Loading...
HomeMy WebLinkAbout3268 E Lake Mary Blvd; 17-2650; SOLAR PANELSi 1 CITY OF SANFORD kl AUG 3 2017 BUILDING & FIRE PREVENTION PERMIT APPLICATION Application No s v Documented Construction Value: $ 13 .00 !T Ol 0D0'%^ o 1N4(A' Job Address: 3268 E Lake Mary Blvd, Sanford FL 32773 Historic District: Yes MoFN Parcel ID: 03-20-31-5AY-0000-042E ResidentiaiO Commercial Type of Work: New ® Addition Alteration Repair Demo Change of Use Move Description of Work: Install New 5.4KW Photovoltaic Solar Electric, 18 Panels - Solar World SW300 Mono, Solar Edge SE5000A-US Inverter, Ironridge Roof Mount Rail System Plan Review Contact Person: Jim Smith Title: Permit Consultant Phone: 813-230-1287 Fax: Email:_ jimcsmith007@gmail.com Property Owner Information Name Holcomb, Richard & Kathi Phone: 407-322-9271 Street: 3268 E Lake Mary Blvd Resident of property? : yes City, State Zip: Sanford FL 32773 Contractor Information Name Blue Sky Solar Energy; Otto A. Curbelo Phone: 800-588-1950 Street: 15155 W. Colonial Drive #783113 Fax: City, State Zip: Winter Garden FL 34778 State License No.: EC13004873 Architect/Engineer Information Name: Phone: Street: Fax: v City, St, Zip: E-mail: Bonding Company: Mortgage Lender: Address: Address: WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for electrical work, plumbing, signs, wells, pools, furnaces, boilers, heaters, tanks, and air conditioners, etc. FBC 105.3 Shall be inscribed with the date of application and the code in effect as of that date: 5" Edition (2014) Florida Building Code Revised: June 30. 2015 Permit Application • f NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. Acceptance of permit is verification that I will notify the owner of the property of the requirements of Florida Lien Law, FS 713. The City of Sanford requires payment of a plan review fee at the time of permit submittal. A copy of the executed contract is required in order to calculate a plan review charge and will be considered the estimated construction value of the job at the time of submittal. The actual construction value will be figured based on the current ICC Valuation Table in effect at the time the permit is issued, in accordance with local ordinance. Should calculated charges figured off the executed contract exceed the actual construction value, credit will be applied to your permit fees when the permit is issued. OWNER'S AFFIDAVIT: I certify that all of the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. Signature of Owner/Ageni Dat Richard Holcomb Print Owner/Agent's Name L Lo 211s//-7 Signature of Contractor/Agent DAte Print Contractor/Agent's Name K-Igna 1Fe bT'No^La," < e or JAMES C SMITH e St 5y°. A 4iy-State F C SMITH A . f:'reoo? MY COMMISSION #FF093721 ao my COMMISSION #FF093721 February 18. 2018EXPIRESFebruary18. 2018, EXPIRES 407) 398-0153 FloridallotaryService.com 701) 398V 53 FlorideNotary Service.com Owner/Agent is Personally Known to Me or Co 'ractor/Agent is Personally Known to Me or Produced ID Type of ID Produced ID Type of ID BELOW IS FOR OFFICE USE ONLY Permits Required: Building Electrical Mechanical Plumbing[] Gas Roof Construction Type: Total Sq Ft of Bldg: Occupancy Use: Min. Occupancy Load: Flood Zone: of Stories: New Construction: Electric - # of Amps Plumbing - # of Fixtures Fire Sprinkler Permit: Yes No # of Heads APPROVALS: ZONING: UTILITIES: ENGINEERING: FIRE: COMMENTS: Fire Alarm Permit: Yes No WASTE WATER: BUILDING: '07 4•5• 17 Revised: June 30, 2015 Pen -nit Application 8/26/2017 SCPA Parcel View: 03-20-31-5AY-0000-042E Property Record Card FA t e Parcel: 03-20-31-5AY-0000-042E Wr i Owner: HOLCOMB RICHARD G & KATHI A Property Address: 3268 E LAKE MARY BLVD SANFORD, FL 32773 1 Value Summary 2017 Working 2016 Certified Values Values Valuation Method Cost/Market Cost/Market Number of Buildings 1 1 Depreciated Bldg Value $94,859 86,972 Depreciated EXFT Value $1,188 1,250 Land Value (Market) $44,727 44,727 i Land Value Ag Just/Market Value $140,774 132,949 Portability Adj Save Our Homes Adj $27,094 21,607 Amendment 1 Adj P&G Adj $0 0 Assessed Value $113,680 111,342 Tax Amount without SOH: $1,851.00 2016 Tax Bill Amount $1,418.00 Tax Estimator Save Our Homes Savings: $433.00 TRIM Notice Het Does NOT INCLUDE Non Ad Valorem Assessments Legal Description PT OF LOT 42 DESC AS BEG 20 FT W OF SE COR OF W 1/2 RUN E 20 FT N TO S LI OF S 264 FT W TO E LI OF W 109 FT S 178.3 FTETOAPTN OF BEG STO BEG (LESS RD ON S) SANFORD CELERY DELTA PB 1 PGS 75 & 76 Taxes Taxing Authority j Assessment Value Exempt Values Taxable Value County General Fund j 113,680 50,000 63,680 Schools 113,680 ` 25,000 88,680 I City Sanford 113,680 ` 50,000 63,680 SJWM(Saint Johns Water Management) 1 113,680 50,000 = 63,680 County Bonds 113,680 