Loading...
HomeMy WebLinkAbout2772 Depot StTYPE Al ENER ;Y' 1)E CUf&tZT N-(."L-'CH'E'(;M I"ST-FO'K /'� U.S. F1'd0t �bVe iris;s UILDING DE ;IGN BY CORPONENT PERFORMANCE APP%. ,n TO BE F] dD WITH BU . LDINC PER."! ,.T APPLICATION THIS CODE COMPLI.%XCE TYPICAL UL AND CEILING SCCTIONS SHALL SUPPLEMENT BUILDING VALUES THIS FOR . / l,—IV 17 20730 BUILDING INFORMATION GROSS SQUARE FEET CONDITIONED/HEATED FLOOR SPACE 1,052 S.F. WALL AREAS: TOTAL OPAQUE AREA - A 913 _ S.F. TOTAL GLASS AREA - A 69. S.F. TOTAL DOOR AREA - Adg 42 S.F. GROSS WALL AREA (TOTAL OF ABOVE) A 1._024 S.F. ROOF AREAS: TOTAL OPAQUE AREA - A 1,052 S.F. TOTAL SKYLIGHT AREA wA 0 g • U VALUE CALCULATION ( 6 . 7% glass) UW- U OF OPAQUE AREA .090 U - U OF GLASS AREA 1 . 130 Ua- U OF DOOR AREA .300 U - U OF OVERALL WALL/GLASS/DOOR - .150 .150 .30 Uo- U OF CEILING/ROOF AREA .050 Uw- U OF SKYLIGHT AREA --- Ug- U OF OVERALL CEILING/ROOF .050 .050 * .05 Uo- U OF FLOOk OVER UNHEATED SPACE- --- .200 .30 0 NOTE: SUPPLEMENTAL INFORMATION IS NECESSARY TO SHOW *See Footnote 2, TRADE-OFF BETWEEN CEILING/ROOF ASSEMBLY AND WALL/ Table 5-1. GLASS/DOOR ASSEMBLY OVERALL U VALUES. WINDOW AND DOOR. INFILTRATION WINDOW INFILTRATION RATES .350 .5 WINDOW MFR. 6 MODEL 11 Mesco # RS 54 DOOR INFILTRATION RATES _ .450 Table 5-3 _ DOOR MFR. & MODEL 11 Mesco #3070 MECHANICAL SYSTEMS REHEAT COMPLIANCE WITH CODE (503.3) Z($1C HVAC EQUIPMENT PERFORMANCE EER OR COP (UNDER 65,000 BTU/HR.) 8.4 eer Tables 5-4. 5.5L EER OR COP (65,000 BTU/HR. 6 OVER) X 5-1 or 5-8 MFR. 6 MODEL # Rheem #06785 or equivalent AIR TRANSPORT FACTOR 14.20 8.0 CHECK HVAC CONTROLS FOR COMPLIANCE im DUCT SYSTEM INSULATION R VALUES JMK R - .6 t/15 _ PIPING INSULATION THICKNESS 1.15 Table 5-8 SERVICE WATER HEATING CHECK PERFORMANCE EFFICIENCY504.2 _ SWIMMING POOL CONTROL COMPLIANCE X% 504.2(b) 3_ CONSERVATION OF HOT WATER (SHOWER FLOW RATE) 3GPM 3 GPM _ OUTLET TEMPERATURE ELECTRICAL POWER AND LIGHTING (NON RESIDENTIAL) CHECK COMPLIANCE OF: POWER FACTOR CORRECTION Sect. 505.2 VOLTAGE DROP Sect. 505.2 LIGHTING SWITCHING XZZK Sect. 505.2 I CERTIFY T T WHIS &UILDIVO LIES WITH THE ENERGY CODE. if ev ipbps'ki--cigc-Dn'729 J. 2 roursuay ' - o��L�L zwsoxw*zznx Erection drawing set oz mru oo ^°�m��� - oLm-` zvs�mc�*ns OCT� ^1 1QW� � ' '- �»c�o' »u�t layout oo iD oa ' v u - 1 uv l 1s and Fasteners - �- � ao-o^-u Standard Symbols arid «uu,eviativns 3 - 1aT-z- 03F MAIMEzRzcus ` so-oo-1 waoxor cumuun with A3c4 uous ! ,. �J u13'30'1 and oa,o of wote,ials ' | s11-31-1 Receipt and Care of Materials ' SECT ION I urxocruxoL oYorowo ` nz-uc-1 LuE,xee I pur s,aminy 91-03-1 wm s,aminy 51-04-4 xom Frame Connection Details � ^ nz-oo'z wex Connection Details aI-oa-u x-oraciny Connection Details � aI'ov-z o`aoxra»m Channel Details � �J � seuzmx o swuw*u oxorowo | | ------------- y2-o1'e aea,i^o End Fmwo z TO 12 -/ | oc'ua-o ararmy o^u Frame Connection | | Details ro � 121 | j ou'on-o Full cou cmme enuvau xeisot Transition | osczIcw , uuoe s�ytswu x *cusssuuzeo ' . |` J __________—_______ s+v�'� u�onooro U.L.xo wvu�-xm Roof | . panel Installation | `J | 6*'06-3 ot^noaru,Fire aateu,znsulnteo ax'utes |` | y4-03'l Continuous Vents save x xoxe Trim -Installation s�-c-z make x aa,e Trim For uneo coouiuoo SECT ION 5 w«UL o/orawo x Anccosuazsu | ' ~/ o5'01-3 Base Ancxura»e ( a5-0z-u waz/ panel Installation on'oo-z cvroe, x Jamb z,iw Inst. Details ' | su-0e-1 wsx Trim Connections and Details caution: All dimensions shown on staouo,u and ! sx'o-o oavc Framed upovm» Inst. ---- Erection drawings are theoretical and pcx. poscs o,o,u ou not include allowances for deflections oo'12'4 ai,x Framed ovenm» Inst. or ,"rinuvns in v,pmiu» and construction su-e-u oo,ir. ouun Window Inst. /n mu/wL Panel | `J so-zz-o thru Su-m-n uo?o/w,v ono, Inst. wavufacmre,fs.desi»o certification | prx. w/mum. Trim Kit -------�--------------- � '�� The structural design of this metal buildinq system is in accordance with good engineering pratice for the conditions specified by buyer iKlR ARK �KIP�) `IJN fi fliA_ tT- )Kim) I ®®®®®= & . • WIND • ` Kam I I ALEAl-Z " ENDWALL COLUMN FORCES ACTING ON THE FOUNDAii" (SEE A2-2_ ENDWALL COLUMN DETAIL"4 GENERAL NOTES FOR VWG.� At This drawing shows column forces acting on the foundation and base .pla.te siies required to design the, anchorage and, foundation foe 'the Metal Building,System. (Forces are 'in' kips (1000 lbs.).) Z. The notation, orientation, and sign convention used for the presentation of this data is shown -on drawing A-2, 3. Positive forces are in the direction of the arrows"shown on drawing A-2. A negative force or moment is in the direction opposite of the arrow. 4. The orientation of.the.column base plates is shown on. drawing A2, and the"center lines of the bolt patterns are located on drawing A3. 5. Anchor bolt diameters are adequate to transfer column forces from the base plate to the anchor bolt. Design of the anchor bolts and other embedments to transfer column forces to the foundation and, design of the foundation is not by Mesco. " �,'fED God, ELA AR 5t400AI. LINE P>A5E ?LATE (SEE A2—$ .WIND, COLUMN DETAR.S) F F„ F (SEE A2 —4 'TERMIAIATION COLUMN DETAILS) •(KIX) (KIO�) (K!Pf) F�l RELAT7r� .r Fri Fv Fv Frt WALL, /) d 1 6.�1 1--I,d � (IN) d (IN) ANGH. Px'T. tjtk. SAT" �`flaNT 9YP I- 6.5-6 BLIND RIVET (f oQ FNST) Pfla": lls;1I4 ALum WurT'i use.��: i`12ir1'r II��Td��AToI� -NI m To . P4N E L SELF TAPPING._ FASTENER PRIMARY FRAMING SECONDARY FRAMING Px x1x P,oi.T H �dp "UT bO --r P F-61p NUT �e,; (,RIP IL90 : QhTn l 43Z� 3/4110 AOL? V& 15L9L1-5 Argo q LIT dots;= TO i'NSTALL, HIGH 51REN(aTH EOL"r5 195-TALL.BOLT6 l:NT0 oE��a l PiIOW : 14 X 31a" - P� '� ' CONNECTION ANp TIGH'rEh} SNUG TIeiWT!-rIUHTEN ALL BOLTS ONE THIRD REVOLUTION MORE. TIGHTENING SHALL PROqRE55 W I T4 H e� H [0 A Q V W1 o f PO m E 5Y5TEMATIGAL y FRONT THE CENTER OF THE CONNECTION TO [ULisu E R QQ r)1/f5" Tu Iro PR EN 1�, I-r5 FRET, EPgE5. 5EE "5PEGIFICATION5 FOR 5iRUGTURAL JOINT U51N� AS -TM A525 OR A4g0 P,OL1,5" TH CURRENT A15G W 4-1�1H E R- MANUAL. uSAG�: PAW��To SL�GoWDAtR�' FRAMIIJ� . PAUEI. 5117E.1.AP5 �sTAUDAPD) TKIM. : St:GGo►1I�R'( �RAI'l l �G . %g'I � �R PAWf:L "1'o r7AI.�EL TYPAL �: me<,lPriotJ " 0-1-4 x 1/4' yEW-TAPPIW6 WHITS : r--ASTF.I.MR w/ A III PIA. I'LATyTI.. WASNEIR W IrH A r-rAcHF P NE0(2RI NI yE�ALI WI WA5HEFR USAGE" Whip RESryTA1aCE yKY LITE F::A EtNER 1. Dr,66R I F f I oN ,-914 X 1° '(1(PE' 1r3' W I -rH HEX 14I aW AHO Wl(/ 9 Dome WA!. HeR LI�L1Ca � = PAf� �)✓ To S�l.��-ID01�� �RAYY! I h.1t�: �OtES: RECOMMENDED TOOL-6 FOR Fe,�-rENCR I146TALI-ATIO►-1: POWER DRIVEN FA6're"0FZ aUlA UJITtd P061TIVE CLUTCH AND ADJU6TA6LE DEPTH LOCArINCI N05EPIEGE, FA,�tEUER (jUN 5HOUL? TURN APPROXIMATELY 2500 RPM AND BE RATED 4 AMP5 OR HIGHER. U5E %'4 HEX 6XKET FORI�14 FA61EI4E9S, AIJ P �1104, +1EX 50GKET FOR ,1�12 FQST"EUERh. TO sN5TALL.FASTEI.JWQ669KR&lWADJU5T TUE N05EPIEG6 50 THAT THE WA5NER SEAL WILL COMPRE55 TO THE POINT IT 15 JU5T V15113LE AROUND THE FETAL WA5HER. SELF DRILLING. FASTENER ��S�RIPtlol�:#12-14X111 HEX LUQ6141�9 PEW WITH 4 114 H rPKeAD4N0 PILE-Pol"fAl�E,W5LEI? W I TH A 1/ZI I U I? 1ri,I,1 I q/, �,d L LU A/, 14 e 9- U5A(415 VA09I,.'`0 h(WgPARy FRAtTlI�4l Pall 9L, 6IPeL&�r 'flOQAL-) -'RIM. � 1 II P66CA I KI011: A6Trrt A301 Y214� X 11/411 �X �Ati ELT � N �T OJ boLTH9&0 Nut G .s6&f'I p'(101� : 1 Alol AS,9I � s"& x 1 '/4i1 PLnt1✓p UVEHNEIlp� SIN NeGK 601-f AND NUr A640 Q uT 12666 ►P1 ,4 fIOW W1 354'/ZI4 600r4W12 OU'i r U5�i7 A6 A rnonl i5NT 60PH �GTIoN 5Er✓ Ware UN06� PRIMAL-Y rgAri I w la. IJr71'E: TO INSTALL i��` HEX 0GMj5•.ANP OVENHEAD BOLT5 SN6TALL 60LT5 IN -To GONNEcrOH AND ?IARTEN 5NUG TIGHT'. STAQP-orir FASTENER .R�QLIIREMENT5 FOR RIUID BOARD TN5ULA110H FASTENER DESCRIPTION. RIGAID BOARD 'THIGKNE55 5TAND-OFF S/4" THRU V THICK *12 x 2�1 5TAND-OFF 1/g THRU 1%2" THICK #j2 x 3 ° 5TAND-OFF 15/g t+IRU 2 u THICK D�66 1 P1'I(YW : IZ-14 Y 1 /4 H EX WQ I1 P,K HE4V _ _ �T4� D-�1F�AI�D Pi L.oT-PUINrQ�S�f?113�L�D W ITN 4 ��ZI I (i. L- LLIA,6 Uh A�� 15, : r)4,U E L roMAILMMSCO L.I IiN lg6U LAl-ld0 I/-? � RafOlZ THAN 21/Z'I MESCO METAL BUILDINGS CORPORATION • P.O. BOX G GRAPEVINE, TEXAS 76051 TITLE BOLT & FASTENER SPECIFICATIONS RECOMMENDED INSTALLATION METHODS DATE 9/18/81 DRAWN BY CHECKED BY 5NUCa fIC W-r SHALL BE DEFINED AS TIGHTNESS . ATTAINED BY A FEW TMPAGTS OFAN :MPACT WRENGH OR THE FULL EFFORT OF A MAN W61 NCI AH ORDI HA,R( SPUD WREHCH. REVISION TANDARDI PAGE NO. SG-02-1 RECEIPT Y Receipt and Care of Materials INTRODUCTION This article has been prepared as a guideline for Buyer or Buyer's Receiving Agent who is responsible for receipt and care of materials manufactured by Mesco Metal Buildings Corporation. The care taken in receipt and handling of materials directly affects the appearance, performance, and life of the completed building. This article identifies the various Shipping Documents received with each shipment of materials and presents Mesco's standard procedures in packaging and marking of materials. Cautions'are given for the unloading of materials and procedures for receipt of materials are discussed. Finally, cautions for the job site storage of materials are given. SHIPPING DOCUMENTS A complete set of Shipping Documents are provided by Mesco with each shipment of materials. The Shipping Documents include a Bill of Lading, a Shipping Manifest, and a Shipping List. The Bill of Lading shows the general classification on weight of materials shipped. Essentially the Bill of Lading serves three functions: (1) receipt; (2) contract of shipment; and (3) the document of title. The Shipping Manifest shows the quantity of individual parts and packages included in a shipment. The Shipping Manifest is designed to permit the receiving agent to quickly and accurately receive a shipment of materials. The Shipping List is a detailed listing of all materials included in an order showing the total quantity, part number, and .ription of materials. A copy of the Shipping List marked to show the materials included in the package is provided with shipment. PACKAGING AND MARKING Materials for the Mesco