HomeMy WebLinkAbout3268 E Lake Mary Blvd; 17-2650; SOLAR PANELSi
1
CITY OF SANFORD
kl AUG 3 2017 BUILDING & FIRE PREVENTION
PERMIT APPLICATION
Application No s
v
Documented Construction Value: $ 13 .00 !T Ol 0D0'%^
o 1N4(A'
Job Address: 3268 E Lake Mary Blvd, Sanford FL 32773 Historic District: Yes MoFN
Parcel ID: 03-20-31-5AY-0000-042E ResidentiaiO Commercial
Type of Work: New ® Addition Alteration Repair Demo Change of Use Move
Description of Work: Install New 5.4KW Photovoltaic Solar Electric, 18 Panels - Solar World SW300
Mono, Solar Edge SE5000A-US Inverter, Ironridge Roof Mount Rail System
Plan Review Contact Person: Jim Smith Title: Permit Consultant
Phone: 813-230-1287 Fax: Email:_ jimcsmith007@gmail.com
Property Owner Information
Name Holcomb, Richard & Kathi Phone: 407-322-9271
Street: 3268 E Lake Mary Blvd Resident of property? : yes
City, State Zip: Sanford FL 32773
Contractor Information
Name Blue Sky Solar Energy; Otto A. Curbelo Phone: 800-588-1950
Street: 15155 W. Colonial Drive #783113 Fax:
City, State Zip: Winter Garden FL 34778 State License No.: EC13004873
Architect/Engineer Information
Name: Phone:
Street: Fax:
v City, St, Zip: E-mail:
Bonding Company: Mortgage Lender:
Address: Address:
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE
RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN
FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF
COMMENCEMENT.
Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has
commenced prior to the issuance of a permit and that all work will be performed to meet standards of all laws regulating construction
in this jurisdiction. I understand that a separate permit must be secured for electrical work, plumbing, signs, wells, pools,
furnaces, boilers, heaters, tanks, and air conditioners, etc.
FBC 105.3 Shall be inscribed with the date of application and the code in effect as of that date: 5" Edition (2014) Florida Building Code
Revised: June 30. 2015 Permit Application • f
NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be
found in the public records of this county, and there may be additional permits required from other governmental entities such as water
management districts, state agencies, or federal agencies.
Acceptance of permit is verification that I will notify the owner of the property of the requirements of Florida Lien Law, FS 713.
The City of Sanford requires payment of a plan review fee at the time of permit submittal. A copy of the executed contract is required
in order to calculate a plan review charge and will be considered the estimated construction value of the job at the time of submittal.
The actual construction value will be figured based on the current ICC Valuation Table in effect at the time the permit is issued, in
accordance with local ordinance. Should calculated charges figured off the executed contract exceed the actual construction value,
credit will be applied to your permit fees when the permit is issued.
OWNER'S AFFIDAVIT: I certify that all of the foregoing information is accurate and that all work will
be done in compliance with all applicable laws regulating construction and zoning.
Signature of Owner/Ageni Dat
Richard Holcomb
Print Owner/Agent's Name
L Lo 211s//-7
Signature of Contractor/Agent DAte
Print Contractor/Agent's Name
K-Igna 1Fe bT'No^La," < e or
JAMES C SMITH
e St 5y°. A 4iy-State F C SMITH
A .
f:'reoo?
MY COMMISSION #FF093721
ao my COMMISSION #FF093721
February 18. 2018EXPIRESFebruary18. 2018, EXPIRES
407) 398-0153 FloridallotaryService.com 701) 398V 53 FlorideNotary Service.com
Owner/Agent is Personally Known to Me or Co 'ractor/Agent is Personally Known to Me or
Produced ID Type of ID Produced ID Type of ID
BELOW IS FOR OFFICE USE ONLY
Permits Required: Building Electrical Mechanical Plumbing[] Gas Roof
Construction Type:
Total Sq Ft of Bldg:
Occupancy Use:
Min. Occupancy Load:
Flood Zone:
of Stories:
New Construction: Electric - # of Amps Plumbing - # of Fixtures
Fire Sprinkler Permit: Yes No # of Heads
APPROVALS: ZONING: UTILITIES:
ENGINEERING: FIRE:
COMMENTS:
Fire Alarm Permit: Yes No
WASTE WATER:
BUILDING: '07 4•5• 17
Revised: June 30, 2015 Pen -nit Application
8/26/2017 SCPA Parcel View: 03-20-31-5AY-0000-042E
Property Record Card
FA
t
e
Parcel: 03-20-31-5AY-0000-042E
Wr i Owner: HOLCOMB RICHARD G & KATHI A
Property Address: 3268 E LAKE MARY BLVD SANFORD, FL 32773
1
Value Summary
2017 Working 2016 Certified
Values Values
Valuation Method Cost/Market Cost/Market
Number of Buildings 1 1
Depreciated Bldg Value $94,859 86,972
Depreciated EXFT Value $1,188 1,250
Land Value (Market) $44,727 44,727
i Land Value Ag
Just/Market Value $140,774 132,949
Portability Adj
Save Our Homes Adj $27,094 21,607
Amendment 1 Adj
P&G Adj $0 0
Assessed Value $113,680 111,342
Tax Amount without SOH: $1,851.00
2016 Tax Bill Amount $1,418.00
Tax Estimator
Save Our Homes Savings: $433.00
TRIM Notice Het
Does NOT INCLUDE Non Ad Valorem Assessments
Legal Description
PT OF LOT 42 DESC AS BEG 20 FT W OF
SE COR OF W 1/2 RUN E 20 FT N TO S
LI OF S 264 FT W TO E LI OF W 109 FT
S 178.3 FTETOAPTN OF BEG STO
BEG (LESS RD ON S)
SANFORD CELERY DELTA
PB 1 PGS 75 & 76
Taxes
Taxing Authority j Assessment Value Exempt Values Taxable Value
County General Fund j 113,680 50,000 63,680
Schools 113,680 ` 25,000 88,680 I
City Sanford 113,680 ` 50,000 63,680
SJWM(Saint Johns Water Management) 1 113,680 50,000 = 63,680
County Bonds 113,680 50,000 63,680
Sales
Description Date Book Page Amount
I
Qualified 1 Vac/Imp
QUIT CLAIM DEED 2/1/2016 08632 0818 100 No Improved
I CORRECTIVE DEED 11/1/2013 08162 0616 j 100 '.. No
I....