50,000 63,680 Sales Description Date Book Page Amount I Qualified 1 Vac/Imp QUIT CLAIM DEED 2/1/2016 08632 0818 100 No Improved I CORRECTIVE DEED 11/1/2013 08162 0616 j 100 '.. No I.... Improved ORDER OF TAKING 11/1/2003 05104 02.5.2 100 No Vacant QUIT CLAIM DEED 11/1/1995 03007 0 008 1 12,000 No Vacant SPECIAL WARRANTY DEED 10/1/1995 02090 0014 964,100 Yes Vacant Find C><arnpzrt r. 3 Land Method Frontage Depth Units Units Price I Land Value http://parceldetaii.scpafl.org/ParceiDetaillnfo.aspx?PID=0320315AY0000042E 1/2 Blue Sky Solar Energy LLC Installation Agreement 15 1 SS W. C0!0n1jj or. 783113 W nter CiArdito• Ft, 34718 BLUE SKY I fw CC13063$73 InIo4pbluelkytols senergy,ctim rra.bltt kytols.e r y.t r 800-588.1950 970 take C.i,r'1«!ri 3rd f:0or St. Petcmburr, 11. 33716 o,+te tj r R • fMt 1 y "" r r 4 t• 1.'' ... , ' r r Address; Zop COdC: 1i:3 4,e, County: o,M! 1-i3 1 Watts Of War PaAvr 280 to 340 watt per panel (depends of ava+lib-'ay and spue) Y llmwler -SS tr , L- tirorwtor Sunny Island (fluttery"up) 4S :$-us, 6049,us Number Of Flatteries Ground Mount of uncicr ,r nd wire a rom the m l Roof f.lount Sh:nglC ' To Barrel T to flat h!etal S5 !.!etst SV wi hg r panel; and Inverter-. included 20 Watt solar attic fan up to 2C.,q t/ 3O Watt solar fan up to 2&00 sq ft r ^ n. Ca3 premium t ue Sky SoUr Energy ti.0 has no control vecr the Po -over compaVs t,nv f rame to coc«nrct,on to tht trill. Vve Sky Sots Energy ttC'w pr a fria:cri? f, deigns ar}d factory cng.netrwna. g;,,rc S:y So:ar Energy LLC ism noway re;ponutke for federal tax credits, State or Foyter Comparr3• rebates. &'ve Sky SOW EWgy ttC has in no way 0,-uarantetd nVM00y w-r-t on the po-%vt b.',l, rc l9d:Cs or sd'iiry-s to the s?;d homeowner. 5 ' Total Contract Amount Owner Agrcc°s to Pay to Contractor: payment as Fo!"o-az. 1) 5 _ Dep osrt upon signing of tMContract; Cacho Checko Bank Draw 2) S 24 Draw due upon 3) S l_l Balar e due upon cornp!etAon o' job Job to btu financed: Y(--.t,ioO Gent Card r~ Visa Master Card D.-,cover AhlX Expiration Dite CV[ 3 or 4 diet a Bank Draw Drivers Lice r,sc' No. l uc Date a S j fxp Date a'' f 1 Drivers License No. Issue Date Exp Date State _ Credit Card Authoriration(s) Signed: u, the buyer, may cancel this transaciion at arty tlrni prior to midnight of the third buNiness day after the date of is transaction. See the atUched notice of cancellation form for an explanation of this right. 3 r:OT S!Gti THIS CO'ITR:.CT IF BL',,,iK. YOU ARE ENTITLED TO A COPY OF THE CO'NTR,ICT AT THE TIME OF SIGNING. OWNER R%!tiG BEL0',y REPRESEUTS THAT HE/SHE IS AUTHORIZED TO EXECUTE THIS CONTRACT. 7 H /SITE V.A. S7/,,,C. o$ . EO BY T -E CO'1 Ri Or '.IiH A COPY OF THIS CONTRACT. l,rI..rter. X_Homeowner: X j", C/ Sky Solar Energy Representative: X 1 BY SIGN114G BELOW OWNER CER11FtES N I 119111111111111111111111111111111111 fill fill GRANT NAI..OY7 SENINOLE COUNTY CLERK OF CIRCUIT COURT & CONF'TROLLER O'!' 89,82 Pq 109 (1Pis) Permit Number CLERK'S v 2017088327 Tax Folio/Parcel ID: 03-20-31-5AY-0000-042E RECORDED 08/:.11/21317 09:47:41 ;1N RECORDING FETES $10.00 NOTICE OF COMMENCEMENT RECORDED BY hdevore THE UNDERSIGNED hereby gives notice that improvement will be made to certain real property, and in accordance with Chapter 713, Florida Statutes, the following information is provided in this Notice of Commencement: 1. Description of property: (legal description of property, and street address if available) PT OF LOT 42 DESC AS BEG 20 FT W OF SE COROFW1/2RUN E20ffNTOSLIOFS264FTWTOELIOFW109FTS178.3FTETOAPTNOFBEG STO BEG LESS RD ON S SANFORD CELERY DELTA PB 1 PGS 75 & 76 3268 E Lake Mary Blvd, Sanford FL 32773 2. General description of Improve.1 ent: Install New Photovoltaic Solar 3.Owner information: a. Name and address: Holcomb, Richard & Kathi 3268 E Lake Mary Blvd Sanford FL 32773 b. Phone number: 407-322-9271 c. Name and address of fee simple titleholder (if other than owner): 4. Contractor: a. Name and address: Blue Skv Solar Enerlay. 1S1SS W. Colonial Drive #793113_ Winter (TardPn PT. 3477R b. Phone number: t 5. Surety: a. Name and address: b. Amount of bond $: 6. Lender: a. Name and address: b. Phone number: 7. Persons within the State of F 713.13( 1)(a)7,Florida Statutes: a. Name and address: N/A b. Phone number: 8. In addition to himself, owner b), Florida Statutes: a. Name and address: N/ A c. Phone number: W"q, designatedby Owner upon whom notices or other documents may be served as the following person(s) to receive a copy of the Lienor's Notice as provided in Section 713.13(1) b. Phone number: 9. The expiration date of the notice if commencement is one (1) year from the date of recording unless a different date is specified WARNING TO OWNER: ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT AREI CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713, PART 1, SECTION 713.13, FLORIDA STATUTES, AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. e d, Q l Cldrx[ Owner Signature of Owner or Owner's Authorized Officer/Director/Partner/Manager Signatory's Title/Office STATE OF FLORIDA, COUNTY OF SEMINOLE The foregoing instrument was ackno Iwdged before me this 15 day of AUgUSt 20 17 by Holcomb, Richard (name of person) as Owner (type of authority: e.g., officer, trustee, attorney in fact) for (name of party on behalf of whom instrument was executed), who is personally know to me or who has produced as identification x •, JAMES C SMITH i My COMMISSION #FFO93721 E ? EXPIRES February 18. 2018 407) 398- 0153 James Smith 8604 E Sligh Ave Tampa FL 33610 g.atN. tru b ay PVerificationPursuant to Section 92.525, Florida Statutes Under penalties of perjury, I declare that I have read the foregoing and that the facts stated in are true to the best of my knowledge and belief Signature of Natural Person Signing Above LIMITED POWER OF ATTORNEY Altamonte Springs, Casselberry, Lake Mary, Longwood, Sanford, Seminole County, Winter Springs Date: 8/30/2017 I hereby name and appoint: James Smith an agent of. Blue Sky Solar Energy Name of Company) to be my lawful attorney -in -fact to act for me to apply for, receipt for, sign for and do all things necessary to this appointment for (check only one option): IX The specific permit and application for work located at: 3268 E Lake Mary Blvd, Sanford FL 32773 Street Address) Expiration Date for This Limited Power of Attorney: 8/30/2018 License Holder Name: Otto A. Curbelo State License Number: EC13004873 Signature of License Holder: STATE OF FLORIDA COUNTY OF U The foregoing instrument was acknowledged before me this 30day of August , 20 17, by Otto Curbelo who is rxpersonally known to me or who has produced as identification and who did (did not) take an oath. PATRICIA.A NASRALLAH' MY COMMISSION # FF24.1 Signature1'62 ot EXPIRES June 17, 2019 i4C7)39P.-0!.53 @ 1i e.con' C] Sri C Q JO S O l `L Print or type name euWwio4" lbqauntS3LIIdX3 AVI =>: Notary Public -State of C= c 4— CO1Tll111SSlOn No. o 4, VgS'VN NOISSIWWO0Lya/I3RIl`dd ; '+,' ` My Commission Expires: Rev. 08.12) RECORD COPY 5.4KW Photovoltaic Solar Array Project Holcomb, Richard & Kathi 3268 E Lake Mary Blvd, Sanford FL 3277 4 a Install New 5.4KW Photovoltaic Solar Electric 18 Panels - Solar World SW300 Mono Solar Edge SE5000A-US Inverter Ironridge Roof Mount Rail System ASIDE ANY OF THE CODES, NOR SHALI THE BUILDING REQUIRING A COI CONSTRUCTIOt Blue Sky Solar Energy Otto Curbelo - EC13004873 15155 W. Colonial Drive #783113, Winter Garden FL 34778 Phone: (561) 441-1592 J\DING ottocurbelo@gmail.com SAP FDRD Panel Placement Area 18 Panels Roof Mounted Flush) LIVED FORrODF COMPLIANCE PLANS EXAMINER 4 5•' DATE 3UILDING DIVISION HALL. BE CONSTRUED TO BE A D WITH THE WORK AND NOT AS LATE, CANCEL, ALTER OR SET ROVISIONS OF THE TECHNICAL SSUANCE OF A PERMIT PREVENT FFICIAL FROM THEREAFTER ECTION OF ERRORS IN PLANS, R VIOLATIONS OF THIS CODE PROPERTYVIEW PHOTOVOLTAIC SYSTEM APPROVAL CERTIFICATE AWARDEDFSEC aBlueSkySolar Energy 1155 W. Colonial Dr., #783113 Winter Garden, FL 34778 http://www.blueskysolarenergy.com/ CERTIFICATION #: BT-17-02834 DESIGNATION: SE5000Awith SW300 SYSTEM SIZE: 6,600 Wdc DATE: 2017-08-14 EXPIRATION: 2022-08-14 Module Manufactuer Module Model FSEC Registration Number Strings" Shortest String' Longest String" Total SolarWodd Sunmodule Plus SW300 Mono SW15-ACTL-0439 2 8 14 22 Inverter Manufacturer Inverter Model Min. Input Voltage Max. Input Voltage Max DC Input AC Power Rating Output Voltage SolarEdge SE5000A-US 250 V 500 V 6,250 W 5,000 W 240 V Charge Controller Manufacturer Charge Controller Model 113attery Manufacturer 113attery Model 113atteril Type ICapacity (C120 rate) Quantity N/A N/A INA INA N/A INA N/A Review Comments Inspection Electrical Design (Verify the following items for agreement between the installed components and the supplied electrical schematic.) Size, type and location of all conductors in the PV system; Conduit, raceways, junction boxes, and combiner boxes; Size, current rating, voltage ratings, and location of all over -current protection devices; Rating and location of all disconnects; Point of connection to the utility; PV module and equipment grounding system (including conductor size); PV DC circuit and system grounding (including grounding electrode conductor size); e Ground fault detection & interrupter (GFDI) rating and location; Battery wiring and cable sizes (if applicable). Inspector Name (printed) Inspector Signature Date Installer Information and Certification Company Name: Website: Address: Phone Number: Florida Contractor License Number: Florida Contractor License Type: Solar Electrical Other, please specify: I hereby certify that this PV system has been installed in full accordance with the National Electrical Code. Installer Name (printed) Installer Signature Date Note: FSEC approvals do not replace or exempt any requirements of electrical utilities or local jurisdiction authorities in matters such as permitting, inspections, or utility interconnection agreements as required for PV system installations. When referring to FSEC approvals in any documentation produced by the supplier, including technical or marketing information, the following statement shall In. includerl' The photovoltaic system design described in this manual, when properly installed and maintained, meets the minimum recommended practices established by the Flonda Solar Energy Center. This 'approval' does not imply endorsement or warranty of this product by the Florida Solar Energy Center or the State of Florida." SolarTesti &Certification oordinator 6600 Watt DC Photovoltaic System Electrical Diagram Solaredge SE 5000A-US Inverter with Two Strings of Solarworld SW300 Modules and Solaredge P300 Optimizers Optional Supply Side Connection Tutmwne. NEC705.12A Solarworld Sw300 sw- L+ Modules r 300 N M 6 bare cop+er GEC f3) H 6 Utility mar THHNlrHWN•2 mun 3/d" PVC conduN 4) #10 AWG PV wi 60 A fused 1) #6 Bare Copper disconnect with 30A fuses e,ye„y Main Distribution dam Panel aeco-ade W- 300 150A Panelboard with 150A main 150A-2 O 10 OO (4) #10 AWG THHN/THWN-2 1) #8 AWG THHN/THWN-2 Nema 3R 2-B, 2-R, 1-G 11 30A/2 Junction 3/4" EMT, FMC(inside structur LFNC, PVC (outside structure) Box 690.31 E iIe_ Solaredge SE5000A-US Transformerless Inverter v D existing integrated DC disconnect. Q 1 Ac grounding Lj electrode i (3) #10 AWG THHN/THWN-2 i 1-B,1-R,1-W 1) #8 AWG THHN/THWN-2 b 1-G I N _ - _ _ _ - : 3/4" EMT, FMC, LFNC, or PV 1-B, 1-R, 1-W 1) #8 AWG THHN/THWN-2 1-G 3/4" EMT, FMC, LFNC, or P' If required by Utility 30A 240V AC Disconnect with label : 13 On -site Utility Generation DC Disconnect Label Disconnect Switch Requirements Vmpp 350 vdc PV AC Disconnect Label Requirements Vmax 500 vdc Operating Current:21A Impp 15.5A Operating Voltage: 240V Imax 30 A Drawn by Matthew Corona -Corona solar Consultants,LLC maximum if moaufes per string and minimum 8 modt 1]4 per string as per Solaredge olaredae P300 Factory DC leads I Factory Cable I 8 Solaredge P300 Power Optimizer N ° N N Max input power: 300 Wp-dc Max. Input DC Voltage: 48 VDC Max Input current: 12.5A MPPT Range: 8-48 VDC Max Output Voltage: 60 VDC Max Output current: 15A Module Specifications Pmax: 300 Wp Voc: 40.0 V Vmpp: 32.6 V Isc: 9.83 A Impp: 9.31 A Notes: All work to meet or exceed NEC 2011 DJunction box to be located within the array boundary. Junction box must be minimum Nema 311 UL listed enclosure. Free air conductors must be installed in raceway if readily accessible as per 690.31(A). The minimum volume of the Nema 3R enclosure for the transition of PV wire to THWN-2 wire shall be2 42 cubic inches. Heyco 5 wire Masthead gland seals or similar connector are required as strain relief for PV wire into Nema 3R junction box at array. Interconnection with 30 Amp 2 pole OCPD via 2011 NEC 705.12(D)(2)Load Side Connection. The 30 A backfed breaker must be located at the opposite end of the bus from the 150 A main supply breaker The required PV Backfed breaker plus the main breaker rating must be less than or equal to 120%of the Main service bus rating . 705.12(D)(2) DOptional Supply Side connection via 705.12A using parallel line taps in a NEMA 3R box (as required) using NSI IPCS4002, Ilsco IPC-KUP-L or NSI Tork IPLD 3/0-3 Multi -Tap Connector or equivalent. DPV service disconnecting means for "optional' supply side connection must have neutral/ EGC bond within and must be listed as "suitable for use as service equipment." 230.66 The fuses in the disconnect for the"supply side" option must be rated to handle the maximum short- circuit current available at the supply terminals. 110.9, 110.10 Over -current protection for the supply side connected conductors shall be located within 10 feet of the connection to the service. 705.31 DGrounded conductor shall be routed with ungrounded conductors to PV Service disconnecting means as per 250.24(C) if "Supply Side" option is used. For "Supply Side option" Continuous or irreversibly spliced Grounding Electrode Conductor installed per 250.24(D). Grounding Electrode Conductor shall be specified as per 250.64 and sized per 250.66 10 The following label is required on meter can and main panelboard "Services fed from dual power sources Utility and Photovoltaic system" 11 "PV input Do not relocate this OCPD" label required adjacent to backfed breaker. 