Loading...
HomeMy WebLinkAbout245 Towne Center Cir 00-4074 (A) INTERIOR REMODEL� L15 -TQtivN- CL SUBDIVISION: ZONE _ DATr Q 690' ��c E�t,Lt., G'�1yLG��v PERMIT' # / �- LOT NO. CONTRACTORS - � r�) 7 -. �✓�--� /) a s' �e ,c. 6 L; ,c oA/c Job ADDRESS C) J l0 SECTION: PHONE # COST .C�y�.y- (e' -;—SQUARE FEET: LOCATION fyEE It 1.560 OWNER ADDRESS STATE NO. OCCUPANCY CLASS: PHONE # -- PLUMBING CONTRACTOR FEE $ ADDRESS PHONE # ,K) C CTOR� �(1IC FEE$� ELECTRICAL CONTRA ADDRESS PHONE # - _ MECHANICAL CONTRACTOR G 1 ,. FEE $ ADDRESS PHONE It INSPECTIONS TYPE DATE OK REJECT BY Clec .end it -1 -vv MISCELLANEOUS CONTRACTOR FEE $ ENERGY SECT. EPI: ADDRESS SEPTIC TANK PERMIT NO. SOIL TEST REQUIREMENTS FINISHED FLOOR ELEVATION REQUIREMENTS () ____ _ CERTIFICATE OF OCCUPANCY ARCH i T'EC�)TURAL APPROVAL DATE: ISSUED # J f / DATE:- FINAL DATE / / �` � `✓ � Ros "I Desi g n � i (4i1 iiiittllHtJYl�iY1it18CYL W fkiC�AitJiEfl6ittlCRYYLCt�If ELJ BEFORE START OF WORK, CONSTRUCT A RIDGED DUST -PROOF BARRICADE AS INDICATED, MEETING ALL MALL REQUIREMENTS. DO NOT ATTACH THE STRUCTURE TO THE FLOOR OR ANY OTHER MALL FINISHED SURFACES. PROVIDE AN ACCESS DOOR WITH LOCK AND CLOSER AND A. WALK -OFF MAT INSIDE THE BARRACADE. PAINT AS DIRECTED. DEMOLITION PLA SCALE 1/8" = 1'-0" . I. ,. - _ . - - r. , Tom.•. w. . . I .. t . I - t, .. Jn I ,� . ��� -. , . .. �.. t . G RAL CON ITIONS ENE Q . M. CUTTING, PATCHING &' DEMOLITION - BUILDING N . ' , T. INSULATION . - ;, I . eneral condition's e 1. Contractor o e - G co diti ns of A.I.A. Document A201, 1987 t xercise necessary care to 9. Clea Upon come letion. of lacement P P . 15. Prime Coats: Apply rime ,coat of paint edition are hereb made a art of the Construction Documents revent, dama e to other areas. 1. Provide insulation maters Is in batt or and rout�n clea PP Y P p -n to Y P P 9 a y y, n,• aU eerarnic tale surfaces nd id form ass 'specified material which is required ,to 'be painted ' or . . , and apply to all aspects of the work. P so the are free of foreign n mat r • 2. Execute cuttin g.. or demolition methods which Y y t e finished and which has not been rime g , . : with f r i e performance, characteristics as , . P 1. . result in least a til.e may be cleaned with acid . mount of dama e to ad oinin Unglazed y coated b others. GENERAL CONDITION DEFINITIONS g. J 9 determined by ASTM test methods listed Y surfaces and provide surfaces acceptable to new below or b th solutions only when permitted by the and 16. Upon ' ' • Owner Simon •Pro 'Properties P P er t sti g or artizations as , p n completion of panting work, acce ted byyhe autori les P work. P. Y it f aving grout manufacturers ,printed instructions, remove spattered paint b proper er methods 115 West Washington Street - Jurisdiction, :. but riot sooner than 14 days after Y P P - 'I diana o is , a. Surface burnin charac e y of `washing and scraping using care not to ,r n p I In. 46104 3. Minimize amount of cutting and demolition g t ristie . installation. Protect metal surfaces, cast � 11ASTM E84. scratch .or otherwise damage finished ;, } Owner Representative required by coordinating trades requiring cutting ;, iron and vitreous plumbing fixtures from ` - . R p entative b. , Fire resistance ratings ASTM E119. P g surfaces. and demolition. 9 effects of acid cleaning. Flush surface 17. At the completion letion of work of r c. Combustion characteristics ASTM with clean water.. before and after cleaning. P other - _ ,Tenant _ The .ART SHOPPE, as tenant of Simon Properties. � 4. .F�nish patching shall be completed, by. trades E136. . •I � 9• trades, touchup and restore all damaged or - I 11. - p 9401 West Colonial Dr. West Oaks Mall, It skilled in the t e of repair required. 