Loading...
HomeMy WebLinkAbout269 Bellagio CirSANFORD FIRE DEPARTMENT FIRE PREVENTION DIVISION 300 N. Park Ave., Sanford, Fl. 32771 / P. O. Box 1788, Sanford, Fl. 32772 (407) 302-1091 / FAX (407) 302-2625 F - �D b Plans Review Sheet Date: 8/03/07 Business Address: 269 Bellagio circle #3 Occ. Business Business Name: The Fountain Market Place Ph. (407)264-0100 Contractor: ADTsecurity Fax (407)712-1813 Reviewed [ ] Reviewed with comment [ x ]j Rejected [ ] Reviewed by: Orlando Nunez, Fire Inspector/Plans Examiner Comment: 1.1 Application — The following items submitted for permitting 1.2 Will need to submit approved sprinkler plans. Please call (407) 302-1022 Inspector James for fire inspections 48 notice required on all inspections. 1 Compliance Summary Component Gross Energy Use LIGHTING CONTROLS EXTERNAL LIGHTING HVAC SYSTEM PLANT WATER HEATING SYSTEMS PIPING SYSTEMS Met all required compliance from Check List? Design 1,847.8 Criteria Result 2,507.7 ASSES ASSES A S None Entered None Entered None Entered Yes o/NA RTANT NOTE: An input report of this design building must be submitted with this Compliance Report. 7/20/2007 EnergyGauge. FLA/COM 2004 v3.00 2 CERTIFICATIONS I hereby certify that the plans and specificatio s covered by this calculation are in compliance with the Florida Energy Code Prepared By Building Official: Date: vG _ Date: I certify that this building is in compliance with the FLorida Energy Efficiency Code Owner Agent: Date: If Required by Florida law, I hereby certify (*) that th s sign' in compliance with the FLorida Energy Efficiency Code Archite Reg No: Electrical Desi&mer: Reg No: Lighting Designer Reg No: Mechanical Designer: ►�� � /�L / �.y�,,�/ Reg No: ��%yY1 O Plumbing Designer: Reg No: {"} Signature is required where Florida Law requires design to be performed by registered design professionals. Typed names and registration numbers may be used where all relevant information is contained on signedisealed plans. nergyGauge Summit v3.10 incorporating Florida Energy Code Version - FLA/COM 2004 v2.E 3 Project: Tennant Suite # 3 Title: Tennant Suite # 3 Type: Office (WEA File: Orlando.TMY) Whole Building Compliance Design Reference Total 72.52 100.00 $1,848 $2,508 ELECTRICITY(MBUk 72.52 100.00 Wh/$) 36302 50053 $1,848 $2,508 AREA LIGHTS 20.97 16.70 10498 8362 $534 $419 MISC EQUIPMT 9.14 9.14 4583 4583 $233 $230 PUMPS & MISC 0.12 0.12 62 64 $3 $3 SPACE COOL 25.95 23.61 12993 11813 $661 $592 VENT FANS 16.34 50.44 8166 25231 $416 $1,264 Credits & Penalties (if any): Modified Points: = 72.53 r- -PASSES 7/20/2007 EnergyGauge FLA/COM 2004 v3.00 Project: Tennant Suite # 3 Title: Tennant Suite # 3 Type: Office (WEA File: Orlando.TMY) External Lighting Compliance Description Category Allowance Area or Length ELPA CLP (W/Unit) or No. of Units .(W) (W) . (Sgft or ft) Ext Light 1 Other (doors) than main entries 20.00 18.0 360 100 Design: 300 (W) PASSES Allowance: 360 (W) Project: Tennant Suite # 3 Title: Tennant Suite # 3 Type: Office (WEA File: Orlando.TMY) Lighting Controls Compliance Acronym Ashrae Description Area No. of Design Min Compli- ID (sq.ft) Tasks CP CP ance Toilet 6 Toilet and Washroom 57 1 1 1 PASSES Open Work Area 16 Office - Open Plan 2,006 1 2 1 PASSES Mezzanine Storage 3 Storage & Warehouse - Bulky 522 1 1 1 PASSES Active Storage Stair 4. Stair - Active Traffic 92 1 1 1 PASSES PASSES 7/20/2007 EnergyGauge FLA/COM 2004 v3.00 Project: Tennant Suite # 3 Title: Tennant Suite # 3 Type: Office (WEA File: Orlando.TMY) System Report Compliance RTU-1 System 1 Constant Volume Packaged No. of Units System 1 Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Cooled 65000 