Improved
ORDER OF TAKING 11/1/2003 05104 02.5.2 100 No Vacant
QUIT CLAIM DEED 11/1/1995 03007 0 008 1 12,000 No Vacant
SPECIAL WARRANTY DEED 10/1/1995 02090 0014 964,100 Yes Vacant
Find C><arnpzrt r.
3
Land
Method Frontage Depth Units Units Price I Land Value
http://parceldetaii.scpafl.org/ParceiDetaillnfo.aspx?PID=0320315AY0000042E 1/2
Blue Sky Solar Energy LLC
Installation Agreement
15 1 SS W. C0!0n1jj or.
783113
W nter CiArdito• Ft, 34718
BLUE SKY I
fw
CC13063$73
InIo4pbluelkytols senergy,ctim
rra.bltt kytols.e r y.t r
800-588.1950
970 take C.i,r'1«!ri
3rd f:0or
St. Petcmburr, 11. 33716
o,+te tj r
R •
fMt 1 y "" r r 4 t• 1.'' ... , ' r r
Address;
Zop COdC:
1i:3 4,e,
County: o,M! 1-i3 1
Watts Of War PaAvr 280 to 340 watt per panel (depends of ava+lib-'ay and spue)
Y llmwler -SS tr , L- tirorwtor
Sunny Island (fluttery"up) 4S :$-us, 6049,us Number Of Flatteries
Ground Mount of uncicr ,r nd wire a rom the m
l Roof f.lount Sh:nglC ' To Barrel T to flat h!etal S5 !.!etst SV
wi hg r panel; and Inverter-. included
20 Watt solar attic fan up to 2C.,q t/ 3O Watt solar fan up to 2&00 sq ft
r ^ n. Ca3 premium
t ue Sky SoUr Energy ti.0 has no control vecr the Po -over compaVs t,nv f rame to coc«nrct,on to tht trill. Vve Sky Sots Energy
ttC'w pr a fria:cri? f, deigns ar}d factory cng.netrwna. g;,,rc S:y So:ar Energy LLC ism noway re;ponutke for federal tax
credits, State or Foyter Comparr3• rebates. &'ve Sky SOW EWgy ttC has in no way 0,-uarantetd nVM00y w-r-t on the po-%vt b.',l,
rc l9d:Cs or sd'iiry-s to the s?;d homeowner.
5 ' Total Contract Amount Owner Agrcc°s to Pay to Contractor: payment as Fo!"o-az.
1) 5 _ Dep osrt upon signing of tMContract; Cacho Checko Bank Draw
2) S 24 Draw due upon
3) S l_l Balar e due upon cornp!etAon o' job Job to btu financed: Y(--.t,ioO
Gent Card r~ Visa Master Card D.-,cover AhlX
Expiration Dite CV[ 3 or 4 diet a Bank Draw
Drivers Lice r,sc' No. l uc Date a S j fxp Date a'' f 1
Drivers License No. Issue Date Exp Date State _
Credit Card Authoriration(s) Signed:
u, the buyer, may cancel this transaciion at arty tlrni prior to midnight of the third buNiness day after the date of
is transaction. See the atUched notice of cancellation form for an explanation of this right.
3 r:OT S!Gti THIS CO'ITR:.CT IF BL',,,iK. YOU ARE ENTITLED TO A COPY OF THE CO'NTR,ICT AT THE TIME OF SIGNING. OWNER
R%!tiG BEL0',y REPRESEUTS THAT HE/SHE IS AUTHORIZED TO EXECUTE THIS CONTRACT.
7 H /SITE V.A.
S7/,,,C. o$ .
EO BY T -E CO'1 Ri Or '.IiH A COPY OF THIS CONTRACT.
l,rI..rter. X_Homeowner: X
j", C/ Sky Solar Energy Representative: X
1
BY SIGN114G BELOW OWNER CER11FtES
N I 119111111111111111111111111111111111 fill fill
GRANT NAI..OY7 SENINOLE COUNTY
CLERK OF CIRCUIT COURT & CONF'TROLLER
O'!' 89,82 Pq 109 (1Pis)
Permit Number CLERK'S v 2017088327
Tax Folio/Parcel ID: 03-20-31-5AY-0000-042E RECORDED 08/:.11/21317 09:47:41 ;1N
RECORDING FETES $10.00
NOTICE OF COMMENCEMENT RECORDED BY hdevore
THE UNDERSIGNED hereby gives notice that improvement will be made to certain real property, and in accordance with Chapter
713, Florida Statutes, the following information is provided in this Notice of Commencement:
1. Description of property: (legal description of property, and street address if available) PT OF LOT 42 DESC AS BEG 20 FT W OF SE
COROFW1/2RUN E20ffNTOSLIOFS264FTWTOELIOFW109FTS178.3FTETOAPTNOFBEG STO BEG LESS
RD ON S SANFORD CELERY DELTA PB 1 PGS 75 & 76 3268 E Lake Mary Blvd, Sanford FL 32773 2. General
description of Improve.1 ent:
Install
New Photovoltaic Solar 3.Owner
information: a. Name
and address: Holcomb, Richard & Kathi 3268 E Lake Mary Blvd Sanford FL 32773 b. Phone
number: 407-322-9271 c. Name
and address of fee simple titleholder (if other than owner): 4. Contractor:
a. Name
and address: Blue Skv Solar Enerlay. 1S1SS W. Colonial Drive #793113_ Winter (TardPn PT. 3477R b. Phone
number: t 5. Surety:
a. Name
and address: b. Amount
of bond $: 6. Lender:
a. Name
and address: b. Phone
number: 7. Persons
within the State of F 713.13(
1)(a)7,Florida Statutes: a. Name
and address: N/A b. Phone
number: 8. In
addition to himself, owner b), Florida
Statutes: a. Name
and address: N/ A c. Phone
number: W"q,
designatedby
Owner upon whom notices or other documents may be served as the following
person(s) to receive a copy of the Lienor's Notice as provided in Section 713.13(1) b. Phone
number: 9. The
expiration date of the notice if commencement is one (1) year from the date of recording unless a different date is specified WARNING TO
OWNER: ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT
AREI CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713, PART 1, SECTION 713.13,
FLORIDA STATUTES, AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVMENTS TO YOUR PROPERTY. A
NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST
INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE
COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. e d,
Q l Cldrx[ Owner Signature of
Owner or Owner's Authorized Officer/Director/Partner/Manager Signatory's Title/Office STATE OF
FLORIDA, COUNTY OF SEMINOLE The foregoing
instrument was ackno Iwdged before me this 15 day of AUgUSt 20 17 by Holcomb,
Richard (name of person) as Owner (type of authority: e.g., officer, trustee, attorney in fact) for (name
of party on behalf of whom instrument was executed), who is personally know to me or who has
produced as identification x •, JAMES
C SMITH i My
COMMISSION #FFO93721 E ? EXPIRES
February 18. 2018 407) 398-
0153 James Smith
8604 E
Sligh Ave Tampa FL
33610 g.atN.