705.12(d)(7) 12 Bonding of module to rail and module to module accomplished through WEEB washers or self grounding mid -clamps. 13 "Warning: DC conductors of this system are ungrounded and may be energized" required on the DC Disconnect 690.35F 14. "Warning: Photovoltaic Power Source" label required on conduit per 690.31 (E)(3)(4) 15. Total voltage drop %for all circuits based on listed conductors is 1.65%based on: A. 100 foot round trip PV wire open air run to Nema 3R junction box B. 150 round trip source circuits (THWN-2) to termination in DC disconnect C. 30 feet round trip Inverter Output circuit to point of interconnection. D. Conductors should be sized for max 2%voltage drop to decrease possible inverter shutdown and production losses due to AC voltage rise at the inverter. TUV Power controlled: TUVRheinlanE Lowest measuring tolerance in industry Every component is tested to meet 3 times IEC requirements J Designed to withstand heavy accumulations of snow and ice J NO Sunmodule Plus: Positive performance toleranceJ1 a,.25-year linear performance warranty and 10-year product warranty r- Glass with anti -reflective coating J World -class quality9Y Fully -automated production lines and seamless monitoring of the process and Qua6Pied,IEC6i215 sore*r ee.cea, IE<bn5o Blowing sanJ resistance, IEC 6006836Hoe .Ammonlarevrvban<e.iEtfi1„s material ensure the quality that the company sets as its benchmark for its sites P°ed<S;P-I., C6°°' e Us worldwide. I •reaeaii:r dro ruwer<mvroned UL 1703 SolarWorld Plus -Sorting ovn.«w"' Plus -Sorting guarantees highest system efficiency. SolarWorld only delivers modules Home Innovation that have greater than or equal to the nameplate rated power. 25-year linear performance guarantee and extension of product warranty to 10 years SolarWorld guarantees a maximum performance digression of 0.7% p.a. in the course j of 25years, a significant added value compared to the two-phase warranties common in the industry, along with our industry -first 10-year product warranty." Solar cells manufactured in U.S.A. or Germany. Modules assembled in U.S.A. in accordance with the applicable SolarWorld Limited Warranty at purchase. www.solarworld.com/warranty solarworld.com Sunmodule;//Plus SW 285-300 MONO REALVALUE PERFORMANCE UNDER STANDARD TEST CONDITIONS (STC)* SW 285 SW 290 SW 295 SW 300 Maximum power Pm„ 285 Wp 290 Wp 295 Wp 300 Wp Open circuit voltage V_ 39.7 V 39.9 V 40.0 V 40.1 V Maximum power point voltage VmPp 31.3 V 31.4 V 31.5 V 31.6 V Short circuit current 1„ 9.84 A 9.97 A 10.10 A 10.23 A .. Maximum power point current -PP 9.20 A 9.33 A 9.45 A 9.57 A Module efficiency ri , 17.00 % 17.30 % 17.59 % 17.89 STC: 1000W/m=, 25'C, AM L5 PERFORMANCE AT 800 W/M1, NOCT, AM 1.5 SW 285 SW 290 SW 295 SW 300 Maximum power Pm„ 213.1 Wp 217.1 Wp 220.5 Wp 224.1 Wp Open circuit voltage Vp, 36.4 V 36.6 V 36.7 V 36.9 V Maximum power point voltage V-P 28.7 V 28.8 V 28.9 V 31.1 V Short circuit current I„ 7.96 A 8.06 A 817 A 8.27 A Maximum power point current ImPp 7.43 A 7.54 A 7.64 A 7.75 A Minor reduction in efficiency under partial load conditions at 25 °G at 200 W/m', 100%of the STC efficiency (1000 W/m=) is achieved. COMPONENT MATERIALS 1000 W/m= Cells per module 60 Front Low -iron tempered glass 800 W/m with ARC (EN 12150) a 6-6-0 m= Monocrystalline Cell type 5-busbar Frame Clear anodized aluminum a00 w/m= Cell dimensions 6.17 in x 6.17 in 156.75 x 156.75 mm) Weight 39.7 Ibs (18.0 kg) THERMAL CHARACTERISTICS ADDITIONAL DATA 100 W/m= r NOCT 46 °C Powersorting -0 Wp/+5 Wp V_ Moavl.-It.ge[v] TCI„ 0.04%/°C 1-60x IP65 TCVo, 0.30 % / °C Connector PV wire per UL4703 37.8 (961) with H4/UTX connectors 4.20 00 C Module fire performance (UL 1703) Type 1 106.65) y 4x - Operating temp 40 to +85 7.12 0 0.26 (6.6) 180.85) PARAMETERS FOR OPTIMAL SYSTEM INTEGRATION 00.35(9) 0 Maximum system voltage SC II / NEC 1000 V 0o Maximum reverse current 25 A o+ Number of bypass diodes 3 o + o Design loads" Two rail system 113 psf downward, 64 psf upward a Design loads' Three rail system 178 psf downward, 64 psf upward Design loads' Edge mounting 178 psf downward, 41 psf upward Please refer to the Sunmodule installation instructions for the details associated with these load cases. 0a3I»I Compatible with both "Top -Down" a 00,35(9) 11 32 T 1 and 'Bottom"mounting methods 1Grounding Locations: 287.50) 3o1„I 4locations along the length ofthe I module in the extended flange. I 1.30 (33) j1° hyl All units provided are imperial. SI units provided in parentheses. SoIarworld AG reserves the right to make specification changes without notice. SW-01-751OUS 161006 SolarEdge Single Phase Inverters For North America SE3000A-US / SE380OA-US / SE500OA-US / SE600OA-US I SE760OA-US / SE1000OA-US / SE1140OA-US m www.solaredge.us solar =@@ Single Phase Inverters for North America SE3000A-US SE380OA-US / SE5000A-US / SE6000A-US SE760OA-US SE10000A-US SE1140OA-US m8COA US E -6i j 'US jSE7600A-US OUTPUT Nominal AC Power Output 3000 3800 5000 6000 600 1980 0 208V 11400 VA 5-4' 0-0' .... .... . 