to 135000 Btu/h Cooling Capacity Air Handling Air Handler (Supply) - System -Supply Constant Volume 13.00 10.30 13.00 PASSES 0.31 0.90 PASSES RTU-2 System 2 Constant Volume Air Cooled No. of Units Single Package System < 1 65000 Btu/hr Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Cooled < 65000 Btu/h Cooling Capacity Air Handling Air Handler (Supply) - System -Supply Constant Volume 13.00 13.00 13.00 PASSES 0.23 0.90 PASSES PASSES Plant Compliance Description Installed Size Design Min No Eff Eff Design Min Category Comp IPLV IPLV liance None Water Heater Compliance Description Type Category D Design Min Design Max Comp Eff Eff Loss Loss liance None 7/20/2007 EnergyGauge FLA/COM 2004 v3.00 Piping System Compliance Category Pipe Dia Is Operating Ins Cond Ins Req Ins Compliance [inches] Runout? Temp [Btu-in/hr Thick [in] Thick [in] [F] SF.F] None Project: Tennant Suite # 3 Title: Tennant Suite # 3 Type: Office (WEA File: Orlando.TMY) Other Required Compliance Category Section Requirement (write N/A in box if not applicable) Check Infiltration 406.1 Infiltration Criteria have been met System 407.1 HVAC Load sizing has been performed d Ventilation ADS 409.1 410.1 Ventilation criteria have been met Duct sizing and Design have been performed T & B 410.1 Testing and Balancing will be performed d Motors 414.1 Motor efficiency criteria have been met Lighting 415.1 Lighting criteria have been met raw/ O & M 102.1 Operation/maintenance manual will be provided to owner Roof/Ceil 404.1 R-19 for Roof Deck with supply plenums beneath it Report 101 Input Report Print -Out from EnergyGauge FlaCom attached? 7/20/2007 EnergyGauge FLA/COM 2004 v3.00. EnergyGauge FLA/COM 2004 v3.00 INPUT DATA REPORT Project Information Project Name: Tennant Suite # 3 Orientation: West Project Title: Tennant Suite # 3 Building Type: Office Address: 269 Bellagio Circle Building Classification: Renovation to existing building State: Florida No.of Storeys: 2 Zip: 32771 GrossArea: 2677 SF Owner: Zones No Acronym Description Type Area Multiplier Total Area Istl Isf] 1 I St Floor Zone 1 CONDITIONED 2062.6 1 2062.6 ❑ 2 2 nd Floor Zone 2 CONDITIONED 614.0 1 614.0 ❑ 7/20/2007 EnergyGauge FLA/COM 2004 v3.00 1 Spaces No Acronym Description Type Depth Width Height Multi Total Area Total Volume IN [ft] [ft} plier [sf] [cf] In Zone: 1 St Floor 1 Toilet Zo0Sp2 Toilet and Washroom 8.50 6.66 9.00 1 56.6 509.5 ❑ 2 Open Work ArZo0Sp6 Office - Open Plan 78.18 25.66 9.00 1 2006.0 18054.0 ❑ In Zone: 2 nd Floor 1 Mezzanine StoZo0Sp1 Storage & Warehouse - 20.34 25.66 8.00 1 522.0 4175.8 El Bulky Active Storage 2 Stair Zo0Sp3 Stair - Active Traffic 11.00 8.36 22.00 1 92.0 2023.8 El Lighting No Type Category No. of Watts per Power Control Type No.of Luminaires Luminaire [W] Ctrl pts In Zone: 1 St Floor In Space: Toilet 1 Compact Fluorescent General Lighting 2 34 68 Manual On/Off 1 El In Space: Open Work Area 1 Recessed Fluorescent - General Lighting 20 128 2560 Manual On/Off 2 No vent In Zone: 2 nd Floor In Space: Mezzanine Storage 1 Recessed Fluorescent - General Lighting 6 128 768 Manual On/Off 1 El No vent In Space: Stair 1 Suspended Fluorescent General Lighting 1 32 32 Manual On/Off 1 El 7/20/2007 EnergyGauge FLA/COM 2004 v3.00 Walls No Description Type Width H (Effec) Multi Area DirectionConductance Heat Dens. R-Value [ft] [ft] plier [sf] [Btu/hr. sf. F] Capacity [lb/cf] [h.sf.FBtu] [Btu/sf.F] In Zone: 1 St Floor 1 PrOZo1Wa1 Concrete Tilt Wall 25.66 12.00 1 307.9 West 0.3139 14.496 119.74 3.2 ❑ w/ .75"ins./GypBd 2 PrOZo 1 WO Concrete Tilt Wall 25.66 22.00 1 564.5 East 0.3139 14.496 119.74 3.2 ❑ w/ .75"ins./GypBd In Zone: 2 nd Floor 1 PrOZo2Wal