tru b ay PVerificationPursuant
to Section 92.525, Florida Statutes Under penalties
of perjury, I declare that I have read the foregoing and that the
facts stated in are true to the best of my knowledge and belief Signature of
Natural Person Signing Above
LIMITED POWER OF ATTORNEY
Altamonte Springs, Casselberry, Lake Mary, Longwood, Sanford,
Seminole County, Winter Springs
Date: 8/30/2017
I hereby name and appoint: James Smith
an agent of. Blue Sky Solar Energy
Name of Company)
to be my lawful attorney -in -fact to act for me to apply for, receipt for, sign for and do all things
necessary to this appointment for (check only one option):
IX The specific permit and application for work located at:
3268 E Lake Mary Blvd, Sanford FL 32773
Street Address)
Expiration Date for This Limited Power of Attorney: 8/30/2018
License Holder Name: Otto A. Curbelo
State License Number: EC13004873
Signature of License Holder:
STATE OF FLORIDA
COUNTY OF U
The foregoing instrument was acknowledged before me this 30day of August ,
20 17, by Otto Curbelo who is rxpersonally known to
me or who has produced as
identification and who did (did not) take an oath.
PATRICIA.A NASRALLAH'
MY COMMISSION # FF24.1 Signature1'62
ot EXPIRES June 17, 2019
i4C7)39P.-0!.53
@ 1i e.con' C] Sri C Q JO S O l `L
Print or type name
euWwio4" lbqauntS3LIIdX3
AVI =>:
Notary Public -State of C= c 4—
CO1Tll111SSlOn No. o 4, VgS'VN
NOISSIWWO0Lya/I3RIl`dd ; '+,' ` My Commission Expires:
Rev. 08.12)
RECORD COPY
5.4KW Photovoltaic Solar Array Project
Holcomb, Richard & Kathi
3268 E Lake Mary Blvd, Sanford FL 3277
4
a
Install New 5.4KW Photovoltaic Solar Electric
18 Panels - Solar World SW300 Mono
Solar Edge SE5000A-US Inverter
Ironridge Roof Mount Rail System
ASIDE ANY OF THE
CODES, NOR SHALI
THE BUILDING
REQUIRING A COI
CONSTRUCTIOt
Blue Sky Solar Energy
Otto Curbelo - EC13004873
15155 W. Colonial Drive #783113,
Winter Garden FL 34778
Phone: (561) 441-1592
J\DING
ottocurbelo@gmail.com
SAP FDRD
Panel Placement
Area
18 Panels
Roof Mounted
Flush)
LIVED FORrODF COMPLIANCE
PLANS EXAMINER
4 5•'
DATE
3UILDING DIVISION
HALL. BE CONSTRUED TO BE A
D WITH THE WORK AND NOT AS
LATE, CANCEL, ALTER OR SET
ROVISIONS OF THE TECHNICAL
SSUANCE OF A PERMIT PREVENT
FFICIAL FROM THEREAFTER
ECTION OF ERRORS IN PLANS,
R VIOLATIONS OF THIS CODE
PROPERTYVIEW
PHOTOVOLTAIC SYSTEM APPROVAL CERTIFICATE
AWARDEDFSEC aBlueSkySolar Energy
1155 W. Colonial Dr., #783113
Winter Garden, FL 34778
http://www.blueskysolarenergy.com/
CERTIFICATION #: BT-17-02834
DESIGNATION: SE5000Awith SW300
SYSTEM SIZE: 6,600 Wdc
DATE: 2017-08-14
EXPIRATION: 2022-08-14
Module Manufactuer Module Model FSEC Registration Number Strings" Shortest String' Longest String" Total
SolarWodd Sunmodule Plus SW300 Mono SW15-ACTL-0439 2 8 14 22
Inverter Manufacturer Inverter Model Min. Input Voltage Max. Input Voltage Max DC Input AC Power Rating Output Voltage
SolarEdge SE5000A-US 250 V 500 V 6,250 W 5,000 W 240 V
Charge Controller Manufacturer Charge Controller Model 113attery Manufacturer 113attery Model 113atteril Type ICapacity (C120 rate) Quantity
N/A N/A INA INA N/A INA N/A
Review Comments
Inspection
Electrical Design (Verify the following items for agreement between the installed components and the supplied electrical schematic.)
Size, type and location of all conductors in the PV system;
Conduit, raceways, junction boxes, and combiner boxes;
Size, current rating, voltage ratings, and location of all over -current protection devices;
Rating and location of all disconnects;
Point of connection to the utility;
PV module and equipment grounding system (including conductor size);
PV DC circuit and system grounding (including grounding electrode conductor size);
e Ground fault detection & interrupter (GFDI) rating and location;
Battery wiring and cable sizes (if applicable).
Inspector Name (printed) Inspector Signature Date
Installer Information and Certification
Company Name: Website:
Address: Phone Number:
Florida Contractor License Number:
Florida Contractor License Type:
Solar Electrical Other, please specify:
I hereby certify that this PV system has been installed in full accordance with the National Electrical Code.
Installer Name (printed) Installer Signature Date
Note: FSEC approvals do not replace or exempt any requirements of electrical utilities or local jurisdiction authorities in matters such as permitting, inspections, or utility interconnection
agreements as required for PV system installations. When referring to FSEC approvals in any documentation produced by the supplier, including technical or marketing information, the following
statement shall In. includerl'
The photovoltaic system design described in this manual, when properly installed and maintained, meets the
minimum recommended practices established by the Flonda Solar Energy Center. This 'approval' does not imply
endorsement or warranty of this product by the Florida Solar Energy Center or the State of Florida."