10. Finished Tile Work: Leave finished defaced .SU aces. . Ocoee Florida 34761 , YP P q 2. Insulation shall provide an R value of 19. - installation clean and free of cracked, . ` 5. Patches shall be made to logical intersection or 3. Install as per manufacturer's chipped, broken, unbounded, or otherwise Y. CARPET Tenant Representative Hari$h Mir urs edges.. instructions, in one layer of required ` P P defective tale work. 6. Existing piping, , duct work valves fittings s or thickness. General: ,M g PP 9 g 4. Extend full thickness of insulation to 1 1. Protection Protect installed tale work 1. Installer must examine areas, and W ' • - equipment altered or temporarily removed for fill e Contractor The person or firm who enters into a Con-- of completing the project must be ,entire. insulated area. Cut and fit with Kraft paper or other heavy covering conditions under which carpet is to t J purposes P g p J ti tightly at obstructions and fill voids. Burin construction period to prevent P " �� - Owner and undertakes to com- returned to their original operating condition or g y P P be installed and notify contractor in writing tract with the tete the scope defined in these ConstructionCL 5. , Install clips, adhesive or other surface staining, damage and wear. I of conditions detrimental to W • P P as specified in these drawings. proper and � � C\1 ` Documents, including all Subcontractors under _ n method to hold insulation in place. 12.. Before final inspections, remove timely completion of work. Uo not proceed - ;, . his employ. . /. Area not receiving' new finishes shall be protective coverings and rinse neutral with work until unsatisfactory conditions Z Designer - Rossi Design, 160 W. Evergreen Ave., patched to match surrounding areas. . U. GLASS STOREFRONT cleaner from file surfaces. l Suite 230, P g - have been corrected. W Longwood, FL 32750 * (407) 830-0033. rby All systems required for life safety must remain 1. Construct standard entrance and storefront work X. ACOUSTICAL TILE CEILINGS: 2 Install in one direction only with minimal seams. U W erational or alternative means provided as approved in accordance with manufacturers details and spec- I- . theauthorities having jurisdiction. ifications for the work shown in the drawings. 1. Acoustical ceiling as specified in the Avoid seams in heavy traffic areas. Use compression method :A. OMISSIONS & SUBSTITUTIONS ,g finish schedule to be installed in strict to fabricate seams. Cuts at walls cabinets or fittings shall L i N. SUBMITTALS 2. Glass sizes up to 4'-2" wide x 10'-O" high accordance with manufacturer's instructions be neat, tight and clean.,U) Z ,Z 1. The Drawings and Specifications are complimentary. g P P rY• 1. Submit shop drawings of an millwork shall be 3/8 thick, and specifications. W '•Q Anything in one is understood as being in both and anything ( g Y � � 2. 'The � stem shall conceal :all 3 The work includes all tom and materials necessary far a �axurse� _J not shown, but reasonably implied shall be furnished without items included in the contractor's scope of system plenum complete installation. Q .extra charge. service. Millwork is to conform to AWI 3. All lass shall be fully tempered safety services and still , allow access to some. P CLO �- �- g lass with polished butt edges. . . 3. All spaces shall have equal border the �.• custom grade. '. g P y W 2 The designer .is the sole judge of what is :reasonable - r � notice, satisfactory, suitable, proper or accepted equal. 2. Submit samples of an finishes specified 4. No silicone or other sealers at `vertical of greatest possible size or as shown on Z Y P P P q P Y P joints. drawings. g (� Q 3 Substitutions for reasons not caused b the Desi ner or i.e.; paint, special coatings or finishes, wall owner may result in charges to the contractor for re -design coverings, VCT, ceramic tile, carpet, trim 5. Gap between panels to be uniform @ 1/4 +- 4. Wires shall not splay more than 5 in a J C) including re1.-design of related items. materials etc. to the designer. 6. Base height and finish as specified in the drawings. p: Z. WOOD FLOORING , 4 vertical drop- z O 7. Reuse existing lass and trim as shown in the 5• Finished ceiling shall be clean, straight �Juj LL 3. See Item A-3 of the specifications. y y and level, free of smudges, chips, holes, I. DIMENSIONS P Genera _ • 9 P I' • drawings. New trim to match reused trim. � Q Z B 1. Installer must examine areas and 1. Do' not scale: drawings. Dimensions shown are to � - cracks' and fingerprints. ��� 0. LITE GAUGE METAL FRAMING . conditions under which car et is to finished surfaces unless noted otherwise. _ V. GYPSUM WALLBOARD ASSEMBLIES o Ceiling is not