Loading...
HomeMy WebLinkAbout2526 Elm Ave; 17-2034; ROOFECEIVEM CITY OF SANFORD BUILDING & FIRE PREVENTION JU 6 2017 PERMIT APPLICATION BY P? Application No: Documented Construction Value: $ q 2_0 . 0 Job Address: 25 Z (o 5 'E l)!b Ave. 'ion ((grr F 1 37-7-13Historic District: Yes No Parcel ID: (p (- Zo - 3c) - S b y — 0 So p Residential Commercial Type of Work: New Addition Alteration Repair Demo Change of Use Move Description of Work: I1`12 YYI o Vf ' x i s-F )yl a A S hit I 5 '} i - G ,PS r1 ^A YP ram( 1. i e c G S i7 h a t - 5 r n o11 e S — U _ Plan Review Contact Person: Title: Phone: Fax: Email: Property Owner Information Name V i I rvict Phone: Street: 2 52 G 5 F I M pa P Resident of property? City, State Zip: SO n Voy Cl F I., I Z -- - -3 Contractor Information Name \1ordank.1S HecdoT Phone: L{O`_---07 _k$Cl Street: QS'C, 5C)o Se 4- TeryacP 1)r_ Fax: City, State Zip: 0 r f a Vt a o F 1 r 32- g 2 S State License No.: C C. C. t 3 3 a 13 4 Name: Street: City, St, Zip: Bonding Company: Address: Architect/Engineer Information Phone: Fax: E-mail: Mortgage Lender: Address: WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for electrical work, plumbing, signs, wells, pools, furnaces, boilers, heaters, tanks, and air conditioners, etc. FBC 105.3 Shall be inscribed with the date of application and the code in effect as of that date: 51h Edition (2014) Florida Building Code Revised: June 30, 2015 Permit Application NOTICE: In addition to the requirements of this permit, there may be additional restrictions' applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. a Acceptance of permit is verification that I will notify the owner of the property of the requirements of Florida Lien Law, FS 713. The City of Sanford requires payment of a plan review fee at the time of permit submittal. A copy of the executed contract is required in order to calculate a plan review charge and will be considered the estimated construction value of the job at the time of submittal. The actual construction value will be figured based on the current ICC Valuation Table in effect at the time the permit is issued, in accordance with local ordinance. Should calculated charges figured off the executed contract exceed the actual construction value, credit will be applied to your permit fees when the permit is issued. OWNER'S AFFIDAVIT: I certify that all of the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. Signature of Owner/Agent Print Owner/Agent's Name Date Signature of Notary -State of Florida Date Owner/Agent is Personally Known to Me or Produced ID Type of ID Signature of Contractor/Agent Date Print Contractor/Agent's Name Signature of Notary -State of Florida Date Contractor/Agent is Personally Known to Me or Produced ID Type of ID BELOW IS FOR OFFICE USE ONLY Permits Required: Building Electrical Mechanical Plumbing Gas Roof Construction Type: Occupancy Use: Flood Zone: _ Total Sq Ft of Bldg: Min. Occupancy Load: New Construction: Electric - # of Amps Fire Sprinkler Permit: Yes No # of Heads APPROVALS: ZONING: ENGINEERING: COMMENTS: UTILITIES: FIRE: of Stories: Plumbing - # of Fixtures Fire Alarm Permit: Yes No WASTE WATER: BUILDING: Revised: June 30, 2015 Permit Application Application is hereby made to obtain a permit to do the work and'instal19tions as indicated. I certify that no work or installation has commenced prior to the issuarr6ce of.a permit and'that all work will be performed to4t, meet standards of all laws regulating construction in this jurisdiction:' 'I understand that a separate permit must be secured for electrical work, plumbing, signs, wells, pools, furnaces, boilers, heaters, tanks, and air conditioners, etc. OWNER'S AFFIDAVIT: I certify that all -of the, foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. - WARNING TO OWNER: YOUR FAILURE TO, RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE- RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. NOTICE: In addition to the requirements.of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county,.and there may be additional permits required from other governmental entities such as water management districts, state agencies, or -federal agencies. Acceptance of permit is verification that I will notify the owner of the property of the requirements of Florida Lien Law, FS 713. I, The City of Sanford requires payment of a plan review fee. A copy of the executed contract is required in order to calculate a plan -review charge. If the executed contract is not submitted, we reserve the right to calculate the plan review feet' based on past permit activity levels. Should calculated charges exceed the documented construction value when the executed contract is submitted, credit will be applied to your permit fees when the permit is released. Signature of Owner/Agent Print Owner/Agent's Name Date P,,,ti TANYA RODRIGUEZ Notary Public • State of Florida 5 Commission # GG 083859 r fiAy Comm. Expires Mar 15, 2021 O i•`,, Bonded through National Notary Assn. Owner/Agent is' Personally Known to Me or Produced ID Type of ID APPROVALS.- ZONING: ENGINEERING - COMMENTS: UTILITIES: FIRE: Agent k Date l3J Print Contractor/ Signature of Nory-State of Florida Lor/Agen7is TANYA RODRIGJEZ-- Notary Public • State of Florida Commission a GG 083859 My Comm. Expires Mar 15, 2021 3onded through Nationa Notary Assn. ersonal y Produced ID V-- Type of ID WASTE WATER: BUILDING: 151r' to Me or Shall be inscribed with the date of application and the code in effect as of that date (Code 2010 FBC) 713.135(5x6) Florida Statutes. REV 07.14 Application No: JUL 0 6 2017 BY• CITY OF SANFORD BUILDING & FIRE PREVENTION PERMIT APPLI&y_ iION eb Documented Construction Value: $ L L CI Z 0- Job Address: '25 Z (v ! £ j M Ave. :5 an Ford F I Historic District: Yes No Parcel ID: j 3 2 1 -132 Q _ 3 0 5oN - 0 00 ' O Z ( Zoning: Description of Work: 131cmoL#_- rjcr5}rnQ Ar,12 G,4shipS and u ) p L c h Lz ore-5 if Plan Review Contact Person: Title: Phone: Fax: E-mail: Property Owner Information Name I11 ro(A n+ a i,+ Phone: Street: 2. 