7 1. QIPPQ.0. 19Y . ........... . 1 10800 @ 208V Max. AC Power Output 3300 4150 6000 8350 12000 VA OV logs .. ...... AC Output Voltage Min.-Nom.- Max.` 183 - 208 - 229 Vac AC Output Voltage Min.-Nom.-Max. 211 - 240 - 264 Vac AC Frequency M in .-N om,- Max!" : 5 9.3 6 0 6 0.5 Hz Max. Continuous Output Current 12.5 4 0 , 8V .. ................ 16 32 32..........4248 @ 208 ... .... ... .... .... 75 A47.5....... GFDl Threshold .............. Utility Monitoring, Islanding Protection, Country Configurable Thresholds Yes PUT Yes IN_____ M#murnDCPo r(STQ . ... 4050 650 Transformer -less, Ungrounded Yes Max. Input Voltage 1-- .... I—— ........... ...... 0 Vdc Nom. DC Input Voltage o ' ... ............. . 325 @ 208V / 350 @ 240V Vdc 33 @ 208VMax. Input Current(21 9.5 18 34.5 Adc IS.5.(p 2 I .......... Max. Input Short Circuit Current Adc Reverse -Polarity Protection ........... Yes Ground -Fault Isolation Detection i 600kn Sensitivity Maximum Inverter PpciM.. 97.7 9&2 983, 983 1 18 98 CEC Weighted Efficiency 97.5 97 @ 2011V 98 97 5 97 5 97 @ 208V 97.5 @, 2 40Y 9 ........... Nighttime Power Consumption 2.5 4 W ADDITIONAL FEATURES Supported .Communication .Interfaces' ............... RS485, RS232, Ethernet, ZigBee (optional) Revenue Grade Data, ANSI C12.1 optional") Rapid Shutdown —NEC 2014 690.12 Yes STANDARD COMPLIANCE Safety UL1741, UL1699B, 1.11-1998, CSA 22.2 I ............ ....... ............ Grid.......... Connect Standards.. ..... ................... IF. E.1. 4.7. ......... Emissions FCC partly class B INSTALLATION SPECIFICATIONS AC output conduit size /AWG range l 3/4" minimum 16-6 AWG 3/4" minimum / 8-3 AWG DC input conduit size ii-of,strings 3/4" minimum 1-2 strings 16-6 AWG 3/4" minimum / 1-3 strings/ AWG ran e j, ..... 14-6 AWG Dimensions with Safety Switch 30.5 x 12.5 x 7.2 775 x 315 x 184 1 30.5 x 12.5 x 10.5 in/ HxWxD775 x 315 x 260 mm Weight with Safety Switch 51.2/23.2 54.7/24.7 88.4/40.1 lb kg Natural convection I Cooling Natural Convection and internal Fans (user replaceable) fan (user re laceable 25 .......................1 < 50 .... Noise Min. -Max. Opera ....... * ................... .... * .................. .. .......................... ting Temperature I 13 to +140 / -25 to +60 (-40 to +60 version available!") Protection Rating NEMA3R dBA F -C Trolar SolarEdge Power Optimizer Module Add -On For North America W EE USA CANADA GERMANY fALY KRANCL JAPAN CHINA NJS!!IIA,!.IA 1-HENHHERLANDS UK SRAPI WWW.solaredge.us solar ® & SolarEdge Power Optimizer Module Add -On for North America P300 / P320 / P400 / P405 P300 P320 P400 P405 for 60-cell modules) (for high -power (for 72 & 96-cell for thin film 60-cell modules) modules) ( modules) INPUT Rated Input DC Powerhl 300 i 320 400 405 W Absolute Maximum Input Voltage j Voc at lowest temperature)!............................... I... 48 80 125 Vdc MPPT O eratin Ran eA.......g..................................................... 8 48 8 80 12.5 - 105 Vdc Maximum Short Circuit Current (Isc) i 10 11 10.1 Adc Maximum DC Input Current 1............................ 12.5 13.75 12:63 Adc Maximum EfficiencY.................... 99.5 Weighted Efficiency ..... 98 Overvoltage Category i II OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) Maximum Output Current 15 1 Adc Maximum Output Voltage i..................................... 60 85 Vdc OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF) Safety Output Voltage per Power Optimizer 1 Vdc STANDARD COMPLIANCE _ EMC — FCC Part15 Class B, IEC61000 6 2, IEC61000.6,3 i ............... Safety..........................................................................IEC62109,1 class 11 safety),. UL1741.......... RoH5 Yes INSTALLATION SPECIFICATIONS Maximum Allowed System Voltage„j...................................................... 1000.........,.. 1.. 1 Vdc Compatible inverters i.................- I........................... All SolarEdge Single Phase and Three Phase inverters Dimensions (W x L x H) 128x152x27.5/ 128x152x35/ 128x152x50/ mm / in 5x5.97x1.08 5x5.97x1.37 5x5.97x196 Weight (including cables) ..................................... 760 / 1.7 .......... I 830 / 1.8 1064 / 2.3 Input Connector I MC4 Compatible........................................... Output Wire Type /Connector Double Insulated; MC4 Compatible ......................................... Output Wire Length ........ ......... ......... 0;95 / 3 0........ ...........................2...3:9..........................m..ft.... Operating Temperature Range.........i.............................................40-+85/ 40+185.....................................,..........'C./.'F. Protection Rating IP68 / NEMA6P Relative Humidity ............................................................................................................................... 0 100 Rated STC power of the module. Module of up to +s% power tolerance allowed. Iw] L LJ C E Q O W U I-- a Z c C7 ra o E NO1ULD z 3 O 3 9 8 7 6 5 4 3 2 ICERTIFYTHATTHE FRAMING OF THIS STRUCTURE WILL SAFELY W HDESIGNEDFORV —2OO MPH., N R i4 eortrMeroa aESPDNS-E TO vEa THE FIT of THIS —v OR TO l«srnuwrloN: IIE 9p wraooln.E MRAv THE FIEDWAPROVIDEDBYT CON—TORcoNTRncloR5H4GOMNCTTNE UNIVERSALPVSTRUCTURALPLANPERASCE-7 ACCOMMODATECALCULATEDAND 11:AACCOMMODATECALCUATEDWNDUPLIFTANDUTERALFORCESAND(00 2014 (5T' EDITION) FLORIDA BUILDING CODE Z ULT— L W BHOWNHEREISBVIEOON Er NEERI TNEMRAYMAYNOTHTASPRO.IEOTEn. sATEwTE IAuoEm slww«MAY HOT coaREcnY INDIUTE I'DPLAN ON FILE. EACH PERMIT PULLED REQUIRES INDIVIDUAL SEALED PLAN.) EOUCCOM SIGNATURE SEALFBCATTESTEDTMYS RISK III, EXPOSURE D. W POTENTIAL CIIPREM SHADING DC PROPERTY. WNTRACIORRESPONB1e TOV BYSUNExPOsuREMIOSW NGOF INSTAUATION—OR TO INST—TION1ONTHISDRAWINGATTHEUPPERRIGHT. V GENERIC PV ROOF MOUNT STRUCTURAL INSTALLATION PLAN. THIS PAPER PLAN 15 INTENDED TO PROVIDE THE ESSENTIAL INFORMATION NEEDED BY AH1 (AUTHORITY HAVING JURISDICTION AKA BUILDING DEPARTMENT) AND INSTALLERS. USERS ARE ENCOURAGED TO ACCESS EV (ELECTRONIC VERSION) OF THIS PLAN. ACTIVE HYPERLINKS ON EV PROVIDE EASY ACCESS TO SUPPLEMENTAL INFORMATION. EV ALSO ALLOWS VIEWER TO STUDY THE PLAN DETAILS AT MAGNIFICATION OF VIEWER CHOICE UP TO 6400%. 1. PLAN USERS ARE INVITED TO SUGGEST PLAN IMPROVEMENTS. 2. ENGINEER OF RECORD (EOR) PREFERS EMAIL allen@gezelmanpe.com 3. THIS 15 A SINGLE SHEET GENERIC STRUCTURAL PLAN. CONTRACTOR SHALL PROVIDE AHJ WITH OEM DOCUMENTATION (INSTALLATION INSTRUCTIONS & DATA SHEETS) FOR EQUIPMENT TO BE USED & WHICH ARE HEREBY ADOPTED AS SUPPLEMENTAL TO THIS PLAN. 4. SEE OEM DOCUMENTS, NOTES, DRAWINGS, & PHOTO IMAGES HEREON FOR MATERIALS, MEANS, & METHODS INFORMATION. 5. CONTRACTOR SHALL IDENTIFY TO AHJ WHICH DETAILS ARE TO BE USED. 6. THIS PLAN MAY BE USED WITH ANY PV MODULE APPROVED BY AN NRTL (NATIONALLY RECOGNIZED TESTING LABORATORY). AXITEC, CANADIAN SOLAR, SOLAR WORLD ARE AMONG THE MANY SUCH - A MORE COMPLETE LISTING MAY BE VIEWED @ http://www.fsec.ucf.edu/en/certification-testing/pv/PVmodules/registered_modutes/index.php 7. THIS PLAN OFFERS MULTIPLE INSTALLATION METHODS. SEE NOTES, OEM DOCUMENTS, DRAWINGS & PHOTOS. a. SHEETING METHOD (SLOPED& LO-SLOPE). b. ADHERED BALLAST METHOD (LO-SLOPE) c. LAG INTO TRUSS/JOIST & SPANNER METHOD. J. STANDING SEAM METAL ROOF. USE CLAMP OF CHOICE; L. ACE. http://www.pmcind.com/aceciamp/ 11. S-5. http://www.s-5.com/clamps/ iiL TRA. http://trasnowandsun.com/product-category/solar-mounting/ 8. SOLAR EQUIPMENT ADDS LESS THAN 4-PSF GRAVITY LOAD TO STRUCTURE. 9. THERE SHALL BE A PV MODULE TO RAIL MOUNTING CLAMP AT EVERY MODULE/RAIL CROSSING POINT WITH MINIMUM 4 CLAMPS PER MODULE, ADJOINING MODULES SHALL SHARE GROUNDING MIDCLAMPS. MODULES MAY BE LANDSCAPE OR PORTRAIT AT CONTRACTOR OPTION. CONTRACTOR SHALL FURNISH END CLAMPS OF CHOICE. 10. PV MOUNTING RAILS MAY BE EXTRUDED ALUMINUM SUCH AS UNIRAC, IRON RIDGE, ETC... IN WHICH CASE, USE OEM SPAN DISTANCES & STRUCTURAL DETAILS. 11. PV MOUNTING RAILS MAY BE STANDARD 14 GAGE, 4-INCH X 2,5-INCH, COLD -FORMED, GALVALUM-COATED STEEL, ZEES/CEEB. INSTALL/LAP RAILS TO DRAIN. FOR SUPPLIER. 12. RAILS SHALL BE INSTALLED PERPENDICULAR TO ROOF FRAMING. 13. STEEL RAILS SHALL NOT CANTILEVER BEYOND OUTSIDE OF END ROOF ATTACHMENT BY MORE THAN 4-FEET. 14, ALUMINUM RAILS 1-FT MAX OUTSIDE END CANTIVER. 15. SHEETING METHOD: a. RAILS SHALL ATTACH TO ROOF THRU L-FEET ATTACHED TO 4-INCH SQUARE X 1/8-INCH THICK GALVANIZED STEEL, SHEETING -ONLY, SELF -FLASHING, ROOF ATTACHMENT PLATES. PLATES SHALL ATTACH TO ROOF SHEETING BY FOUR, #14 X 2-INCH SS SHEET METAL SCREWS. FOR SUPPLIER b. SHEETING -ONLY PLATES INSTALLED AS HEREIN SPECIFIED HAVE UNDERGONE EXTENSIVE TESTING, RESULTS GIVE FOLLOWING MAXIMUM ALLOWABLE UPLIFT PER ROOF ATTACHMENT ON ROOFS BUILT SINCE INTRODUCTION OF 2001 ITLORIDA BUILDING ON 1 MARCH 2O02: (POUNDS/ROOF ATTACHMENT) SHINGLE 1200, STANDING SEAM CLAMPS 600, V-CRIMP/PBR ON SHEETED DECK 1200, TILE 900, LEGACY ROOFS (BUILT BEFORE 2001 FBC) 900-POUNDS OR INSITU TEST VALUE. 