to be attached to the owners p W Q Q be installed and notify contractor in writing �n 111 (n N 2. All dimensions are to be field verified b the Contrac- 1. Install metal studs aril metal framing duct -work, piping, conduit or roof deck. Y J . Y „ 1. Refer to light gauge metal framing of conditions detrimental to proper and • tor. Any discrepancies or conflicts are to be brought system in accordance with manufacturer's section. Y, PAINTING timely completion of work. Do not proceed • to the Designer's attention. Stop work until determination � printed or written instructions and 2. Install according to manufacturer's �, is made by the Designer. recommendations, instructions with, type S and type S-12 1. All colors as .specified in the finish with work until unsatisfactory conditions r `:'' s c h e d u l e. utjttilt .lfft tvflta" ugmi'�I[amt 1, 2. Install continuous tracks sized to match drywall screws, length as required. have been corrected. j C. PERMITS/CODES 3. Fire rated walls shall be 5 8" type X 2• All manufacturers specified are to 1. The Contractor is to provide and a for all permits, studs. Secure tracks as recommended by YP . . P Y p gyp. bd. with tapered edges. ee partition establish color, quality and type of finish. p stud manufacturer. Do not exceed 24 AA, VINYL COMPOSITION TILE and VINYL BASE . notices, sales taxes etc. required for his work. section details. Comparable products of other 2. All work is to be completed in compliance with all inches O.C. spacing to nail or power -driven 4. Curved, non -rated partitions shall have a bd. manufacturers will be full considered applicable codes of authorities having jurisdiction over the pp y U) fasteners. Provide fasteners at corners thickness suitable to achieve a smooth radius gwithout appropriate submittals. All productsmust1. Installer must examine areas and . , work. All of the contractors (including his subcontractors) and ends of tracks. facets or ridges in the surface. This may be Z accomplished with 1 or 2 layers, be manufacturers 1st line quality. conditions under which carpet is to - bids shall reflect work meeting these codes.. 3.. Set studs plumb and secure to top and P• y however, the total P � (.i) t bottom runner tracks b either welding or • 3. C�yp. bd. walls Lavatories only_ be installed and notify contractor in writing _J y g thickness shall be a minimum of 1 /2" Y g z D. CONTRACTORS' INSURANCE 5 Tiled or wet areas to have water C a. 1st coat - primer/sealer, tint to of conditions detrimental to proper and Q.1 I � -- � screw fastening at both inside and outside • finish color. 1. Contractor shall carry and issue certificates to the flanges: resistant 5/8 gyp. bd. � timely completion of work. Do not proceed - .. Owner as required b the Owner and Tenant. � F < . b. 2nd coat - 2 art epoxy, color as with work until unsatisfactory conditions W , q y •' 4. Install �• ,blocking 6. Metal trim; Durabead corner . P P Y �f supplementary framing, ocking . reinforcement Perf-a-bead and No. 200 specified. ' . have been corrected. _ and bracing in metal framing system. Install series metal `trim No. 093 control joint. G bd. walls; 'soffit , bulkheads, etc E. MATERIALS & WORKMANSHIP j -yp• s Z Q horizontal stiffeners, -spaced vertically not L.L ,1. Contractor is to furnish and install all materials in 7. Finish joints and nailheads with 3 coat unless s ecificaly noted otherwise in the 2. Provide and install 12"x12" Vinyl Composition �.1� more than 54 inches O.C. p Z perf-a-tape tint system properly sanded ,. finish schedule: i each division of work covered by these drawings, Con- �, the with all necessary trim to provide a complete 5. Studs 3 5/8 , 20 gage for general non -load and finish receive finish as per finish _ Jum := U tractor, to provide all transportation, tools, equipment and : schedule, a. 1 st, coat latex or acrylic primer/sealer,, installation. Color and pattern to be selected from W bearing construction, unless rioted otherwise. tin • related items necessary to completion of the work. Perf-a-bead at all external corners of 120 t to finish color. •,;; Armstrong Premium Excelon tile, 1 8 ua e. �-�CL By wheeling Corr., Unimast or equivalent. ,', ,.degrees or greater. Durabead at all 90 b. Znd coat latex flat, color as y': °' i ' work to be completed by competent, knowledgeable de pee exte „ ';;� ', 2. All 6. At control or expa joints lace one 9 coal corners No. 200 A Trim at s ecified. 