SolarTesti &Certification oordinator
6600 Watt DC Photovoltaic System Electrical Diagram
Solaredge SE 5000A-US Inverter with
Two Strings of Solarworld SW300 Modules and Solaredge P300 Optimizers
Optional Supply Side Connection
Tutmwne. NEC705.12A Solarworld
Sw300 sw-
L+ Modules r 300
N M
6 bare cop+er
GEC f3) H 6 Utility mar
THHNlrHWN•2 mun
3/d" PVC conduN 4) #10 AWG PV wi
60 A fused 1) #6 Bare Copper
disconnect with
30A fuses
e,ye„y Main Distribution
dam Panel
aeco-ade W-
300
150A Panelboard
with 150A main
150A-2
O
10 OO (4) #10 AWG THHN/THWN-2
1) #8 AWG THHN/THWN-2
Nema 3R 2-B, 2-R, 1-G
11
30A/2 Junction 3/4" EMT, FMC(inside structur
LFNC, PVC (outside structure)
Box
690.31 E
iIe_ Solaredge SE5000A-US
Transformerless Inverter v
D
existing
integrated DC disconnect. Q 1 Ac
grounding Lj
electrode i (3) #10 AWG THHN/THWN-2
i 1-B,1-R,1-W
1) #8 AWG THHN/THWN-2
b 1-G
I N _ - _ _ _ - : 3/4" EMT, FMC, LFNC, or PV
1-B, 1-R, 1-W
1) #8 AWG THHN/THWN-2
1-G
3/4" EMT, FMC, LFNC, or P'
If required by Utility
30A 240V AC Disconnect with label : 13
On -site Utility Generation DC Disconnect Label
Disconnect Switch Requirements
Vmpp 350 vdc
PV AC Disconnect Label Requirements Vmax 500 vdc
Operating Current:21A Impp 15.5A
Operating Voltage: 240V Imax 30 A
Drawn by Matthew Corona -Corona solar Consultants,LLC
maximum if moaufes per
string and minimum 8 modt
1]4 per string as per Solaredge
olaredae P300
Factory
DC leads I Factory Cable I
8
Solaredge P300 Power Optimizer
N ° N N
Max input power: 300 Wp-dc
Max. Input DC Voltage: 48 VDC
Max Input current: 12.5A
MPPT Range: 8-48 VDC
Max Output Voltage: 60 VDC
Max Output current: 15A
Module Specifications
Pmax: 300 Wp
Voc: 40.0 V
Vmpp: 32.6 V
Isc: 9.83 A
Impp: 9.31 A
Notes: All work to meet or exceed NEC 2011
DJunction box to be located within the array boundary. Junction box must be minimum Nema 311 UL listed
enclosure. Free air conductors must be installed in raceway if readily accessible as per 690.31(A).
The minimum volume of the Nema 3R enclosure for the transition of PV wire to THWN-2 wire shall be2
42 cubic inches. Heyco 5 wire Masthead gland seals or similar connector are required as strain relief
for PV wire into Nema 3R junction box at array.
Interconnection with 30 Amp 2 pole OCPD via 2011 NEC 705.12(D)(2)Load Side Connection. The 30 A
backfed breaker must be located at the opposite end of the bus from the 150 A main supply breaker
The required PV Backfed breaker plus the main breaker rating must be less than or equal to 120%of
the Main service bus rating . 705.12(D)(2)
DOptional Supply Side connection via 705.12A using parallel line taps in a NEMA 3R box (as required)
using NSI IPCS4002, Ilsco IPC-KUP-L or NSI Tork IPLD 3/0-3 Multi -Tap Connector or equivalent.
DPV service disconnecting means for "optional' supply side connection must have neutral/ EGC bond
within and must be listed as "suitable for use as service equipment." 230.66
The fuses in the disconnect for the"supply side" option must be rated to handle the maximum short-
circuit current available at the supply terminals. 110.9, 110.10 Over -current protection for the supply side
connected conductors shall be located within 10 feet of the connection to the service. 705.31
DGrounded conductor shall be routed with ungrounded conductors to PV Service disconnecting means as
per 250.24(C) if "Supply Side" option is used.
For "Supply Side option" Continuous or irreversibly spliced Grounding Electrode Conductor installed
per 250.24(D). Grounding Electrode Conductor shall be specified as per 250.64 and sized per 250.66
10 The following label is required on meter can and main panelboard "Services fed from dual power sources
Utility and Photovoltaic system"
11 "PV input Do not relocate this OCPD" label required adjacent to backfed breaker. 705.12(d)(7)
12 Bonding of module to rail and module to module accomplished through WEEB washers or self grounding
mid -clamps.
13 "Warning: DC conductors of this system are ungrounded and may be energized" required on the
DC Disconnect 690.35F
14. "Warning: Photovoltaic Power Source" label required on conduit per 690.31 (E)(3)(4)
15. Total voltage drop %for all circuits based on listed conductors is 1.65%based on:
A. 100 foot round trip PV wire open air run to Nema 3R junction box
B. 150 round trip source circuits (THWN-2) to termination in DC disconnect
C. 30 feet round trip Inverter Output circuit to point of interconnection.
D. Conductors should be sized for max 2%voltage drop to decrease possible
inverter shutdown and production losses due to AC voltage rise at the inverter.
TUV Power controlled:
TUVRheinlanE Lowest measuring tolerance in industry
Every component is tested to meet
3 times IEC requirements
J
Designed to withstand heavy
accumulations of snow and ice
J
NO Sunmodule Plus:
Positive performance toleranceJ1
a,.25-year linear performance warranty
and 10-year product warranty
r- Glass with anti -reflective coating
J
World -class quality9Y
Fully -automated production lines and seamless monitoring of the process and
Qua6Pied,IEC6i215
sore*r ee.cea, IE<bn5o
Blowing sanJ resistance, IEC 6006836Hoe .Ammonlarevrvban<e.iEtfi1„s
material ensure the quality that the company sets as its benchmark for its sites P°ed<S;P-I., C6°°' e Us
worldwide. I •reaeaii:r dro
ruwer<mvroned
UL 1703
SolarWorld Plus -Sorting
ovn.«w"'
Plus -Sorting guarantees highest system efficiency. SolarWorld only delivers modules
Home Innovation
that have greater than or equal to the nameplate rated power.
25-year linear performance guarantee and extension of product warranty to 10 years
SolarWorld guarantees a maximum performance digression of 0.7% p.a. in the course j
of 25years, a significant added value compared to the two-phase warranties common
in the industry, along with our industry -first 10-year product warranty."