Metal Building System are packaged for ease in loading, unloading, and to prevent loss of trials during transit. Standard packaging as outlined below is suitable for transportation by Mesco truck, and any other caging requirements must be specified by Buyer on the Contract Documents. Panel is wrapped in waterproof paper in packages of a maximum weight of 3500 pounds. Panel packages are separated !onfiguration ar,d color and loaded separated by configuration. A waste or cover panel is provided oniy when other erials are loaded on top of a panel package. Ridge caps are banded in packages with approximately 50 per package. Each ,el package is marked with the package number and the order number. Trim is packaged in a waterproof carton, except when a small amount of trim is required, in which case the trim is pped in waterproof paper. Like pieces of trim are nested together and marked with the part number. Each trim package is -ked with a package number and the order number. Heavy structural framing, such as frame columns, frame rafters, wind columns, are not packaged. Each item is marked i the part number and the order number. Press -brake structural items, such as bearing end frame rafters, endwall columns, etc., are blocked and banded in groups maximum weight of 3500 pounds. Each item is marked with the part number and each group is marked with the package nber and order number. Rollform structural items, such as purlins, girts, etc., are blocked and banded in packages of a maximum weight of 3500 ,inds. Each item is marked with the part number and each package is marked with the package number and order number. Light structural items, such as rod bracing, angle bracing, base, rake, and corner angles are wired in groups of like items. ch group of like items is marked with the part number and the group is marked with the package number and order number. Clips, when identical, are wired together, and all clips are banded together as a group. Flange braces are wired together size. Each group of like items is marked with the part number. The group of clips and flange braces is marked with the ckage number and order number. Fasteners, such as connection bolts, panel fasteners, nuts, etc., are bagged by item type, size, and color, and packaged a can or drum. Each package is marked with the package number and order number. Other items, such as sealants, panel closures, light hardware, etc., are boxed and then placed in the trim or fastener ickages. Accessory items, such as vents, doors, windows, etc., are prepackaged in boxes; cartons, crates, or paper wrapped by item, except roll -up doors, which are loaded with rubber spacers. UNLOADING Buyer is responsible for unloading materials at the delivery address or jobsite. If shipment is by truck, delivery is made to the nearest safe and accessable point to the job site. It is essential that the Buyer or Buyer's Receiving Agent be prepared with adequate workmen and equipment to meet and unload the shipment promptly at the scheduled time of delivery. Substantial damage can be done to the materials if careless methods or inadequate equipment is used during unloading. All araterials must be lifted from the truck using cranes, forklifts, or hoists of the proper size and capacity. Materials must never bepushedor dropped from the truck. Trim and panel packages need careful handling to avoid damage to these materials. The use of metal slings or chains for lifting trim and panel packages must be avoided. Error in determining the correct balance points, or careless attempts to lift oversized loads can result in damage to items, such as frame members, light gauge roll formed members, or long panel packages. Structural beam flanges can be damaged from improper placement of chains during attempts to unload heavy lifts. Buyer is responsible for all claims, damages, or injuries related to the unloading of materials. AMESCO It is the Buyer's responsibility to receive each shipment including verifying all quan''' as shown on the Shipping Manifest and inspecting all pieces or packages for damage. Quantities are verified by marking the quantity received on the Shipping Manifest.. -iortages of parts and packages must be noted by Buyer or Buyer's Receiving Agent on the Shipping Manifest. Buyer must carefully inspect pieces or packages for damage as materials are receiveo. Each damaged part or package must be listed and the damage described on the Shipping Manifest. All nested or packaged materials must be carefully inspected and any materials that have become wet in transit must be immediately unpacked, unstacked, and dried by Buyer. Particular care must be exercised in receipt of nested panels (see "Metal Building Panels" published by Mesco for additional information). When all materials have been received and Buyer has identified all shortages or damages on the Shipping Manifest, both Buyer or Buyer's Receiving Agent and the driver of the carrier must sign the Bill of Lading and Shipping Manifest All packages must be opened by Buyer and the quantity of each item or part must be verified against the quantity shown on the Shipping List within ten (10) days following receipt of the shipment. All claims for shortages or damages are subject to the Terms and Conditions of the Contract Documents.' STORAGE Substantial deterioration and damage can occur to materials during job site storage. Materials should always be assembled or erected promptly on receipt. If assembly must be delayed, materials should be stored under p,otectiu,.. All materials must be located in areas that are free from standing water. Materials must always be placed well abc e ground and stacked in a manner that provides free drainage of rain water or condensed moisture. Frame columns, rafters, and other items must be turned so water does not stand inside enclosed portions of the members. Particular care must be exercised in the storage of nested panels (see "Metal Building Panels" published by Mesco for additional information). Materials should be stored in fenced and/or locked areas to reduce loss by vandalism or theft. Buyer is responsible for all deterioration, damage, loss, or claims related to the job site storage of materials. Metal Building Panels Introduction Metal building panels are high quality construction materials. Proper care of these building components can enhance the appearance of a building and will assure full service life. Improper care or lack of maintenance will definitely produce the opposite results. In addition, cost of materials repair or replacement and delays in construction due to problems resulting from lack of care are very expensive. In those instances where lack of care and maintenance is evident, warranties will be voided. These recommendations are presented by Mesco in an effort to help the Buyer protect and insure the appearance and performance of these materials. TYPES OF FINISHES Galvanized The use of zinc coated steel, commonly referred to as galvanized, for building materials dates back many years. Because the zinc coating acts as an effective barrier to corrosion, this material offers excellent performance in many building applications. Protection of cut edges, scratches, and drilled holes is provided by the zinc's "sacrificial action". In this cathodic process the zinc builds up a light colored corrosion product on all exposed edges, a protective layer is formed, and corrosion of the base steel is inhibited. Galvalume Galvalume is the tradename for a patented steel sheet and coil product having a coating of corrosion resistant aluminum -zinc alloy. The alloy mixture is balanced to obtain the coating that retains the corrosion resistance and heat reflectivity of aluminum and the sacrificial action of galvanized. The best properties of both aluminum and zinc are combined in this coating and offer added service life for building panels. Pre -painted Using galvanized steel as a substrate, pre -painted steel is given an additional rust inhibitive primer coat. This primer coat further increases the corrosion resistance. It also permits the use of attractive finish coats formulated to give the best in -color and gloss retention. These coatings are applied to the exterior surface of the panels and a wash coat, designed only for interior use, is applied on the opposite side. Galvanized, Galvalume and Pre -painted steel can give excellent service for many years if a few rules concerning their +.care and maintenance are observed. All of these finishes are equally subject to damage and corrosion when care is not provided. OF MA PANELS DATE S/11 DRAWN BY RA CHECKED BY N.1 REVISION STANDARDS 7_9Z PAGE NO. SG-30-1 MESCO METAL BUILDINGS CORPORATION • PO. BOX G GRAPEVINE, TEXAS 75051 Packaging of Mesco panels is designed to protect materials and prevent material loss during transit. Standard packaging includes wrapping in waterproof paper in bundles not exceeding 3500 pounds in weight. Panel bundles are separated by configuration and color and loaded separated by configuration. Bundles are marked with Mesco's order number. An envelope marked "Packing List Enclosed" is attached to the bundle in an accessible place. This packing list shows the quantity, length, color and configuration of the panels in the bundle. Most importantly, recommendations for panel care are printed on each bundle. On all shipments transported by Mesco truck or commercial carrier, a waste or extra panel is placed on the bundle top when other materials are to be loaded atop the bundle. Panels transported by motor freight (component shipments) are banded to 2 x 4 skids at the bottom with an extra panel banded to the top of the bundle. DAMAGE DURING CONSTRUCTION The quality of workmanship in steel erection, construction practices, and handling methods used during the construction of the metal building can significantly affect the appearance and performance of the building panels. Most panel damage during construction is the result of faulty methods or carelessness. A good example of