HomeMy WebLinkAbout186 Lakeside Cir; 17-2672; AC CHANGE OUT AND HEAT PUMPBUILDING
P
APPlicat ion No: Documented
Construction Value.$ 4,51C Job
Address: 186 Lakeside Circle, Sanford, FL 32773 Historic Dil Parcel
ID: 11-20-30-5KB-0000-0730 Residential
Type
of Work: New U Addition R Alteration El Repair 0 Demo emo0 Description
of Work: 3.0 Ton, 14 SEER, Heat Change
CITY
OF SANFORD FIRE
PREVENTION IMIT
APPLICATION 92
ict:
Yes Q No I
Commercial Use
0 move Plan
Review Contact Person - Eliane Huffman Title: Owner Phone:
321-972-9935 Fax: 321-972-9937 Email: offica@tropical-air:com Property
Owner Infortination Name
CAH 2014-2 Borrower LLC Phone-... 8557-224-5484 Street:
8685 E. Hartford Dr. Ste. 2()() Resident
of property? Daphne Austin City,
State zip* Scottsdale, AZ 86255 Contractor
Information Name
Tropical Air of Central Florida Phone: 321-97249935 Street:
460 West SR 434, Unit 104 Fax 321-972-9937 City,
State Zip: _Longwood, F1 32710 State License No.: CAC1817411 ArchiteeVEngineer1nformation
Name:
NA Phone..,
Street:
Fax
City,
St, zip. E-mail: Bonding
Company. NA Mortgage
Lender: NA Address:
Address:
WARNING
To OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MA'(RESULT IN YOUR PAVINGTWICEFORIMPROVEMENTSTOYOURPROPERTY. A NOTICE OF COMMEN"' RECORDEDANDPOSTEDONTHEJOBSITEBEFORETHEFIRSTCEMENT
MUST BE, INSPECTION.
IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING" COMMENCEMENT. VOURI NOTICE OF Application
is hereby, made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has aorPissuanceofapermitandthat. work will be perf performedto meet standardsof ail lawsregulating construction commenced priortotheinthis
jurisdiction. I understand that a separate permit must be secured for electrical work, plumbing, signs, wells,pools, furnaces, boilers, heaters, tanks, and air conditioners, etc. FRC 105.
3 Shall be inscribed with the date of application and tl3c code in effect as of that date: 511 Edition {2014) Florida Building Code Rev,i§
r& June 30,2015 1 1 Fennit Applic-
ation
i.
wT10E In addition to the requirements of this permit, there may be additional restrictions applicable to this property that mayfoundinthepublic'records of this county, and there .ay be additional permits required from other governmental entities such as water
management districts, state agencies, or federal agencies.
Acceptance of penr it is verification that 1 will notify the owner of the property of the requirements of Florida Lien Law, F5 713'
redittal. A copy of e execut d act is
The City of Sanford requires payment°f and rylithe eons dered the -,estimated confeeatthetimeofpermitstructionvalueof}the j b at e
n re of submittal.
in order to calculate a plan review ch rgTheactualconstructionvaluewillbefigured based theaees figured off the executedntIcCValuationlcontractexceedtheactualeonstruckionvaluermitisis,sued, e
accordance with local ordinance. Should calculatedcreditwillbeappliedtoyour, permit fees when the permit is issued.
OWNER S AFFIDAVIT: I certify that all of the foregoing information is accurate and that all work willbedoneincompliancewithallapplicablelaws,regulating construction and zoning.