3, Provide and m�tall 4 Vin I wall base ; t and trained •trades people, experienced in their trade, with P J P P Y ,top set , CV,stud at each side of .joint. Do not brig e all exposed edges or at Juncture with with all nesseca trim to ro de ' ..I. expert supervision, in best workmanship manner. J g dissimilar materials. :•• rY p v a complete . joint with framing components. • , ::. ,., i P installation. Color to be selected from Ro e �� ..; � , 4 Woodwork, °doors` and trim - PP ' 3. All•work not in accordance with the plans and specifi- MJ --"- g P . , ,., 7. Coordinate installation of required 1/8" ua e vinyl base. Inside corners to be coped B cations and generally accepted standards of the specific _. -• •. q 8, Provide access doors as shown m the drawings or a. 1st coat - enamel undercoat. / g g Y P - concealed wood blockin re uired to access mechanical and/or electricals stems outside to be pre formed. tFlflf-f trade shall be removed and replaced by the Contractor at g q / Y b. 2nd coat satin finish, color as1. . • no expense to the Owner. ` 8. Refer to wall section drawings. specified. .'4. All materials are to be new and unused. P. ROUGH CARPENTRY 9 Access doors to be factory prime coated steel with Sand between coats `and c 4 Vinyl wall base to be installed in all areas with finished 1. Provide wood framin i lean thoroughly. . ' - 5. • All finished surfaces, i.e., plastic laminate, painted or g, including ceiling concealed hinges and -alien key locks. The assembly .shall flooring, including clear sealer unless specificaly noted REVISIONS ' pre finished items, wall covering, carpet, etc. are to be joists, headers, blocking, and nailers. Use have the same fire rating as the ceiling area. The door General: otherwise in the drawings. installed in proper sequence and protected from dirt or fire retardant treated woad where located shall be 24" square and fit flush with the ceiling surface. 5. Applicator must examine areas and 0 damage by subsequent trades. in concealed spaces. conditions under which painting work is to n . F. CONTRACTORS' RESPONSIBILITIES AT SITE I h d 2• Where installing blocking for equipment 'be applied and notify contractor in writing • 1. Contractor is to be familiar with and comply with the to be installed by others, where locations of conditions detrimental to proper and ' Owner's standard requirements and procedures, including, are not sufficiently indicated on drawings, timely completion of work. Do not proceed b t t 'I' 't d t d' ' verify the exact location with the Designer. with work until unsatisfactory conditions u no imi e o, access, isposa , sc e Wes, etc. ' ' 2. The is responsible for the professional and W, CERAMIC TILE STONE MARBLE / / . have been corrected. Protect carpet and other P .Contractor courteous conduct of all 'trades people In his employ and 3. Lumber : No. 2' rade, Southern inn, g P 1. Examine surfaces to receive file work � � � finishes from apill, and patters. for cooperation among trades. 3. SPIB rules. 4. Rough Hardware: Provide and install all and conditions under which tile will be installed. Do not with tile 6. Do not paint over dirt, rust, scale, Contractor is responsible for damage caused by conduct of .work. - rough hardware and metal fastenings of proceed work P until surfaces and conditions comply with PY grease, moisture, defects or conditions otherwise detrimental to of • 4. The Contractor is responsible for safety at the job size and type required for proper installation and code approval. All rough requirements indicated in referenced the q .formation a durable, unmarred, unblemished paint film.. ` site. installation standard. hardware shall exceed the strength of the 2. ANSI Tile Installation Standard: Compty . 