faulty methods is found in the installation of panel fasteners. The practice of overdriving these fasteners is fairly common. Overdriven fasteners cause indentations or shallow pockets in the panel around the fastener head. Rain water or condensed moisture combined with atmospheric pollutants (principally sulphur dioxides) and dirt particles collect in these pockets. The combination of pollutants and water creates acid solutions that will cause corrosion damage to the panel and fastener. Rain may wash some pollutants away, but moisture in the form of high humidity can keep these areas wet and continue the problem. Overdriving the fastener also forces the sealing washer from under the fastener head creating a leak at this point. Proper torque adjustment of the screw gun or preferable the use of a depth gauge will eliminate the problem of overdriven fasteners. It is extremely important that all drill shavings from the installation of panel fasteners and filings from the saw cutting of panels be removed from the panel surface. Corrosion will occur in a matter of hours when these shavings or filings are not removed and are allowed to come in contact with water or condensed moisture. When panels are pre -drilled or cut in a stack prior to erection all shavings or filings must be cleaned from both sides of the panel. Many times these raw steel particles are embedded in the panel finish coat and must be removed with a bristle brush. To prevent corrosion of the panel by these particles it is imperative that the roof be swept clean at least daily and certainly at job completion. The final cleaning of the roof should be done prior to installing the gutter so that the shavings are not deposited into the gutter and left to corrode. Any other foreign objects or debris left by construction personnel should also be removed from the roof. During the erection of the roof and the installation of equipment such as air conditioning units, etc., carelessness by personnel walking on the panels can cause damage. Workmen should step or walk in the broad flat areas of the panel and avoid stepping on the major corrugations. Panel ends and edges can be bent by careless handling. If this damage is severe, the edges must be straightened prior to erection since the appearance and/or weather tightness of the panel could be affected. Dragging one panel across another can cut or abrade the coating causing unsightly marks on the panel surface. Attempts to erect panels during windy conditions should be avoided to prevent damage and for safety considerations. Another cause of panel damage that is consistently overlooked by the builder is the practice of leaving dirt piled against the exterior wall panels at the foundation. This dirt may be wet or at least will contain some moisture. Mud may have been splashed onto the wall during construction. Corrosion damage may occur where this wet dirt or mud contacts the panels. In areas where lime stabilization of the soil is required, corrosion damage from the soil's content will be accelerated and most likely severe. All dirt must be removed from the panel walls at the completion of the work. Pre -painted panels may require touch-up if the coating has been damaged during handling or erection. The appearance of the building may be affected if damaged spots or scratches are located in highly visible places such as around doors, windows, etc. If the damage is extensive then replacement of the entire panel should be considered. Touch-up paint can be supplied by Mesco on request. The paint•should be applied with a small, soft bristle artist's style brush. Maintenance All panel finishes offered by Mesco have excellent durability and provide an attractive appearance for the metal building's exterior. Periodic maintenance will extend the service life and add to the aesthetic value of the building panels. Only minor maintenance is required for any of the finishes mentioned in this article and consists principally of an occasional thorough cleansing of the panel surface. Air borne dirt and pollutants may cause apparent discoloration of the panels, especially affecting the appearance of the pre -painted steel. Simply washing the building with plain water using hoses or pressure sprays is adequate. If dirt deposits are heavy, a solution of water and mild laundry detergent (1/3 cup detergent per gallon of water) may be used with a long handled, soft bristle brush. AILIMVIJC�SCO A S RECEIPT OF MATERIALS It is the responsibility of the Buyer to receive all shipments from Mesco verifying the quantities received and inspectii the shipment for damage. A document titled "Shipping Manifest" is provided with each load listing the number of bundles of panels as well as other building components. An initial count of the bundles should be made at the time of unloading and an\ shortage noted on the manifest. Concurrent with the bundle count a close inspection for panels damaged during shipment should be made. It is very important at this time to check for panels that may have become wet during transit. The Buyer is responsible for checking panels and for unstacking and drying these panels to prevent water staining. An exact count of the panels within the bundles verifying the quantities shown on the "Packing List" must be made by the Buyer within fourteen (14 days of the date of delivery and any claim for material shortage filed with Mesco within this time limit. Notation of shortages or damages made on the shipping manifest should be acknowledged with the signature of Mesco's driver or the carrier's driver or agent. Claims for shortages or damaged materials on shipments transported by Mesco should be filed with Mesco and claims on shipments transported by common carrier filed with the carrier. Unloading, Stacking and Storage Proper unloading and stacking techniques can help prevent unnecessary damage, reduce handling time, and pay dividends in increased erection efficiency. To assist in unloading panels from the truck, each bundle is loaded with the ends off -set. This allows the unloader to I. one end and insert a wooden block or dunnage under the bundle. Long panel bundles may require two (2) blocks. A fork lift o, bridle with web slings can now be used to lift the bundle. Under no circumstances should metal slings, chokers or chains be used as lifting devices. Damage to the panels will result from using such devices. Tag lines tied to the bundles and/or ground personnel can guide the materials safely into place. Dunnage should be placed on the ground or building floor spaced 8' on center to receive the bundles. Panel bundles should be stacked separate from the structural steel and in a dry area free from danger of water ponding. If possible, bundles should be stored under -roof. For open storage, bundles must be placed on dunnage with one and elevated approximately 24 inches above ground or floor. The lower end should be approximately 4 inches above ground or floor. Dunnage should be placed under the center of long bundles to prevent sagging and water ollection. Special attention must be given to keeping the low end out of contact with mud or water. The wrapping at the low ,nd should be opened to allow ventilation and drainage. All bundles or unwrapped panels must be secured to avoid wind 'amage. DAMAGE FROM CONDENSATION OR TRAPPED WATER It is extremely important that the panels be checked at unloading, and then constantly monitored for evidence of ,rapped water or moisture condensation while awaiting erection. High humidity conditions with temperature cycling will cause condensation between the panels within the bundle. Condensation can occur frequently near the sea coast -or other large bodies of water . In addition, panels can become_ wet by wind -driven rain if the wrappings are torn during handling. If jobsite covers are used, they should be tied away from the bundle at the corners to allow air circulation around the bundle. This will help prevent moisture evaporating from the ground or building floor from condensing on the panels. Plastic or other impermeable covers are not recommended. Immediate action is required if the panels are found to be wet from any cause. The bundles must be opened and each panel unstacked and thoroughly dried on both sides. Re -stacking the panels at a slight angle to each other to prevent nesting will allow air circulation and assist in keeping the panels dry..ln severe conditions large fans can be used to circulate air between the unstacked panels and accelerate drying. Damage to the panel coating occurs when panels become wet and are allowed to stay wet. Damage can occur to nested panels within 24-48 hours. This damage shows as corrosion and discoloration of the panel surface and is commonly called wet storage stain, zinc oxidation, or "white rust". All of the panel finishes discussed earlier in this article are subject to this damage and discoloration. Pre -painted steel is perhaps less vulnerable but by no means exempt. A softening of the paint film can occur with pre -painted steel under wet storage conditions and the durability of the panel finish substantially decreased. Galvanized and Galvalume panels react more quickly to surface oxidation since they lack the additional protection of paint. Zinc coated or Galvalume panels under normal exposure form a zinc or aluminum oxide film on their surface allowing a slow oxidation process called "weathering" to occur that inhibits further corrosion. In nested bundles constant contact of the panels with condensed or trapped water prevents this weathering process. Rapid oxidation of the zinc or zinc aluminum coating can now occur and may lead to "red rust" in a short time. If discoloration or stains are minor, a household cleaner of the type used on porcelain sinks and bathtubs may be used with a bristle brush to remove the stains. Wire brushing or using abrasive materials should be avoided since scratching or removal of the coating could occur. Damage from condensation or trapped water adversely affects the service life of metal building panels. Panels with significant damage should be replaced by the Buyer before erection. TITLE METAL BUILDING PANELS DATE •6/11/89 DRAWN BY EA CHECKED BY !""' REVISION 5-li-01 TANDARDt PAGE NO. SG-31-1 ,,!,FSCO METAL BU LDINGS CORPORATION - PO BOX G GRAPEVINE, TEXAS 750511 - POP RIVET CLIP I\ CLOSURE OPEN HOLE O BOLT IN HOLE DIAMETER SQUARE FEET DXXIX SECTION OR DETAIL NO. DRAWING NO. SECTION A SECTION A NUMBER 0 REVISION CENTER LINE - -HIDDEN LINE OR PANEL NOTCH LINE OBJECT LINE OR STEEL LINE BREAK LINE CONCRETE ® PRESSURE SENSITIVE TAPE ABBREVIATIONS SL = STEEL LINE BL = BASE LINE RL = RIDGE LINE ABL = ABOVE BASE LINE B.E.S. = BOTTOM OF EAVESTRUT SYM. = SYMMETRICAL NS/FS = NEAR SIDE & FAR SIDE B.E.F. = BEARING END FRAME F.E.F. = FULL END FLAME O.C. = ON CENTER P.S.F. = POUNDS PER SQUARE FOOT KIP = EQUAL TO 1000 LBS. WEX = WIDTH EXTENSION GA. = GAUGE SIM. = SIMILAR BLD'G = BUILDING UN = UNLESS NOTED TITLE STANDARD SYMBOL s AND ABBREVIATIONS AICSCO 'IT MESCO METAL BUILDINGS CORPORATION - P.O. BOX G GRAPEVINE, TEXAS 76051 DATE 12_3-81 DRAWN BY RJS 1 CHECKED BY REVISION 4,, .84 CAH r TANDARD: PAGE NO. STANDARD' 2 c�Aur�� luT 1 _ P r--,TAI L IA' way ��, D�TAI L ' E5� DATE g- 17-82 DRAWN BY (ZQ CHECKED BY MM 3TANDARD3 PAGE NO. so-05-1 MESCO METAL BUILDINGS CORPORATION - P.O. BOX G GRAPEVINE, TEXAS 7f051 GENERAL NOTES: 1. THIS IS A STANDARD REFERENCE DRAWING TO BE USED IN CONJUNCTION WITH OTHER REFERENCE DRAWINGS AND THE ERECTION DRAWINGS. 