Solar cells manufactured in U.S.A. or Germany. Modules assembled in U.S.A.
in accordance with the applicable SolarWorld Limited Warranty at purchase.
www.solarworld.com/warranty
solarworld.com
Sunmodule;//Plus
SW 285-300 MONO REALVALUE
PERFORMANCE UNDER STANDARD TEST CONDITIONS (STC)*
SW 285 SW 290 SW 295 SW 300
Maximum power Pm„ 285 Wp 290 Wp 295 Wp 300 Wp
Open circuit voltage V_ 39.7 V 39.9 V 40.0 V 40.1 V
Maximum power point voltage VmPp 31.3 V 31.4 V 31.5 V 31.6 V
Short circuit current 1„ 9.84 A 9.97 A 10.10 A 10.23 A ..
Maximum power point current -PP
9.20 A 9.33 A 9.45 A 9.57 A
Module efficiency ri , 17.00 % 17.30 % 17.59 % 17.89
STC: 1000W/m=, 25'C, AM L5
PERFORMANCE AT 800 W/M1, NOCT, AM 1.5
SW 285 SW 290 SW 295 SW 300
Maximum power Pm„ 213.1 Wp 217.1 Wp 220.5 Wp 224.1 Wp
Open circuit voltage Vp, 36.4 V 36.6 V 36.7 V 36.9 V
Maximum power point voltage V-P 28.7 V 28.8 V 28.9 V 31.1 V
Short circuit current I„ 7.96 A 8.06 A 817 A 8.27 A
Maximum power point current ImPp 7.43 A 7.54 A 7.64 A 7.75 A
Minor reduction in efficiency under partial load conditions at 25 °G at 200 W/m', 100%of the STC efficiency (1000 W/m=) is achieved.
COMPONENT MATERIALS
1000 W/m=
Cells per module 60 Front Low -iron tempered glass
800 W/m with ARC (EN 12150)
a 6-6-0 m=
Monocrystalline
Cell type 5-busbar
Frame Clear anodized aluminum
a00 w/m= Cell dimensions
6.17 in x 6.17 in
156.75 x 156.75 mm)
Weight 39.7 Ibs (18.0 kg)
THERMAL CHARACTERISTICS ADDITIONAL DATA
100 W/m=
r
NOCT 46 °C Powersorting -0 Wp/+5 Wp
V_
Moavl.-It.ge[v] TCI„ 0.04%/°C 1-60x IP65
TCVo, 0.30 % / °C
Connector PV wire per UL4703
37.8 (961) with H4/UTX connectors
4.20 00
C
Module fire performance (UL 1703) Type 1
106.65)
y 4x - Operating temp 40 to +85
7.12 0 0.26 (6.6)
180.85) PARAMETERS FOR OPTIMAL SYSTEM INTEGRATION
00.35(9)
0
Maximum system voltage SC II / NEC 1000 V
0o Maximum reverse current 25 A
o+ Number of bypass diodes 3
o +
o Design loads" Two rail system 113 psf downward, 64 psf upward
a
Design loads' Three rail system 178 psf downward, 64 psf upward
Design loads' Edge mounting 178 psf downward, 41 psf upward
Please refer to the Sunmodule installation instructions for the details associated with these load cases.
0a3I»I Compatible with both "Top -Down"
a 00,35(9)
11 32
T
1
and 'Bottom"mounting methods
1Grounding Locations:
287.50)
3o1„I 4locations along the length ofthe
I module in the extended flange.
I
1.30 (33)
j1° hyl
All units provided are imperial. SI units provided in parentheses.
SoIarworld AG reserves the right to make specification changes without notice. SW-01-751OUS 161006
SolarEdge Single Phase Inverters
For North America
SE3000A-US / SE380OA-US / SE500OA-US / SE600OA-US I
SE760OA-US / SE1000OA-US / SE1140OA-US
m
www.solaredge.us
solar =@@ Single Phase Inverters for North America
SE3000A-US SE380OA-US / SE5000A-US / SE6000A-US
SE760OA-US SE10000A-US SE1140OA-US
m8COA US E -6i j 'US jSE7600A-US
OUTPUT
Nominal AC Power Output 3000 3800 5000 6000 600
1980 0 208V
11400 VA
5-4' 0-0' .... .... .
7
1. QIPPQ.0. 19Y . ........... .
1 10800 @ 208V
Max. AC Power Output 3300 4150 6000 8350 12000 VA
OV logs .. ......
AC Output Voltage Min.-Nom.- Max.`
183 - 208 - 229 Vac
AC Output Voltage Min.-Nom.-Max.
211 - 240 - 264 Vac
AC Frequency M in .-N om,- Max!" : 5 9.3 6 0 6 0.5 Hz
Max. Continuous Output Current 12.5
4 0 , 8V .. ................
16 32 32..........4248 @ 208 ... .... ... .... ....
75 A47.5.......
GFDl Threshold ..............
Utility Monitoring, Islanding Protection, Country Configurable Thresholds Yes
PUT
Yes
IN_____
M#murnDCPo r(STQ . ... 4050 650
Transformer -less, Ungrounded Yes
Max. Input Voltage
1-- .... I—— ........... ......
0 Vdc
Nom. DC Input Voltage
o ' ... ............. .
325 @ 208V / 350 @ 240V Vdc
33 @ 208VMax. Input Current(21 9.5 18 34.5 Adc
IS.5.(p 2 I ..........
Max. Input Short Circuit Current Adc
Reverse -Polarity Protection ........... Yes
Ground -Fault Isolation Detection i 600kn Sensitivity
Maximum Inverter PpciM.. 97.7 9&2 983, 983 1 18 98
CEC Weighted Efficiency 97.5
97 @ 2011V
98 97 5 97 5
97 @ 208V
97.5
@, 2 40Y 9 ...........
Nighttime Power Consumption 2.5 4 W
ADDITIONAL FEATURES
Supported .Communication .Interfaces' ............... RS485, RS232, Ethernet, ZigBee (optional)
Revenue Grade Data, ANSI C12.1 optional")
Rapid Shutdown —NEC 2014 690.12 Yes
STANDARD COMPLIANCE
Safety UL1741, UL1699B, 1.11-1998, CSA 22.2
I ............ ....... ............
Grid.......... Connect Standards.. ..... ................... IF. E.1. 4.7. .........
Emissions FCC partly class B
INSTALLATION SPECIFICATIONS
AC output conduit size /AWG range
l
3/4" minimum 16-6 AWG 3/4" minimum / 8-3 AWG
DC input conduit size ii-of,strings
3/4" minimum 1-2 strings 16-6 AWG
3/4" minimum / 1-3 strings/
AWG ran e
j, .....