Dwner
e or
Produced I Type of ID
Permits Required: Building[j Electricals Mechanical LJ Plumloingt.,a 'Ja5L1 '•""' t—j
occupancy Use:
Flood Zone:
Construction Type:
Total Sq Ft of Bldg-_ Min. Occupancy Load:
itof Stories: Plumbing - #
of New
Construction: Electric - #€ of Amps Fixtures
s
No El # of Heads FireSprinklerPermit: Ye Fire
Alarm Permifi: ;'es NO APPROVALS.,
ZONING: UTILITIES: wAb t r w n i L.«• ENGIEERING:
FARE: BUILDING: COMMENTS:
Permit
Applicatias Revised:
June 30, 2015
LETTER OF AUTHORIZATION
The individuals listed below are fully authorized to act on behalf of the following subsidiary entities:
Adalwin, LLC; Beauly, LLC; Fetlar, LLC; SRP Sub, LLC; SRP TRS Sub, LLC; Starwood Waypoint TRS, LLC;
ColFin AI -FL 2, LLC; ColFin AI -FL 3, LLC; ColFin AI -FL 4, LLC; ColFin AH-Florida 5, LLC; ColFin AH-Florida 6,
LLC; ColFin AH-Florida 7, LLC; SWAY 2014-1 Borrower, LLC; CAH 2O14-1 Borrower, LLC; CAH 2O14-2
Borrower, LLC; CAH 2O15-1 Borrower, LLC; CSH 2O16-1 Borrower, LLC and CSH 2O16-2 Borrower, LLC
together the "Entities") to apply for, negotiate, settle or appeal and execute all necessary documents with
any municipality in connection with all matters related to, building permits, code violations, special
assessments, liens, fines, or property taxes for properties owned by any of the Entities until this Letter of
Authorization is changed or withdrawn by written notification to such municipalities.
Randy Gray Regional Manager
John Rapisarda Regional Manager
Allen Waters Field Operations Manager
David Leger Service Operations Manager
Tia Gonzalez Service Operations Manager
Michael Fuster Service Operations Manager
Michael Scott Service Operations Manager
Jazz Mitchell Service Operations Manager
Julie Hynds Property Compliance Coordinator
James Vance Compliance Manager
Leo Lluberes Service Operations Manager
Rebeca Venzal Property Manager
Giselle Roig Property Manager
Sultana Higgs Property Manager
Address for Correspondence:
Colony Starwood Homes
8665 East Hartford Drive, Suite 200
Scottsdale, AZ 85255
Ryan B r
EVP, General Counsel
5/0-/ t--7
Date
954) 256-9100
813) 666-8455
813) 892-9547
813) 321-3103
813) 414-5443
954) 547-24SS
954) 534-6881
727) 385-5264
954) 256-9101
480) 800-3401
813) 321-3103
954) 399-6794
954) 519-5205
954) 399-6749
Colony Starwood Homes • 9305 E Via pie Ventura, Suite 201 - Scottsdale. Ai 85258 • t: 480.800.3300
Proposal Date: 08/15J2017 Job # B1447631
Tropical Air of Central Florida
CONTRACT
Customer Name: CAH 2O14-2 Borrower LLC
460 W. SR 434, Suite 104
Customer's Home Phone: 855-224-5484 Longwood; FL 32750
321) 972-9935
Customer's Cell Phone: Email: office@Trooical-Air.com
Street Address: 186 Lakeside Circle
M
City, State and Zip: Sanford, FL 32773
Billing Address (if different from above):
8665 E. Hartford Dr., Suite 200
o
C
Scottsdale, AZ 85255 41 CBRBAL FLORIpQ LLC
License Number: CAC1817411
County: Seminole Email address:
Description of the Project and Description of the Significant Materials to be Used and Equipment to be, installed
SYSTEM INFORMATION:
Equipment Brandt Goodman SEER: 14.0 Cooling BTU: Ton: 30
Split System / Package / Straight Cool / Heat Pump j Furnace): Heat Pump / Split System
Comments or special instructions:
Equipment Specifications: Furnace Fuel:
Existing / New / Moiel # of New Component Gas/Oil/LP Gas/Electric:
X Air Handler Unit: AUF37C14 AFUE (up to)
X Condenser Unit: GSZ140361 Heating BTU:
f Evaporator'Coil:
J O Package Unit: Electrical:
J X Thermostat,
f Humidifier: X Connect to existing electrical
Air Cleaner: Install new AM Main Panel
UV Light: New Disconnect Furnace Condenser
J Evap Cooler: New GFl Outlet Attic Light /Receptacle
Heat Strip: HKSX05XC Other:
Miscellaneous: Duct Work:
X / Line Set /X Pad X Reuse existing duct'system
El Drain Line / Condensate Pump Install new duct system w/# new runs
El Auxiliary Drain Pan El Other:
Rebuild plenum (Supply/Return):
Rebuild plenum, flush existing line set, reline return box, new platfort New trunkline(s) (Supply/Return):
top, float switch, whip and disconnect, tie downs, security caps, New return grill(s): breaker, and permit
Existing return grill size:
Replace Register(s) #:
El Other:
Flue Venting and/or Chimney:
Use existing vent or chimney Install new chimney liner PVC vent pipe for high -efficiency furnace
Horizontal Vertical Type B vent pipe
Stainless steel vent pipe 1 Pipe installation 2 Pipe installation
Combustion Existing Modify
Other
Special Instructions:
waive my right to, cancel: X X
All of the above check boxes and "special instructions" have been reviewed and explained to as confirmed by my
initials / Customer(s) initials: X -K X
Approximate start date and approxomate completion date
The work will start Septemer 5, 2017 (Approximate Start Date). The work will be substantially completeted by September
5, 2017 (approximate completion date)
These dates are subject to change at the time the contract is accepted by Tropical Air of Central Florida, LLC. ("Tropical Air")
or at any other time by mutual written agreement. Customer understands that the Approximate Start Date is only an
estimated date and the Customer will be contacted prior to this date to schedule the actual start date, inclement weather
permitting.
Asbestos Abatement: This Estimate and Proposal assumes that there are no asbestos containing materials ("ACMs") that
would be disturbed in the performance of the installation work. if upon further inspection by the contractor or others it is
learned that ACMs have to be disturbed to perform work, then Customer must arrange and pay for abatement of asbestos
by a qualified person prior to the start or continuation of work. If Customer fails to arrange for necessary asbestos
abatement within thirty (30) days, Tropical Air may cancel this contract upon written notice to Customer.
Customer(s) Initial confirming above paragraph knowledge and understanding X itl X .
Please Note that Tropical Air is not responsible for correcting any existing code violations or pre-existing conditions of any
ductwork, piping, electrical supplies, or equipment not being replaced at this time. If additional work is required, it will be
the Customer's responsibility.
Additional charges will be quoted and approved prior to start of additional work.
Customer(s) Initial confirming above paragraph knowledge and understanding X 3A X
Contract price includes:
One year labor warranty and ten year parts and compresser warranty.
Total price:
Price, including all labor, material, taxes, and any applicable discount is $4,510.56
Additional finance charges (if applicable and defined below): *
Total price and amount due upon completionof installation: $4,510.56
Credit card usage fee (if applicable) determined at a 3% rate
If financed, an additional transaction charge will be incurred at 3%
Customer(s) Initial confirming above paragraph knowledge and understanding X Sh X
NOTICE TO BUYER: YOU, THE BUYER, MAY CANCEL THIS TRANSACTION AT ANY TIME PRIOR TO MIDNIGHT OF THE
THIRD BUSINESS DAY AFTER THE DATE OF THIS TRANSACTION
Additional Provisions
Proposal and Approval. Tropical Air offers to furnish the materials and arrange for delivery and installation as specified on first page and/or the
attached sketches and specification sheets for the TOTAL PRICE shown. This offer must be approved by the Installation Department.. If this is a credit sale
or a payment on completion sale, it must be approved by the Credit Sales Department. If this proposal is not approved or the installation cannot be made
in accordance with the law, this offer will be withdrawn and any payments you have made will be refunded to you. Any materials left over after the
installation has been completed are Tropical Air property and will be removed by Tropical Air.
Installation. Tropical Air is not, responsible for materials or installation NOT furnished or arranged by Tropical Air. Tropical Air will obtain all building
permits required by local law. For homes located in historic or landmark zoning districts, Customer will be responsible for obtaining required approvalsandrelatedpermitspriortothecommencementofworkonthiscontract.
Authorization. I authorize Tropical Air to: (1) issue awork order for this installation per contract; (2) inspect the installation;, and (3) pay the contractor
when the installation is complete if I have signed a, certificate that the installation has been completed to my satisfaction.