16. MAX SPANS IN FLORIDA FOR SPECIFIED STEEL RAILS ON 12004 ROOF (REDUCTION FACTOR 0-75/900, O.5/600) a. NORTH OF STATE ROAD (511 PZ1=16, PZ2=14, PZ3=12 b. BETWEEN SR 44 & SR 70; PZ1=14, PZ2=12, PZ3=10 c. BETWEEN SR 70 & SR 80; PZ1=12, PZ2=10, PZ3=8 d. SOUTH OF SR 80; PZ1=10, PZ2=8, P73=6 (NO PZ3 USE IN MIAMI-DADE) e. ABOVE SPANS ARE FOR RSK 11, EXPOSURE B & SHALL BE REDUCED 2-FT IN FXP. C, 4-FT IN EXPOSURE D. 17. INSTALLATIONS ON TILE ROOFS SHALL BE POSITIONED SO ATTACHMENTS ARE OVER LONG DIMENSION MIDDLE OF TILE, CONTRACTOR SHALL USE MINIMUM %-INCH DIAMETER X 1-1/4-INCH TAPCONS, and CONTRACTOR SHALL INJECT DOW FOAM (TILE BOND OR GREAT STUFF) TO FILL CAVITY UNDER TILE BEFORE INSTALLING TAPCONS. NO FLASHING OR ROOF SEALANT REQUIRED UNLESS THERE IS A PENETRATION OF ROOF MEMBRANE 18. CONTRACTOR SHALL PROVIDE ADDITIONAL INFORMATION PER AHJ NEED - WHICH INCLUDES SKETCH SHOWING LOCATIONS: ELECTRIC SERVICE ENTRANCE, MAIN DISTRIBUTION PANEL, PV MODULE ROOF LAYOUT, INVERTER, and PV DISCONNECT, GRID CONNECTION, & OEM DATASHEETS/MANUALS. 01 ENGINEERING NOTES. SAF-. NR rL FOR L-FOOT. l! HEIGHT VARIES. 7- ® MIN. 4 #14 X 2" FOR SMS -SS GALVANIZED 1 OR MIN./,INCH 0 X PLATE \ 1 1-1R A717H TAPCON PER TTACHMENT O EPDM J/ GASKET CARRIAGE BOLT FOR GALVANIZED SQUARE PLATE 02 \ SHEETING. ONLY, SELF -FLASHING ROOF ATTACHMENT SLll£'NR 9 1 8 1 7 GROUNDING - --. PV MODULE -, GROUNDING ID -CLAMPMID -CLAMP PV RAIL 318 - 16 x 3/4 ROOF HEX HEAD BOLT TILE PV RAIL 3/8-16 FLANGE BOLT L-FOOT SS METAL PLATE, - SQUARE OR ROUND ROOF SHEETING EXIST.ROOF _ FOAM EXISTING FRAMING ASPH.SHINGLE FLORIDA PRODUCT ADHESIVE 4- MINIMUM APPROVED SEALANT MINIMUM %INCH 12 X 2-INCH, EXISTING DIAMETER X SS, SMS UNDEPLAYMENT 1-1/4-INCH TAPCON SHINGLE. TILE. SINGLE PLY 03 suu-. NR FLAT TILE ROOF ATTACHMNET C4 scAls N*. PV RAIL APPEARANCE MAY VARY. MID -CLAMP MID -CLAMP B-16x4HEY HEAD BOLT I PV RAIL a - 16 FLANGE BOLT EXIST. PV MODULE PV RAIL ROOF TILE EXIST. METAL DECKING SERRATED L ON ROOF ROOF MOUNT SHEETING ROOF MEMBRANE WATER OPTIONAL PROOFING TILE ROOF STANDOFF EXISTING FRAMING MIN. 4 #14 X 2" SMS -SS WATER PROOFING WITH SONOLASTIC 5/16" CRS. LAG W/ 3" NP- 1 OR EQUAL THREAD EMBEDMENT POLYURETHANE CAULK IN BLOCKING,]DIST, OR TRUSS FRAMING - METAL ROOF ATTACHMENT: BARREL TILE ROOF ATTACHMNET ROOF COVERING COULD BE SHINGLE.TILE, OR SINGLE -PLY. OS SCALE. ITSTIEsULE: NR Y PZ1: ROOF INTERIOR PZ2: ROOF PERIMETER Flat Roof Hip Roof (7° <0 <-27') (MIN. 3' & LEAST OF 40% EAVE HEIGHT OR 10% BUILDING L/W. h PZ3: OUTSIDE CORNERS L& W= PZ2 a = PZ2 WIDTH., h = EAVE HEIGHT. Gable Roof (B _< 7Roof _< 7°) Gable Roof (T < A <- 45') tizones EM zones F.. Camw Zones 07 ASCE 7-111 COMPONENT A CLADDING WIND PRESSURE ZONES. SUIF. NR 6 5 4 y® Proper Flashing Placement TYPICAL SHEETING-0NLY,SELF-FLASHING, SOLAR ROOF ATTACHMENT WITH OPTIONAL. TTA REDUNDANT WATERPROOFING.APPEARANCE Ii• w• MAY vMr 4)IM/sDR/RNDIETc. Classic Composition Mounting Instructions COMPLETED LOSL W- OPTIONAL REDUNDANT TARGET 08 l SELF FLASHING ATTACHMENT PHOTOS uLE NR I. manC ACECLAMP TRA MOUNTING CLAMP 4w 1 r SHINGLE MOUNTING INSTRUCTIONS .r APPROVED STANDING SEAM CLAMPS D9 SULf: «R 10 SULE- NR COMPLETED ADHERED BALLAST SYSTEM ADHERED BALLAST MfflT F « _ r TYPICAL GROUNDING MIDCL.AMP. APPEARANCE TMAY VARY. TYPICAL END CLAMP -APPEARANCE MAY VARY PV RAIL SYSTEM, ORIENTATION OTIONAL 4" x8" x16"CONCRETE BLOCK DOW TILE BOND OR EQUAL OPTIONAL TARGET 4" X4" PLATE 4.5" HDG 3/8" 0 DECK SCREWS IF NEEDED TPO ROOF MEMBRANE CARRIAGE BOLT INSULATION 11 ADHERED BALLAST SOLAR ATTACHMENT SYSTEM SUIE NR 3 2 1 -104 ENGINEER ALLEN GEZELMAN 16502 HANNA RD. LUTZ, FLORIDA 33549 A PH. 813 909 1956 AIIen@GezelmanPE.mm www. GezelmanPE. com PE 59180 A 2 3 201 ewu• erAx rAra B DRAFTSMAN: ALPER ICELI al pe riceli@mai I. u sf. a du CONTRACTOR: APPROPRIATE LICENSEE OR OWNER/BUILDER C IN r AI- USPV 17.4. 17) F 1 REQUIRED INSPECTION SEQUENCE Bpg .•1. 9 Gce Adld dress: 2.9G}i Y- c..lc_ 1V&A H I uILDING ]PERMIT min Max .. I ns ectionn Description Footer / Setback Stemwall Foundation / Form Board Survey Slab / Mono Slab Prepour Lintel / Tie Beam / Fill / Down Cell Sheathing — Walls Sheathing — Roof Roof Dry In Frame Insulation Rough In Firewall Screw Pattern Drywall / Sheetrock Lath Inspection Final Solar Final Firewall Final Roof Final Stucco / Siding Insulation Final Final Utility Building Final Door Final Window Final Screen Room Final Pool Screen Enclosure Final Single Family Residence Final Building (Other) ELECTRICAL IP.E12MiIT min Max I ns ectioffi Descri tion Electric Underground Footer / Slab Steel Bond Electric Rough T.U.G. Pre -Power Final Electric Final f`,ff ,wia....kA rY".. , x ... .. a.,,g yw)ct AY'e?`r, {p lc.,ap+.. J.'$.y.yr. 97'l1 CNnaLF {CV;. •.. , 7'•A.:tf.`ilhTv'E i'..i . Y /iVS`t'... min Max Ins ection IIDescn i tion Plumbing Underground Plumbing Sewer Plumbing Tub Set Plumbing Final MECHANICAL 7PERNIIT Min Max Inspection Description Mechanical Rough Mechanical Final Gas Unde Gas Roug Gas Final REVISED: June 2014