5 2(o S Et m Ave -'bjMft Resident of property?: City, State Zip: _5Cdl.-oy CC I ,3 Z +_+3 Udarw Contractor Information Name_c r Phone: L16--- %02 --9!ZG - Street: 211* 0 '5Ur1se+ Tea yn-Cf- r a Fax: City, State Zip: 0 Y I an Gl0 E I . 3 2 82,45 State License No.: CCL-I a 30 13tA, Architect/Engineer Information Name: Phone: Street: Fax: City, St, Zip: E-mail: Bonding Company: Mortgage Lender: Address: Address: apy a?!,.: ^: 9 rw a-a:^:°...ofJ1..vY.se-•'..-^,...G+.,.,:n v....g._+w .: s `cr1-lS$: f.t+ r'&?ow4,n-.w ,`wx _#?1M,. ^„i PERMIT INFORMATION f Building Permit+ 1 Square Footage: ` l © `+ Construction Type: No. of Stories: No. of Dwelling Units: Flood Zone: Electrical New Service - No. of AMPS: Mechanical (Duct layout required for new systems) Plumbing New Construction - No. of Fixtures: Fire Sprinkler/ Alarm No. of heads: Shall be inscribed with the date of application and the code in effect as of that date (Code 2010 FBC) 713.135(5X6) Florida Statutes. REV 07. 14 Permit Number: Folio/Parcel ID #: - - - 5 - 280 Prepared by: Yordanys Hector Return to: 2156 Sunset Terrace Dr. Orlando FI 32825 DOC# 20170352337 06/23/2017 03:09:44 PM Page 1 of 1 Rec Fee: $10.00 Phil Diamond, Comptroller Orange County, FL Mil - Ret To: YORDANYS HECTOR III II I NOTICE OF COMMENCEMENT State of Florida, County of Orange The undersigned hereby gives notice that improvement will be made to certain real property, and in accordance with Chapter 713, Florida Statutes, the following information is provided in this Notice of Commencement. 1. Description of property (legal description of the property, and street address if available) LOT 28 BLK 5 DREAMWOLD PB 4 PG 30 2526 S ELM AVE SANFORD, FL 32773 2. General description of improvement Re -Roof 3. Owner information or Lessee information if the Lessee contracted for the improvement Name VILMA H. KNIGHT Address 2526 S ELM AVE SANFORD, FL 32773 Interest in Property Name and address of fee simple titleholder (if different from Owner listed above) Name Address 4. Contractor Name Yordanys Hector Telephone Number 407-765-2118 Address 2156 Sunset Terrace Dr Orlando, FL 32825 5. Surety (if applicable, a copy of the payment bond is attached) Name Telephone Number Address Amount of Bond $ 6. Lender Name Telephone Number Address 7. Persons within the State of Florida designated by Owner upon whom notices or other documents may be served as provided by §713.13(1)(a)7, Florida Statutes. Name Telephone Number Address 8. In addition to himself or herself, Owner designates the following to receive a copy of the Lienor's Notice as provided in §713.13(1)(b), Florida Statutes. Name Telephone Number Address 9. Expiration date of notice of commencement (the expiration date will be 1 year from the date of recording unless a different date is specified) WARNING TO OWNER: ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713, PART I, SECTION 713.13, FLORIDA STATUTES, AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Signature of Owner or Lessee; orOwr(4r's or Lessee's Authorized Officer/Director/Partner/Manager Signatory's Title/Office The foregoing instrument was acknowledged before me this, day of) . ,on by C 1 \ mo name of person as for pe of authority, e.g., 55oe , rus ee, a or cd Name of party on behalf of whom instrurn rd"'nras, ti Signaturl9f Notary Public — Sta a Print, type, or stamp commissioned name of F Personally Known OR Pro 10- .a..._ ' i,;,;.-, TANYARODRIGUFI TypeofIDProduced0( ;,-3 t-S`-1l-ci '''- lw—_44 r O:. Notary Public - State ofFbdda Commission # GG 083859 Y My Comm. Expires Mar 15, 2021 F``• e«deaimuugnr aa riaary rasa; L" M 1 Form content revised: 01/23/14 Tel. 321 214 ROOF Fax. 407 567 9012 Email. RoofDepot@iCloud.com ®® s o 390 North Orange Ave. 17 ®® fDepot Inc Suite 2300 Of Yave Yire Enterprises inc Orlando, A. 32801 Our Experience Makes The Difference www.RoofDepotFlorida.com wwW.RoofDepotF1oriida.com Estimate FL. Estate License No. CCC1330134 Estimate No: 2258 Date: Jun 20, 2017 BIII TO: KNIGHT VILMA H/2526 2526 S. ELM AVE SANFORD, FL 32773 R001 REMOVE EXISTING ASPHALT SHINGLE ROOF AND HAUL AWAY DEBRIS 1 0.0c 0. RPT ROOF PERMIT 1 0.00 0.0 R003 RE NAIL ROOF DECKING 1 0.00 0.0 R009 KRAND INSTALL 30 YRS ASPHALT SHINGLE ARCH _ STYLE TBD TBD COLOR HINGLE x_ 130 mph 1 4,770. 4,770.0 REMOVE 2ND LAYER OF ASPHALT SHINGLE R004-03 DRY IN WITH 30# SYNTHETIC BLEND FELT UNDERLAYMENT 1 0.00 0.0 PEEL N STICK IN VALLEYS AND OPENINGS 1 0.00 0.0 R005 INSTALL 21/2" DRIP EDGE _white- COLOR 1 0.00 0.0 R007 INSTALL NEW LED PIPES 1.5" 2" 3" 4" 1 0. 0. GOOSE NECK 4" 6" 10" 1 0.00 0.0 REPLACE CONTINUOUS RIDGE VENT 1 0.00 0.00 TRCHSYS MODIFIED BITUMEN ROOFING SYSTEM TCH12B DRY IN WITH _75_ LBS FIBER GLASS BASE SHEET TCH14C INSTALL CAP SHEET 4.2mm (168 mills) THICK_ white _ COLOR R010 CLEAN GROUNDS THOROUGHLY & RUN MAGNET ( INCLUDED) 1 0.0q 0.00 1/2 WOOD REPLACEMENT IS NOT INCLUDED. WOOD CHARGE WILL,BE CHARGED AT $65.00 PER PLYWOOD AND $4.85 OR Subtotal $4,770.00 LESS PER LINEAR FOOT' OF WOOD. BEFORE AND AFTER PICTURES WILL BE TAKEN OF THE WOOD. WOOD CHARGE Discount $0.00 WILL BE CHARGED AT $60.00 PER PLYWOOD AND $4.25 OR LESS ,PER LINEAR FOOT OF WOOD. BEFORE AND AFTER PICTURES WILL BE TAKEN OF THE WOOD. Total $ , HOMEOWNER Signature Print " 1Dat ' es\, t' ROOF DEP Sign t rePrint 2/2 Roof Depot Inc. Contract for Services General Terms and Conditions Proiect Name / Number: owner: VILMA H KNIGHT Jobsite Address: 2526 S. Elm Ave. Sanford, FL 32773 1) INSURANCE a) Roof Depot, Inc. will carry workman's compensation insurance covering Roof Depot, Inc.'s, employees and liability insurance covering the operation of trucks and automobiles. Roof Depot, Inc. will also take out and maintain General Liability Insurance. b) Evidence of the insurance is in the form of certificates that will be issued to the Owner prior to starting work. Certificates of insurance shall be filed with the Owner. 