Delays in Installation. I agree that Tropical Air is not responsible for delays in delivery or installation due to weather, fire, strikes, war, government
regulations or any causes -beyond Tropical Air's control.
Oral Agreements and Changes in Contract. I understand that there are rib oral agreements between Tropical Air and me..Everything I expect Tropical Air
to do has been included in writing in this contract. Nothing can be changed in this contract unless it is in writing on a separate form accepted by me andTropicalAir.
Responsibility of Buyer. I agree that any information ormeasurements that I give to Tropical Air are correct and.. complete. I am responsible; for any specialworkdescribedinthiscontract. Electrical &
Plumbing Service. I will"provide adequate electrical and/or plumbing;service(s) to run any newly installed; appliances or other furnishings. If the
electrical and/or plumbing service(s) do not meet the standards of the utility company or electrical and/or plumbing codes, I will make the necessary changes
at my expense unless Tropical Air has agreed in this contract to make the changes. Payment.
I will pay Tropical Air the price of material and installation as shown on the first page. Warranty
Information. Appropriate product warranty documents will be given to me by Tropical,Air. Tropical-Air's Warranty on Installation is: TROPICAL
AIR'S LIMITED WARRANTY ON INSTALLATION In
addition to any manufacturer warranty extended to you on the product(s) used (which warranty becomes effective the date the merchandise is installed),
if the workmanship`(or application) of any Tropical Air arranged installation proves faulty within one year after the completion of installation, then
upon notice from you Tropical Air will cause such faults to be corrected by repair at no additional cost to you. If1rcpical Air determines that repair is not
commercially practicable or cannot be timely made, then, at Tropical Air's sole discretion, Tropical Air may elect to provide replacement or refund. Service
under this Limited Warranty is available by calling Tropical Air of Central Florida, LLC. at 1-321-972-9935: Thiswarranty gives"you specific legal rights,
and you may also have other rights that vary from State to State. Notice
to Buyers 1.
DO NOT SIGN THE AGREEMENT IF ANY OF THE SPACES INTENDED FOR THE AGREED TERMS TO THE EXTENT OF THE AVAILABLE INFORMATION ARE
LEFT BLANK. 2.
YOU ARE ENTITLED TO A COPY OF THIS AGREEMENT AT THE TIME YOU SIGN IT. KEEP IT TO PROTECT YOUR LEGAL RIGHTS. 3.
THIS HOME IMPROVEMENT CONTRACT MAY CONTAIN A MORTGAGE OR OTHERWISE CREATE A LIEN ON YOUR PROPERTY THAT COULD BE FORECLOSED
ON IF YOU DO NOT PAY..BE SURE YOU UNDERSTAND ALL PROVISIONS OF THIS CONTRACT BEFORE YOU SIGN. 4..
YOU MAY PAY OFF THE FULL UNPAID BALANCE DUE UNDER THE AGREEMENT AT ANY TIME, AND IN SO DOING'YOU SHALL BE ENTITLED TO A FULL
REBATE OF THE UNEARNED FINANCE AND INSURANCE CHARGES. S.
YOU MAY CANCEL THIS TRANSACTION AT ANYTIME PRIOR TO MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE DATE OF THIS TRANSACTION.
FAILURE TO EXERCISE THIS OPTION, HOWEVER, WILL NOT INTERFERE' WITH ANY OTHER REMEDIES AGAINST THE RETAIL SELLER YOU
MAY POSSESS. IF YOU WISH, YOU MAY USE THIS PAGE AS NOTIFICATION BY WRITING "I HEREBY RESCIND" AND ADDING YOUR NAME AND
ADDRESS., A DUPLICATE OF THIS RECEIPT IS PROVIDED BY THE SELLER FOR YOUR RECORDS. 6.