2, FOR NON-STANDARD SECTIONS AND/OR' DETAILS SEE THE' ERECTION DRAWINGS. 3. SEE ERECTION DRAWING FOR INTERIOR COLUMN TO RAFTER CONNECTION AT PBF BUILDING ONLY . FLANGE BRACE EAVESTRUT COLUMN z0 A%CSCO. 0 DETAIL NUMBER 00 DRAWING NUMBER / 7 \ I ATE 8/1T/81 RAWN BY Vq, HECKED BY STEEL LINE- SIDEWALL GIRT �TEEI LINE 4 1 REVISION TANDARDS PAGE NO. S 1-02 1 r MESCO METAL BUILDINGS CORPORATION • P.O. BOX G GRAPEVINE, TEXAS 76051 GENERAL NOTES: 1. THIS IS A STANDARD REFERENCE DRAWING TO BE USED IN CONJUNCTION WITH OTHER REFERENCE DRAWINGS AND THE ERECTION DRAWINGS. 2. FOR NON-STANDARD SECTIONS AND/OR' DETAILS SEE THE ERECTION DRAWINGS. FLANGE BRACE A�\l I A%CSCO MESCO METAL BUILDINGS COR' DETAIL NUMBER DRAWING NUMBER -STEEL LINE SIDEWALL GIRT /STEEL LINE COLUMN j TITLE FRAMING WEX SERIES )N • P.O. BOX G GRAPEVINE, TEXAS 76051 DATE 8/17/81 DRAWN BYV�. CHECKED BY STANDARDS PAGE NO. STANDARDS 1-03 1 PUQLIN EQVE VNEGK BOLT6 LUMN GPId, RAFftR 51UEwILL 1'-,9" mluu1 r-oI� SIDEWALL l COLUMN TO OAJE LKIE EAVESTRUT CONNECTION' FOR UBM, PBM, WEX S MSS cc- ( p ---1 1'/? Ov PURL Q 611 CUP "4=I44" 1VZ :.HeAftnp ReFTEa ( OPf 1014AL) PURLIN CLIP 4" I,h�I RAFtEK (hfe N DAR p) I I' FRAME 5 PURLIN CONNECTION FOR MAIN FRAMES (ALL TYPES) COLUMN "2"*x I�' 1 41QT 1%D L (41aT - C;,1 C FPQME COLUMN — I _ .. � cat %1 SIDEWALL GIRT CONNECTION FOR UBM, PBM, WEX. MSB FLAAJ&E nReeE ice( Nf V ►XL T c SYM. 4' - 7'/4° O O � o PU&UN RAF(E R FLAu&E 6gA,(e 0 6 FLANGE BRACE CONNECTION FOR MAIN FRAMES (ALL TYPES) L, AVCSCO. KIJE- bQRcE (Le =_.> FIN %F_C1(60LT 1-1 R F FIN NECY, BOLT GUT FOR CL — COLUMN LRF, P5r- CP14 , EAVESTFRUT CONNECTIONS 6.0 FOR HRr-, LRF, 4 PBF EAlEh U (HFir Kw EE Yxl Hex GUhSE'( PLefE uOfE: IF EAYESiRuf '(O Ks�r;E PRA(.E NOt,ES WILL HOf AL100 WITHOUT (715fv9TI1a(1 EAVFhfRUf, MOVE KHM gRAcE FRom t1 WP.E 1101.E IN LOLUMW tlWh6T PLATE fo OUE OF fNE NOLEh (/µ EITHER 61og. (ACCO912111& fowAl(11 WAY AD.fU6fmENf 16 IJEEDED.) KNEE BRACE CONNECTION ' FOR LRF, HRF, & PBF TITLE FULL END FRAME & MAIN FPE EdE CONNECTIC "' u DETAILS COLUMN 41QT GPI I �Z cox l I/bN Nf-X Ni'pd7 ►'.�-t (OLUrtIN X:�c) (l/4 44 ( 9%9 FJOLt r-FLAN46 PIRA( E a N to o 0 51PEWOLL w Yd 61VT %ta �F12AwE 4 SIDEWALL GIRT & FLANGE BRACE CONNECTION FOR LRF, HRF, & PBF Puaup. O O • s COLUMN tor RAFTER FLANGE RAGE Y� X IY4 Nix Hs�.c �� LATERAL STRUT DETAIL ACENERA.: NOTES- L: THIS Ili A STANDARD REFERENCE DRAWIN3f TO SE USED` IN CONJUNCTION WITH OTHER REFERENCE DRAWINGS AND THE ERECTION DRAWINGS. 4: FOR NON -Si ANDARO SECTIONS AND/OR DETAILS $EE . THE IREC740N DRAWINGS.. [DATE 8/19/81 RAWN BY VK. HECKED BY [FREVISION M M' s1-83 C/A j-� f TANDARDS PAGE NO. S 1-04- .4. L MESCO METAL BUILDINGS CORPORATION • P.O. BOX G GRAPEVINE, TEXAS 76051 PUI?LIN EeVFhtRi V2"AlX 1'/4' N60 NEAR golfs OLumN PuAulu I— RAFTER J� 51DEU1Au, NEI�,Ht M1140 V-O° ' ' L� I 510EtJ4LL -(O FAb6LIuE col umu EAVESTRUT CONNECTION PURLI LI C►uP- e 1V2 iz 0 1.1ex N D (ovlloNaL) CLIP I''M IY2 PURLIN air 4 1'I CLIP �— RDEfER ER (h-rA0 94 R 19) FRAME 5 PURLIN CONNECTION �//COLT /Z.Y WEX � eo (IRT FRemE �ol.umN—� I L—GIRf CG1 r21 SIDEWALL GIRT CONNECTION vllftLIN, //I GLAUGE bQGGE 7 eco eok,T 5YM. 2 -7Y? L1 �i FLANGE BRACE CONNECTION GENERAL NOTES: 1. THIS IS A STANDARD REFERENCE DRAWING' TO BE USED IN' CONJUNCTION WITH OTHER' REFERENCE DRAWINGS AND THE ERECTION DRAWINGS. !. FOR NON-STANDARD' SECTIONS AND/OR DETAILS SEE . THE ERECTION DRAWINGS. AVCSCO EXI5110 ayl wRuf G1FK ' o 'q'41xIV4" • OVEN NEeD P�oLfS c ' RAFTER h N ul�u ExlSjlN� GOwmN 4tREutal+l rSO�PS 3 WEX RAFTER CONNECTION AT LRF, HRF, & PBF 4 WEX RAFTER CONNECTION AT UBM & PBM i._ �u ILatERIOR FRArrIE FIELD Loc. "/�b"t441oLE FIELV VKIL'Lajg d Ill (aIQT FOR+/L BOLE 60Lf olt IN IaIRt pp 1/711 bolt— I'-O° ATg" GAUE- R,hlu 6UIL✓t, { INTERIOR Fs'�I` r MAIN buILV1144 hlDEllleU, GIRT S,DEIuaLL 611F T GG1 I � O —�o GPI- G r, L � J EEL �L 0uuE E O O UIIDfN EXiEuhIOLJ ENaweu. (aIR'( UjWfEKt(JENhION EuDAI GIRT L MI&L L11,16 LTM UME &SECTION THRU WEX & SIDEWALL INTERSECTION (UBM 8, PBM) B SECTION THRU WEX &SIDEWALL INTERSECTION (LRF, HRF, PBF) DATE 8/2j DRAWN BYCHECKED REVISION I I IS 83 CAM STANDARDS PAGE NO. s 1-05y z MESCO METAL BUILDINGS CORPORATION • PO. BOX G GRAPEVINE, TEXAS 76051 L FULL END FRAME OR MAIN FRAME ISOMETRIC iis-P nwn amen[ HII STEEL LINE CONNECTION AT FLANGE CONNECTION AT WEB RACE ROD ROD I �P3 B.E.F. RAFTER I I I W 2 — N W FIELD LOCATE 1C�,O,MMOO�Ni HOLE) 9/16- 1 HOLE W Gr' section 'c' FIELD LOCATE (!HOLE FOR B.E.F. RAFTER I \ eOLT W I 1\ 2 J WI • � • O 0 c I Gi35 section 'b' b 2• C T X-BRCE AE CIO B.E.F. RAFTER r STEEL LINE 7- DETAIL 'A' B.E.F. CONNECTION AT RIDGE BEARING END FRAME RAFTER (11 X 4) 2- a 1 1 II X-BRACING oil i . COLA • I *CBSCLIP BOLTS INTO I I 7 X 6 COL. COMMON HOLES W/CCt CLIP II STEEL LINE B.E.F. RAFTER. I I c a5 ia- section 'a' DETAIL 'B' B.E.F. CONNECTION AT COLUMN CORNER COLUMN ++ B.E.F. RAFTER 1 `C` o • • G85 1'- 4'/i' TAIL TION AT CORNER --------------------------- EAVESTRUT+� TOP OF COLUMN h =a O l" BEARING END i i — ~ m FRAME RAFTER I o> m t I ~ O W • I 1'//2. O rw O - ±� I 1 m X. -. BRACE RODS �y X - BRACE R ec3 r sAae LINE NOTE: REMOVE 2 - 1/2- # Hl:i:i"IWOOLTS AT BASE CLIP FOR ATTATCHMENT OF Gc3C Lip . I ROTATE COLUMN SO THAT SOLII FACE IS TOWARDS THE SIDEWAL STEEL LINE. 2• I FIELD LOCATE 4. I I � I S/16. 0 HOLEP I COLUMN I I ENDWALL STEEL LINI - -1I T 1 d 1 4-I. 1 1 1 1 /2' 1 ,/2HEAD I I 1 BOLTS E CLIP V S —ENDWALL STEEL LINE SIDEWALL STEEL LINE section 'd' DETAIL 'D' CORNER COLUMN CONNECTION GENERAL NOTES: 1: THIS' IS A STANDARD REFERENCE DRAWING' TOSE USED ° IN CONJUNCTION WITH OTHER REFERENCE DRAWINGS AND THE ERECTION DRAWINGS. . !: FOR NON-STANDARD' SECTIONS AND/OR DETAILS SEE . THE ERECTION DRAWINGS.. 3. Lee %zI'd x1 %g. Np-x NeAp eo .Ts AT ALL C Wl? C.oN094,noNS. TITLE X-BRACING CONNECTIONS S DETAILS AVCSCO a I MESCO METAL BUILDINGS CORPORATION • P.O. BOX G GRAPEVINE, TEXAS 76051 DATE 8/31/81 DRAWN BY Vf- CHECKED BY REVISION C A 1-I STANDARDS PAGE NO. L nffmi I.l C—P NNEs S M'JST $E INSTAL.LED cOR STRAIG�-+T NG AND ALIGNV,St-jT OP EA\'ESTRIlJ7 / RIDGE PURL,I N (SEE NcTE G) 01APHRAGM CHANNEL AT HI•SIOE SAVE (OcS38t DC I BrJO-� R1_ Or- BI-DG. A.rvD CL Or - DIAPHRAGM CH^NNEL RIDGE PURLI N O O RI DGE �, —---------- PURLIN CP13 (TYPICAL) 2,0 OIAPHRAM CHANNEL AT �� RIDGE (IDC1800� z DIAPHRAGM CHANNEL SP^CING TABLE BAY OIL ENDBAY SG7/�GING l.ESSB'HAN NONE REOD, GREATER THAN I THAN ' TO 16 BUT LESS tHANSO 2 B^`! OR END6AY 5PACE GREATEN THAN OR EQUAL TO 30' SEE 'THE EIREC•TION DwGS. RL DC5288 -, EAVESTRUT p 0 P u R L I N CPt3 (TYPICAL) 560 ,I SL -� 171APHRAGM CHANNEL AT E/.\VE (DC5288� INSTALLATION NOTES: 1. DIAPHRAGM CHANNELS ARE TO BE INSTALLED AT THE SPACING LISTED IN THE (DIAPHRAGM CHANNEL SPACING TABLE ' AND/OR SHOWN ON THE ERECTION 0RAwINGS- 2. INSTALLA710N OP 'THE DIAPHRAGM! CHANNELS REOUIRIr A TOTAL Otr 8 - I/2 x 1 %4 A50'7 HEX - HEAD BOLTS. 4 CONNECTING EACH END OF THE DIAPHRAGM CHANNEL TO THE CLIPS ANp 4 CONNEC-rIt�JG THE CLIPS TO THE APPR0PI^TE 9 x 3 CHANNELS, 3. BOLT C013 CLIPS TO THE LIPS OF APPROPRIATE 9 x S CHANNEL FIGURE A � WHILE THE CHANNEL IS STILL ON THE GROUND. CP13 CLIPS CAN BE INSTALLED B`r TILTING THE CLIP AND ENGAGING � O � THE NOTCHES OP CLIP TO THE LIPS OP 9x3 CH/.NN1.NELS. i TO HELP I'IREVENT TW!5T•OUT OUR! NC--7 !N5TALL^71ON OP DIAPi�R/.\GM CHANNEL INST^LL A. ++rC K "ELF DRILLING ' _ t__ SCREW TI-IRU 71-IE B0770 4 O= C>„3 /.AND INTO T±=E LIP OF THE 9Y.5 CI-tANNEL. SEE PIGUPE 'A. ' 12 x I� O 4. !NSTALL APPIROPIATE 9x 3 CHANNELS TO M^-IN• PRAMES. 5. INSTALL 01Ar-'HR^GM CHANNELS. G. PROPER ADJUSTMENT OF THE ex3 CHANNELS WAY 6E ACCOMPLISHED 13Y PIRST LOOSENING THE BOLTS CONNECT'NG THE DIADI,-IRAGM CHANNEL TO -THE CLIPS. ALIGN THE EAVESTRUT / RIDGE PURLIN AND Tt-IEN RETIGHTEN THE BOLTS. GENERAL NOTES: 1. TH15 ►S A STANDARD REFERENCE DRAWING TO BE USED IN CONJUNCTION WITH OTHER REFERENCE DRAWINGS AND/OR THE ERECTION DRAWINGS. 2, POR WON - STANDARD SEG-frONS AND/OR DETAILS SEE THE ERECTION aRAW I NGS. TITLE RP DIAMGM CHANWL DETA", AtESCO NESCO METAL BIJIL DINGS CORPORATION - PO- BOX G GRAPEVINE, TEXAS 76051 DATE MAY, 11, 1983 DRAWN BY C. ANDY HERD CHECKED BY M. MYRICA REVISION S • 12.83 CAH IO- 11, 83 CAN TANDARD', PAGE NO. S 1-09- �5 A'. 0 DETAIL NUMbEIZ 00 t9QAWIN4 NUM15EQ NOTE: RIGHT HAND CLIPS TO RIGHT OF RIDGE LINE OF BLD'G LEFT HAND CLIPS TO LEFT OF RIDGE (VIEWED FROM OUTSIDE OF BLD'G). 1/2: IS GLIF' No. S4 0WN 1N (xxx-x) EAVESTRUT CONNECTION FOR SINGLE SLOPE BLDG. GENERAL NOTES: 1. THIS IS A STANDARD REFERENCE DRAWING TO BE USED IN CONJUNCTION WITH OTHER REFERENCE DRAWINGS AND THE ERECTION DRAWINGS. 