2) COMMENCEMENT OF PROJECT 3) Start Date and Delays - Roof Depot, Inc. shall be given reasonable time in which to make delivery of materials and/or labor to commence and complete the performance of the contract. Roof Depot, Inc. shall not be responsible for delays or defaults where occasioned by causes of any kind and.extent beyond its control, including but not limited to: delays caused by the Owner, architect and/or engineers, delays in transportation, shortage of raw materials, civil disorders, labor difficulties, vendor allocations, fires, floods,, accidents and acts of God. Roof Depot, Inc. shall be entitled to equitable adjustment in the contract amount for additional costs due to unanticipated; project delays or accelerations caused by others whose acts are not Roof Depot, lnc?responsibility and to, time;extensions for' unavoidable delays. 4) Working Hours -Work called for herein is to be performed during regular working hours. All work performed outside of such hours shall be charged for at, the rates or amounts,agreed upon by the parties at the time overtime is authorized. a) Change of Conditions=`If'unexpected conditions are encountered during tF%p work, or, if the Owner, Owner's agent, or any public body inspector directs additional or modifications to the work and the conditions adversely affect the cost or progress of work, Roof Depot, ,Inc. will notify the Owner immediately, and the Owner will negotiate a'change-order to resolve the unexpected condition. 5) Materials and Deviations — Roof Depot, Inc., shall guarantee all material to be as specified. All work is to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from these specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All agreements contingent upon delays beyond our control. 6) PRICING and PAYMENT a) b) c) d) e) 7) Initials 6 L Pricing - The prices given in all quotations are those currently in effect. In the event of price increase of material, supply, equipment, or energy occurring between the date of this proposal and the first day of performance of the contracted work through no fault of Roof Depot, Inc. the contract sum shall be equitably adjusted by change-order(s) to reflect the pr' increase(s) Payment (See chart) I Project Amount (Total): $ 8 Z _ il Amount due upon Acceptance of Contract: $ Amount due after In progress Inspection passed: $ / Balance due in full upon 100% completion: -$- - - Plus A resfen wood damage: - - 8) 3.3. Work Stoppage — Roof Depot, Inc., shall have the right to stop work and keep the job idle:if payments are not made to it when due. After thirty (30) days of payment being due, on 5 days' notice, Roof Depot, Inc., may demand and receive payment for all work executed and materials ordered and supplied and other losses sustained including Roof Depot, Inc,, normal overhead plus profit of 20% of the contract price. Therefore, Roof Depot, Inc., is relieved of further liability. If work stops for any reason, Owner shall provide for protection of all materials on the premises and shall be responsible for any damage, warp, age, racking, or loss of said materials 9) WARRANTY Upon completion of construction and payment in full by Owner, Roof Depot, Inc. will warrant the Owner that all work performed is free from defective workmanship and materials for a period of _5_ years. The warranty will obligate Roof Depot, Inc. to repair without cost to the Owner any such defects that are discovered during the term of the warranty. A Limited Labor Roof Warranty is attached and when executed forms part of the contract documents. The exclusive remedy shall be that Roof Depot, Inc., will replace or repair any part of its work, which is found to be defective. Roof Depot, Inc. shall not be responsible for damage or defect caused by abuse, modifications not executed by Roof Depot, Inc. improper or insufficient maintenance, improper operation or normal wear, tear and usage. THIS WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING ANY WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. 10) USE OF PREMISES 11) Use of Premises - Owner is to prepare all work areas so as to be acceptable for Roof Depot, Inc.'s work. 12) Roof Depot, Inc. will not be called upon to start work until sufficient areas are ready to ensure continued work. Owner r shall furnish all temporary site facilities including suitable storage space; temporary electrical and water at no cost to Roof Depot, Inc. Owner shall grant free access to work areas for workers and ,vehicles,and shall provide areas for storage of material and debris. Roof Depot, Inc `shall nott be liable for `damage toAiriveways; walks, lawn and shrubs caused by movement of trucks, workers or equipment m dischargjng thehcontract 13) Owner's Responsibility - The Owner will,periodically examine the'work in progress, as well as upon completion in order to ascertain the extent to which the materials ;aridprocedures'corformto the requirements of these specifications. 14) ROOF CONDITIONS 15) Roof Mounted Equipment - During the roofing project it is often necessary to raise pipes, conduit and air conditioning units to roof under them. Roof Depot, Inc, will exert due diligence to handle these items with care, however, Roof Depot Inc. will not accept any liability for damage to pipes, conduits, air conditioners and ducting or other roof top mounted equipment which is raised or moved during the normal roofing activity. Similarly Roof Depot, Inc. is not responsible for the operational condition of these items after reinstallation. 