IT SHALL NOT BE LEGAL FOR THE SELLER TO ENTER YOUR PREMISES UNLAWFULLY OR COMMIT ANY BREACH OF THE PEACE TO REPOSSESS GOODS
PURCHASED UNDER THIS AGREEMENT. rwrouH
numtUwrvtKY LUNSTKUL] ION RECOVERY FUND PAYMENT
MAY BE AVAILABLE FROM THE FLORIDA HOMEOWNERS` CONSTRUCTION RECOVERY FUND IF YOU LOSE MONEY ON A PROJECT PERFORMED
UNDER CONTRACT, WHERE THE LOSS RESULTS`FROM SPECIFIED VIOLATIONS OF FLORIDA LAW BY A LICENSED CONTRACTOR. FOR INFORMATION
ABOUT THE RECOVERY FUND AND, FILING A CLAIM, CONTACT THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD AT THE FOLLOWING
TELEPHONE' NUMBER AND ADDRESS: CONSTRUCTION INDUSTRIES' RECOVERY FUND, 1940 NORTH MONROE STREET, TALLAHASSEE, FL ACCORDING
TO FLORIDA'S CONSTRUCTION LIEN LAW (SECTIONS 713.001-713.37, FLORIDA STATUTES), THOSE WHO WORK ON YOUR PROPERTY OR PROVIDE
MATERIALS AND SERVICES AND ARE NOT PAID IN FULL HAVE A RIGHT TO ENFORCE THEIR CLAIM FOR PAYMENT AGAINST YOUR PROPERTY.
THIS CLAIM IS KNOWN AS A CONSTRUCTION LIEN. IF YOUR CONTRACTOR OR A SUBCONTRACTOR FAILS TO PAY SUBCONTRACTORS, SUB -
SUBCONTRACTORS, OR MATERIAL SUPPLIERS, THOSE PEOPLE WHO ARE OWED MONEY MAY LOOK TO YOUR PROPERTY FOR PAYMENT, EVEN IF
YOU HAVE ALREADY PAID YOUR CONTRACTOR IN FULL. IF YOU FAIL TO PAY YOUR CONTRACTOR, YOUR CONTRACTOR MAY ALSO HAVE A LIEN ON
YOUR PROPERTY. THIS MEANS IF A LIEN IS FILED YOUR PROPERTY COULD BE SOLD AGAINST YOUR WILL TO PAY FOR LABOR, MATERIALS, OR OTHER
SERVICES THAT YOUR CONTRACTOR OR A SUBCONTRACTOR MAY HAVE FAILED TO PAY. TO PROTECT YOURSELF, YOU SHOULD STIPULATE IN THIS
CONTRACT THAT BEFORE ANY PAYMENT IS MADE, YOUR CONTRACTOR IS REQUIRED TO PROVIDE YOU WITH,A WRITTEN RELEASE OF LIEN FROM
ANY ON OR COMPANY THAT HAS PROVIDED TO YOU A "NOTICE TO OWNER:' FLORIDA'S CONSTRUCTION LIEN LAW IS COMPLEX, AND IT
IS REMM§NDED THAT YOU CONSULT AN ATTORNEY. 8/
24/17 Date
cepted
by Tropical Air of Central Florida; U.C. ('Tropical Air") on 8/24/17 6 Date
Date
Detail by Entity Name Page 1 of 2
Florida Department of State
U
Department of State / Division of Corporations / Search Records / Detail By Document Number /
Detail by Entity Name
Foreign Limited Liability Company
CAH 2O14-2 BORROWER, LLC
Filinq Information
Document Number M14000003293
FEI/EIN Number N/A
Date Filed 05/14/2014
State DE
Status ACTIVE
Last Event LC STMNT OF RA/RO CHG
Event Date Filed 08/22/2016
Event Effective Date NONE
Principal Address
8665 E Hartford Dr Suite 200
Scottsdale, AZ 85255
Changed: 05/03/2016
Mailing Address
8665 E Hartford Dr Suite 200
Scottsdale, AZ 85255
Changed: 05/03/2016
Reaistered Aaent Name & Address
CT CORPORATION SYSTEM
1200 SOUTH PINE ISLAND ROAD
TALLAHASSEE, FL 33324
Name Changed: 08/22/2016
Address Changed: 08/22/2016
Authorized Person(s) Detail
Name & Address
Title AS