7• 1Perform preparation and . G. SUBCONTRACTORS AND `RIGHT OF REJECTION member attached. with applicable arts of ANSI 108 series of pp p cleaning procedures in accordance with 1. Contractor shall submit names of all subcontractors to 5. All concealed wood shall be fire tile installation standards included under paint manufacturers instructions and as be employed on the project. resistant treated. "American National Standard Specifications 'herein specified for each particular I : 2. The Owner and the Designer reserve the right to reject Q. FINISH CARPENTRY AND MILLWORK , for the Installation of Ceramic Tile". substrate condition. 11 I any and all bids and any subcontractors employed by the 1, Fabrication and installation of all 3. TCA Installation Guidelines: TCA "Handbook - 8. Remove hardware, hardware accessories, Contractor. cornice, millwork, trim, paneling and molding for Ceramic Tile Installation"; plates, lighting fixtures, and similar items in work. comply with TCA installation methods place and riot to be finish painted, or H. TEMPORARY UTILITIES 2. Installation of rough carpentry and indicated or, if not otherwise indicated, as provide surface -applied protection prior to • 1. Contractor to provide power, water, heat, lighting or rough •hardware. applicable to installation conditions shown, ' "surface preparation and painting operations. other utilities required to ,complete the project. 3. Furnishing doors, wood trim and frames. 4. Extend file work into Remove if necessary for complete painting ' I: RELEASE OF LIENS AND CERTIFICATE OF OCCUPANCY As specified in the Door Schedule. recesses and under or behind equipment and fixtures, to of items and adjacent Following �' surfaces. • 1. Contractor to provide full release of liens to Owner form a complete covering without completion of painting of each space or ,area, prior to final payment, ' P P Y R. WORKMANSHIP interruptions, except as otherwise shown. reinstall painting items. 1. "9. 'before. .11 : 2: Contractor to furnish Certificate of Occupancy rior to P Y P. 1. Finish work shall be flat, plumb and true. Terminate work neatly at obstructions, Clean surfaces to be painted . final payment and occupancy: Veneer surfaces to be free of bubbles or edges and corners without disrupting applying- paint or surface treatments. . J. -TIMELY:,.COMPLETION other irregularities. 2. Concea c I fastenin s w herever possible; 9 P pattern. or joint alignments. -;10. Point application to wallboard may be -brush, roller or - . . 1. Contractor to -efficiently coordinate the Subcontractors � where not possible locate in inconspicuous 5. Accurately form interjections and , airless spry. Wood worth application and other items to / p be airless spray or brush. Apply point in accordance . I 11 . work to complete the project at the agreed upon completion places. returns. Perform cutting and drilling of with manufacturer's directions. Obtain owners date and notify the Owner of any delays. 3. Where nailingthrou h face of woodwork, g tile without marring visible surfaces. g . - -approval before using spray application _ conceal nail heads with wood putty or Carefully grind cut edges of tile abutting . K. FINAL CLEANUP plastic wood tinted to match millwork color. trim finish or built, -in items for straight 1. The contractor shall employ skilled, experienced aligned joints. Fit tile closely to electrical 1 1. Apply additional coats - or stain -kill cleaning staff. Clean all surfaces and units to the S. INSTALLATION outlets, piping, fixtures and other primer when stains or other conditions show . condition expected in a normal commercial 1 • All molded members and trim shall be penetrations so that plates, collars, or 'through final coat of paint, until paint film buildin cleaning and maintenance program; lass 9 g P g g mitered . at outside or coped at inside corners.. covers overlap tile. Utilize appropriate trim pieces at exposed edges. is of uniform finish color and appearance. pp and reflective surfaces cleaned to q streak -free � Exposed edges of stone are to be finished to match Give special attention to insure 'that P shine, remove non -permanent labels and hard 2, Scribing, mitering and joining shall be the main front surface, Raw edges of stone or tile surfaces, includin ed es, corners, crevices, y g . .. . surfaces shall be free of dust,. dirt , and stains. completed accurately, neat) an tight, little