16) Foil Insulation - Foil, insulation, and other equipment such as heater units and lighting systems attached to the underside of roof members can be disturbed during normal roofing activities. Roof Depot, Inc. will not accept any liability for any item that may become dislodged or deemed to have become inoperable as consequence of normal exterior roofing activities. 17) Drainage -. Uniform Building Code and some city building codes specify that the roof is to have positive drainage. Roof Depot, Inc. shall not be held responsible if the design or structure of the deck being roofed does not conform to these requirements with resulting standing water. 18) MISCELLANEOUS 19) Integration Clause -This document and all documents incorporated by reference constitute the parties' entire agreement. No other agreements, oral or written, regarding the work to be performed under this agreement exist between the parties. 20) Initials /<' . 21) Severability Clause - If any provision of this Agreement or the application thereof shall be invalid or unenforceable to any extent, the remainder of this Agreement or the application thereof shall not be affected, and each remaining provision of this Agreement shall be valid and enforceable to the fullest extent permitted by law. 22) Governing Law -This agreement shall be construed in accordance with and governed by, the laws of the state of Florida. 23) Indemnification - Roof Depot, Inc. will indemnify and hold harmless the Owner .from damages only to the extent such damages were caused by sole negligent act or omission of Roof Depot, Inc. 24) Risk Insurance - Owner shall purchase and maintain risk insurance upon full value of the entire work and/or materials delivered to the job site, which shall include the interest of Roof Depot, Inc. 25) Claims - No back -charges or claim of the Owner for services shall be valid except by an agreement in writing by Roof Depot, Inc. before the work is executed, except in the case of Roof Depot, Inc: s failure to meet any requirements of this Contract. In such event, the Owner shall notify Roof Depot, Inc. of such default, in writing and allow Roof Depot, Inc. reasonable time to correct any deficiency before incurring any cost chargeable to Roof Depot, Inc. 26) Asbestos and Hazardous Waste - Unless the agreement specifically calls for the removal, disturbance, or transportation of asbestos containing material or other hazardous substances, the parties acknowledge that such work requires special procedures, precautions and/or licenses. If Roof Depot, Inc. encounters such substances, Roof Depot, Inc. will immediately stop work and take steps to institute the„ special procedures, licenses and precautions. Such work will be treated as a change under this contract. 27) AUTHORIZATION n 28) The above prices, specifications and conditions are satisfactory and are hereby accepted. Roof Depot, Inc., is authorized to do the work as specified. Payment will be made as out jj` above Home Owner/Authorize Agent Print Name !'.1 L/G'1 Iy `.. . Signature- te Roof Depot Inc./Authorize Agent Signature: Date: Print Name: TITLE: FLORIDA STATUTES ON CONTRACTOR'S LIENS ON PROPERTY ACCORDING TO FLORIDA'S CONSTRUCTION LIEN LAW (SECTIONS 713.001-713.37, FLORIDA STATUTES), THOSE WHO WORK ON YOUR PROPERTY OR PROVIDE MATERIALS AND SERVICES AND ARE NOT PAID IN FULL HAVE A RIGHT TO ENFORCE THEIR CLAIM FOR PAYMENT AGAINST YOUR PROPERTY. THIS CLAIM IS KNOWN AS A CONSTRUCTION LIEN. IF YOUR CONTRACTOR OR A SUBCONTRACTOR FAILS TO PAY SUBCONTRACTORS, SUBSUBCONTRACTORS, OR MATERIAL SUPPLIERS, THOSE PEOPLE WHO ARE OWED MONEY MAY LOOK TO YOUR PROPERTY FOR PAYMENT, EVEN IF YOU HAVE ALREADY PAID YOUR CONTRACTOR IN FULL. IF YOU FAIL TO PAY YOUR CONTRACTOR, YOUR CONTRACTOR MAY ALSO HAVE A LIEN ON YOUR PROPERTY. THIS MEANS IF A LIEN IS FILED YOUR PROPERTY COULD BE SOLD AGAINST YOUR WILL TO PAY FOR LABOR, MATERIALS, OR OTHER SERVICES THAT YOUR CONTRACTOR OR A SUBCONTRACTOR MAY HAVE FAILED TO PAY. TO PROTECT YOURSELF, YOU SHOULD STIPULATE IN THIS CONTRACT THAT BEFORE ANY PAYMENT IS MADE, YOUR CONTRACTOR IS REQUIRED TO PROVIDE YOU WITH A WRITTEN RELEASE OF LIEN FROM ANY PERSON OR COMPANY THAT HAS PROVIDED TO YOU A "NOTICE TO OWNER." FLORIDA'S CONSTRUCTION LIEN LAW IS COMPLEX, AND IT IS RECOMMENDED THAT YOU CONSULT AN ATTORNEY. SCPA Parcel View: 01-20-30-504-0500-0280 Page 1 of 2 Property Record Card P/ URVW Rrftuw, CFA Parcel: 01-20 30-504-0500-0280 Owner: KNIGHT VILMA H scµ.+ou:v, h4cenw Property Address: 2526 S ELM AVE SANFORD, FL 32773-5111 Parcel Information Value Summary Parcel 01-20-30-504-0500-0280 Owner KNIGHT VILMA H Property Address 2526 S ELM AVE SANFORD, FL 32773-5111 Mailing 2526 S ELM AVE SANFORD, FL 32773-5111 Subdivision Name DREAMWOLD Tax District S4-SANFORD- 17-92 REDVDST DOR Use Code 01-SINGLE FAMILY Exemptions 00-HOMESTEAD(1994) 28` .: o 135.23 Seminole County GIS 2017 Working Values 2016 Certified Values Valuation Method Cost/Market Cost/Market Number of Buildings 1 1 Depreciated Bldg Value 45,375 40,894 Depreciated EXFT Value 1,204 1,224 Land Value (Market) 12,000 12,000 Land Value Ag Just/Market Value *' 58,579 54,118 Portability Adj Save Our Homes Adj 9,668 6,213 Amendment 1 Adj P&G Adj 0 0 Assessed Value 48,911 47,905 Tax Amount without SOH: $403.00 2016 Tax Bill Amount $340.00 Tax Estimator Save Our Homes Savings: $63.00 Does NOT INCLUDE Non Ad Valorem Assessments http://parceldetail.scpafl.org/ParcelDetailInfo.aspx?PID=01203050405000280 7/6/2017 LIMITED POWER OF ATTORNEY Altamonte