Concrete Tilt Wall 25.66 11.00 1 282.3 West 0.3139 14.496 119.74 3.2 ❑ w/ .75"ins./GypBd 2 PrOZo2Wa2 Partition wall, 0.75 25.66 11.00 1 282.3 North 0.8350 2.500 100.00 1.2 ❑ in. gyp, airspace, 0.75 in. gyp Windows No Description Type Shaded U SHGC Vis.Tra W H (Effec) Multi Total Area (Btu/hr sf F] IN [ft] plier [sf] In Zone: 1 St Floor In Wall: West 1 PrOZo 1 Wal Wi 1 User Defined No 1.2500 0.82 0.76 4.66 8.00 2 74.6 ❑ 2 PrOZo1Wa1Wi2 User Defined No 1.2500 0.82 0.76 6.00 8.00 1 48.0 ❑ In Zone: 2 nd Floor In Wall:. West 1 PrOZo2WalWi1 User Defined No 1.2500 0.82 0.76 4.66 4.66 3 65.1 ❑ Doors No Description Type Shaded? Width H (Effec) Multi Area Cond. Dens. Heat Cap. R-Value [ft] [ft] plier [sf] [Btufhr. sf. F] [lb/cf] [Btu/sf. F] [h.sf.FBtu] In Zone: 1 St Floor In Wall: East 1 PrOZolWa3Dr1 Hollow core flush No 3.00 6.66 1 20.0 0.7553 0.00 0.00 1.32 ❑ 7/20/2007 EnergyGauge FLA/COM 2004 v3.00 In Zone: 2 nd Floor In Wall: Partition 1 PrOZo2Wa2Dr1 Solid core flush No 3.00 6.66 1 20.0 0.3504 0.00 0.00 2.85 ❑ (2.25) Roofs No Description Type Width H (Effec) Multi Area Tilt Cond. Heat Cap Dens. R-Value [ft] [ft] plier [sf] [deg] [Btu/hr. SE F] [Btu/sf. F] [lb/cf] [h.sLFBtu] In Zone: 1 St Floor 1 PrOZo1Rfl Mtl Bldg Roof/R-19 25.66 55.65 1 1428.0 0.00 0.0492 1.34 9.49 20.3 ❑ Batt In Zone: 2 nd Floor 1 PrOZo2Rf1 Md Bldg Roof/R-19 25.66 24.32 1 624.0 0.00 0.0492 1.34 9.49 20.3 ❑ Batt Skylights No Description Type U SHGC Vis.Trans W H (Effec) Multiplier Area Total Area [Btu/hr sf F] [ft] [ft] [Si] [Sf] In Zone: In Roof: ❑ Floors No Description Type Width H (Effec) Multi Area Cond. Heat Cap. Dens. R-Value [ft] [ft] plier [sq [Btu/hr. sL F] [Btu/sf. F] [lb/cf] [h.sEFBtu] In Zone: 1 St Floor 1 PrOZo1F11 1 ft. soil, concrete 25.66 80.01 1 2053.0 0.1745 54.00 108.00 5.73 0 floor, carpet and rubber pad 7/20/2007 EnergyGauge FLA/COM 2004 v3.00 Systems RTU-1 System 1 Constant Volume Packaged System No. Of Units 1 Component Category Capacity Efficiency IPLV 1 2 Cooling System (Air Cooled 65000 to 135000 BtLA Cooling Capacity) Air Handling System -Supply (Air Handler (Supply) - Constant Volume) 72000.00 13.00 13.00 2400.00 0.31 ❑ ❑ RTU-2 System 2 Constant Volume Air Cooled Single No. Of Units 1 Package System < 65000 Btu/hr Component Category Capacity Efficiency IPLV 1 2 Cooling System (Air Cooled < 65000 Btu/h Cooling Capacity) Air Handling System -Supply (Air Handler (Supply) - Constant Volume) 24000.00 13.00 13.00 800.00 0.23 Plant Equipment Category Size Inst.No Eff. IPLV Water Heaters W-Heater Description Capacit3Cap.Unit UP Rt. Efficiency Loss Ext-Lighting Description Category No. of Watts per Area/Len/No. of units Control Type Wattage Luminaires Luminaire [sf/ft/No] [W] 7/20/2007 EnergyGauge FLA/COM 2004 v3.00 I Ext Light 1 Other (doors) than main 3 entries 100 18.00 Astronomical Timer Coi 300.00 ❑ Piping No Type Operating Temperature [F] Insulation Conductivity [ Btu-in/h.sf.F] Nomonai pipe Insulation Is Runout? Diameter Thickness [in] [in] Fenestration Used Name Glass Type No. of Glass SHGC VLT Panes Conductance [Btu/h.sf.F] ASHULSg1C1rAll User Defined 1 1.2500 0.8200 0.7600 ❑ Frm Materials Used Mat No Acronym Description Only R-Value Used RValue [h.sf.F/Btu] Thickness [ft] Conductivity [Btu/h.ft.F] Density [lb/cf] SpecificHeat [Btu/1b.F] 187 Mat1187 GYP OR PLAS No 0.4533 0.0417 0.0920 50.00 0.2000 ❑ BOARD,1/2IN 178 Mat1178 CARPET W/RUBBER PAD Yes 1.2300 ❑ 265 Mat1265 Soil, 1 ft No 2.0000 1.0000 0.5000 100.00 0.2000 0 48 Mat148 6 in. Heavyweight concrete No 0.5000 0.5000 1.0000 140.00 0.2000 ❑ 57 Mat157 3/4 in. Plaster or gypsum No 0.1488 0.0625 0.4200 100.00 0.2000 ❑ 72 Mat172 AIR LAYER, 3/41N OR