filling. - I left exposed are not acceptable. welds, and exposed fasteners receive a dry . ,Carpet to, be clean and vacuumed. ' requiring no or ver q g Y 9 film thickness equivalent to that of flat 2. Remove and dispose of temporary barricade ` 3. Apply door hardware in accordance with p 6. , Jointin Pattern Lay tile in the surfaces. • ' . - . as directed b .owner.. Yhaven manufacturers'instructions fit accurately, Y a I secu e r I and ad'us car P P Y Y. J t efull . Y as s on drawings. Layout P g y tele .. , I first coo , 12. A - surf' t material to �u a Apply rf ces _ L, CLOSE-OUT, GUARANTEES & WARRANTEES I work and center e fiel s . n both w til d i > than e lea e have been cleaned, pretreated or -- 4. Install oors, track, frames and trim, in , directions in each space or on each wall o th rwise prepared fo.r painting as' soon as 1. Provide all manuals and instruction documents a workmanlike manner. area. Adjust to ..minimize tile cutting. ` ; practical after preparation and before for warranties and operation of equipment. 5. To the extent possible, all millwork I Provide uniform joint widths, unless : subsequent surface deterioration. ° ` t 2.`' ' Provide instruction in proper operation requiring a painted or clear finish, shall be otherwise shown. : 13. Allow sufficient time between successive and maintenance of equipment. pre finished, in the shop, in appropriate 7. Grout tile to comply with referenced P Y 1 coatings to permit. proper drying. . :. - .' . z nn -. r----4....- --a ..._.�_-_,.--- '__- 1_ � - -11 conditions. installation stnnrinrH-q � A � � ----.. __ � L. T . t , K IYb [ dad _ .. �j �YPiiSiiFtlt8fiY18iCiJ3lii6rlCdif�iYYt�IYiIJ�:6lTL#IldtliYIZPPIfYJIYhilrYki:#J�LtUKLkZ�lkllA�tP%��SE�3,6IY3E4&lYiltltt:4 �._ FQ4tltit Kk ee[ [a[N n[[uczen [Na#ee[R�aena[m[ w . 1'► � �.,I' llt�ktLfi�itf�t3iC3ittY�RkiY�LJiY4iit�kLtEAYEiYC�L'tii1JNYkYtildttY�lLtiYYitBE_�_N�Tt4JlEi � tiiYl�Y2X53lSlLtktiLCiiY—.ate mom____._ Lt LhY t[[e4 c[aN umHSN-_n[r[i[ »#[at tt ✓ kit � � YtCCiYfYlYYli ttkiY65&ttkiii�MtYtYiiiEYYYidDt@lgilY s a__—_ LEY0.RibtitiXEt:8�1EiHCi�E1H�FiYFfl�3!]EYEI6i! 4- LilrlFl�iY59HYil[t6liiYlEakWtlbiiBltFMFJi'�ttP1N2IITriLRYj' LflFk9i f� FiPtktCY4dE! xti[caa gmaxla rl*Isi . 4�� �itl t1illi:��lF�LilYlflY�UlY4f:___,S� �, tY�YIkYCIEEBZ2YY!!II'tiYYY�iILi�ll FIXTURESEE SPACING INSURE THAT 1 HR WINDOW AREA ON EEr E1 SEPERATION EXTENDS' BEFORE FRAMING SOFFIT THROUGH THE SOFFIT BUILD OUT TO ALIGN WITH MALL SOFFIT AREA TO CLOSE HORIZONTAL EXTEND EXISTING PARTITION ,f 1 GLASS LINE SHAFTAT BOTH DEMISING WALLS. T A2 HOLD HOLD- VERIFY WITH EXISTING GLASS , w ... ,,,..... w...,. .M,w ....... .. . 1 All Work to be com lete'd to conform to the ' .. P applicable codes' of -the' authorities ,� 2 , having •jurisdiction over the work. B I ALIGN • 2 Contractor to ,field verify all dimensions, and conditions. Contractor shall notifyT ...... ............. ............ ......... ......... .., ...... ....................... .........,.. ............ .....,,................ ............. .....•. r the designer immediately of any discrepancies. \ Unless Indicated otherwise, all dimensions shown are to the face of finished gyp. bd. j 3 Contractor shall become familiar with and conform to all standards and LINE OF CEILING SOFFIT procedures' set forth by the MallManagement 3 4 Contractor shall contract with the Mall approved sprinkler contractor to install r a complete fire sprinkler system in the space. The sprinkler contractor shall submit 16'-11NI sprinkler drawings signed and sealed by a qualified sprinkler designer, to the city of Sanford for approval and permitting. 5 SALES AREA Sprinkler heads. in the front gyp. bd. soffit area are to be concealed type.' o p" 5 Contractorshall coordinate with tenants security and sign contractors for installation of o their equipment, by their installers. FRAME GYP, BD. CI N TO COLUMN. 