRED PROVIDE BLOCK -OUT AS REQUIRED FOR COLUMN INSTALLATION FOR COLUMN INSTALLATION COAT ALL PORTIONS OF COLUMN IN EXISTING CONCRETE 19—AAC 7::, COAT ALL PORTIONS OF COLUMN IN CONTACT WITH CONCRETE, ASPHALT, CONTACT WITH CONCRETE, ASPHALT, OR SOIL W/ CLEAR ACRYLIC SEALER OR SOUL N CLEAR ACRYLIC SEALER EXISTING ASPHALT PAVEMENT - GC TO VERIFY THICKNESS MJUST NEW ASPHALT TIACCORDINGLY NEW GROUT TO BE MINIMUM 2000 PSI COMPRESSIVE STRENGTH 4) 45VERTICk STEEL RFJNF. -I AT EACH CORNER 9 4) 97 STEEL REINF EACH WAY, EQUAL SPACING d INEW TREATED COMPACTED FILL AS REQUIRED AT NEW FOOTING 4-0 ALL NEW CONCRETE TO BE MINIMUM 3000 PSI PROVIDEBLOCK- OUT AS REQUIRED FOR COLUMN INSTALLATION A§,REOUtRREQUi COAT ALL PORTIONS OF COLUMNS IN CONTACT WITH CONCRETE, ASPHALT, OR $OIL N CLEAR ACRYLIC SEALER EXISTING ASPHALT PAVEMENT . GC TO VERIFY THICKNESS & ADJUST NEW ASPHALT ACCORDINGLY HOLES IN BOTTOM OF COLUMNS TO KEY GROUT, SIZE & LOCATIONS PER MANUFACTURER 0 4) # 6 VERTICAL STEEL RBNF I AT EACH CORNER —0 4) - V STEEL REINF EACH WAY, EQUAL SPACING NEW TREATED COMPACTED FILL AS REQUIRED AT NEW FOOTING, ALL NEW CONCRETE TO BE COLUMN FOOTING DETAIL MINIMUM m PSI Scale: N, TS. NOTE THE NEW FOOTING SIZE & REINFORCING IS BASED ON INFORMATION PROVIDED BY THE NEW CANOPY SHOP DRAWING STRUCTURAL ENGINEER. NEW FOOTING DESIGN TO BE CONFIRMED WITH THE STRUCTURAL ENGINEER PRIOR TO INSTALLATION r COLUMN FOOTING DETAIL Scale: NTS. MOBILE 1693 IlIfor" AM Swim 101 Swf"A R 12m gn- 3n- 5493 Odando Sanfo- ld International Airport Va-lue Lot Entry Canonu ry S&hW, FW!da PERMIT SET 2015.052 03MI6 RMH RMH is— data dram by acomed by V"d mobe, DETIMLS A7. 1 0K y f76E kTAMOWE OR,StATE MPM82R k AWNTE SPPNG, R 3M- P'13 E 401333M LCEXSE#AACOWM - PERMIT:Zolll 7 tw sm-' I, z Starr w'S Orlando Sanford International Airport Value Lot Entry Canopy Sanford, Florida PERW SET 2015.052 DEMS AM 4 16 ( 0 Davis & Clealon Engineering, Inc. 260 Wekiva Springs Road, Szaie 1060 Longivood, FL 32779 407-539-2353 April 19,2016 Mobile Specialties, Inc. 4 1683 N. Beardall Avenue Suite 101 Sanford, J-L 32771 Attn.: Mr. Dennis Towel] Re: Orlando Sanford Airport in Sanford, Fl- Nat Mr. Towell: We have been notified that there are a grouping of (3) conduits and (1) pipe extending through the location of one of the footers for the referenced prc icct. The conduits are located approximately 21 " from the top of tooter and the pipe is located approximately 3'-0- from top of footer. This is acceptable if horizontal and vertical r5 bars are added on each side to provide a reinforcing cage around of each set of conduits and pipe. if there are any questions, please do not hesitate to call us.