Springs, Casselberry, Lake Mary, Longwood, Sanford, Seminole County, Winter Springs Date: 11,5 1 t I hereby name and appoint: RG nm l ""m-A-or an agent of: :L n C - Name of Company) to be my lawful attorney -in -fact to act for me to apply for, receipt for, sign for and do all things necessary to this appointment for (check only one option): The specific permit and application for work located at: 11016 $fh S 50nford PJ,32-41 , 2S2C, 5, LIM y. san c rc1 1, 3Z 3 Street Address) Expiration Date for This Limited Power of Attorney: License Holder Name: 1 d r n J TieC cat State License Number: CCC 13 3 Q Signature of License Holder: STATE OF FLORIDA COUNTY OF The foregoing instrument was acknowledged before me this 'D dayof:3-,JkkA 20k3,7 , by 1 O ©M -,r fl who is personall known to me or Bwho has produced as identification and who did (did not) take an oath. CL Signature 0 t Notary Seal) t A n\A Fv U l o Print or typJ name TANYA RODRIGUE2 Nota Public -State of y public - state of Florida ' Commission Ar GG 083859 Commission No. C My Comm. Expires Mar 15, 2021 My Commission Expires: fy lc l6) -2-0Zl SOP" Bonded through National Notary Assn. Rev.08.12) City of Sanford Building Division Residential Re -Roof Inspection Policy & Procedures PERMITTING REQUIREMENTS — NO PLAN REVIEW REQUIRED This document (signed) along with an accurate and completed Residential Re -Roof Scope of Work are required to be submitted as part of your permit application. The Scope of Work must.include all applicable Florida Product Approval;numbers for all roof components that will be installed on the project. A permit will not be issued without these documents. Copies will be made to post on the job site. Projects located in the Sanford Historic District will require plan review and approval by the Sanford Historic Preservation Board INSPECTION POLICY & PROCEDURES A Final Roof Inspection is the only inspection required for Residential (Single Family, Townhouse, Mobile Home, Apartment and/or Condominium) Re -Roof Permits. The Following is required to be provide on the job site: Permit Card, posted in a conspicuous and weatherproof location Completed, Residential Re -Roof Scope of Work Completed and Notarized Inspection Affidavit All Florida Product Approval and Corresponding Installation Instructions Product Approval shall match what is on the scope of work) Digital Photographs (must include the permit number or address in each picture) o Each plane of the roof, showing the underlayment installed o Roof Deck Nailing Pattern & Spacing (including a measuring device or ruler) o Roof Deck Nails used (including a measuring device or ruler showing size of nails) o Underlayment Pattern & Spacing (including a measuring device or ruler) o Drip Edge & Valley Attachment (including a measuring device or ruler) ; o Shingles installed, nail pattern and location of nails Skylights (if applicable) o Digital photographs showing all installation components, per FL Product Approval o Digital photographs showing all required flashing, per FL Product Approval Failure to follow these specific guidelines will result in a affidavit provided by a Florida Design Professional (architect or engineer), certifying FBC compliance-hy-personal inspection. CONTRACTOR (OR OWNER/BUILDER) SIGNATURE: / DATE: y PERMIT # I '7 aD 3 City of Sanford Building Division Residential Re -Roof Scope of Work JOB ADDRESS: 2.5Z CU J- V-\ m I t i C 5Ci n &y d F-1 l 3 Z -7 -4-3 STRUCTURE TYPE: INGLE FAMILY RESIDENCE/TOWNHOUSE O MOBILE HOME O APARTMENT/CONDOMINIUM RE - ROOF TYPE: REPLACEMENT (TEAR OFF EXISTING ROOF AND REPLACE WITH NEW COMPONENTS) O RE-COVER (NEW ROOF INSTALLED OVER EXISTING ROOF) DECK TYPE (PLEASE SPECIFY): Y tI 1 Dood . PLEASE NOTE: ONLY l 00 SQUARE F EOF THE EXISTING DECK IS PERH[TTED TO BE REPLACED** ROOF VENTILATION: DOFF -RIDGE RIDGE OSOFFTT OPOWERED VENT OTURBINES SKYLIGHTS: O YES `fv "O IF YES, PLEASE PROVIDE FLORIDA PRODUCT APPROVAL #: MAIN ROOF AREA ROOF SLOPE: O LESS THAN 2:12 O 2:12 - 4:12 412 OR GREATER TYPE OF ROOF PERMIT # I '7 aD 3 City of Sanford Building Division Residential Re -Roof Scope of Work JOB ADDRESS: 2.5Z CU J- V-\ m I t i C 5Ci n &y d F-1 l 3 Z -7 -4-3 STRUCTURE TYPE: INGLE FAMILY RESIDENCE/TOWNHOUSE O MOBILE HOME O APARTMENT/CONDOMINIUM RE -ROOF TYPE: REPLACEMENT (TEAR OFF EXISTING ROOF AND REPLACE WITH NEW COMPONENTS) O RE- COVER (NEW ROOF INSTALLED OVER EXISTING ROOF) DECK TYPE ( PLEASE SPECIFY): Y tI 1 Dood . PLEASE NOTE: ONLY l 00 SQUARE F E OF THE EXISTING DECK IS PERH[TTED TO BE REPLACED** ROOF VENTILATION: DOFF -RIDGE RIDGE OSOFFTT OPOWERED VENT OTURBINES SKYLIGHTS: O YES `fv "O IF YES, PLEASE PROVIDE FLORIDA PRODUCT APPROVAL #: MAIN ROOF AREA ROOF SLOPE: O LESS THAN 2:12 O 2:12 - 4:12 412 OR GREATER TYPE OF ROOF MANUFACTURER FLORIDA PRODUCT APPROVAL HINGLE CejEACAnkeCi FL# METAL FL# 0MODIFIED BITUMEN FL# OTORCH DOWN FL# OINSULATED FL# OTILE FL# OOTHER: FL# ROOF EXTENSIONS ( PORCHES, PATIOS, ETC.) **IF APPLICABLE** ROOF SLOPE: O LESS THAN 2:12 O 2:12 - 4:12 O 4:12 OR GREATER TYPE OF ROOF MANUFACTURER FLORIDA PRODUCT APPROVAL O SHINGLE FL# O METAL FL# O MODIFIED BITUMEN FL# OTORCH DOWN FL# QINSULATED FL# O TILE FL# 0 OTHER: FL# 0 Tel. 321 214 ROOF' Fax. 407 567 9012 ® n ®' ' Email. RoofDepot@iCloud.com ®® ®® 390 North Orange Ave. RoofDepot Inc Suite 2300 Of Yave Yire Enterprises inc Orlando, A. 32801 Our Experience Makes The Difference www.RoofDepotFlorida.com www.RoofDepotFlorida.com Estimate FL. Estate License No. CCC1330134 Estimate No: 2258 Date: Jun 20, 2017 Bill To: KNIGHT VILMA H/ 2526 2526 S. ELM AVE SANFORD, FL 32773 Code d #era. v ' Description A, ri. t n. Al ` fa l33 Quantity f` Rate R - t• Amount 5y { R001 REMOVE EXISTING ASPHALT SHINGLE ROOF AND HAUL AWAY DEBRIS 1 0.00 0.00 RPT ROOF PERMIT 1 0.00 0.0 R003 RE NAIL ROOF DECKING 1 0.00 0.00 R009 INSTALL 30_ YRS ASPHALT SHINGLE ARCH _ STYLE _TBD_ BRAND TBD _ COLO HINGLE _x 130 mph 1 4,770.00 4,770.0 REMOVE 2ND LAYER OF ASPHALT SHINGLE R004-03 DRY IN WITH 30# SYNTHETIC BLEND FELT UNDERLAYMENT 1 0.00 0.0 PEEL N STICK IN VALLEYS AND OPENINGS 1 0.00 0.00 R005 INSTALL 21/2" DRIP EDGE YA*e_ COLOR 1 0.00 0.0 R007 INSTALL NEW LED PIPES-- 1.5"_ _ 2" _ _ 3" _ _ 4" 1 0. 