14-6 AWG
Dimensions with Safety Switch 30.5 x 12.5 x 7.2 775 x 315 x 184 1 30.5 x 12.5 x 10.5 in/
HxWxD775 x 315 x 260 mm
Weight with Safety Switch 51.2/23.2 54.7/24.7 88.4/40.1 lb kg
Natural
convection I
Cooling Natural Convection and internal Fans (user replaceable)
fan (user
re laceable
25 .......................1 < 50 .... Noise
Min. -Max. Opera ....... * ................... .... * .................. .. .......................... ting Temperature I
13 to +140 / -25 to +60 (-40 to +60 version available!")
Protection Rating NEMA3R
dBA
F -C
Trolar
SolarEdge Power Optimizer
Module Add -On For North America
W
EE
USA CANADA GERMANY fALY KRANCL JAPAN CHINA NJS!!IIA,!.IA 1-HENHHERLANDS UK SRAPI WWW.solaredge.us
solar ® & SolarEdge Power Optimizer
Module Add -On for North America
P300 / P320 / P400 / P405
P300 P320 P400 P405
for 60-cell modules) (for high -power (for 72 & 96-cell for thin film
60-cell modules) modules) ( modules)
INPUT
Rated Input DC Powerhl 300 i 320 400 405 W
Absolute Maximum Input Voltage j
Voc at lowest temperature)!...............................
I...
48 80 125 Vdc
MPPT O eratin Ran eA.......g..................................................... 8 48 8 80 12.5 - 105 Vdc
Maximum Short Circuit Current (Isc) i
10 11 10.1 Adc
Maximum DC Input Current 1............................ 12.5 13.75 12:63 Adc
Maximum EfficiencY.................... 99.5
Weighted Efficiency ..... 98
Overvoltage Category i II
OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER)
Maximum Output Current 15 1 Adc
Maximum Output Voltage i..................................... 60 85 Vdc
OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF)
Safety Output Voltage per Power
Optimizer
1 Vdc
STANDARD COMPLIANCE _
EMC — FCC Part15 Class B, IEC61000 6 2, IEC61000.6,3 i ...............
Safety..........................................................................IEC62109,1 class 11 safety),. UL1741..........
RoH5 Yes
INSTALLATION SPECIFICATIONS
Maximum Allowed System Voltage„j...................................................... 1000.........,..
1..
1 Vdc
Compatible inverters
i.................-
I...........................
All SolarEdge Single Phase and Three Phase inverters
Dimensions (W x L x H)
128x152x27.5/ 128x152x35/ 128x152x50/
mm / in
5x5.97x1.08 5x5.97x1.37 5x5.97x196
Weight (including cables) ..................................... 760 / 1.7 .......... I 830 / 1.8 1064 / 2.3
Input Connector I MC4 Compatible...........................................
Output Wire Type /Connector Double Insulated; MC4 Compatible .........................................
Output Wire Length ........ ......... ......... 0;95 / 3 0........ ...........................2...3:9..........................m..ft....
Operating Temperature Range.........i.............................................40-+85/ 40+185.....................................,..........'C./.'F.
Protection Rating IP68 / NEMA6P
Relative Humidity ............................................................................................................................... 0 100
Rated STC power of the module. Module of up to +s% power tolerance allowed.
Iw]
L
LJ
C E
Q O
W U
I-- a
Z c
C7 ra
o E
NO1ULD
z 3
O 3
9 8 7 6 5 4 3 2
ICERTIFYTHATTHE FRAMING OF THIS STRUCTURE WILL SAFELY W HDESIGNEDFORV —2OO MPH., N R i4 eortrMeroa aESPDNS-E TO vEa THE FIT of THIS —v OR TO l«srnuwrloN: IIE 9p wraooln.E MRAv
THE FIEDWAPROVIDEDBYT CON—TORcoNTRncloR5H4GOMNCTTNE
UNIVERSALPVSTRUCTURALPLANPERASCE-7 ACCOMMODATECALCULATEDAND 11:AACCOMMODATECALCUATEDWNDUPLIFTANDUTERALFORCESAND(00 2014 (5T' EDITION) FLORIDA BUILDING CODE Z ULT— L W
BHOWNHEREISBVIEOON
Er NEERI TNEMRAYMAYNOTHTASPRO.IEOTEn. sATEwTE IAuoEm slww«MAY HOT coaREcnY INDIUTE
I'DPLAN ON FILE. EACH PERMIT PULLED REQUIRES INDIVIDUAL SEALED PLAN.) EOUCCOM SIGNATURE SEALFBCATTESTEDTMYS RISK III, EXPOSURE D. W POTENTIAL CIIPREM SHADING DC PROPERTY. WNTRACIORRESPONB1e TOV BYSUNExPOsuREMIOSW NGOF
INSTAUATION—OR TO INST—TION1ONTHISDRAWINGATTHEUPPERRIGHT. V
GENERIC PV ROOF MOUNT STRUCTURAL INSTALLATION PLAN.
THIS PAPER PLAN 15 INTENDED TO PROVIDE THE ESSENTIAL INFORMATION NEEDED BY AH1 (AUTHORITY HAVING
JURISDICTION AKA BUILDING DEPARTMENT) AND INSTALLERS. USERS ARE ENCOURAGED TO ACCESS EV (ELECTRONIC
VERSION) OF THIS PLAN. ACTIVE HYPERLINKS ON EV PROVIDE EASY ACCESS TO SUPPLEMENTAL INFORMATION. EV ALSO
ALLOWS VIEWER TO STUDY THE PLAN DETAILS AT MAGNIFICATION OF VIEWER CHOICE UP TO 6400%.
1. PLAN USERS ARE INVITED TO SUGGEST PLAN IMPROVEMENTS.
2. ENGINEER OF RECORD (EOR) PREFERS EMAIL allen@gezelmanpe.com
3. THIS 15 A SINGLE SHEET GENERIC STRUCTURAL PLAN. CONTRACTOR SHALL PROVIDE AHJ WITH OEM
DOCUMENTATION (INSTALLATION INSTRUCTIONS & DATA SHEETS) FOR EQUIPMENT TO BE USED & WHICH ARE HEREBY
ADOPTED AS SUPPLEMENTAL TO THIS PLAN.