Yes 0.9000 ❑ LESS, VERT. WALLS 269 Mat1269 .75" ISO BTWN24" oc No 2.2321 0.0625 0.0280 4.19 0.3000 ❑ 7/20/2007 EnergyGauge FLA/COM 2004 v3.00 6 23 Mat123 6 in. Insulation No 20.0000 0.5000 0.0250 5.70 0.2000 ❑ 94 Mat194 BUILT-UP ROOFING, No 0.3366 0.0313 0.0930 70.00 0.3500 ❑ 3/81N Constructs Used Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sfF] [Btu/sf.F] [lb/cf] [h.sf.FBtu] 1025 Hollow core flush No Yes 0.76 1.3 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 276 Hollow core flush (1.75") 0.000 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/cf] [h.sf.FBtu] 1047 Mtl Bldg Roof/R-19 Batt No No 0.05 1.34 9.49 20.3 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 94 BUILT-UP ROOFING, 3/81N 0.0313 0.000 ❑ 2 23 6 in. Insulation 0.5000 0.000 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.F] [Btu/sEF] jib/co [h.sfFBtu] 1056 Concrete Tilt Wall w/ .75"ins./GypBd No No 0.31 14.50 119.74 3.2 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 48 6 in. Heavyweight concrete 0.5000 0.000 ❑ 2 269 .75" ISO BTWN24" oc 0.0625 0.000 ❑ 3 187 GYP OR PLAS BOARD,1/21N 0.0417 0.000 ❑ 7/20/2007 EnergyGauge FLA/COM 2004 v3.00 7 Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.F) [Btu/sEF] [lb/cf] [h.sf.FBtu] 1057 1 ft. soil, concrete floor, carpet and rubber pad No No 0.17 54.00 108.00 5.7 ❑ Layer Material Material Thickness Framing No. [ft] . Factor 1 265 Soil, 1 ft 2.0000 0.000 ❑ 2 48 6 in. Heavyweight concrete 0.5000 0.000 ❑ 3 178 CARPET W/RUBBER PAD 0.000 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/cf] [h.sf.F/Btu] 1058 Solid core flush (2.25) No Yes 0.35 2.9 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 279 Solid core flush (2.25") 0.000 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/cf] [h.sf.FBtu] 1059 Partition wall, 0.75 in. gyp, airspace, 0.75 in. No No 0.83 2.50 100.00 1.2 ❑ gyp Layer Material Material Thickness Framing No. [ft] Factor 1 57 3/4 in. Plaster or gypsum 0.0625 0.000 ❑ 2 72 AIR LAYER, 3/41N OR LESS, VERT. 0.000 ❑ WALLS 3 57 3/4 in. Plaster or gypsum 0.0625 0.000 ❑ 7/20/2007 EnergyGauge FLA/COM 2004 v3.00 8 City of Sanford Building Division 300 N. Park Ave Sanford, Florida 32771 Phone: 407.330.5656 Fax: 407.328.3859 PLAN REVIEW RESPONSE Date: August 23, 2007 Contact Person: Norman Hallock Contact Phone Number: 321-947-3150 Contact E-mail Address: Reference Number: 07-2799 Project Description: Tenant Finish Job Address: 269 Bellagio Cir. (Suite 3) Contact Fax Number: 407-644-2617 The following is a list of the areas of the submitted plans that contained violations of the codes adopted by the City of Sanford and enforced by the Building Division. The violations noted must be addressed before the plans can be approved. Changes to plans shall be submitted on the same size format as the original submittal. Changes to construction documents that require an Architect or Engineer's seal must be submitted with the appropriate seal. ARCHITECTURAL A-1 Enclosed usable space under stairs are required to be protected by a minimum one -hour fire resistive construction. Provide an approved assembly for the walls and ceiling. FBC 1019.1.5. PLUMBING P-1 B-occupancy use groups require a drinking fountain per FPC Table 403.1. Bottled water is not allowed for substitution when there is a single fountain. FPC 410.1 Any error or omission in this plan review shall not be construed to grant approval of any violation of any of the adopted codes or municipal ordinances of this jurisdiction. Please direct any questions you may have to Wayne Thorne at (407) 330.5686 or fax to (407) 328.3859. You may also contact me by E-mail at thornew@ci.sanford.fl.us. - 1 -