0. GOOSENECK 4" 6 10" 1 0.00 0.0 REPLACE CONTINUOUS RIDGE VENT 1 0.0c 0.0 TRCHSYS MODIFIED BITUMEN ROOFING SYSTEM TCH12B DRY IN WITH 75 LBS FIBER GLASS BASE SHEET TCH14C INSTALL CAP SHEET 4.2mm (168 mills) THICK_ white _ COLOR R010 CLEAN GROUNDS THOROUGHLY & RUN MAGNET ( INCLUDED) 1 0.0c 0.0 e— c>Q 1/2 WOOD.REPLACEMENT IS NOT INCLUDED. WOOD CHARGE WILL BE CHARGED AT $65.00 PER PLYWOOD AND $4.85 OR LESS PER LINEAR FOOTOF WOOD. BEFORE AND AFTER PICTURES WILL BE TAKEN OF THE WOOD. WOOD CHARGE WILL BE CHARGED AT $60.00 PER PLYWOOD AND $4.25 OR LESS PER LINEAR FOOT OF WOOD. BEFORE AND AFTER PICTURES WILL BE TAKEN OF THE WOOD. HOMEOWNER / — Signature "!/ Print ROOF DEP Sign re Print Date Subtotal $ 4,770.00 Discount $ 0.00 Total $ , 7-7 212 Roof Depot Inc. Contract for Services General Terms and Conditions Project Name / Number: Owner: VILMA H KNIGHT Jobsite Address: 2526 S. Elm Ave. Sanford, FL 32773 1) INSURANCE a) Roof Depot, Inc. will carry workman's compensation insurance covering Roof Depot, Inc.'s, employees and liability insurance covering the operation of trucks and automobiles. Roof Depot, Inc. will also take out and maintain General Liability Insurance. b) Evidence of the insurance is in the form of certificates that will be issued to the Owner prior to starting work. Certificates of insurance shall be filed with the Owner. 2) COMMENCEMENT OF PROJECT 3) Start Date and Delays - Roof Depot, Inc. shall be given reasonable time in which to make delivery of materials and/or labor to commence and complete the performance of the contract. Roof Depot, Inc. shall not be responsible for delays or defaults where occasioned by causes of any kind and.extent beyond its control, including but not limited to: delays caused by the Owner, architect and/or engineers, delays in transportation, shortage of raw materials, civil disorders, labor difficulties, vendor allocations, fires, floods,:accidents and acts of God. Roof Depot, Inc. shall be entitled to equitable adjustment in the contract amount for additional costs -due to unanticipated project delays or accelerations caused by others whose acts are not Roof Depot, nc.'s responsibility and -to time. extensions fob unavoidable delays. 4) Working Hours - Work called for herein is to be performed :during regular working hours All work performed outside of such hours shall be charged forat the rates or amounts agreed upon by the parties at the time overtime is authorized. a) Change of Conditions If unexpectedconditions are encountered during the work, or if the Owner, Owner' s agent,.or any.pub(ic body inspector directs additional or modifications to the work and the conditions adversely affect the cost or, progress of work, Roof Depot, Inc..will notify the Owner immediately, and the Ownerwill negotiate a change -order to resolve the unexpected condition. 5) Materials and Deviations — Roof Depot, Inc., shall guarantee all material to be as specified. All work is to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from these specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All agreements contingent upon delays beyond our control. 6) PRICING and PAYMENT a) Pricing - The prices given in all quotations are those currently in effect. In the event of price increase of material, supply, equipment, or energy occurring between the date of this proposal and the first day of performance of the contracted work through no fault of Roof Depot, Inc. the b) c) d) e) 7) Initials 66<. contract sum shall be equitably adjusted by change-order(s) to rWthe'increase(s) Payment ( See chart) I Project Amount (Total): $ Amount due upon Acceptance of Contract: $ j Amount due after In progress Inspection passed: $ Balance due in full upon 100% completion: $ AI V Plus A res en wood damage. 8) 3.3. Work Stoppage — Roof Depot, Inc., shall have the right to stop work and keep the job idle if payments are not made to it when due. After thirty (30) days of payment being due, on 5 days' notice, Roof Depot, Inc., may demand and receive payment for all work executed and materials ordered and supplied and other losses sustained including Roof Depot, Inc., normal overhead plus profit of 20% of the contract price. Therefore, Roof Depot, Inc., is relieved of further liability. If work stops for any reason, Owner shall provide for protection of all materials on the premises and shall be responsible for any damage, warp, age, racking, or loss of said materials 9) WARRANTY Upon completion of construction and payment in full by Owner, Roof Depot, Inc. will warrant the Owner that all work performed is free from defective workmanship and materials for a period of _5_ years. The warranty will obligate Roof Depot, Inc. to repair without cost to the Owner any such defects that are discovered during the term of the warranty. A Limited Labor Roof Warranty is attached and when executed forms part of the contract documents. The exclusive remedy shall be that Roof Depot, Inc., will replace or repair any part of its work, which is found to be defective. Roof Depot, Inc. shall not be responsible for damage or defect caused by abuse, modifications not executed by Roof Depot, Inc. improper or insufficient maintenance, improper operation or normal wear, tear and usage. THIS WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING ANY WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. 10) USE OF PREMISES 11) Use of Premises - Owner is to prepare all work areas'so as to be acceptable for Roof Depot, Inc.'s work. 12) Roof Depot, Inc. will not be called upon to start -work until sufficient areas are ready to ensure continued work. Owner shall furnish all temporary site facilities includmg suitable storage space; temporary electrical and water at no cost to Roof Depot, Inc. Owner shall grant free access to workjareas for workers and vehid es and shall provide areas for storage of material and debris. Roof Depot ,Inc - shall n`otxbe liable for' -damage to"driveways; walks, lawn and shrubs caused by movement of trucks, workers or equipment in is ,hargtng,the contract S Imo, t 17 13) Owner's Responsibility - The Owner will -periodically examine; the work in progress, as well as upon completion in order to ascertain the extent to which the m`ateriels;arid pr"ocedureslco-h drm to the.requirements of these specifications. 14) ROOF CONDITIONS 15) Roof Mounted Equipment - During the roofing project it is often necessary to raise pipes, conduit and air conditioning units to roof under them. Roof Depot, Inc. will exert due diligence to handle these items with care, however, Roof Depot Inc. will not accept any liability for damage to pipes, conduits, air conditioners and ducting or other roof top mounted equipment which is raised or moved during the normal roofing activity. Similarly Roof Depot, Inc. is not responsible for the operational condition of these items after reinstallation. 16) Foil Insulation - Foil, insulation, and other equipment such as heater units and lighting systems attached to the underside of roof members can be disturbed during normal roofing activities. Roof Depot, Inc. will not accept any liability for any item that may become dislodged or deemed to have become inoperable as consequence of normal exterior roofing activities. 17) Drainage - Uniform Building Code and some city building codes specify that the roof is to have positive drainage. Roof Depot, Inc. shall not be held responsible if the design or structure of the deck being roofed does not conform to these requirements with resulting standing water. 18) MISCELLANEOUS 19) Integration Clause - This document and all documents incorporated by reference constitute the parties' entire agreement. No other agreements, oral or written, regarding the work to be performed under this agreement exist between the parties. 20) Initials . 21) Severability Clause - If any provision of this Agreement or the application thereof shall be invalid or unenforceable to any extent, the remainder of this Agreement or the application thereof shall not be affected, and each remaining provision of this Agreement shall be valid and enforceable to the fullest extent permitted by law. 22) Governing Law - This agreement shall be construed in accordance with and governed by, the laws of the state of Florida. 23) Indemnification - Roof Depot, Inc. will indemnify and hold harmless the Owner from damages only to the extent such damages were caused by sole negligent act or omission of Roof Depot, Inc. 24) Risk Insurance - Owner shall purchase and maintain risk insurance upon full value of the entire work and/or materials delivered to the job site, which shall include the interest of Roof Depot, Inc. 25) Claims - No back -charges or claim of the Owner for services shall be valid except by an agreement in writing by Roof Depot, Inc. before the work is executed, except in the case of Roof Depot, Inc.'s failure to meet any requirements of this Contract. In such event, the Owner shall notify Roof Depot, Inc. of such default, in writing and allow Roof Depot, Inc. reasonable time to correct any deficiency before incurring any cost chargeable to Roof Depot, Inc. 26) Asbestos and Hazardous Waste - Unless the agreement specifically calls for the removal, disturbance, or transportation of asbestos containing material or other hazardous substances, the parties acknowledge that such work requires special procedures, precautions and/or licenses. If Roof Depot, Inc. encounters such substances, Roof Depot, Inc. will immediately stop work and take steps to institute the -special procedures, licenses and precautions. Such work will be treated as a change under this contract. 27) AUTHORIZATION 28) The above prices, specifications and conditionseare satisfactory and are hereby accepted. Roof Depot, Inc., is authorized to do the work as specified. Payment will be made as outlined above F , Home Owner/Authorize Agent EA Print Name Signature _=, /" to-: _. Roof Depot Inc./Authorize Agent Signature: Date: Print Name: TITLE: FLORIDA STATUTES ON CONTRACTOR'S LIENS ON PROPERTY ACCORDING TO FLORIDA'S CONSTRUCTION LIEN LAW (SECTIONS 713.001-713.37, FLORIDA STATUTES), THOSE WHO WORK ON YOUR PROPERTY OR PROVIDE MATERIALS AND SERVICES AND ARE NOT PAID IN FULL HAVE A RIGHT TO ENFORCE THEIR CLAIM FOR PAYMENT AGAINST YOUR PROPERTY. THIS CLAIM IS KNOWN AS A CONSTRUCTION LIEN. IF YOUR CONTRACTOR OR A SUBCONTRACTOR FAILS TO PAY SUBCONTRACTORS, SUBSUBCONTRACTORS, OR MATERIAL SUPPLIERS, THOSE PEOPLE WHO ARE OWED MONEY MAY LOOK TO YOUR PROPERTY FOR PAYMENT, EVEN IF YOU HAVE ALREADY PAID YOUR CONTRACTOR IN FULL. IF YOU FAIL TO PAY YOUR CONTRACTOR, YOUR CONTRACTOR MAY ALSO HAVE A LIEN ON YOUR PROPERTY. THIS MEANS IF A LIEN IS FILED YOUR PROPERTY COULD BE SOLD AGAINST YOUR WILL TO PAY FOR LABOR, MATERIALS, OR OTHER SERVICES THAT YOUR CONTRACTOR OR A SUBCONTRACTOR MAY HAVE FAILED TO PAY. TO PROTECT YOURSELF, YOU SHOULD STIPULATE IN THIS CONTRACT THAT BEFORE ANY PAYMENT IS MADE, YOUR CONTRACTOR IS REQUIRED TO PROVIDE YOU WITH A WRITTEN RELEASE OF LIEN FROM ANY PERSON OR COMPANY THAT HAS PROVIDED TO YOU A "NOTICE TO OWNER." FLORIDA'S CONSTRUCTION LIEN LAW IS COMPLEX, AND IT IS RECOMMENDED THAT YOU CONSULT AN ATTORNEY. r City of Sanford Building and Fire Prevention RESIDENTIAL RE -ROOF INSPECTION AFFIDAVIT NAILING, SHEATHING, DRY -IN, FLASHING, AND ALL FINAL ROOF COVERINGS PERMIT #: 7 r 3 ADDRESS: 25 2 G 6• F_ 1 m Ny e Scan fo r cl E l t b2 -743 I N O r cwn1 S f l-e c for AS A(N) GENERAL, BUILDING, RESIDENTIAL, OR ROOFING CONTRA TOR, ENGINEER, ARCHITECT, OF F.S. CHAPTER 468 BUILDING INSPECTOR, I HEREBY AFFIRM, THAT ALL OF THE FOREGOING INFORMATION IS TRUE AND ACCURATE AND THAT ALL ROOFING COMPONENTS LISTED ON THE SCOPE OF WORK AT THE ABOVE REFERENCED ADDRESS HAVE BEEN INSTALLED IN ACCORDANCE WITH THEIR PRODUCT APPROVALS AND ALL APPLICABLE CODE REQUIREMENTS - SPECIFICALLY FLORIDA BUILDING CODE, EXISTING BUILDING. IN ADDITION I CERTIFY THE INSTALLATION MEETS ALL REQUIREMENTS FOR SECONDARY WATER BARRIER AND NAILING OF THE ROOF DECK, IN ACCORDANCE WITH THE HURRICANE RETROFIT MANUAL REQUIREMENTS ( BASED ON F.S. CHAPTER 553.844). l LICENSE #: LC13 3 V ' 3 L4 COMPANY / CONTRACTOR: ffioo-r e on L' C CONTRACTOR SIGNATURE: DATE: S- MUST BE SIGNED BY LICENSE HOLDER OR RB A FINAL ROOF INSPECTION IS REQUIRED: THIS SIGNED AND NOTARIZED AFFIDAVIT MUST BE PROVIDED AT THE JOB SITE AT THE TIME OF THE FINAL ROOF INSPECTION, ALONG WITH DIGITAL PHOTOGRAPHS OF EACH PLANE OF THE ROOF SHOWING IN DETAIL ALL COMPONENTS (DECKING, UNDERLAYMENT, FLASHING, DRIP EDGE ATTACHMENT) WITH THE PERMIT NUMBER OR ADDRESS CLEARLY MARKED ON THE DECK FOR EACH INSPECTION. THE PHOTOGRAPHS MUST INCLUDE A RULER OR MEASURING DEVICE TO CONFIRM ALL NAIL SPACING AND OVERLAPS, INCLUDING DRIP EDGE AND VALLEY FLASHING. PLEASE REFER TO THE RE -ROOF POLICY AND INSPECTION PROCEDURE PAPERWORK FOR FURTHER EXPLANATION OF ALL REQUIREMENTS. FAILURE TO FOLLOW ALL REQUIREMENTS WILL RESULT IN A FAILED INSPECTION, A RE -INSPECTION FEE AS WELL AS REQUIRING A DESIGN PROFESSIONAL (ARCHITECT OR ENGINEER) TO CERTIFY, BASED ON PERSONAL INSPECTION, THE INSTALLATION OF ALL ROOFING COMPONENTS. STATE OF FLORIDA COUNTY OF 0 "A n PA s Sworn to and Subscribed before me this day of V _ 20 i3 by: CWho is Personally Known to me or has F10Iroduced (type of i entification) I— as identification. Signature of Wotary Public State of Florida.;;dr'p' AI , TANYA RODRIGUEZ y.. sNotary Public . State of Florida Commission N GG 083859 a My Comm. Expires Mar 15. 2021 Print/TName '•,; yl Bondedthrough National Notary Assn. of Notary Public I t PERIVHT # / -7,X 3 City of Sanford Building Division Residential Re -Roof Scope of Work JOB ADDRESS: _ % S Z (n \ M i P C 11-'nYd F I , 3 Z -' -7 STRUCTURE TYPE: (D /SINGLE FAMILY RmIDENCE/rOWNHOUSE O MOBILE HOME O APARTMENT/CONDOMINIUM RE -ROOF TYPE: 0REPLACEMENT (TEAR OFF EXISTING ROOF AND REPLACE WITH NEW COMPONENTS) O RE-COVER (NEW ROOF INSTALLED OVER EXISTING ROOF) DECK TYPE (PLEASE SPECIFY): PLEASE NOTE: ONLY 100 SQUARE OF THE EXISTING DECK IS PERMITTED TO BE REPLACED** ROOF VENTILATION: DOFF -RIDGE (RIDGE OSOFFTT OPOWERED VENT OBINES SKYLIGHTS: OYES `f / "0 IF YES, PLEASE PROVIDE FLORIDA PRODUCTAPPROVAL #: MAIN ROOF AREA RooF SLoPE: O LESS THAN 2:12 0 2:12 - 4:12 4 _12 OR GREATER TYPE OF ROOF MANUFACTURER FLORIDA PRODUCT APPROVAL HINGLE atLklffiked FL# O METAL FL# OMODIFIED BITUMEN FL# O TORCH DOWN FL# OINSULATED# O TUX FL# O OTHER: FL# ROOF EXTENSIONS (PORCHES PATIOS ETC) **IFAPPLICABLE** ROOF SLOPE: O LESS THAN 2:12 0 2:12 -4:12 04:12 OR GREATER TYPE OF ROOF MANUFACTURER FLORIDA PRODUCT APPROVAL O SHINGLE OMETAL FL# OMODWIED BITUMEN FL# O TORCH DOWN FL# OINSULATED FL# O TILE FL# 0 OTHER: FL# r , City of Sanford Building Division y } Residential Re -Roof Inspection Policy & Procedures PERMITTING REQUIREMENTS — NO PLAN REVIEW REQUIRED This document (signed) along with an accurate and completed 'Residential Re -Roof Scope of Work are required to be submitted as part of your permit application. The Scope of Work must.include all applicable Florida Product Approval numbers for all roof components that will be installed on the project. A permit will not be issued without these documents. Copies will be made to post on the job site. Projects located in the Sanford Historic District will require plan review and approval by the Sanford Historic Preservation Board INSPECTION POLICY & PROCEDURES A Final Roof Inspection is the only inspection required for Residential (Single Family, Townhouse, Mobile Home, Apartment and/or Condominium) Re -Roof Permits. The Following is required to be provide on the job site: Permit Card, posted in a conspicuous and weatherproof location Completed Residential Re -Roof Scope of Work Completed and Notarized Inspection Affidavit All Florida Product Approval and Corresponding Installation Instructions Product Approval shall match what is on the scope of work) Digital Photographs (must include the permit number or address in each picture) o Each plane of the roof, showing the underlayment installed O Roof Deck Nailing Pattern & Spacing (including a measuring device or ruler) o Roof Deck Nails used (including a measuring device or ruler showing size of nails) o Underlayment Pattern & Spacing (including a measuring device or ruler) o Drip Edge & Valley Attachment (including a measuring device or ruler) ; o Shingles installed, nail pattern and location of nails - Skylights (if applicable) o Digital photographs showing all installation components, per FL Product Approval o Digital photographs showing all required flashing, per FL Product Approval Failure to follow these specific guidelines will result in a affidavit provided by a Florida Design Professional (architect or engineer), certifying FB compliance -by -personal inspection. CONTRACTOR (OR OWNER/BUILDER) SIGNATURE: / DATE: 2 - S - I