4. SEE OEM DOCUMENTS, NOTES, DRAWINGS, & PHOTO IMAGES HEREON FOR MATERIALS, MEANS, & METHODS
INFORMATION.
5. CONTRACTOR SHALL IDENTIFY TO AHJ WHICH DETAILS ARE TO BE USED.
6. THIS PLAN MAY BE USED WITH ANY PV MODULE APPROVED BY AN NRTL (NATIONALLY RECOGNIZED TESTING
LABORATORY). AXITEC, CANADIAN SOLAR, SOLAR WORLD ARE AMONG THE MANY SUCH - A MORE COMPLETE LISTING MAY
BE VIEWED @ http://www.fsec.ucf.edu/en/certification-testing/pv/PVmodules/registered_modutes/index.php
7. THIS PLAN OFFERS MULTIPLE INSTALLATION METHODS. SEE NOTES, OEM DOCUMENTS, DRAWINGS & PHOTOS.
a. SHEETING METHOD (SLOPED& LO-SLOPE).
b. ADHERED BALLAST METHOD (LO-SLOPE)
c. LAG INTO TRUSS/JOIST & SPANNER METHOD.
J. STANDING SEAM METAL ROOF. USE CLAMP OF CHOICE;
L. ACE. http://www.pmcind.com/aceciamp/
11. S-5. http://www.s-5.com/clamps/
iiL TRA. http://trasnowandsun.com/product-category/solar-mounting/
8. SOLAR EQUIPMENT ADDS LESS THAN 4-PSF GRAVITY LOAD TO STRUCTURE.
9. THERE SHALL BE A PV MODULE TO RAIL MOUNTING CLAMP AT EVERY MODULE/RAIL CROSSING POINT WITH
MINIMUM 4 CLAMPS PER MODULE, ADJOINING MODULES SHALL SHARE GROUNDING MIDCLAMPS. MODULES MAY BE
LANDSCAPE OR PORTRAIT AT CONTRACTOR OPTION. CONTRACTOR SHALL FURNISH END CLAMPS OF CHOICE.
10. PV MOUNTING RAILS MAY BE EXTRUDED ALUMINUM SUCH AS UNIRAC, IRON RIDGE, ETC... IN WHICH CASE, USE OEM
SPAN DISTANCES & STRUCTURAL DETAILS.
11. PV MOUNTING RAILS MAY BE STANDARD 14 GAGE, 4-INCH X 2,5-INCH, COLD -FORMED, GALVALUM-COATED STEEL,
ZEES/CEEB. INSTALL/LAP RAILS TO DRAIN. FOR SUPPLIER.
12. RAILS SHALL BE INSTALLED PERPENDICULAR TO ROOF FRAMING.
13. STEEL RAILS SHALL NOT CANTILEVER BEYOND OUTSIDE OF END ROOF ATTACHMENT BY MORE THAN 4-FEET.
14, ALUMINUM RAILS 1-FT MAX OUTSIDE END CANTIVER.
15. SHEETING METHOD:
a. RAILS SHALL ATTACH TO ROOF THRU L-FEET ATTACHED TO 4-INCH SQUARE X 1/8-INCH THICK GALVANIZED STEEL,
SHEETING -ONLY, SELF -FLASHING, ROOF ATTACHMENT PLATES. PLATES SHALL ATTACH TO ROOF SHEETING BY FOUR, #14 X
2-INCH SS SHEET METAL SCREWS. FOR SUPPLIER
b. SHEETING -ONLY PLATES INSTALLED AS HEREIN SPECIFIED HAVE UNDERGONE EXTENSIVE TESTING, RESULTS GIVE
FOLLOWING MAXIMUM ALLOWABLE UPLIFT PER ROOF ATTACHMENT ON ROOFS BUILT SINCE INTRODUCTION OF 2001
ITLORIDA BUILDING ON 1 MARCH 2O02: (POUNDS/ROOF ATTACHMENT) SHINGLE 1200, STANDING SEAM CLAMPS 600,
V-CRIMP/PBR ON SHEETED DECK 1200, TILE 900, LEGACY ROOFS (BUILT BEFORE 2001 FBC) 900-POUNDS OR INSITU TEST
VALUE.
16. MAX SPANS IN FLORIDA FOR SPECIFIED STEEL RAILS ON 12004 ROOF (REDUCTION FACTOR 0-75/900, O.5/600)
a. NORTH OF STATE ROAD (511 PZ1=16, PZ2=14, PZ3=12
b. BETWEEN SR 44 & SR 70; PZ1=14, PZ2=12, PZ3=10
c. BETWEEN SR 70 & SR 80; PZ1=12, PZ2=10, PZ3=8
d. SOUTH OF SR 80; PZ1=10, PZ2=8, P73=6 (NO PZ3 USE IN MIAMI-DADE)
e. ABOVE SPANS ARE FOR RSK 11, EXPOSURE B & SHALL BE REDUCED 2-FT IN FXP. C, 4-FT IN EXPOSURE D.
17. INSTALLATIONS ON TILE ROOFS SHALL BE POSITIONED SO ATTACHMENTS ARE OVER LONG DIMENSION MIDDLE OF
TILE, CONTRACTOR SHALL USE MINIMUM %-INCH DIAMETER X 1-1/4-INCH TAPCONS, and CONTRACTOR SHALL INJECT DOW
FOAM (TILE BOND OR GREAT STUFF) TO FILL CAVITY UNDER TILE BEFORE INSTALLING TAPCONS. NO FLASHING OR ROOF
SEALANT REQUIRED UNLESS THERE IS A PENETRATION OF ROOF MEMBRANE
18. CONTRACTOR SHALL PROVIDE ADDITIONAL INFORMATION PER AHJ NEED - WHICH INCLUDES SKETCH SHOWING
LOCATIONS: ELECTRIC SERVICE ENTRANCE, MAIN DISTRIBUTION PANEL, PV MODULE ROOF LAYOUT, INVERTER, and PV
DISCONNECT, GRID CONNECTION, & OEM DATASHEETS/MANUALS.
01 ENGINEERING NOTES.
SAF-. NR
rL
FOR
L-FOOT.
l!
HEIGHT VARIES.