CAH 2O14-2 EQUITY OWNER, LLC
8665 E Hartford Dr Suite 200
Scottsdale, AZ 85255
DIVISION OF CORPORATIONS
http://search.sunbiz.org/Inquiry/CorporationSearchISearchResultDetail?inquirytype=Entity... 9/ 1 /2017
Detail by Entity Name Page 2 of 2
Title CEO
Tuomi, Fred
8665 E Hartford Dr Suite 200
Scottsdale, AZ 85255
Title CFO
Prawer, Arik
8665 E Hartford Dr Suite 200
Scottsdale, AZ 85255
Title Executive Vice President, Secretary, General Counsel
Berry, Ryan
8665 E Hartford Dr Suite 200
Scottsdale, AZ 85255
Title Asst. Secretary
Blanchette, Julianne
8665 E Hartford Dr Suite 200
Scottsdale, AZ 85255
Annual Reports
Report Year Filed Date
2015 04/30/2015
2016 05/03/2016
2017 06/01 /2017
Document Images
06/01/2017 -- ANNUAL REPORT I View image in PDF format
08/22/2016 -- CORLCRACHG I View image in PDF format
05/03/2016 -- ANNUAL REPORT View image in PDF format
04/30/2015 -- ANNUAL REPORT View image in PDF format
05/14/2014 -- Foreign Limited View image in PDF format
F—de Department of State, Division of Corporations
http://search. sunbiz. orglInquiry/CorporationSearchISearchResultDetail?inquirytype=Entity... 9/ 1 /2017
CITY OF
S,;NFORD
FIRE DEPARTMENT
PERMIT NO.
CONTRACTOR:
JOB ADDRESS:
Building & Fire Prevention Division
Residential Permit Card
7 - a (op 7 a/ %ISSUE DATE: 0q. NO. / 7
TYPE OF WORK: v/ M
Post this permit in a conspicuous location outside
Approved plans must be posted with permit for inspection
Leave all work uncovered until inspected and approved
Permit expires 6 months from date of issue or last approved inspection
PROTECT FROM WEATHER
BUILDING
INSPECTION 7YPE APPROVED REJECTED INSPECTOR
ELECTRICAL
INSPECTION 7TPE APPROVED REJECTED INSPECTOR
FOOTER INSPECTION ELECTRIC UNDERGROUND
STEMWALL FOOTER/SLAB STEEL BOND
FORMBOARD SURVEY T.U.G. / PRE POWER
SLAB / MONO -SLAB ELECTRIC ROUGH
LINTEL / TIE BEAM ELECTRIC FINAL
SHEATHING - ROOF MECHANICAL
INSPECTION 7TPE APPROVED REJECTED INSPECTORSHEATHING - WALLS
FRAME MECHANICAL ROUGH
INSULATION ROUGH IN MECHANICAL FINAL
DRYWALL/SHEETROCK PLUMBING
INSPECTION TYPE APPROVED REJECTED INSPECTORLATHINSPECTION
FINAL STUCCO/SIDING UNDERGROUND ROUGH
FIREWALL SCREW TUB SET
FIREWALL FINAL SEWER
INSULATION FINAL PLUMBING FINAL
FINAL SFR GAS INSPECTIONS
INSPECTION TYPE APPROVED REJECTED INSPECTORROOF
INSPECTION TYPE APPROVED REJECTED INSPECTOR GAS UNDERGROUND PIPE
ROOF DRY -IN GAS ROUGH -IN
FINAL ROOF IGAS FINAL
MISCELLANEOUS / FINAL INSPECTIONS
INSPECTION TYPE APPROVED REJECTED INSPECTOR INSPECTION TYPE APPROVED REJECTED INSPECTOR
PRE -DEMO FINAL DOOR
FINAL DEMO FINAL WINDOW
FINAL SOLAR PANELS IRRIGATION FINAL
FINAL POOL SCREEN FINAL SCREEN ROOM
FINAL UTILITY BUILDING FINAL BUILDING OTHER
MOBILE HOME TIE -DOWN MOBILE HOME FINAL
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING
TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND
POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH
YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
NOTICE: IN ADDITION TO THE REQUIREMENTS OF THIS PERMIT, THERE MAY BE ADDITIONAL RESTRICTIONS APPLICABLE TO THIS PROPERTY THAT MAY BE FOUND IN THE PUBLIC RECORDS
OF THIS COUNTY, AND THERE MAY BE ADDITIONAL PERMITS REQUIRED FROM OTHER GOVERNMENTAL ENTITIES SUCH AS WATER MANAGEMENT DISTRICTS, STATE AGENCIES OR FEDERAL
AGENCIES FBC105.3.3
REVISED: 4-17 Inspection Line: 407.792.6069 or 855.541.2112
TO SCHEDULE AN INSPECTION:
Dial 407.792.6069 or 855.541.2112
Provide the items requested during the message
The type of inspection requested must be scheduled under the appropriate permit type
Follow the prompts
To Schedule Fire Inspections: Please call 407.562.2786 ***
PLEASE NOTE: Inspections scheduled by 5:00 p.m. will be conducted the next business
day. If you experience difficulty, please call 407.688.5150 Monday - Thursday 7:30 am -
5:30 pm for assistance.
BUILDING
FOOTER
STEMWALL
FORMBOARDSURVEY
SLAB / MONO -SLAB
LINTEL / TIE BEAM
SHEATHING - ROOF
SHEATHING - WALLS
FRAME
INSULATION ROUGH -IN
DRYWALL /SHEETROCK
LATH INSPECTION
FINAL STUCCO / SIDING
FIREWALL SCREW
FIREWALL FINAL
INSULATION FINAL
FINAL SFR
ROOF
ROOF DRY -IN
FINAL ROOF
PRE -DEMO
FINAL DEMO
FINAL SOLAR PANELS
FINAL POOL SCREEN
FINAL UTILITY BUILDING
MOBILE HOME TIE -DOWN
Miscellaneous Notes:
AUTOMATED INSPECTION SYSTEM CODES
ELECTRICAL
104 ELECTRIC UNDERGROUND 211
102 FOOTER / SLAB STEEL BOND 221
147 T.U.G. 216
103 PRE POWER FINAL 218
105 ELECTRIC ROUGH 212
106 ELECTRIC FINAL 213
MECHANICAL115
109 MECHANICAL ROUGH 409
110 MECHANICAL FINAL 410
PLUMBING131
132 UNDERGROUND ROUGH 322
130 TUB SET 312
120 SEWER 311
143 PLUMBING FINAL 313
113 GAS
138 GAS PIPING UNDERGROUND
GAS ROUGH -IN
328
314
116 GAS FINAL 315
III
MISCELLANEOUS / FINAL INSPECTIONS
144 FINAL DOOR 136
126 FINAL WINDOW 137
134 IRRIGATION FINAL 321
139 FINAL SCREEN STRUCTURE 127
124 FINAL BUILDING - OTHER 112
145 MOBILE HOME BUILDING FINAL 146
REVISED: 4-17 Inspection Line: 407.792.6069 or 855.541.2112
FIRE INSPECTIONS CITY OF SANFORD
407.562.2786 BUILDING & FIRE PREVENTION
BUILDING INSPECTIONS 300 N PARK AVE
855.541.2112 SANFORD FL 32771
DRIVEWAYS -SIDEWALK 407.688.5080
Page 2
Application Number . . . . 17-00002672 Date 9/06/17
Property Address . . . . . 186 LAKESIDE CIR
Parcel Number . . . . . . . 11.20.30.5KB-0000-0730
Application description . . MECHANICAL PERMIT
Subdivision Name . . . . .
Property Zoning . . . . PUD
Permit . . . . . . MECHANICAL PERMIT -RESIDENTIAL
Additional desc . .
Phone Access Code 1001668
Permit pin number 1001668
Required Inspections
Phone Insp
Seq Insp# Code Description Initials Date
1000 410 MH02 MECHANICAL FINAL _/_/