6 All concealed wood blocking to be fire treatedlumber or plywood. No plywood is allowed above the' ceiling. _ O 7 No connection or attachments of any kind are allowed to the roof deck. Structural Items must be attached to the top chord of existing roof joists over panel points OR bottom chords. Z E EXTINGUISHER w '— R .8. Thedrawings .. - electrical and 'rriechanical information in these drawin s is to convey the de g �� y sign AND CABINET Intent of the project and for coordination of the designers work. Electrical, plumbing and x I' ........... mechanical drawings, by others, are included to fully describe the requirements of the project. `L' • 1 STOCK .ROOM I - Li a 9 The designer has exercised -great care in complying with the intent' of the current edition ' 24'^7y"I'-4" of the Americans with Disabilities act. No warranty is given, or legal responsibility assumed, � either expressed or implied, of said compliance. 10 The tenant shall supply their own security system and installation. the General Contractor • ..... shall provide MT conduit to the locations indicated and coordinate 'with tenants x .. •...:. •. ... ... ........ .... .................... .., ... ... ........ ....... . ...... ... .... •.•, .... .... � .......... .. .....: .., A.... .• security contractor........... El EXISTING TENANT — BODY WORKS 11 . The tenant shall supply their own telephone equipment and installation. The General Contractor shall provide empty conduit to the phone/data locations indicated and coordinate with tenants 64'-11Y" telephone contractor. i 9 DIMENSIONED f ��) 8r.► '1 ' PLAN ' . • , � � - �. ! ��� !ate �� � � �� FLOOR pn � � }�''` ' � 12 : During construction maintain all life safet systems . g terns In ro er o eratin condition. An - interruption y p P 9 Y P to these systems must be approved In advance with the Sanford Fire Department and/or SCALE: 1/4" other appropriate authorities. 13 Each sub—contractor is expected `to review the complete set of contract documents in determining the scope of thier work. Change orders will not be approved for failure to do . so if the information is in the documents 14 The general contractor is responsible for securing all permits, inspections and certificate of occupancy. 15 See the Demolition. plan for required store' front barricade prior to beginning' work. ....... ...... .... ................................ ...... .......................... ...... ..LAY F IRFI �.�IJ LE........... ....:. ± 8 UN - .... "C" DISPLAY \. » ITS, .WITH INTERNAL' ILLUMINA NIC:: NIr All DESK-N.I.C. . ` ..... ........... "B" DISPAY„B DISPLAY DISPLAY BDISPLAYB» DISPLAY BDISPAY i —21-2000WRAP ' PLYWOOD SHELVING PL OOD SHELVING ppn i Kin nnl n a i 1I :0 W Q , W W ry0 W — , W 0 o U __J W lam. _ `rC Wim' . n o o, ry .0 7- o� YGf@Y 75r o z W 0 Q GO N (� G�Y9EiYltrs4�EAkI8SY11N,ti�l�a[vt-i�tfFYtAYi�T�FA�MfiF9 LLJ J�. < O < O ry a O W i R Ll W I q' a LILYCl7�4Eii9oiTdil'�L% 1 REVISIONS 0 DESK-N.I.C. . ` ..... ........... "B" DISPAY„B DISPLAY DISPLAY BDISPLAYB» DISPLAY BDISPAY i —21-2000WRAP ' PLYWOOD SHELVING PL OOD SHELVING ppn i Kin nnl n a i +A _ _ }F'Idf� krrl:l T Y YFYr. a}PYM} x Ml w 4rM I t i N \MYi'Y\erI) iwwtM t W t , .. .. r.7 ..7 ] �✓ *./ i�nl�YY6ittifiill�! �#ffYi�ti�tt�YllYdfEst�4ELbf2t.Y! Y►RtkT6t���YtbEliriu _ta»_ .t pY Yr __ i t_ � at s�et,�ras�aY tq gaaux iItMYY Rff�. IEMYtR Y . . 1t1YJlHfld'$i�Cii'4tlF}pPlll5E�I9SYFfk1A19iP@�F�fAP�1FffiLt�l3iitISDY6l4iilE4fiF:lE►tlY�lL6[IMAWAfik9rFtiL"FtLtYfEE4G4lY#�f3?-wrrYYeYc\Y_�rrm tnYncYYYesua.' • ,' � 1�k13l5Ldlltilh3ll 9i61t�liG4iltdllN tdlltli t(#/ kMr Yamxironi Y}f,HirrrY. lk6t+ifJEAIq. 90tteilPGEOL!!iJ 3E1Y�t✓IP;kCPl3t bi2L11liliC�klfil7�t�(t&1i%blEl}5ki8EL 4 PtaYxuirertfnYerrxwreYrnrYaYxY®neowiewnY i EXISTING TENANT DEMISING PARTITION 5/8" TYPE X GYP. BD. ON 4" METAL STUDS. CONTRACTOR TO VERIFY AND MAINTAIN 1 HR. RATING. ALL PENETRATIONS TO BE PROPERLY SEALED SEE DETAIL THIS SHEET. THESE PARTITIONS ARE TO BE LABELED, PER CODE, AS 1 HR. RATED, ABOVE THE CEILING AT 8' CENTERS. L �J UL 465 DESIGN 1 HOUR RATED. Ff-n 3 5/8" 20 GA, STU SIDE 8" , GYP. BD. EACH VINYL BASE - FLOOR RUNNER - STRAIGHT PARTITIONS - NON RATED LTJ HEIGHT- TOABOVECEILING 2 X . 2 CEILING SYE WHERE INDICATED. 