7- ® MIN. 4 #14 X 2"
FOR
SMS -SS
GALVANIZED 1 OR MIN./,INCH 0 X
PLATE \
1
1-1R A717H TAPCON
PER TTACHMENT
O
EPDM J/
GASKET
CARRIAGE
BOLT
FOR GALVANIZED
SQUARE PLATE
02 \ SHEETING. ONLY, SELF -FLASHING ROOF ATTACHMENT
SLll£'NR
9 1 8 1 7
GROUNDING - --. PV MODULE -,
GROUNDING
ID -CLAMPMID -CLAMP
PV RAIL
318 - 16 x 3/4 ROOF
HEX HEAD BOLT TILE
PV RAIL
3/8-16
FLANGE BOLT
L-FOOT
SS METAL PLATE, -
SQUARE OR ROUND
ROOF
SHEETING
EXIST.ROOF _ FOAM
EXISTING
FRAMING
ASPH.SHINGLE FLORIDA PRODUCT ADHESIVE
4- MINIMUM APPROVED SEALANT
MINIMUM %INCH
12 X 2-INCH, EXISTING
DIAMETER X
SS, SMS UNDEPLAYMENT
1-1/4-INCH TAPCON
SHINGLE. TILE. SINGLE PLY
03 suu-. NR
FLAT TILE ROOF ATTACHMNET
C4 scAls N*.
PV RAIL APPEARANCE MAY VARY.
MID -CLAMP MID -CLAMP
B-16x4HEY HEAD BOLT I PV
RAIL a - 16 FLANGE BOLT EXIST.
PV
MODULE PV RAIL ROOF
TILE EXIST.
METAL DECKING
SERRATED
L ON ROOF ROOF
MOUNT SHEETING ROOF
MEMBRANE WATER OPTIONAL
PROOFING TILE
ROOF STANDOFF
EXISTING FRAMING MIN.
4 #14 X 2" SMS -SS WATER
PROOFING WITH
SONOLASTIC 5/16" CRS. LAG W/ 3" NP-
1 OR EQUAL THREAD EMBEDMENT POLYURETHANE
CAULK IN BLOCKING,]DIST, OR
TRUSS FRAMING -
METAL ROOF ATTACHMENT: BARREL
TILE ROOF ATTACHMNET ROOF COVERING COULD BE SHINGLE.TILE, OR SINGLE -PLY. OS
SCALE. ITSTIEsULE: NR Y
PZ1: ROOF INTERIOR PZ2:
ROOF PERIMETER Flat
Roof Hip Roof (7° <0 <-27') (MIN. 3' & LEAST OF 40% EAVE HEIGHT
OR 10% BUILDING L/W. h
PZ3: OUTSIDE CORNERS L&
W= PZ2 a =
PZ2 WIDTH., h = EAVE HEIGHT. Gable
Roof (B _< 7Roof _< 7°) Gable Roof (T < A <- 45') tizones
EM zones F..
Camw
Zones 07
ASCE 7-111 COMPONENT A CLADDING WIND PRESSURE ZONES. SUIF.
NR 6
5 4 y®
Proper
Flashing Placement TYPICAL
SHEETING-0NLY,SELF-FLASHING, SOLAR
ROOF ATTACHMENT WITH OPTIONAL. TTA
REDUNDANT WATERPROOFING.APPEARANCE Ii•
w• MAY vMr 4)IM/sDR/RNDIETc. Classic
Composition Mounting Instructions COMPLETED
LOSL W-
OPTIONAL REDUNDANT TARGET 08
l SELF FLASHING ATTACHMENT PHOTOS uLE
NR I.
manC
ACECLAMP TRA MOUNTING CLAMP 4w
1
r
SHINGLE
MOUNTING INSTRUCTIONS .r
APPROVED
STANDING SEAM CLAMPS D9
SULf: «R 10 SULE- NR COMPLETED
ADHERED BALLAST SYSTEM ADHERED BALLAST MfflT
F « _
r
TYPICAL
GROUNDING
MIDCL.AMP.
APPEARANCE TMAY VARY. TYPICAL END
CLAMP -APPEARANCE MAY VARY PV RAIL
SYSTEM, ORIENTATION OTIONAL 4" x8"
x16"CONCRETE BLOCK DOW TILE
BOND OR EQUAL OPTIONAL TARGET
4" X4"
PLATE 4.5"
HDG 3/8" 0 DECK SCREWS
IF NEEDED TPO ROOF
MEMBRANE CARRIAGE BOLT
INSULATION 11
ADHERED
BALLAST SOLAR ATTACHMENT SYSTEM SUIE NR
3 2
1 -104
ENGINEER
ALLEN
GEZELMAN
16502 HANNA
RD. LUTZ, FLORIDA
33549 A PH.
813
909 1956 AIIen@GezelmanPE.mm
www. GezelmanPE.
com PE 59180
A 2
3 201 ewu• erAx
rAra
B
DRAFTSMAN: ALPER
ICELI
al pe
riceli@mai I. u sf. a du CONTRACTOR: APPROPRIATE
LICENSEE
OR
OWNER/BUILDER
C IN
r
AI-
USPV
17.4.
17) F 1
REQUIRED INSPECTION SEQUENCE
Bpg .•1. 9 Gce Adld dress: 2.9G}i Y- c..lc_ 1V&A H
I uILDING ]PERMIT
min Max .. I ns ectionn Description
Footer / Setback
Stemwall
Foundation / Form Board Survey
Slab / Mono Slab Prepour
Lintel / Tie Beam / Fill / Down Cell
Sheathing — Walls
Sheathing — Roof
Roof Dry In
Frame
Insulation Rough In
Firewall Screw Pattern
Drywall / Sheetrock
Lath Inspection
Final Solar
Final Firewall
Final Roof
Final Stucco / Siding
Insulation Final
Final Utility Building
Final Door
Final Window
Final Screen Room
Final Pool Screen Enclosure
Final Single Family Residence
Final Building (Other)
ELECTRICAL IP.E12MiIT
min Max I ns ectioffi Descri tion
Electric Underground
Footer / Slab Steel Bond
Electric Rough
T.U.G.
Pre -Power Final
Electric Final
f`,ff ,wia....kA
rY".. ,
x ... .. a.,,g yw)ct AY'e?`r, {p lc.,ap+.. J.'$.y.yr. 97'l1 CNnaLF {CV;. •.. , 7'•A.:tf.`ilhTv'E i'..i . Y /iVS`t'...
min Max Ins ection IIDescn i tion
Plumbing Underground
Plumbing Sewer
Plumbing Tub Set
Plumbing Final
MECHANICAL 7PERNIIT
Min Max Inspection Description
Mechanical Rough
Mechanical Final
Gas Unde
Gas Roug
Gas Final
REVISED: June 2014