2. FOR NON-STANDARD SECTIONS AND/OR DETAILS SEE THE ERECTION DRAWINGS. T- i . !1A 41► 11 O O CAV4711 O (cc Gg .0 Fe NOTCH DETAIL Eu PI11AL , GIRT r FIELP NOTGIJ CGIQT TO CLEAR CCV R CC2-OR� L'- I---GC2-IR ENDWALL GIRT DETAIL AT TOP OF ENDWALL COLUMN BEARING END FRAME ISOMETRIC �0 AVESCO . TITLE. BEARING END FRAME CONNECTION DETAILS FOR 1:12 AND 1/2:12 SLOPE 510E 519ALE 1419"f c(:Z,9 DATE 8/20/811 DRAWN BY �rl� CHECKED BY -NOON bIl9f '(O GUAR GP3 -(pEu FIl�11-0 WeLlD Mgf fo ur SIDE SPACE GIRT DETAIL rIEVISION 1,15.83 r-,41-1 rSTANDARDS PAGE NO. ,gZ-01- 2 MESCO METAL BUILDINGS CORPORATION - P.O. BOX G GRAPEVINE, TEXAS 76051 NOTE V 12 CLIP Drwlo0 64417 PA► ':-IO.. GR,AAM6 KArfCR 514011164 10`4 I C>ooc•>d (cBIA . THIS EN C M�RkED TO RIDGES (-rYP, ) RIDGE CONNECTION TYPE 'S'ENDWALL FA6-rE U RAKE AN4LE (PA --- ) L ?U¢UN 5 RAKE ANGLE ATTACHMENT E NOW ALL COLUMN i as,t o O BASE (.LIP 9 COLUMN BASE DETAIL ENDWALL COLUMN . .I" 60LT Mp'lu(, twig FRAmg RAFfI;R BUIL01144 "ARKEp '-rp 0 .'1 1'' o GG4'IR (cc2-OR) rtI pGt ° �TY P,) � • � I I • ENaLt14L.L WLUmN CGt- I L (CC,2-OL) 2 RIDGE CONNECTION TYPE 'C' ENDWALL PIRuU grAglwe. ENv a -.a • GP3 FRAME G,AF1'ER WPPER) I• o °� �Z o . • � P�eRIUU END C &2 _ , of FRernE RAFt9R PURLIN CONNECTION AT BEARING END FRAME SPLICE ENPJALL COLUMN 411?T 1 CG I -E:I� O �Y-; r� 1• -STEEL LI NF 10 ENDWALL GIRT CONNECTION TO ENDWALL COLUMN CG4 EL19UJ4W GIRT I � 5t661 _ uuE P. Fj 1pLUAW E u". C G 1 talRf GowmN _6EARIW4 64V PURLIN FRern6 RAFf6R C14-1 (cP4-0) 0 o CCVI (CC-L-OP-) (CC2-OR) CC1lI 0 • O EuoulAu. COwmN 3 PURLIN CONNECTION AT ENDWALL COLUMN 66ARIL6 50V FRAmE RAFfa I r crc2-IR (cc2-OR) O r O 0 0 ° 0 CG2•IR � � ---j (cc2-oR) EµvL,1Aw wLumU 6f661• UN6 CG1 .0 011 aJQ eKt.LE PAxvy GoRweg GOLUrr1N GENERAL NOTES* TITLE t. THIS IS A STANDARD REFERENCE' DRAWING TO BE USEC 3• RI(A AT NAND U.\% TO RIGNT Or- BEARING END FRAME IN' CONJUNCTION WITH OTHER REFERENCE DRAWINGS R10CaE LINra- LEFT >AA4O CL►fj To I \ AND THE ERECTION DRAWINGS. AFT Cr- RIi E L 0s . CONNECTIONS S DETAILS 2. FOR NON-STANDARD SECTIONt AND/ DETAILS SEE 4'� u6z HEX HeAV THE ERECTION DRAWINGS.. �L-f5 r-OfZ 4L.L u'IIP ®�� ®� FOR 1:12 AND 1 /2:12 SLOPE E CO 00 Ed* ON. MESCO METAL BUILDINGS CORPORATION - P.O. BOX G GRAPEVINE, TEXAS 76051 9fEEL LINE -{ �F4h1EuER RAKE Au41-E I• • • 0 PURL1t{ . o • K i • 6EA9I14(4 9"t7- FRemc RA6fER 4 PURLIN CONNECTION TO RAM AFTER �-f-ffeft UNE bGARILIG Ew0 r—.—EAVESfKUf FRAm6 ReFtEa--� WRR (G�CGP2S-i-I •RIIR� ) (CCecoumu Z 6t66L U46 EAVEhTRUf — TN13 ENO MA FtKEfrl (CC2-OR r CPII IF 10 0 , o FFIDUTALt. rnN� n 1 Lys u4 6u0 FUME �r� RAP(ER 12 CORNER COLUMN do EAVESTRUT CONNECTION AT RIDGE FOR SINGLE SLOPE BLDG. CP5 HEx E+EAD END Fx" �I R4CEER ` WIPT Cmar \V o cuwN -G63-1 (cBs-I) 13 WIDTH EXTENSION RAFTER CONNECTION TO B.E.F. RAFTER DATE 8/25/81 DRAWN BY L7& CHECKED BY REVISION STANDARD: 8-IS-83 CAH PAGE NO. 11 (S t33 _4 Sl-02= 2 FULL END FRAME AT IBM, AND PBM SERIES C TYPE ENDWALL ONLY rgVE CORNER QN4LE ILL T cU4 vivx 1412L&n E3d gIRT " 1 ■ I'+" lem VWAO LVLT6 PLUMN �IDEv 412T COLUMN �TEIJE; R FIELD L0GR7.E HOL.E,S —IN EFWESTRUT / FL6, R5 5X4 W N V4, I'1" ;Al �F4ryA�5 COLUMN 41RT PA6TW ER RAKE PN4 L PU2LIN ' �e, RAKE ANGLE GI PUP+LII,I GOIJNEG'(101�1 �E'rAll Gc4 io 0 V. ENDWALL COLUMN FIELD LfX -M HOLES IN WEB I'Q" HFx HOAP to4v% _7 x 5 5 W. COLU MN .:'(o FULL END FRAME' GONNEG?ION. DE'fAI L " 1■ Iy4■ ENDWALL Hgx Hc; 50LT COLUMN . • 41ei 41QT GVi ' LON4 LE4 OUT �G wwry LE4 CUT �GLUMNEWE)WALL cmIAT�5 TO 7x 5 �L EIDWALL _ COCONAJ&-_T10W-_D6rAIL__._. _ _._. ENOWPLL COLUMN iI a! t/x+ A 144,■HEX HBdD 0 RAKE RN4Li L PUQLIN A =-_RAKE :ANGLE 4 PUFiLI►J GONNE:G'flOh! DETAIL O ENOwpll N HOLES IN wE6 COLUMN . GIELD LOCAl h■e,ly�'N�t N4EAD F BUILL-"-UP E;.W COLUMN To FULL 9N9 FRAME G07NEGTl0r4 DETAIL ENOWQ L L COLUMN i■ /. I41' �-r 41 QT / ENDWALL G1RT5 TO BUILT-UP 5NOWALL COLUMN CONWgr-floIW DETAIL ENOWALL COLUMN 5A�,If GL\P t3oVT5 L pNCHOQ COLT 7X5 ENDWALL COLUMN $ASE DE:TAII H SUIL-T-UP ENDWALL COLUMN 9ASE DETAIL hGKEw P"H•14■ CRNER IN&LE MACH. ODIT O.. CONDITION AT x 5 ENDWALL COLUMN CONDITION AT BUILT-UP H-SECTION ENDWALL COLUMN FAE/14/81 BYR1D BY REVISION STANDARDS I I • Irj ' 83 IA P'AGE N0. s�-fl6- 2 L MESCO METAL BUILDINGS CORPORATION • P.O. BOX G GRAPEVINE, TEXAS 76051 STEEL LINE I END BAY r� l� RAKE ANGLE? r ROOF PANEL T;R 1 PURLIN B-E. F. RAFTER TRANSITION PANEL (FIELD CUT BOTTOM TO SLOPE OF ROOF) CLOSURE RAKE ANGLE FASTENER T-1-� _ ROOF PANE, Tc CQ3 (CORNER TRIM) PURLIN MASTIC I I B. E. F. RAFTEINTERIOR WALL PANEL (OPTIONAL) -1 1 1/2- 4 1/4 EW. ( PURI A A CAI (FIELD LOCATE) B. E. F. BEAM PURLIN TO ENDWALL COL, CONNECTION DETAIL NOTE: APPLY ROLL MASTIC BETWEEN T26 TRIM AND ROOF PANEL OF LOWER BUILDING. RAKE., ANGLE_ CG1 - FIELD LOCATt /I!p 0 HOLES IN COL. FACE. ENDWALL COLUMN COLUMN SECTION 'A - A' B. E. F. RAFTER NOT SHOWN EW. CORNER COLUMN KrTl 664 SW. EW. PANEL :.C-� i GIRT SIDEWALL GIRT CONNECTION AT CORNER COLUMN _SECTION 'A' ENDWALL HEIGHT TRANSITION - USING BEARING END FRAME W/ COMMON ENDWALL COLUMNS STL. LINE _ - END BAY RAKE ANGLE ROOF PANEL TRI OL1T�lDE' ! ^i • `I'4 PURLIN CLOSURE O O CC2 OO ------ O T L- .. i—S. E. F. RAFTER TRANSITION PANEL (FIELD CUT " Tr BOTTOM TO SLOPE OF ROOFI rNS�o1E ENDWALL COLUMN CLOSURE -- \ I.RA KE ANGLE FASTENER TTI- 'ROOFPANEL — — — — MASTIC PURLIN CG4����' o ---- 0 GGGI LOWER MAIN FRAME RAFTER SECTION 'B' LOCATE) PURLIN LOWER CG1 � i el­t7 LaA'V/ HOLES IN FACE OF COL. - LOWER MAIN_ FRAME RAFTER -EW. COLUMN PURLIN COLUMN CG 6 EW., CORNEA Cy 4 CGI SW. GIRT SECTION 'B -B' SIDEWALL GIRT CONNECTION AT CORNER COLUMN PURLIN & EW. COLUMN TO MAIN FRAME RAFTER GENERAL NOTES: CONNECTION DETAIL 3. USE �2 X NEX �U0 010LC5 1. THIS I$ A STANDARD REFERENCE DRAWING TO; BE USED FOR Al.t.. GI.tPGONNI:C,-rI I . IN CONJUNCTION WITH OTHER' REFERENCE DRAWINGS AND THE ERECTION DRAWINGS. 21. FOR NON-STANDARD SECTIONS AND/OR DETAILS SEE ENDWALL HEIGHT TRANSITION - USING A LOWER MAIN FRAME THE ERECTION DRAWINGS. MESCO METAL BUILDINGS CORPORATION' P.O. BOX G GRAPEVINE, TEXAS 76051 e PREVAI I.INy WIN 05---► 4 -- DIRECTION OF WORK ROOF PANEL PURLIN J \— BE SURE BEARING RIB 15 IN DIRECTION OF UJORK WALL PANEL' SECTION A, (FIRST PANELI PANELING SEQUENCE RIB 3'@ 1=_1Z_� �/2:1Z ' ,n5TEEL LINE 1 \ ROOF PANEL O pF (4ulZ EAVE57RUT^7I L5TEEL LINE SECTION 'B' (PANEL OVERHANG) 294 yl 4 FASTENER SPACING AT PURLINS - I 5 7' 7- 5TT3/+ 4W 5'/a 7' 7' 5�a 2v4 FASTENER .SPACING AT ENDLAPS AND EAVESTRUTS -hyES R4yTS FASTENER SPACING ISOMETRIC P9E55URE. -- 5EN51TIVE TAPE \ ROOF PANEL PURUN ENDLAP h•- SECTION 'C' (ENDLAPS) ROOF PANEL INSTALLATION INSTRUCTIONS I. START FIRST ROOF PANEL AT THE END OF BUILDINC-J WITH (L OF RIB AT THE STEEL LINE A5 SHOWN iH 5EGTION 'A'. 2. PROCEED SHEETING ROOF A5 5HOWN IN PANELING SEQUENCE DRAWING. 3.5EE SECTION 'E5' FOR PANEL OVERHANG AT EAVESTRvT AND 5EGTION 'G' FOR PANEL ENDLAPS. 4.IN5TAL0-'A6T&)E95b,T PURLINS AS 5HOWN IN FASTENER 5PAGING AT PURLINS. 5.SNST.�LL`'JASTEJJFjAT EAVESTRUT AND ENDLAPS A55HOWN -IN FASTENER SPACING AT ENDLAPS AND EAVE�TRUTS. Fi. INSTALL ROOF PANELS AND 51DEL.APPA6TENERS A5 SHOWN IN FASTENER 5PAGING S50METRIG AND PANEL LAP DETAIL. GENERAL NOTES I. REFER 70 DRAWING hL�-01 F'�2 FASTENER IDENTIFICATION AND RECOMMENDED IN5IALLATION METHOD. 2. NET COVERACIE OF 'MR' PANEL 15 2'-G". 3. THE ROOF MU5T BE 5WEPT CLEAN DAILY OF ALL Mf7 TAL PARTICLES AFTERFAy1 ZRlARF I4WALLZ0- 4. REFER TO ROOF TRIM CRAWINCI5 FOR TRIM INSTALLATION REqUIRENJEHT5. 3.51DELAP PRE55URE SEN5ITIVE TAPE I5 RE`.G'UIRED ON IME!E�CO' STANDARD ROOF 5Y51EM. 0I96LTIOq OF WORK 6NOUL9 BE-(oWARP PRE✓41LIQ(4 UJIN06. IS A STA"OARO REGEREUcE PaLLlikila -rO gE LI_GD II,J GONJUL.IC'(ION Wrri-I OTHER REFERE"L6 NIALLII"y6 AUO'(HE EREC.TIOL4 DRAW1447- 9. FOR NON-6f4NCA90 5EiilON5 Aup/01? DgTDILS :re TJE Ei e&rIoN C2AwIN46. 0 LOWER P, 2NO RUN SIDELAP PRE55URE SENSITIVE TAPE HAS 2'�0" PURLIN 5PAGINU PURLIN! ARE Rf,QUIRED ONL`( �U RLI N. 0 LOUDER PANEL LOT RUN TITLE INSTALLATION INSTRUCTIONS FOR STANDARO ROOF SYSTEM (U.L. 30 CLASSIFICATION) AMESCO MESCO METAL BUILDINGS CORPORATION • P.O. BOX G GRAPEVINE, TEXAS 76051 DATE 9/11/81 DRAWN BY 9I . ICHECKED BY T UPPER PANEL 2 No. RUN ;';'—'STRIPOF — PRE55URE 5EN51TIVE MAtTV..OrlI TAPE MUbT NOT BLCXA CAPILLARY GROOVE ON PANEL 51DELAP. 3 . PANEL LAP DETAIL REVISION UPPER PANEL 15T. RUN PRE55URE 56N0ITIYE TAPE TANDARDI PAGE NO. S4-01— 1 L 4j1 -11111U1MUM 11 �uol AP _ NOTE: SKYLITES DO NOT HAVE THE STRENGTH 3REssuRE _ OF MULTI -RIB ROOF PANELS AND ARE -,eU41TIvF- TAPE v2± Car EUVLAPS ouLY) NOT SAFE FOR FOOT TRAFFIC. SKY61jE PaUEL—� � 1'/a" � F45TEu ER FURLILJ ENDLAP DETAIL Su5ULSKY 911711E 1$4i6 END %v ro RIGGE� pv(Tom iU5LIL5KY S' ToP qn �oTfom q INSULATED SKYLITE DETAIL 14S/a" 15Z/A II DE AIL FASTENER SPACING AT PURLINS bKYL11Ei PANEL , STANDARD, FLAME SPREAD (U.L.25) RATED, & INSULATED SKYLITE INSTALLATION INSTRUCTIONS. 1. INSTALL ROOF PANELS IN ACCORDANCE WITH THE STANDARD REFERENCE S4-01 FOR BASIC ROOF CONSTRUCTION. . 2. DETERMINE THE SKYLITE POSITION FROM THE ERECTION DRAWINGS (ROOF PANELS SHALL BE FACTORY CUT ABOVE AND BELOW SKYLITES (WHERE APPLICABLE) FOR ALL STANDARD SKYLITE LOCATIONS.) 3. INSTALL SKYLITE SIDELAP SUPPORT,CHANNELS Tt�I.4 AS SHOWN IN DRAWING BELOW. APoi PAW IL 30" ro % i TZ24 FIELD CLAMP"-eZ114 PLACE TO HOLD IN POSITION DURING INSTALLATION. 4. LOCATE SKYLITE AS SHOWN IN ENDLAP DETAIL. APPLY PRESSURE SENSITIVE TAPE AT ALL SKYLITE PANEL SIDELAPS AND ENDLAPS. S. - INSTALL FASTENERS IN ACCORDANCE WITH THE PURLIN AND/OR ENDLAP FASTENER SPACING. NOTE: IT IS SUGGESTED TO PREDRILL THE SKYLITE BEFORE INSTALLING FASTENERS. THIS WILL HELP ACTURES WHIC PREVENT FRH MAY CAUSE POSSIBLE LEAKS. 6. INSTALL SIDELAP FASTENERS AS SHOWN IN ISOMETRIC. 7. INSTALLATION OF INSULATED SKYLITES IS TYPICAL TO THE ABOVE INSTRUCTIONS. B. IF NORTHERN ROOF CONSTRUCTION IS REQUIRED, ADDITIONAL SIDELAP FASTENERS MAY BE REQUIRED. SEE STANDARD REFERENCE DR AWI NG'�S4-0S, FOR SIDELAP FASTENER LOCATION.,_.__ JV QP` QJQ' h 1 Note: 11 insulation is used, field .�, `, I nc _ cat insulation -a tut kylite opening. FASTENER SPACING AT ENDLAPS IERAL NOTES: 3. SKYLITE FASTENERS FOR STD: DUTY 6 419 IS A STANDARD REFERENCE DRAWINO' TO' BE USED FLAME SPREAD RATED SKYLITES SHALL ( CONJUNCTION WITH OTHER' REFERENCE DRAWINGS MATCH ROOF PANEL FASTENERS. ND THE ERECTION DRAWINGS. 4. SKYLITE FASTENERS _ SHALL BE A t14" SELF TAPPING. A %CSCO 31I NON-STANDARD' SECTIONS' AND/OR' DETAILB� SEE SCREW WITH A 1DIA: FLAT STEEL WASHER It idRECTION DRAWINQS.. WITH ATTACHED NEOPRENE SEALING WASHER CAMEO WHITE IN bETAIL "A" TITLF INSTALLATION INSTRUCTIONS FOR STANDARD, FLAME SPREAD (U.L. 25) RATED, & INSULATED SKYLITE COLOR. MESCO METAL BUILDINGS CORPORATION • P.O. BOX G GRAPEVINE, TEXAS 76051 DATE 9/14/81 DRAWN BY DRY CHECKED BY DETAIL 'B' REVISION . 5-17-82 MM ass OF 1 FLF O.D 4015H ER TANDARD: PAGE NO. s4-06- S L- /-BIRD SCREEN GENERAL NOTES: C THIS IS A STANDARD REFERENCE DRAWING TO BE USED _ - IN CONJUNCTION WITH OTHER REFERENCE DRAWINGS AND THE ERECTION DRAWINGS. !: FOR NON-STANDARD SECTIONS AND/OR DETAILS SEE . THE ERECTION DRAWINGS.. KUbUt K LLUZUKL SPECIFICATIONS FIXED CONTINUOUS TYPE GRAVITY FLOW RIDGE VENTILATOR OF GALVANIZED STEEL. 10 FT. SECTION WITH 1/4 INCH GALVANIZED HARDWARE CLOTH BIRD SCREEN. AVAILABLE WITH 9" OR 12" THROAT. OPTIONAL 1. DAMPER OF GALVANIZED STEEL WITH CHAIN CONTROLLED OPERATOR, FUSEABLE LINK, AND 10 FT. OF NO. 8 GALVANIZED SASH CHAIN. NORMAL POSITION IS OPEN, PULL CHAIN TO CLOSE. 2. COLOR. COTE OF STANDARD MESCO WHITE. VENT IS MADE OF PRE -COATED GALVANIZED MATERIAL. NOTE: CONTINOUS VENTS WITH DAMPERS, PLACED END TO END, WILL NOT HAVE INTER- LOCKING DAMPERS. DAMPERS WILL OPERATE INDEPENDENTLY. INSTALLATION VENTILATORS MAY BE LOCATED AT ANY POINT ALONG THE RIDGE BY REPLACING 10 FT. OF RIDGE PANELS. FASTEN TO PANEL WITH FASTENERS USING' CLOSURE AND TAPE SEALER AS SHOWN. DATE 9/11/81 DRAWN BY CHECKED BY REVISION STANDARDS PAGE NO. MESCO METAL BUILDINGS CORPORATION • P.O. BOX G GRAPEVINE, TEXAS 76051 a•' AT 1/2 TO 12 SLOPS,,( ANGLE EAVE TRIM INSTALLATION a . AT 1:12 SLOP[ 4• AT 4.12 ILOPE - ROOF PANELS . _ — — — — NOTES: 1. INSTALL CLOSURE BETWEEN ROOF PANEL A EAVESTRUT. INSTALL CLOSURE 'BETWEEN TRIM A PANEL AS TRIM I$ INSTALLED. WALL PANEL CLOSURE STRIP -- ANGLE EAVE. - 2. WORKING FROM REAR OF BUILDING, PLACE TRIM I - EAVE TRIM TO FIT SNUG INTO POSITION. MAKE 'FASTENER AT. I _ !._' SURE TRIM IB FLUSH WITH CORNER TO INSURE, 10' O.C. i i SEE NOTE 1 PROPER FIT WITH RAKE TRIM. SECURE WITH FASTENERS POP RIVETS .. 1• LAP - .:. TYPE WALLI TYPE WALL PANEL I PANEL' CLOSURE STRIPSMR 1 C L,o- h/►QO I I I , Mc `?7 1'r.-t-CLQ,- I co::::4 /�� a. LAP EAVE TRIM A MINIMUM OF 1 INCH r,�+o — N�450 AND FASTEN WITH POP RIVETS. CHECK ALIGNMENT AS WORK PROORESSES. (A) LOCATE PRESSURE SENSITIVE TAPE AS SHOWN IN SECTION 'A'. / \ RAKE TRIM INSTALLATION (B) BEGIN RAKE TRI•R CI PANELS AN[ CORNER CA TO ROOF P/ WORK UP TH A MINIMUM C AS WORK PF (E) USE CORNER TO ALIGN RAI IN PLACE AS AFTER LINING .FASTENERS. GENERAL NOTES: 1. THIS IS A STANDARD REFERENCE DRAWING TO BE USED IN CONJUNCTION WITH OTHER REFERENCE DRAWINGS AND THE ERECTION DRAWINGS. 2. FOR NON-STANDARD SECTIONS AND/OR DETAILS SEE THE ERECTION DRAWINGS. za0 AVCSCO. 2 EAV T ER N TI INSTALLATION NOTESi STEP 1 SEE ANOLE' EAVE TRIM INSTALLATION. STEP 2 FASTEN OUTTEN SUPPORTS TO MAJOR RIB' OF ROOF PANEL AT 40' ON CENTER WITH A MINIMUM OF, TWO FASTENERS. ALLOW SUPPORTS TO OVERHANG PANELS AS SHOWN. UBE TRANSIT OR OTHER MEANS TO ALIGN OUTER CND OF GUTTER SUPPORTS DOWN LENGTH OF BUILDING. STEP a WORKING FROM REAR OF BUILDING, PLACE TOP LIP OF OUTTEN OVER SUPPORTS, AND BOTTOM CORNER OF GUTTER AGAINST WALL PANEL. SECURE AS SHOWN WITH FASTENERS. STEP 4 BECTION OF OUTTEN WHICH IS TO RECEIVE DOWNSPOUT OUTLET MUST BE SELECTED, AND OPENING FOR DOWNSPOUT CUT BEFORE INSTALLATION. CUT AS SHOWN, BENDI NO FLAN OE DOWN. INSTALL GUTTER SECTION ON BUILDING. SLIDE DOWNSPOUT OVER THE FLANGES AND POP RIVET IN PLACE. STEP 6 AFTER DOWNSPOUT LOCATION IS DETERMINED,' ATTACH DOWNSPOUT STRAP TO WALL PANELS WITH POP RIVETS: ATTACH DOWNSPOUT TO STRAPS WITH POP RIVET$. DIMENSION ; K' ♦GUTTER TYPE R G 1 Rt�2 6 7/8' 9 3/8• F2:1 7 1/16• 11/18 6 9/8' 10, 7 9/16. 10 9/16 7 a/4' a 1/4, • SEE ERECTION'DRAWING8 FOR TYPE OF GUTTER REQUIRED, ' I SEE STEP 3 ------ GUTTER SUPPORT (AT 40" 0. CJ I2si ` I I I - I I I I I I DIM. 'X' I I SEE STEP 2 1 STEEL LINE GUTTER SUPPORT INSTALLATION Y' FASTENER AT 1 10' O. C. I , GUTTER BUTYL MASTIC 8EE ERECTION DRAWINGS FORI -- .TYPE OF GUTTER REQUIRED. I :- I NOTt I NBTALL REMApiDER OF GUTTER U$ING BUTYL YA9TIC BEFORE A;GUTTER WORK BEGIN9,THE BUILDF AND EAVE LINESHOULD BCLEAN OF I ALL DEBRII - GUTTER LAP DETAIL j'. GUTTER INSTALLATION SEE STEP 4 g• 8 i/4• 2 1/:• 2 1/2•- a s/8- a s/6• I 1 w , I , I CUT I --- ... .-CUT . FOLD DOWN I FOLD DOWN QT2 5TR/�F Q RD2 DL RT15TR,G I r1 I RN i DOWNSPOUT CUTOUT DOWNSPOUT CUTOUT A2vl GUTTER) (12-G2 GUTTER) DATE 0716181 DRAWN BY Qv. ICHECKED BY DOWNSPOUT INSTALLATION IN REVISION LA TANDARD: PAGE NO. s0-1 11- 3 I — MESCO METAL BUILDINGS CORPORATION - P.O. BOX G GRAPEVINE, TEXAS 76051 ANGLE TRIM (T'IG I)MUST BE INSTALLED BEFORE INSTALLING ROOF PANELS. 'MR' ROOF PANEL- GLD•MRI --� TK I TRI M - FASTENER AT 10" O. C. EAVESTRUI — 'STEEL LINE, 11 SECTION AT SIDEWALL OPEN FULL HEIGHT W/ ANGLE TRIM 1. 1/2' STEEL LINE FASTENERS AT 12' PMqP 10E U7. ROOF PANEL lo PRESSURE E. , SENSITIVE TAPE - R51 MUTTER SUPPORT GUTTER _ ( RG 1 OR RG2 ) TUI EAVE SPACER TRIM FASTENER AT 10' O, C.--- 'MR' ROOF PANEL EAVESTRUT STEEL LINE SECTION AT;SIDEWALL OPEN FULL HEIGHT W/ GUTTER & DOWNSPOUTS GENERAL NOTES; (TRI) RAKE TR 1. THIS IS A STANDARD REFERENCE DRAWING TO _BE USED TUI TRIM O j IN' CONJUNCTION WITH OTHER REFERENCE DRAWINGS FAFASTENERS O AND THE ERECTION DRAWINGS. TE O.C. — — — — — , — — _ 2. FOR NON—STANDARD SECTIONS AND/OR' DETAILS SEE III THE ERECTION DRAWINGS. RAKE ANGLE ICI --- PURLIN FASTENERS AT ail EVERY PURLIN I'I — BEARING END FRAME BEAM FULL END FRAIL BEAM II 2 SECTION AT ENDWALL OPEN LULL HEIGHT B.E.F. OR FFE.F. A%CSCO 0 TITLE RAKE i EAVE SECTIONS FOR OPEN WALL CONDITIONS [DATE 9/11/81 RAWN BY DRYHECKED BY fI�REVISION • I I - 83 r_^H STANDARDS PAGE NO. 841- 13- 2 MESCO METAL BUILDINGS CORPORATION • P.O. BOX G GRAPEVINE, TEXAS 76051 i q INhULdTION OP(IDN4L i ,•. . PulEL �� y rhuYER) i, r ll 3.i. II ir"cYRIu(a91PdNGNoR igY p3uYeR) 5EGTlow A 5 13/4 �r,__RIIJIaRIP 4NLUOR bA`,.: ED(,� Vii"I�NSIOiJy B4hE EDGE k I of Eh: 1. i34hE 0GL 16 A41 OPfi(/QAL 19n1P0NENf Ur •fNE bUIi.D1Nla 6`{61 F.m, . 4ND IF ReQuIRE 17 rnu5f 13E 619E61FIE0 o�1 fWe PUFtiNA6E ORDER. P,Ah6 ED(al, 15 rrlA0ulrACTURED IN feN (10) FOOT LEu(a71a5. 2. mmlf P,469 EVFAE AfALL 00012 )PE14IKI�6. 5.6A6E ED(aE TO BE.FIELD rj1IfIeKE0 OR LAPPED AT LOR�1 • 4. b 5E EfJ(xb'(O 1156 FIELD 6GODKE12 Af ENDWALL 6OLUM106 40 Af U&M AND PF5111 C0LUMNS- 1�45�EEeE sli�_�TAL���_loq (vr�•IvNAL) ZIl POI.JXR ACfuAfEV DRIVE PI�I I �(3Y ofuERh) ge5E - eN r�LE aL UT �Llhfi NER r114NUFAGfLIRER FOR 4 . RErOmrflegpEo FA6TENItlafo -tACELY RE616f A IITERAL LOAD OF looL8,5, MR Lr.IEdR FOOT OG BpSE dUl�L6 6L 5U(a(jeAfED mlLllmuM FAbf9PIN&i: 5/32" DIA. x 11/4" DRIVE PINS Af Q'-O" o.6. WIfN Z"mILIIITIUm EDyE P16fANtE DRIVE AN6NORA4E 3/b'� P,IN(aICIPduGIIUK I CON6ULf FA6fENER MAl.luFd6fU9ER FOR REGOmmRUDEO F45feu IL4(A TU h4rELY RE515T A LptEP,AL LOAD OF IOa LB6. PER LIIJ EAR FOof OF 836E AO&LE. 6UlaG&hf60 mlglmUm FA6fENIQW 'A" PIA- X 11/4" EVi7hW61014 (%OLf AT WITH Z'I t1 IUIMUM PO(-E 716TAt.16E. Zu EXPANh10�J BOLE Coy OfHERt,) BASE �FIELO DRIUI- fPRLI 13A6EAW14LJ 10'fO GLOOR) eu�LE o;BL EXPANSION ANCHORAC-,F. 110iE: . BOtnP"Fk4f Ih FURN1511e0A6e6f4N174R0 6U(j� 6TC_D �3&2h CornpouENf OFf41E F�tJILDiL1(a UUI�v, GIaE OFfHe OpfIOIIAL P41JEL 7A°•F d1Yd�lan IaTS - — 16 SPEUFIEO-E46E ^uGLF_ I,, 11A SteNVARL' LeN6afn5 OF 25' C FP I , I PER COLU MIA 61Y. VZ'?' x 1.(4 r(1.5. PER CL I P BL o, 4 SL L2F'NRF PBF COLUMN UZI (ILIP,ZPER COLUr11U WUR IA4x 11/4" m.fl"• PER CLIP 0 0 o I 51- I--6L ENDWALL COLIMIJ 2 PER COLUmN FoU R 1/4" Yn, e, PEP, CLIP ( CG I ) BI, I 4 FLUSH FRAME COLUMN LI fg6: 1.t,&5g (AIRf IS AN OPiIoNdl.GOmPONENf oFfNE PwL17444;Y6fErr1, AWD IFR6QUIRED mu5-1 13E 5Pt�61FIED Ou THE aiRCNA6E ORDER. Z.uOL66 Age PROVIPeV ICJ ALL CRprnE GOLUmNh AND t;UDWALI- COLLIMM6 FOR AfTA64100 `545E GIRf GUPS. FIELD DRILL "O"6 I N DOOR .SAmBS. ,4N D G I X E D BA3 E r-C) .J VAN', - Wf A'f-rog. VOOR FRAM9 Amp N6If1I�RujgLpeO ORecfLYffof IE� oR FRAME OP ACLIP mU5f gE WELDED f0 fNE BOOR FR4lrIE ANPA bIR'( Of4ILLLEv GOR A WL-TED CONNEt'fION BASE 6iIl2T Z\lTAW mENT -- - (oPtlayAL) GENERAL NOTES: I.THIS' IS A STANDARD REFERENCE DRAWINQ TO BE USED IN CONJUNCTION WITH OTHER REFERENCE DRAWINGS AND THE ERECTION DRAWINGS. 2. FOR NON-STANDARD SECTIONS AND/OR DETAILS SEE THE ERECTION DRAWINGS. DATE 9/17/81 DRAWN BYV9- CHECKED BY REVISION I0 '.. C^H TANDARDI PAGE NO. S5-()1- 3 MESCO METAL BUILDINGS CORPORATION - P.O. BOX G GRAPEVINE, TEXAS 76051 1 STEP � 1 PRIOR TO INSTALLING PANELS, MARK BABE LINE AT 2'-B' INCREMENTS STARTING AT CORNER WHERE PANELING IS TO BEGIN. - STEP � 3 MEASURE AND CUT PANELS AS REQUIRED AT OPENINGS. OPENING TRIM SHOULD BE IN PLACE BEFORE INSTALLING PANELS. GENERAL NOTES: 1, THIS IS A STANDARD REFERENCE DRAWING TO BE USED IN CONJUNCTION WITH OTHER REFERENCE DRAWINGS AND THE ERECTION DRAWINGS.. 2. FOR NON-STANDARD SECTIONS AND/OR DETAILS SEE THE ERECTION DRAWINGS. 3. SEE STANDARD REFERENCE DRAWING S4-11 FOR EAVE AND RAKE TRIM INSTALLATION. (54.14 FOR M55 µi,51cw_ coNpF om) 4. SEE STANDARD REFERENCE DRAWING. SS-03 FOR CORNER TRIM AND JAMB TRIM INSTALLATION. RJR DIRECTION OF WORK —OLOCKIWI, MATERI&L .STEP. � 2 AI BLOCK GIRTS TO 'LEVEL' POSITION BEFORE STARTING PANEL INSTALLATION- (IF REGUIRED). LEAVE BLOCKING MATERIAL IN PLACE UNTIL PANEL IS FASTENED TO GIRTS. B) START PANEL AT THE CORNER. (SEE EXAMPLE 1 FOR Nit AND MalPANELS, EXAMPLE 2 FOR MC AND MBL PANELS.) USE MARKS ON BASE LINE TO ALIGN AND PLUMS FIRST WALL PANEL. CONTINUE PANELING, CHECKING VERTICAL ALIGNMENT AND COVERAGE. C) PANELS MAY BE CROWDED OR STRECNED SLIGHTLY TO MAINTAIN COVERAGE. - - D) SEE FASTENER SPACING FOR MR AND MBL PANELS. INSTALL FASTENERS AT EVERY LOW(AT 10' O.CJ FOR MBL AND MC PANELS. ��.PEAK AT GALE AND SIN4— E SLoPE gLpG. MATOR R0. r� DIRELTION OF EUOWALL <__ OIREGTION OF ELJOLLIALL 5LJ PANEL I).15TALLATIOIJ PAWFL IN61AL1-AfIoq �6L STEP 4 TRIM ENDNALL PANELS TO SLOPE OF ROOF ON BUILDINGS WITH - ROOF SLOPE GREATER THAN 1:12. L, AVC CO. EXAMPLE 1 MR & MB PANEL CoRrJER �— �"TTcEL bNe 4 y �FI E LD G�'T E�GE�,s f'1�:16L I�1NEN N�GE�.R'� ENDING 'PAUE� ENDING PANEL DETAIL` STARTING PANEL DETAIL' FASTENER SPACING 711 5_!4" 4%21 53/4 V 7" OW 42 53� FOR MULTI -RIB AND BATTEN PANELS Muyri-R10 PANEL FASTE1.169 SPAGI 5!� 1AT 0A6E GO►JItEC�IOI.J .. 155W,14 /6 15 /8 LAP SCREWS ARE TO BE SPACED AT 3'-9' AT ALL PANEL SIDELAPS. MULTI -RIB pANEL FASTENER hwAcAH!j AT ALL 41RT5 AUO EAvESfRUTS EXAMPLE 2 MC & H L PANEL' CROWD PANEL - WHEN NECEh4ARY STEEL LINE PL!hN I N AND FAVMN STARTING PANEL, DETAIL, CORNER ANGLE CONTOUR PANEL 6TdRi1►-IG PAN Et. CORNER ANGLE _ . grEt:L UNS FIEI.p CUT UcGE5`5, PANEL LWHEN NEGE/�liARY CONTOUR PANEL EuvI N4 IA 11 ENDING PANELDETAIL' FASTENER SPACM FOR CONTOUR AND lo" ro" lo" io' Io BOLDL I E PANELS . A L�-•���%� GoN10UR �NEL LAP SCREW$ ARE TO K $PACED AT V-S' AT ALL PANEL SIDELAPS. ATE cj1`�/81 DRAWN BY g!� CHECKED BY REVISION 5/26/89 3-3-83 M M TANDARDS PAGE NO. S5-02- 5 - MESCO METAL BUILDINGS CORPORATION • P^_ . D^v TFXAR 7rnc;l I z EXAMPLE —_f1 TL 1 coauER �fFt1111 hfEeL LI1J Pap RIVETS_ f h� s cTGI hieEL U►1E� CORNER fRltil ILIbTALLAfIOLI Wif" tnASOR RI0,12 AT STEEL LWE TGI POP RIV61 P-5" o d. EXAMPLE 1+—SteEL uNE EXAMPLE3 TGI 6ORUER TRIM POP RIvEf9 @ ILS"O•G I�---511EE6 U 14 E 60RW159 -rklM lg6fAU.ATIOu WITH YI1A.foR 1 GORNeR -(RIM IIWALLAT1014 W" LOW RIPS 41r ONE &FEEL UNE AND LOW RIP> 61156 At 6feeL LINE AT"OVIV61'fe 6rE6L LILaE OUTSIDE CORNER TRIM CONDITIONS `FOR MULTI —RIB & BATTEN WALL PANEL - EXAMPLE 1 EXAMPLE 2 EXAMPLE, _ �1 -me TG2 TGZ ooRuER 1RIrn� 6%6t. LINE GORIJER TRIM 6MCL, LINES IL toRNI;R TRIM �(8EL LILT POP R1veT6 @ '�. 3u�G, POP RIvff6 /ll �tfjllOG,JI PaP RIVETS O G- —1 �t TG'2 5TEEl UNE—� �--STEEL uNEEBL UNE GORN6R fRlYtl IW/,fALLA'fION WItI} MAf,99 GORIJER TRIM IL161ALLATION WItN mmSoR CORNER TIZ1119 ILJSTALLA'flDu 11,11111 LOW KI&6 At SfeEL 1.11.1E RIP5 A-1`006 9WL UNE AIAP LOW KIM R1635 Af 6fEe1. UNE JAM F5 pop Ovef@ 12"ate—ti mUL11 KIFi Peur_Ls LPoP aIVE1 MASOR RIg AT T&m6 TRIM 0 EXAMPLE D AT OPPOSITE 6'TEEL LIVE OUTSIDE CORNER TRIM CONDITIONS FOR CONTOUR & BOLD —LINE , WALL PANEL TdmB �Am6---SernB 1 EXAMPLE fl StGeL ULIe TG ( 4' mA4. CORNER TRIM hfEeL uuE Pop R1vEt5 Q 1'- 3" O•G• CORNERTRIM IL46T4LLAfI0N with trnA10R RIPS FAL.LI140 61409 f Or STEEL L106 &" I? LOW RIB AT OW051TE STeEL LINE TG2 claRwr '- STEE L mp RI) EXAMPLE �\ �.----STEEL LINE CORL1eR TRIIt1 11JSTALLATION wITN r11A,foR RIB rALJ_II-IA SNORT 0F6iEEL LINE ws7RIvBt@ IL'IO.G—� POP O. RIvwre IZ"G�� POP RIV6te1Z'O.G-� ` GENERAL NOTESa I.THIS`18 A STANDARD REFERENCE DRAWING TO BE USED IN CONJUNCTION WITN OTHER REFERENCE DRAWINGS' AND THE ERECTION DRAWINGS. mULTI-RIB PdL1EL T'S I GONiOUR PeL1eL� GOIITOuR PAIJEL !. FOR NON-STANDARD SECTIONS` AND/OR DETAILS SEE THE ERECTION DRAWINGS. LOW RIF5 Ar TAmVi TRIM EXAMPLE Z r1'1A.499 RI63 AT JAM15TR lM LOW RI F5 AT SAnt15 fKlrn - EXAMPLE ' S. CTS CORNER TRIM TO BE USED FOR'MR' OR 'NO' PANEL CT08 CORNER TRIM TO 8E USED FOR 'MC' OR VOL' PANEL REFER TO DRAWINGS ABOVE FOR SUGGESTED INSTALLATION. 4. JT/S JAMB TRIM TO BE USED ON ALL PANEL TYPES. INSTALL. • JT/6 PRIOR TO WALL PANEL INSTALLATION. JAMB TRIM CONDITIONS FOR JAMB TRIM CONDITIONS FOR MULTI —RIB & BATTEN WALL PANEL CONTOUR & BOLD —LINE WALL PANEL Ll AMSCOA CORNER TRIM & JAMB TRIM DATE 9/24/81 DRAWN BY QR, CHECKED BY REVISION STANDARD: PAGE NO. 85-03-1 MESCO METAL BUILDINGS CORPORATION • P.O. BOX G GRAPEVINE, TEXAS 76051 4Ve t=!zA►�,E� 7�ENIN � MA E <!A(._ "QU! r2EMEN7.S '�UANIT,E� SHQVJN ArZE r-Or 1) ONE EAvF F17AmE1- OPENI Fr2AME ASSEMBLY (J j _AMR * CLIPS HGT. (PTy, 7 x 3 C oa 7 5 C Cv 1- L CV 1- R CG 1 10 2 J1072S9 JiO?25C18 i 1 8 12 2 J13125q Ji�1 2SgB 1 ! 8 14 2 J1552Sg J1�S2QigB 1 i 8 I 2 J1'1925g J1"742SgB 1 1 10 18 2 J2o325g J2r):�25 g B 1 1 10 20 2 J22?25g J22.725g5 1 1 10 22 2 J2s!25g J2si25(3B 1 1 12 24 -7�:25 9 6 i 1 12 JAMB AND HEA SHAPE MUST M/ SEX. A 71-3 C J� 12Epu1►2ES A 7, HEArDEl2 9` GAGEZ, 4.Ot2 � (1, 4, Ott CC : FINISH CODE EA.S. = EACH SINE OPN'G W. (H� HEAr)ER IK IQTY. 7 w 3 C 1lz 7� 5 C 8 1 H9Co00q H 9Go009B 10 1 H 1 2000g H 1 200090 12 1 H 1440o g H 14400 g B 14 1 H 1C48009 H 1Q8o09F3 l(0 1 I H19200g H192oOg5 18 1 H21�o0og H21CooO95 20 1 H240009 H240009B 11 NOTE THIS DRAWING TO F3E U5E0 IN CONJUNCTION WITH STU. OWG5. 55 - It , PAGES B ANO C . ANO Et2ECTION 0wG5. z a�\, AMEIKO. EA\/E F12AMEO OPENINGS MATERIAL 2EQUI2EMENTS R1FSCO METAL B, IILOINGS CORPORATION • PO BOX G GRAPEVINE. TEXAS 76051 ;NSTALLATION NOTES j. SAVE F2AME^ OPENINGS ArE FIE1_n LOCATED. ANO MAY N07 A0PC-A!Z, ON ERECTION o2AWI NGS. 2. JAMBS EXTENO FROM eL TO e. E. S . UNLES5 SHOWN 07}4E12WISG ON THE ERECTION 0rZAWING5. 'S. ALL FrZAMING CONNECTIONS rZECQul t2E 1/2"0IA. x I 1/4" A30-1 FINNECIL F30L75 EXCEPT JAMB BASE ANCHOr2AGE (NOT 13y ME S CO . SEE TAIBLE 'A' FOR FOrLCES THAT MUST 14E RE - SISTED 15Y ANCHO►ZAGE DEVICES.). 4. 5EE THIS PAGE FOrL MATEt21AL5 I2E(p'D. FOQ INSTALLATION OF EAVE Pr2AMED OPENINGS. 5. LOCATE EAVE Ft2AMEO OPENING IN OESIt2EtC WALL. FIELIJ CUT PANEL OPENING AS SHOWN ON PG. C. QE-F . P4. C F012 BASE CUT-OUT. t2EF. PG. 13 FOrL FrLAMING LOCATION /CONNECTION DETAILS. NOTE : FIELD CUT GIIZT5 (TO OpE1V.WIrDTH +SDI/2"@ 7x3 C, 101/2"@7-A5C) THAT OCCU12 IN F12AME OPENING. IF OMEN. HGT. IS SUCH THAT A GI IQT, 012 GIrLTS, AF30VE OPEN. HGT. MUST BE CUT, THE CUT Poe-rION MU5T 15E FIELD QELOCATF_0 TO P12OPE12 ELEVATION(AS SHOWN ON ERECTION 0VvG 5.) 13ETwEEN JAM135. Co. 5CQUA1ZE F12AME OPC-NING AND INSTALL TrL I M AS SHOWN ON PAGE C. NOTE : JAMB TtZIM PROVIOEID IN 12'0 LENGTHS ANJO MU57 BE FI EL10 CUT. HEAD 7r21M PtZOVII:)EO IN 1210 ANIO Ce10 LENGTHS AND MUST OE FIELO CUT. REF.PAGE C FO1Z SPLICE OETAIL5. DATE MA2.20, 1984 DRAWN BY C. AND-Y HEIZO CHECKED BY M. M`Jt21CIC REVISION REDRAWN 4•2.84 TANDARDS PAGE NO. 'AGE A EAVE FRAMEDOPENING F�!',MTiyr7 CONN CTIONS CV1-L l-- OMEN I NG SIDE -WALL W 10 T 1-I GAy / E N 05AY ) SINE SPACE G►tZT (IZEF. EtZF- OWG5.) -� _------ s--//7— - ------ .. To kD � I N --3L3 I rp - II � I I z I I I I W J II I I a 1-1 11 -1 L 9 A ___ .. OPENING W 1 0 T H ( J) DENOTES JAMB ( H) IOENO-rr=5 HEAt:7El2 ®i-------- i ------ I I -p ENOWALL ( 5PACE) 5117E SPACE GIRT (I2EF- E Q E - 0vlG5. h -T Li I I L J I I In II W I II (J) l O II 2 II W 1 I Q 1 BL Ot0ENING WIDTH ENDWALL SNOWALL. (51c)E Sr.,ACE @ F.E.F> (510E SPACE @ E5.E.F.) 0 NOTESe 0eN07ES ,/ I�1A. x j I/,4';=INNECl/- I50L-r/NUT Q - INtDICATE5 NO. OF 15OLTS t2ECQ0 AT CONN . 2.) TH15 D2AWING TO 13E USED IN CONJUNCTION WIT" STD. OWG. 55 -1 1, PG. A t C AKSCO /- 1 IPa FtIFLO EAVESTI2UT LOCATE r T � I • ,I IIII cvi-L/12 = O WO DETAIL tU J Q �wV CG1 ILO QI EAVE F12AMED OPENINGS FRAMING CONNECTIONS j I I •� (H) l70 z CO DETAIL w tq o= 1 (J) _ CG1 d f- 1 I/2 j1 GI t'LT (J) 0 DETAIL (J ) \ I I GIIZTU0 I I/2n CGt � rU 0 u 5L ° , T — L— BASE ODETAI L DATE MAM . 20,1584 DRAWN BY C. ANDY PC- 2t:) CHECKED BY M. MytZICV- ODETAIL SL _ ANCHOQAGE 15O LT S REVISION f?E DIZAW N 4.2.84 TANDARDI PAGE NO. SS-11-S PAGE 5 -ff' MESCO METAL BUILDINGS CORPOPATION - P.O. BOX G GRAPEVINE, TEXAS 76051 SAVE Ft2AMC-n 00ENIN(; T?2IN4 AS-' E V 6L -PANEL F12EPARATION AT SI015WALL AT ENn_'NALL 12E1=. Or --TAIL .. r A zz PANEL Z I li) _ C9 W ;f W 1 REF. BASE N CUT-OUT m OPEN INQ WI0TH T12I M ASS Iy - INSTALLATION -- - - L CG =1 FIN r SH E d ELEVATION i 3/e,"(T`JPICAL) -OPENING LI n=,rA i I 0 FIELD SLOT PANEL A8 SHOWN j SLIDE HEAD T121M IN PANEL SLOT AND CENTE t'2 � HEADER AI5OUT CL OF OPN'G. CAULK HEAD TrZIM AT SLOT ( LENGTH OF I SLOT NOT TO EXCEEC? ai F + 1 /4 ID !! FASTEN EtZS I 1(( AT 10"O.C. A SECTION 0 y j SPLICE e 'TSicc u - NOTE: E_ I \ THIS DRAWING TO 15E USED IN CONJUNCTION za WITH STD. DWG. S5- 1 10, PIGS. A AND 13 • A%Csco EAVE FtZ.AMED OPENINGS Tt21M ASSE.M15LY MESCO METAL BUILDINGS CORPORATION • P.O. BOX G GRAPEVINE, TEXAS 76051 ') A 40 " 1— /'� I I -r / % 1 I "T OPENING W10TH + %2@7,, 5 C 10t/2'IC 7xSC i -� �- L S L �a,' •vir. AT BASE ANGLE / GIRT OPENING 3'i44 (' 7x3C W 1 O T H 5(/4 (✓ 7 x S C CTyp ) eEL n" d; AT ETAS E EOGE .J Z AT LOW 112115 AT HIGH 2115 JAM15 u JAMB AcD I * I � ,O 1 C) w Z w V W w Z JAMB JAMB t;n i * I � V O V H U fit: POP•21VETS AT 18" O.C. Ft20M INSIDE. I ATE MArZ, 20,1984 RAWN BY C.AND'd HERD HECKED BY M.MYRICK rIZREVISION EDIZAWN 4.2- TANDARDI PAGE NO. 8 a - 1 ;-C RAGE C T V2 A ;, OI^ I'e►.��: AS5 _ E L` I1�ISTALLATION (QTY. DES- ;^710N 2 _I 8GSO, O 7 x 3 C r 2 TS1 CC _ 91000, _jAMI?� -T'ZIM 1 TH1CC I-tEAn, T2tM T131 CC , SI 1L1m 'rIZIM '2ri 1/2" x 11/4" 1=INNECl/- BOLTS 2GO I/2" VIA, HEX NUTS 15 pOP_QI\/ETS G INCHES, 71.,113E - SEALANT g - 7 x 3 GAGE Cc - Tt21M r-INISH COLOrZ F. CUT PANEL - '.)INSTALL Ff2AMING G 1 t2T t3 L -�, C FIELD SLOT nNL. AS SHOVJN --77,%�--OPNIG. tZEF. SLOT DETAIL SLOT DETAIL 0 BL FINI5HE-0 ELEVATION lD of i O0 -G 159009 w s t- Co J855og T8550g* i OPENING VVIOTH A 5 I2 E Iv I0 ( 139" MAX FIELD LOCATE 3.) T121 M. SLIDE TH1cc IN SLOT � CENTER. CAULK AT SLOT. DF SECT]ON A Ll \ AVE F4 0. I/2" oIA. =INNECI< eOI_T/NLIT (T-JrJICA1,) rG11ZT J$550�� CG1 1 DETAI L A— ! 3/4 OF -TAIL _ DETAIL C— 1 1 r `/ - J8550y I 1 n -• - N t h CG 1 C r __ _ -_sL T PANEL N I L EY.PANSION 130LT5 (my OTHEns) GItZT AT LOW 121S AT HIGH IZI15 I I —TH1cc. � � I cc)� uj Z TB1 cc TS i Cc i 'CUT 012 BEND LEG OF r- — (TYP.) T51 cc (T-JR e H I GH tZl6 L U -' ® s �GI5900g-4 W U� W � Z I POP -121vETS Q- AT 10" O.C. - Polyt21VET5 AT 1811 O.C. FROM INSIIOE GIt27 RZAMED OPENINGS ASSEM15L*Y INSTALLATION rr�FREVISION EDRAWN 4-2-84 TANDARDS PAGE NO. SS-12-4 MESCO METAL BU!LDINGS CORPORATION • PO. BOX G GRAPEVINE, TEXAS 76051 m STEP i MATERIAL REQUIREMENTS �; Window Packaoe Contents: One (1) Window Unit Two (2) Pieces Jan Fins 'A' L 'I - Two (2) Pieces SnaP-On-Trim 'C' I / Additional Material Required: y For W122 WZZ 22 112 x 1 self -drilling screws; color 7 to na tch roll panel (SL-T) tube mastic 5' (SL-R3) roll mastic 2 pi eces inside closure (CLO-MCI) at Contour panel (CLO-MLI) at Boldline panel for W152 30 112 x 1 self -drilling screws; color W52 to match .all Aanel CLO•MGI 11' (SL-T) tube mastic S. (SL-R3) roll mastic 4 pieces inside closure CLO•MLI (CLO-MCI) at Contour panel (CEO-MLI) at Boldline panel For WI54 30 112 x 1 self-d ri ]ling . screws: color 1N rJ4 to match rail panel 15' (SL-T) tube na stic 10' (SL-R3) roll mastic • lit -t SELF MILLING SCREW 4 pieces inside closure (CLO-MCI) at Contour panel (CLO-MLI) at Boldline panel Installation Notes: 1. LOCATE ON WINDOW 'TOP OF WINDOW' STICKER. TU DE MASTIC (ayl•T) _ 2. FROM TOP OF YIN DOY, SLIDE JAMB FINS 'A' INTO PLACE AS SHOWN IN DETAIL 'A'. 3. Discard jamb fins 'B' to avoid confusion. �5L-Ftb) ROLL MASTIC \ 4. RETAIN SNAP -ON -TRIM 'C' FOR LA?[. USE. STEP 4 : FINISHED ELEVATION MC' OR ' ML' PANELING BASE LINE A Finished Elevation Notes: 1. Caulk sides of window as shown in section 'B-B' and along panel configuration at top (see section 'A -A'). 2. Install snap -on trim 'C' by engaging rear leg to window frame, as shown in section .I-B' end snaDDinu front leg into place. 3. TUBE MASTIC IS FIGURED IN AMOUNTS REQUIRED PER WINDOW. DO NOT DISCARD PARTIALLY USED TUBES UNTIL ALL•W 140OWS ARE INSTALLED OR TUBE Is EMPTY. STEP G. I PANEL PPEPAPGT ION Panel Preparation Notes: CLEAR OPN G. WICTI-I 1. Windows are designed for Mesco's 30' Contour (MC) and ZG' AT Z K 'j S - AT 1 %'2"5%4r la R15 CORRECT INCORRECT DETAIL 'A' TUBI MAST SECT1( HEAD SEC Boldline (ML) panels. 2. Openings are designed to occur at panel sidelaps. 3. Field cut height as shorn above and/or in section 'a -A' I' 4. Check to insure window cut is souare. 4 OR -'ML' PANEL DE CLOSURE 12•I SCREW E Or O. C. STEP 3 - WINDOW UNIT INSTALLATION I50METRiC _/1 N 301,AT WT22 ME �wIZ•I SCREweto" O. C. I IU l- WINDOW FRAME JE V ROLL ' I MA57 1 C I 43 °o v Z I 0 ' TUBE O I IM3T I G 2 C3 3 � L I SNAO'ON T'RIM'C' Z Z Q SECTION 'C 15 O )AIRS SECTION N o vexI SCREW 010"O.C. ISIDE CLOSURE ' OR 'ML' PANEL BC REIN PRAMG I I II I I '1v4C1 OR 'ML' WALL DANGLING Is; I j II I vVI.00W UNIT � II �� L•( I Il I ' evvv.0 Window Unit Installation Notes: a 1. CHECK WINDOW UNIT FOR PROPER JAMB FIN INSTALL- ATION AND 'TOP OF WINDOW' STICKER ORIENTATION. 2. Apply roll mastic to jamb fins as shorn in section 'A -A'. 3. Set bottom of window unit onto panel openings with screen facing outside of building. 4. Rotate window to vertical position and raise .window for snug fit against top _panels. 5. INSTALL A 112 x 1 SELF -DRILLING SCREW AT EACH TOP CORNER TO AVOID SLIPPAGE. AT THIS TIME CHECK . WINDOW FOR SQUARENESS AND OPERATION. 6. Install closure as shown in section 'A -A'. 7. Install remaining 112 x 1 self -drilling screws at locations shown in 'Finished Elevation'. AT WI52 OR w15d (REF. TA61-E. 1 ht • I SCREW B wINOOVH r-RAME^1 10. .G. qn ROLL /" MASTIC GLASS PANE ✓ 1AA3T IC a" AP -ON TRIM 'C' MOOav WANT WuaANR WINOOw O—SNII{IOWS WINDOW Igl1{tiT WINOOW WIOTN GLUAR O�t No. Nr. ci OOWi. WIOTN W/ w i t 2 2'-O 21-5I/C YI.OI/Z" LI.4" W / W I •t t'•O 4'.qt/t 81-01/t" SI.CO. W / W i S4 4'•0 4'.9Vt 4'-0'/t• `' to" rrtke IMTALLA710N w meawaawa aE SCO wf ICI MDniK'S GOwepwAGGA.Kv.4 11E.014061 mA r! arrwlow liAMOAap! J ULY, 5. ills RlOMwN/4A wA4Ie lao. pkA�v ARP �-2• $4 'rj5-14 owlcmle .. M.M YRICK MATEPIAL r2ECQU112EMENTS F02 3070 00012S HEAD (1 2ECQ'D W ' Ycluj y coW 0 0 0 0 w Q 8' O' 0 0 W d W� _�L IV Lv �" �' O o LL Z i � Z � SOLID CYLINDRICAL VISION CYLIND121CAL SOLID VISION j i MOIZTiSE MORTISE HEAD TQIM ) CYLINOrZICAL LOC IG (C-YL. P ZE►P LEAF) - It Sr-QE-WS Y D WEA7HEIZ.STI2t P O = 1 (3 CGS. 2EQ� t�) CLOSE R Q D ^ D l R E O / IAA N I C O t- UJI 9 8, r- DEVICE w s_ FASTEI.1E25 w In _ Ul Ill w C W C W I-- w w (D (CyL. n, = I O _ Lv -i ti W� Z 2 a- Q Q TUBE MASTIC Y v O J PeE-P. LEAF) ~ \ n VINYL DOOrZ SWEEP J U O 9 ~ Q (��1 O 1=ASTENERS 0 `2EC0 O/ w o j �L, IrI012TISE LOCK. 4 Q THRESHOLD _ it )11 ( MORTISE PIQEP. L�A�� 3 OPTION OPT' ON NOTES i. A� L pAI2T5 FO2 LOCV-5ET N57ALLA710S-i NOT 5.40WN. 2EFE►2ENCE LOCV-SET PACK -AGE F012 IN572UC71ONS. 2. ,-HIS D4AWING IS TO BE USED WITH 5T0. DWG. 55-23 ANO 55-Z4 I=02 3070 0002 INSTALLATION. 3. t2EFER.ENCE 15ILL OF MATE21AL FOrZ ITEMS PQOvIC`r WITH THE A55rzVeLY. LOCATE WEATHEQSTRItp/ rHtZESMOLO IcIT AS SHOWN. OUTSIDE OUTSIv@ --- 6� WTST2.�—-vn D0012 0 DOOrz �� VINYL C�OOn WTSTIZ. 5WEE P OUT510E D00r2 JAMB HEAD ra TI-ft2FSN01_n TITLE 3070 000r2 MATErZIAL rZEgUIr2EMENT5 WITH ALUMINUM TrZ'M IGIT RATION • PO. BOX G GRAPEVINE, TEXAS 76051 DATE MA12.15, l984 DRAWN BY C. ANC)Y HERO CHECKED BY M. My171CK r12REVISIONED12AWN 4,78¢ TANDARD! PAGE NO. SG-21-0 L MATEQI AL 12EQU I P EM ENTS F012 607O D00r25 UL W J O O of O O SOLID CYLI NDRI CAL a[ I ul u VISION CYLINDMICAL (A) ACTIVE -CYL. OR MORTISE ( I) INACTIV E - CYL . ONLY 00 0 A SOLID VISION MORTI S E MOrz'T I S E Y iy LL HEAD ( i 12ECQ'D 5 CD W �[ !D Il 7 W w N w = I CyL. - N 3 A FILLER PL. 0(i R(P.) i >0 Q • api 113 193 L O — > er IL0 flt Z OO LL to 0-' Z _o HEAD TRIM CYL I NDR I CAL I-- ..-J LOC14 (CyL. PQF-P- LEAF) �t r 5Cr1E� o WEATHERSTI?IID O c t15 = (S PCs. IZE(o'D) GLOSEt2 1-r• 12 fl C12ECD�0 ® o PANIC W r a p _ f- DE�IICE - FASTENERS Y Ww qn Jw N CCyL. O Lv H Y P2EP. LEAF) U J Z N j U Y1N,lL TUSE O DOOR SWEEP fl! FASTENER3 {- < v Q MASTIC 0 L-i LLJQ o rn OLu L-i (rz' � . n Q HrzSsNol_o (MORTISE IO2Ep. LEAF 3 OPTION OPTION NOTES: J. ALL PAQTS FOR LOCIGSET INSTALLATION NOT SHOWN. 12Er-EtZENCE LOCIC.SET f0AC4A6E-- FO►Z IN5T12UCT1ON5. 2. Tµ15 DRAWING 15 TO 5E USED WITH STD• OWG5. 55-23 AND 55-24 FO2 GO70 000rz INS-TAL.LATION. 3. Pe;=elZ TO 15ILL OF MATErLIAL FOtZ ITEMS PeoVloeo WITH Tb-IE A55EMeLY. AMESCO LOCATE WEATHC-rZSTRIID/THtZE5HOL0 KIT AS SHOWN. OUTSIDE OUTSIDE — Al T 5T Q. . 000 2 VINYL 0002 W rST,+2 DoorL i,,,, SWEEP OUT. JAMS a HEAD @ -rHIzESI-+OLC? TITLE G070 OOOt2 MATEiZIAL QS(QuirzEMENTS WITH ALUMINUM TtZIM 14IT DATE MAMAS..1984 DRAWN BY C. ANDY HE120 CHECKED BY M.MYIZICW- IF REVISION aEMAWN. 4.-2.84 TANDARDI PAGE NO. S5-22-0 MESCO METAL BUILDINGS CORPORATION • PO. BOX G GRAPEVINE, TEXAS 7W51 L F s - L INSTALLATION sTeP L: PANEL P12EPAt2A?ION 12EF. DETAIL 'A' (TYn) C.] T5I/4a @ G070 DOOt2 39 /4"I 0 3070 DOOM MAN eL Z Z i Ili CL i a0 EL ` I o I a REF. STEP 2 FIELD CUT OIDN'G A5 SHOWN Go 13/8 (TVP.) (I OPN'G. jl BL F1 ELD SLOT PNL. AS SHOWN! DETAIL A INSTALLATION STEP 3 : FRAME ASSEMBLY ,11 5/1G" DIA, x /4 LG. 50L7 (2 PE►2 JAMS) 1/4" DIA. EXPANSION BOLT (2 PEIZ JAMS) n I%e- r- r,I rr r11 IT ,NSTA+LLAWON STEP 2: Di1JC L•v I vLr' I 7311 77 " @ G070 000t2 AT BA�t GIRT 37 M 4111 @ 3070 00012 AT eASt IGINT SL AT BASE ANGLE 2" 7311 @ Cb070 BOOR (TyP.) 3711 @ 3070 0OOt2 - - BL 147 AT BASE EDGE l/-PANEL FRAME HEAD IL I1 I 12EF. NOT If II 4` H EAD GIRT ' SECTION 13 GOOrL F12AME TO G1rZT FRAME JAMS r 1 5/8" ± (TyP.) I I I' ! I * NOTE : D001Z FRAME MUST 66 CENTEIZED IN PNL. OPENING AtESCO s _.. I/4" DIA. 50LT ' (TYP.) = o o INSIDE OF BLDG o " 1 3�0OR 72 If I ^ 1 3 8012 74" �SECTIQN AAOIZ BOLT PLAN MESCO METAL BUILDINGS CORPORATION • P.O. BOX G GRAPEVINE, TEXAS 76051 INSTALLATLON NOTES L. USING BILL OF MATEMIALS ANO 9T0. DWG. 55-21 O2 55 -22 , LOCATE ALL MATE121ALS REQp. TO INSTALL, THE SIZE OF 00012 P120v10EO WITH THS ASSEMeLV. 2. AFTETZ (DOOM t.00A-rl ON HAS SEEN ESTABLISHED FIELD CUT PANEL OPENIN6 AS SHOWN IN INSTALL- ATION STEP L 'PANEL PIZEPA12 - ATION 3. REMOVE PANEL BASE ANCHORAGE MATE121AL TO DIMENSIONS SHOWN IN IN5TALLATION STEP 2 f BASE CUT• OUT'. a) IF 6A5E OR, INTERMEDIATE G112T IS PROVIDED, FIEL0 CUT AS NOTED AND ATTACH TO OOOt2 FRAME WITH SCt2EWS AT LOCATIONS SHOWN ON E12 EGTI ON O W65. 4, ASSEMBLE DOOR. Ft2AME WITH bOLTS Pt2OVIDED IN 41T. S(pUAIZE FRAME AND ATTACH HEAD TO 6.1QT WITH SELF•DIZILLING SCr2EW5 AS SHOWN IN SECTION IB, NOTE DOOR FRAME MUST 6E CENTECE0 IN PANEL CUT-OUT TO ALLOW TQIN INSTALLATION TO WOt21G. ATTACH 6A5E OF DOOM Fr2AME TO ANCH02 POINTS AS SHOWN IN SECTION "A". S. 5EE STD. OWG. S5 -24 FOCZ 7t21 M INSTALLATION, INSTALL HEAD 'TRIM BEFORE SIDE TRIM. DETERMINE PNL. T'yPE AND INSTALL A5 SHOWN IN TM I M ASSEMZLy. G. INSTALL W EATHL125T21 P/THIZESI40LO ANO/OR CLOS E2 I F 2Eqpu 11ZEID. DATE MA12.15,r 1964 DRAWN BY C. ANDY HERO CHECKED BY M.MVVZICIC REVISION R<`DQAW N 4.2. 8 TANDARDI PAGE NO. SS-231-0. .J J I I W U Z h- a, ZO I N PANEL FA-5,7ENEr2S HEAL? TIZiM c ATE „ 5 O c 1 1 5 "_ — FI NISNED E `E� TT.0, EX'TE.121012 VIEW SHOWN IN'TErZIOr2 vIEW AS NOTED(*) I II I G112T II I IN-rE210t2 PNL, 11 I f III (A5 t2E421'J) II I i -Ft2AME I i II, r I I \ I L HEAD T12 I M (A5 rLE(p0 ) @ SECTION E JAM15 r FAsTENEl2s @ to"o.c. r PANEL i2ECEpT012 4 AT IN7EI210►Z PANEL ANC?/Orz, AT A PANEL NOTCH LESS THAN 31tC."/ FI EL0 CUT rZECEPTOIZ AND CAP TO FIT. IN5TALLATION 5•TEP 5 : LOC14SETS QEFEl2 TO INSTIZLIC710N PACT -AGE P120VI0ED vvi-rH LOCIZ-SETS 1~Orz INSTALLATION. NOTE: CYLIPl0QICAL PQI-P L00' ZAP USE WI'rH C'JLIhD121CAL LOC1<-SET5 AND/OrL At. IC DEVICE. IvtC�r<T+SE �t2E�'• DCCq LEAF �:Orz U5'E VVITH Pvlorz7!ss L4�:KSET5 lb AT Mr2 ' PNL. CAULK HEAD -rf2 i M AT SL07 ( LENG71-1 0$= SLOT NOT TO EXCEED Ij4„ AS SHOWN IN ll '*"' SLIDAoEHL0 I5TI 1VA N ( 1 ANO CEN-r15-Z AEiOU-r OP PNL-OPENING- DETAIL C HEAD TrZIM INSTALLATION JAMI5 r FASTENERS @ 10" O.C. I i IZECEPT012 1 * I'ZECEPTOtZ INSTALLATION PANEL .%'--POP•IZIVETS@ 10"o.C. AZ IMC'012 �ML' PNL. SECTION 'ID' INSTALLATION STEP G 60 /0 HAIL DwAt2C JAM15 12ECEPTOM CAP _ 120TA't E CAP �4G INSTALLATION I I! Q�OTO 0002 12ETuI12E (1 )ONE ACTIVE LEAF AND(i) ONE INACTIVE LEAF. INACTIVE LEAF IS AL V\)Ay5 A CYLI ► CrZI CAL R12E►- ooOt2 LEAF. HEAD BOLT FASTEN'rZ OUTSIDE Eol C`JL. r-02. PL. It". LEAF A.LEAF INSTALL CyLINl712iCAL FILLE2 r='L.A"'rE, AST2AG�'+1., HEAL? ANC FOOT 15OLT TO !NAC-TIv6 LEA1=. FOQT E`�LT \—ASTWAGAL, TITLE 3070/eO7O 000rZ INSTALLATION WITH ALUMINUM -rt2IM KIT IT AVESCO a GONT.) MESCO VETAL. BUILDINGS CORPORATION • PO. BOX G GRAPEVINE, TEXAS 76051 DATE MAQ. 15, 1984 DRAWN BY C. AND`! HE120 CHECKED BY M. My121cIG REVISION REDRAWN 4•Z•8¢ TA NDARDI PA, GE NO. SS-24-®