3" 20 GA. STUDS \� ' N t JLVIIVIV ULI/1IL Vf YYVVU DLVUNNU -itV riRr— ir�LNItU L A 1+ 1�_ BLOCKING I Imo;•/ J 5/Qr. PLYWD. o r »;r LINE z w OF NEW "PILASTER YOND BEYOND /83:-5" MEDAL STUDS- 2" METALSTUDS I - - . BRACE TO ABOCE 'AS REQUIRED ' ° RE=USED GLASS 1/2" GYP. BD. 1 GYP. BD /2 W �-- 3 5/8" METAL STUDS .... .. ...... .... .......... U ~^�'•'' CABLE AND. CLAS S W � N DISPLAY SHELF SYSTEM ' — r GAT C -- E OIL z' mr, U � I a ;, �-- i EXISTING TENANT DEMISING PARTITION 5/8" TYPE X GYP. BD. ON 4" METAL STUDS. CONTRACTOR TO VERIFY AND MAINTAIN 1 HR. RATING. ALL PENETRATIONS TO BE PROPERLY SEALED SEE DETAIL THIS SHEET. THESE PARTITIONS ARE TO BE LABELED, PER CODE, AS 1 HR. RATED, ABOVE THE CEILING AT 8' CENTERS. L �J UL 465 DESIGN 1 HOUR RATED. Ff-n 3 5/8" 20 GA, STU SIDE 8" , GYP. BD. EACH VINYL BASE - FLOOR RUNNER - STRAIGHT PARTITIONS - NON RATED LTJ HEIGHT- TOABOVECEILING 2 X . 2 CEILING SYE WHERE INDICATED. 3" 20 GA. STUDS N o z W �-- U W � N z' mr, U � I a ;, �-- :z Li O C)o ' iceLL -I LL ry - LL HIM .� o Wo <C (J-) N,(J) j lT�EYCLHEEtl�tJ�it"YYf#E}S'f ^ 3/16" RD. HD 1 4 PL1 �� I BOLTS WITH WASHERS PL1,,- - ............ o 5/4" X 2 1/2" ..... CONTINUOUS NAILER ELEVATION- WRAP COUNTERPLAN VIEW- CASH COUNTER N SCREW TO SUDS , 12" 12" J PL1 o _ 3/4'PLYWD. SCREW TO HORIZ, NAILERS P L2 5/4" X 2 1/2" CONTINUOUS I 69,i%CY%I�t�'iT�G1V1'h�(St^'t:kStClfdu��e�:,M!'➢E�i�:f�'['�j�J REVISIONS LW:,,IRE�WAY 0 0 DRAWER WIRE -WAY DRAWER ADJ. SHELF �i: ADJ. SHELF ADJ. SHELF ADJ. SHELF uj I PL1 it IR, f`Z�1.3, S 1�� J PL1 o _ 3/4'PLYWD. SCREW TO HORIZ, NAILERS P L2 5/4" X 2 1/2" CONTINUOUS I 69,i%CY%I�t�'iT�G1V1'h�(St^'t:kStClfdu��e�:,M!'➢E�i�:f�'['�j�J REVISIONS 0 0 I it IR, f`Z�1.3, S 1�� �' 'I bCJ W. EVL(�URE�f�1 AVE rl �• SUITE 2 3 Q PH%IE 407.330.0033 FAX 407.830.9059 . ID0000137 ,i ,I i ISSUE DATE 8-21-2000 PROD. NO. 0010 PROJ. MGR. KH DRAWN BY SCALE . AS NOTED , : EXISTING DUPLEX TO REMAIN :. tT 5 5 75 75 75VIA SWICS 7 PANEL DESIGNATION: "A". MAIN SIZING: . 60 .AMP M.C.B. MOUNTING: SURFACE ON WALL' (EXISTING PANEL) SEC PROJECT ' N4: VR2011< LOCATION; STOREROOM PANELVOLTAGE -- 120 208VQLT, 3 : PHASE,! 4 WIRE-' AND GROUND CKT, N0. LOAD DESCRIPTION . `6 REAKE SIZE ' VA PER PHASE r- a LOAD DESCRIPTION RE'AK E VA PER PHASE ' SIZE A B C NOTE k. A B PANEL DESIGNATION: "A". MAIN SIZING: . 60 .AMP M.C.B. MOUNTING: SURFACE ON WALL' (EXISTING PANEL) SEC PROJECT ' N4: VR2011< LOCATION; STOREROOM PANELVOLTAGE -- 120 208VQLT, 3 : PHASE,! 4 WIRE-' AND GROUND CKT, N0. LOAD DESCRIPTION . `6 REAKE SIZE ' VA PER PHASE NOTES CKT, :,NO. LOAD DESCRIPTION RE'AK E VA PER PHASE ' SIZE A B C NOTE k. A B _ C 1 LIGHTING 2OA-1 P 275 3 1, 2 MAIN CIRCUIT BREAKER 6OA"-3P ***** 3 LIGHTING 20A-1 P 1 800 3 4 MAIN CIRCUIT' BREAKER **** 5 LOW VOLTAGE LIGHTS 20A-1 P 1000 3 1'6 MAIN CIRCUIT BREAKER 7 LIGHTING " ! 20A---1 P 750 3 :a LOW VOLTAGE LIGHTS 20A-1 P 1500 3 9' TIMECLOCK/SIGN ' 20A --1P 1000 2 10 _. LIGHTING 20A --1P 1290 3 11 RECEPTACLES 20A-,1 P '300 2 '12 LIGHTING 20A=1 P 960 3 13 RECEPTACLES , " 20A-1 P 300 - 2 14 LIGHTING 20A-1 P 720 3 15 RECEPTACLES 20A -1P 300 2 16 RECEPTACLES 20A -1P 360` 3 17 ' RECEPTACLES ;, 20A--1 P 300 2 18 _: RECEPTACLES , .; 20A-1 P 540 3 19 VAV CONTROLS ' 20A -1P 150 2 20 RECEPTACLES. 20A -1P 300 ; 2 21 COUNTER RECEPTACLE, 20A -1P 360 3_ 22 RECEPTACLES 20A --1P 300 2 23 ,, SPARE 20A -2P .. 5 24 JRECEPTACLES 20A_'l P 300 2 25 ` SPARE .5 26 1 RECEPTACLES ' 20A-1 P 300 2 27 LOW VOLTAGE LIGHTS ,. , 20A-1 P 1000 3, 28 ` ]RECEPTACLES, ', 20A-1 P 180 ' 3 29 , RECEPTACLES 20A--1 P ';' 360 4 30 RECEPTACLES .. 20A1 P _ ; 360. 4 31 ' RECEPTACLES 20A-1 P 36,0 ;'4 , �32 SPACE 20A-1 P ***** 33 RECEPTACLES 2NA=1 P :360: 4 34 SPACE 20A p ***** 35 :: RECEPTACLES. 20A-1 P ;:., 540 4 . 36' SPACE .20A.— 1,P **** 37 RECEPTACLES 20A-1 P 540 4 38 `' SPACE _ 20A-1 P ***** 39' j SPACE 20A -1P ***** 40 " SPACE 20A -1P ***** 41 ISPACE 20A -1P ***** 42 SPACE 20A -1P ***** PHASE LOADING, PHASE A&.`2,' "KVA .- CONNECTED KVA=15.8 .' PHASE BIRO ',KVQ, : DEMAND KVA=' 15.$ `„ PHASE ;C,7 ,KVA; ', TOTAL DEMAND-.= 43.9 AMPS' NOTES: ,1. FIROVIDE NEW UPDATED TYPEWRITTEN PANEL' SCHEDULE. 2. EXISTING, CIRCUIT ANDBREAKER,TO, REMAIN. „ • `CUITEXISTING. 3. ,'CONNECT 'NEW CIRCUIT TO. �'_ XISTING :BREAKER MADE SPARE BY DEMOLITION. '4. PROVIDE 'NEW'CIRCUIT BREAKER (MATCH. EXISTING) AND CONNECT TO',NEW ' CIRCUIT. 5. 'EXISTING BREAKER , MADE SPARE BY DEMOLITION. „ r r: r , , : r , 1 , . fr, r : F .:r F. .. r • .' �r� , Ir'' '::. , „ .. 8r ' ..`�: is le :. :, ...:: , I rR , ,a i I A r , I , , i: