HomeMy WebLinkAbout4111 - 4121 Centerline Ln+� SANFORD FIRE DEPARTMENT
FIRE PREVENTION DIVISION
300 N. Park Ave., Sanford, FI.32771 / P. O. Box 1788, Sanford, Fl. 32772
(407) 302-2516 / FAX (407) 302-2526
Fire Marshal Robles
Plans Review Sheet FFIC
Date: 5/19/07 Business Address: 4111-4121 Centerline Lane
Occ. Air Craft Hanger (interior build out) 1, 581 sq ft
Corporate Hanger Type #2INEP.A. #409
Business Name: Orlando Sanford Airport /South West Ramp
Contractor: Winter Park Construction Ph. (407) 644-8923
Fax. (407) 645-1972
Architect/Engineer: Eric Kuritzky Phone (407) 898-6654
Fax (407) 898-7992
Reviewed Reviewed with comment [X ]
Reviewed by: Timothy Robles, Fire Marsha
Comment: (Corporate Hanger #8)
1.1 Application — Construction of 1, 581 sq ft type #2 hanger with
1.2 Submittal not a T- hanger Storage Hanger Per N.F.P.A #409.
1.3 Local Sanford Fire Prevention Code 49 does not apply to hanger usage (see article #-sec-9-
11).
1.4 Two fire extinguishers required per tenant space 1-20Pound Purple "K" in plan storage
area. One (1) 3A10 BC fire extinguisher required in the interior office.
1.5 Address required being 6" inches and contrasting in color.
1.6 Call (407) 302-2516 for all fire inspections
E
X
1
Florida Energy Efficiency Code For Building Construction
Florida Department of Community Affairs
EnergyGauge FLA/COM 2004 v3.00 -- Form 40OA-2004
Method A: Whole Building Performance Method for Commercial Buildings
Effective December 8; 2006
PROJECT SUMMARY
Short Desc: CORPORATE HANGER Description: 4111-4121 CORPORATE
Owner:
Addressl: SE RAMP ORLANDO SANFORD AIRPORT City: SANFORD
Address2: State: FLORIDA
Zip: 0
Type: Office Class: New Finished building
Jurisdiction: SANFORD, SEMINOLE COUNTY, FL (691500)
Cond Area: 1566 SF Cond & UnCond Area: 1566 SF
No of Storeys: 1 Area entered from Plans 0 SF
Permit No: 0 Max Tonnage 4
If different, write in:
5/7/2007 EnergyGauge FLA/COM 2004 v3.00 FF 10E 1
Compliance Summary
Component Design. Criteria Result
Gross Energy Use 1,28.0.4 1,355.7 PASSES
LIGHTING CONTROLS
EXTERNAL LIGHTING
HVAC SYSTEM
PLANT
WATER HEATING SYSTEMS
PIPING SYSTEMS
Met all required compliance from Check List?
PASSES
None Entered
PASSES
None Entered
PASSES
PSSES
Yes/No/NA
IMPORTANT NOTE: An input report of this design building must be submitted
along with this Compliance Report.
5/7/2007 EnergyGauge FLA/COM 2004 v3.00 2
CERTIFICATIONS
I hereby certify that the plans and specifications covered by this calculation are in compliance with the
Florida Energy Code
Prepared By: Building Official:
Date: Date: ((l % O 7
I certify that this building is in compliance with the Florida Energy Efficiency Code
Owner Agent: Date:
If Required by Florida law, I hereby certify (*) that the system design is in compliance with the FLorida
Energy Efficiency Code
Architect: Reg No:
Electrical Designer: Reg No:
Lighting Designer: Reg No:
Mechanical Designer: Hossein Dayi Reg No: 53461
PlumbingDesigner: Hossein Da i
g y Reg No: 534
(*) Signature is required where Florida Law requires design to be performed by registered design 1
professionals. Typed names and registration numbers may be used where all relevant information is
contained on signed/sealed plans.
5/7/2007 EnergyGauge FLA/COM 2004 v3.00 3
Project: CORPORATE HANGER
Title: 4111-4121 CORPORATE HANGER
Type: Office
(WEA File: Orlando.TMY)
Whole Building Compliance
Design Reference
Total 94.44 100.00
$1,280 $1,356
ELECTRICITY(MBtu/k
94.44
100.00
Wh/$)
25404
26898
$1,280
$1,356
AREA LIGHTS
17.97
19.61
4839
5275
$244
$266
MISC EQUIPMT
12.75
12.75
3442
3442
$173
$173
PUMPS & MISC
0.11
0.11
32
32
$2
$2
SPACE COOL
21.90
20.59
5878
5534
$296
$279
VENT FANS
41.72
46.95
11213
12615
$565
$636
:redits & Penalties (if any): Modified Points: = 94.45 PASSES
External bighting Compliance
Description Category Allowance Area or Length ELPA CLP
(W/Unit) or No. of Units (W) (W)
(Sgft or ft)
Il None
5/7/2007 EnergyGauge FLA/COM 2004 v3.00 4
Project: CORPORATE HANGER
Title: 4111-4121 CORPORATE HANGER
Type: Office
(WEA File: Orlando.TMY)
Lighting Controls Compliance
Acronym Ashrae Description Area No. of Design Min Compli-
ID (sq.ft) Tasks CP CP ance
OFFICE 17 Office - Enclosed 1,566 1 3 1 PASSES
PASSES
Project: CORPORATE HANGER
Title: 4111-4121 CORPORATE HANGER
Type: Office
(WEA File: Orlando.TMY)
System Report Compliance
A/C-1 SPLIT DX Constant Volume Air Cooled No. of Units
Split System < 65000 Btu/hr 1
Component Category Capacity Design Eff Design IPLV Comp-
Eff Criteria IPLV Criteria liance
Cooling System Air Cooled < 65000 Btu/h 13.00 13.00 8.00 PASSES
Cooling Capacity
Air Handling Air Handler (Supply) - 0.80 0.90 PASSES
System -Supply Constant Volume
PASSES
Plant Compliance
Description Installed Size Design Min Design Min Category Comp
No Eff Eff IPLV IPLV liance
None
5/7/2007 EnergyGauge FLA/COM 2004 v3.00
Project: CORPORATE HANGER
Title: 4111-4121 CORPORATE HANGER
Type: Office
(WEA File: Orlando.TMY)
Water Heater Compliance
Description Type
Category Design Min Design Max Comp
Eff Eff Loss Loss liance
Water Heater 1 Electric water heater <= 12 [kW] 0.95 0.89 PASSES
PASSES
Project: CORPORATE HANGER
Title: 4111-4121 CORPORATE HANGER
Type: Office
(WEA File: Orlando.TMY)
Piping System Compliance
Category
Pipe Dia is Operating Ins Cond Ins Req Ins Compliance
[inches] Runout? Temp [Btu-in/hr Thick [in] Thick [in]
[F] SF.F]
Heating System (Steam, Steam
Condensate, & Hot Water)
0.25 False 105.00 0.28 0.75 0.50 PASSES
PASSES
5/7/2007 EnergyGauge FLA/COM 2004 v3.00
Project: CORPORATE HANGER
Title: 4111-4121 CORPORATE HANGER
Type: Office
(WEA File: Orlando.TMY)
Other Required Compliance
Category
Section
Requirement (write N/A in box if not applicable) Check
Infiltration
406.1
Infiltration Criteria have been met
System
407.1
HVAC Load sizing has been performed
Ventilation
409.1
Ventilation criteria have been met
ADS
410.1
Duct sizing and Design have been performed
T & B
410.1
Testing and Balancing will be performed
Motors
414.1
Motor efficiency criteria have been met
Lighting
415.1
Lighting criteria have been met
O & M
102.1
Operation/maintenance manual will be provided to owner
Roof/Ceil
404.1
R-19 for Roof Deck with supply plenums beneath it
Report
101
Input Report Print -Out from EnergyGauge F1aCom attached?
5/7/2007 EnergyGauge FLA/COM 2004 v3.00 7
EnergyGauge FLA/COM 2004 v3.00
INPUT DATA REPORT
Project Information
Project Name: CORPORATE HANGER Orientation:
Project Title: 4111-4121 CORPORATE HANGER Building Type:
Address: SE RAMP ORLANDO SANFORD AIRPORT Building Classification:
State: FLORIDA No.of Storeys:
Zip: 0 GrossArea:
Owner:
North
Office
New Finished building
I
1566 SF
Zones
No Acronym Description Type
Area
lsfl
Multiplier
Total Area
Isfl
1 OFFICE OFFICE CONDITIONED
1566.0
1
1566.0 [I
Spaces
No Acronym Description Type Depth
IN
Width Height Multi Total Area
Iftl Iftl plier Isfl
Total Volume
Icfl
5/7/2007 EnergyGauge FLA/COM 2004 v3.00
In Zone: OFFICE
I OFFICE OFFICE Office - Enclosed 18.00 87.00 10.00 1 1566.0 15660.0
El
Lighting
No Type Category No, of Watts per Power Control Type No.of
Luminaires Luminaire IWI Ctrl pts
In Zone: OFFICE
In Space: OFFICE
1 Rece d Fl
sse uorescent - General Lighting
vent
1
1580 1580 Manual On/Off
3 El
Walls
No Description
Type
Width H (Effec) Multi
Area
DirectionConductance
Heat
Dens.
R-Value
IN
IN plier
[sfl
(Btu/hr. sf. F]
Capacity
JIb/cfl
Ih.sf.F/Btul
Btu/sf.Fl
In Zone: OFFICE
1 WALL
Metal
siding/2x4@24"+R1
87.00
12.00 1
1044.0
North 0.0920
1.0718
19.38
10.87
❑
1 Batt/5/8"Gyp
2 WALL
Metal
siding/2x4@24"+R 1
18.00
12.00 1
216.0
East 0.0920
1.0718
19.38
10.87
❑
1 Batt/5/8 "Gyp
3 WALL
Metal
siding/2x4@24"+R 1
87.00
12.00 1
1044.0
South 0.0920
1.0718
19.38
10.87
❑
1 Batt/5/8"Gyp
4 WALL
8"CMU/3/4"ISO
18.00
12.00 1
216.0
West 0.2642
9.6960
62.72
3.79
BTWN24"oc/5/8
❑
Windows
No Description Type Shaded U SHG Vis.Tr W H (Effec) Multi Total Area
[Btu/hr sf F]
[ft] (ft] plier ]sI'l
5/7/2007 EnergyGauge FlaCom v 2.11
2
In Zone: OFFICE
In Wall: EAST WALL
1 WINDOW
In Wall: NOTRH WALL
I WINDOW
In Wall: WEST WALL
I WINDOW
User Defined
User Defined
User Defined
No
No
No
1.2500 0.82
1.2500 0.82
1.2500 0.82
0.76
0.76
0.76
4.00 3.00
4.00 3.00
4.00 3.00
1
4
1
12.0
48.0
12.0
Doors
No Description
Type
Shaded? Width H (Effec) Multi
Area
Cond.
Dens. Heat Cap.
R-Value
[ftJ IN
plier
[sfl
[Btu/hr. sf. F] jib/cfl (Btu/sf. F1
Ih.sf.F/Btul
In Zone:
In Wall:
El
Roofs
No Description
Type
Width
H (Effec) Multi
Area
Tilt
Cond.
Heat Cap Dens.
R-Value
IN
IN plier
Istj
[deg]
(Btu/hr. Sf. F1
113tu/sf. F1 JIb/cfl
[h.sf.F/Btul
In Zone: OFFICE
1 ROOF
Mtl Bldg Roof/R-19
87.00
18.00 1
1566.0
0.00
0.0492
1.34 9.49
20.34
Batt
❑
Skylights
No Description Type U SHGC Vis.Trans W H (Effec) Multiplier Area Total Area
lBtu/hr sf FJ [ft] [ft]
[Sf) [SfJ
In Zone:
In Roof:
im
5/7/2007 EnergyGauge FlaCom v 2.11
3
No Description
In Zone: OFFICE
1 FLOOR
Floors
Type Width H (Effec) Multi Area Cond. Heat Cap. Dens. R-Value
IN IN plier [sfl [Btu/hr. sf. F) [Btu/sf. F[ jib/cfl Ih.sf.F/Btul
Concrete floor, 87.00 18.00 1 1566.0 0.5987 9.33 140.00 1.67
carpet and rubber
pad
Systems
A/C-1 SPLIT DX Constant Volume Air Cooled Split
System < 65000 Btu/hr
Component Category Capacity Efficiency IPLV
1 Cooling System (Air Cooled < 65000 Btu/h Cooling 48000.00 13.00
Capacity) 8.00
2 Air Handling System -Supply (Air Handler (Supply) - 1600.00 0.80
Constant Volume)
Plant
Equipment Category Size Inst.No Eff.
W-Heater Description
1 Electric water heater
Water Heaters
Capacit Cap.Unit UP Rt.
30 [Gal] 5 [kW]
Efficienc
0.9500 [Ef]
No. Of Units 1
Loss
[Btu/h]
IPLV
5/7/2007 EnergyGauge FlaCom v 2.11
4
UK
8
ON
Ext-Lighting
Description Category No. of Watts per Area/Len/No. of units
Control T
Type
Wattage
Luminaires Luminaire [sf/ft/No]
[ W I
I Ext Light I Building Entrance with (or 1 20
free standing) Canopy
7.50 Photo
Sensor control
20.00
Ej
Piping
No Type Operating Insulation
Temperature
Nomonal pipe
Insulation
Is Runout?
Conductivity
Diameter
Thickness
IFI I Btu-in/h.sf.F)
lint
lint
Heating System (Steam, Steam Condensate, & 105.00 0.28
Hot Wat
0.25
0.75
No
Fenestration Used
Name Glass Type No. of Glass SHGC VLT
Conductance
Panes
lBtu/h.sf.Fl
ASHULS91CIrAII User Defined 1 1.2500 0.8200 0.7600 Frm
El
Materials Used
Mat No Acronym Description Only R-Value RValue Thickness
Conductivity
Density SpecificHeat
Used lh.sf.F/Btul IN
[Btu/h.ft.Fl
lib/cfl
lBtu/Ib.FI
187 Mat] 187 GYP OR PLAS No 0.4533 0.0417
BOARD, I /21N
0.0920
50.00
0.2000
❑
151 Matl151 CONC HW, DRD, 140LB, No 0.4403 0.3333
41N
0.7570
140.00
0.2000
❑
5/7/2007 EnergyGauge FlaCom v 2.11
5
178
Matl178
CARPET W/RUBBER PAD
Yes
1.2300
105
Mat] 105
CONC BLK HW, 81N,
No
1.1002
HOLLOW
269
Mat1269
.75" ISO BTWN24" oc
NO
2.2321
23
Matl23
6 in. Insulation
No
20.0000
4
Mat14
Steel siding
No
0.0002
271
Mat1271
2x4@24" oc + RI I Batt
No
10.417
94
Mat194
BUILT-UP ROOFING,
NO
0.366
3366
3/81N
No Name
1004 Concrete floor, carpet and rubber pad
Layer Material Material
No.
0.6667
0.6060
69.00
0.2000
❑
0.0625
0.0280
4.19
0.3000
❑
0.5000
0.0250
5.70
0.2000
❑
0.0050
26.0000
480.00
0.1000
❑
0.2917
0.0280
7.11
0.2000
❑
0.0313
0.0930
70.00
0.3500
❑
Constructs Used
Simple Massless Conductance
Construct Construct [Btu/h.sEF]
No No 0.60
1 151 CONC HW, DRD, 140LB, 4IN
2 178 CARPET W/RUBBER PAD
No Name Simple Massless
Construct Construct
1014 8"C:MU/3/4"ISO BTWN24"oc/5/8 Gyp No
No
Layer Material Material
No.
1 105 CONC BLK HW, 81N, HOLLOW
2 269 .75 ISO BTWN24" oc
3 187 GYP OR PLAS BOARD,1/2IN
Heat Capacity Density RValue
[Btu/sf.F] [Ib/cf] Ih.sf.F/Btu[
9.33 140.00 1.6703 ❑
Thickness Framing
IN Factor
0.3333 0.00 ❑
0.00 ❑
Conductance Heat Capacity Density RValue
[Btu/h.sf.F) [Btu/sEF1 [Ib/cf[ [h.sEF/Btu[
0.26 9.70 62.72 3.7856 ❑
Thickness
[ft[
0.6667
0.0625
0.0417
5/7/2007
EnergyGauge FlaCom v 2.11
Framing
Factor
0.00
0.00
0.00
6
Im
No Name
Simple
Massless
Conductance
Heat Capacity
Density
RValue
Construct
Construct
[Btu/h.sEF[
IBtu/sf.FI
[Ib/cfl
Ih.sf.F/BtuI
1019 Metal siding/2x4@24"+RI]Batt/5/8"Gyp
No
No
0.09
1.07
19.38
10.8713
❑
Layer Material
No.
Material
Thickness Framing
IN
Factor
1 4
Steel siding
0.0050
0.00
2 271
2x4@24" oc + RI I Batt
0.2917
0.00
❑
3 187
GYP OR PLAS BOARD,1/2IN
0.0417
0.00
❑
❑
No Name
Simple
Construct
Massless
Conductance
Heat Capacity
Density
RValue
1047 Mtl Bldg Roof/R-19 Batt
Construct
[Btu/h.sEF)
Btu/sf.F
I I
Ilb/cfl
[h.sf.F/Btul
No
No
0.05
1 34
9
49 20.3366 ❑
Layer Material Material
Thickness
Framing
No.
IN
Factor
1 94 BUILT-UP ROOFING, 3/8IN
0.0313
0.00
2 23 6 in. Insulation
0.5000
0.00
❑
5/7/2007 EnergyGauge FlaCom v 2.11
7
PROJECT SUMMARY
Short Desc: CORPORATE HANGER
Owner:
Addressl: SE RAMP ORLANDO SANFORD AIRPORT
Address2:
Description: 4111-4121 CORPORATE
City:
State:
Zip:
Type: Office Class:
Jurisdiction: SANFORD, SEMINOLE COUNTY, FL (691500)
Cond Area: 1566 SF Cond & UnCond Area:
No of Storeys: 1 Area entered from Plans
Permit No: 0 Max Tonnage
If different, write in:
5/7/2007 FnergyGauge FLA/COM 2004 v3.00
SANFORD
FLORIDA
0
New Finished building
1566 SF
0 SF
4
Compliance Summary
Component Design Criteria Result
Gross Energy Use 1,280.4 1,355.7 PASSES
LIGHTING CONTROLS
EXTERNAL LIGHTING
HVAC SYSTEM
PLANT
WATER HEATING SYSTEMS
PIPING SYSTEMS
Met all required compliance from Check List?
PASSES
None Entered
PASSES
None Entered
PASSES
PALo/NA
ES
'Y �,
L
IPORTANT NOTE: An input report of this design building must be submitted
ong with this Compliance Report.
5/7/2007
EnergyGauge FLA/COM 2004 v3.00
2
CERTIFICATIONS
I hereby certify that the plans and specifications covered by this calculation are in compliance with the
Florida Energy Code
Prepared By: Building Official:
Date: Date: /n�� 7
I certify that this building is in compliance with the Florida Energy Efficiency Code
Owner Agent: Date:
If Required by Florida law, I hereby certify (") that the system design is in compliance with the FLorida
Energy Efficiency Code
Architect: Reg No:
Electrical Designer: Reg No:
Lighting Designer: Reg No:
Mechanical Designer: Hossein Dayi Reg No: 53461
Plumbing Designer: Hossein Dayi Reg No: 53
(*) Signature is required where Florida Law requires design to be performed by registered design
professionals. Typed names and registration numbers may be used where all relevant information is
contained on signed/sealed plans.
5/7/2007 EnergyGauge FLA/COM 2004 v3.00 3
Project: CORPORATE HANGER
Title: 4111-4121 CORPORATE HANGER
Type: Office
(WEA File: Orlando.TMY)
Whole Building Compliance
Design
Reference
Total
94.44
100.00
$1,280
$1,356
ELECTRICITY(MB A
94.44
100.00
Wh/$)
25404
26898
$1,280
$1,356
AREA LIGHTS
17.97
19.61
4839
5275
$244
$266
MISC EQUIPMT
12.75
12.75
3442
3442
$173
$173
PUMPS & MISC
0.11
0.11
32
32
$2
$2
SPACE COOL
21.90
20.59
5878
5534
$296
$2 79
VENT FANS
41.72
46.95
11213
12615
$565
$636
Credits & Penalties (if any): Modified Points:
= 94.45
PASSES
External Lighting Compliance
Description Category
Allowance Area or Length ELPA CLP
(W/Unit)
or No. of Units (W) (W)
(Sgft or ft)
None
5/7/2007 EnergyGauge FLA/COM 2004 v3.00
Project: CORPORATE HANGER
Title: 4111-4121 CORPORATE HANGER
Type: Office
(WEA File: Orlando.TMY)
Lighting Controls Compliance
Acronym Ashrae Description
ID
Area No. of Design Min Compli-
(sq.ft) Tasks CP CP ance
OFFICE 17 Office - Enclosed
1,566 1 3 1 PASSES
PASSES
Project: CORPORATE HANGER
Title: 4111-4121 CORPORATE HANGER
Type: Office
(WEA File: Orlando.TMY)
System Report Compliance
A/C-1 SPLIT DX Constant Volume Air Cooled No. of Units
Split System < 65000 Btu/hr 1
Component Category Capacity
Design Eff Design IPLV Comp-
Eff Criteria IPLV Criteria liance
Cooling System Air Cooled < 65000 Btu/h
Cooling Capacity
Air Handling Air Handler (Supply) -
System -Supply Constant Volume
13.00 13.00 8.00 PASSES
0.80 0.90 PASSES
PASSES
Plant Compliance
Description Installed Size Design Min
No Eff Eff
Design Min Category Comp
IPLV IPLV liance
None
5/7/2007 EnergyGauge FLA/COM 2004 v3.00
Project: CORPORATE HANGER
Title: 4111-4121 CORPORATE HANGER
Type: Office
(WEA File: Orlando.TMY)
Water Heater Compliance
Description Type
Design Min
Category
Design Max Comp
Eff Eff
Loss Loss liance
Water Heater 1 Electric water heater <= 12 [kW] 0.95 0.89
PASSES
PASSES
Project: CORPORATE HANGER
Title: 4111-4121 CORPORATE HANGER
Type: Office
(WEA File: Orlando.TMY)
Piping System Compliance
Category
Pipe Dia Is Operating Ins Cond
Ins Req Ins Compliance
[inches] Runout? Temp [Btu-in/hr Thick [in] Thick [in]
[F] SF.F]
Heating System (Steam, Steam
0.25 False 105.00 0.28
0.75 0.50 PASSES
Condensate, & Hot Water)
PASSES
5/7/2007
EnergyGauge FLA/COM 2004 v3.00
Project: CORPORATE HANGER
Title: 4111-4121 CORPORATE HANGER
Type: Office
(WEA File: Orlando.TMY)
Other Required Compliance
Category Section Requirement (write N/A in box if not applicable) Check
Infiltration 406.1 Infiltration Criteria have been met
System 407.1 HVAC Load sizing has been performed
Ventilation 409.1 Ventilation criteria have been met
ADS 410.1 Duct sizing and Design have been performed
T & B 410.1 Testing and Balancing will be performed
Motors 414.1 Motor efficiency criteria have been met
Lighting 415.1 Lighting criteria have been met
O & M 102.1 Operation/maintenance manual will be provided to owner Er I
Roof/Ceil 404.1 R-19 for Roof Deck with supply plenums beneath it
Report 10] Input Report Print -Out from EnergyGauge FlaCom attached? rv-l/
5/7/2007 EnergyGauge FLA/COM 2004 v3.00 7
EnergyGauge FLA/COM 2004 v3.00
INPUT DATA REPORT
Project Name: CORPORATE HANGER
Project Information
Orientation: North
Project Title: 4111-4121 CORPORATE HANGER Building Type: Office
Address: SE RAMP ORLANDO SANFORD AIRPORT Building Classification: New Finished buildinsz
State: FLORIDA
Zip: 0
Owner:
No.of Storeys: I
GrossArea: 1566 SF
Zones
No Acronym Description Type
Area
[sq
Multiplier
Total Area
[sfl
1 OFFICE OFFICE CONDITIONED
1566.0
1
1566.0 ❑
Spaces
No Acronym Description Type Depth
[ftl
Width Height Multi
IN [ft] plier
Total Area
[sfJ
Total Volume
[cfJ
5/7/2007 EnergyGauge FLA/COM 2004 v3.00 1
In Zone: OFFICE
1 OFFICE OFFICE
Office - Enclosed
18.00
87.00
10.00
1
1566.0
15660.0
Lighting
No Type
Category
No. of
Luminaires
Watts per
Luminaire
Power
[WI
Control Type
No.of
Ctrl pts
In Zone: OFFICE
In Space: OFFICE
1 Recessed Fluorescent - General Lighting
No vent
1
1580
1580
Manual On/Off
3
Walls
No Description
Type Width H (Effec) Multi
[ft] [ft] plier
Area DirectionConductance
[sf] [Btu/hr. sf. F]
Heat
Capacity
Dens. R-Value
[Ib/cf[ [h.sf.F/Btu)
[Btu/sf.F[
In Zone: OFFICE
1 WALL
Metal 87.00
siding/2x4@24"+R 1
12.00 1
1044.0
North
0.0920
1.0718
19.38 10.87
l Batt/5/8"Gyp
2 WALL
Metal 18.00
siding/2x4@24"+R 1
12.00 1
216.0
East
0.0920
1.0718
19.38 10.87
1 Batt/5/8"Gyp
3 WALL
Metal 87.00
siding/2x4@24"+R 1
12.00 1
1044.0
South
0.0920
1.0718
19.38 10.87
1 Batt/5/8"Gyp
4 WALL
8"CMU/3/4"ISO 18.00
13TWN24"oc/5/8
12.00 1
216.0
West
0.2642
9.6960
62.72 3.79
Gyp
Windows
No Description
Type Shaded
U SHG
Vis.Tr
W
H (Effec)
Multi
Total Area
[Btu/hr sf F]
IN
[ft]
plier
[sf]
5/7/2007 EnergyGauge FlaCom v 2.11
In Zone: OFFICE
In Wall: EAST WALL
1 WINDOW
User Defined
No
1.2500 0.82
0.76
4.00 3.00
1
12.0
❑
In Wall: NOTRH WALL
1 WINDOW
User Defined
No
1.2500 0.82
0.76
4.00 3.00
4
48.0
El
Wall: WEST WALL
I WINDOW
User Defined
No
1.2500 0.82
0.76
4.00 3.00
1
12.0
❑
Doors
No Description
Type
Shaded? Width H (Effec) Multi
Area
Cond.
Dens. Heat Cap.
R-Value
IN [ft]
plier
[sf[
[Btu/hr. sf. F] [Ib/cf[ [Btu/sf. F[
[h.sf.F/Btu[
In Zone:
In Wall:
El
Roofs
No Description
Type
Width
H (Effec) Multi
Area
Tilt
Cond.
Heat Cap Dens.
R-Value
IN
IN plier
[sf[
[deg]
[Btu/hr. SE F]
[Btu/sf. F[ [Ib/cf]
(h.sf.F/Btu]
In Zone: OFFICE
I ROOF
Mtl Bldg Roof/R-19
87.00
18.00 1
1566.0
0.00
0.0492
1.34 9.49
20.34
❑
Batt
Skylights
No Description Type
U SHGC Vis.Trans
W
H (Effec) Multiplier Area
Total Area
[Btu/hr sf F]
IN
IN
[S11
[Sf]
In Zone:
In Roof:
5/7/2007 EnergyGauge FlaCom v 2.11
Floors
No Description Type Width
IN
H (Effec) Multi
[ftl plier
Area Cond. Heat Cap.
[sfl [Btu/hr. sE F] [Btu/sE Ff
Dens. R-Value
jlb/cf[ [h.sf.F/Btu)
In Zone: OFFICE
1 FLOOR Concrete floor, 87.00
carpet and rubber
pad
18.00 1
1566.0 0.5987 9.33
140.00 1.67
Systems
A/C-1 SPLIT DX
Constant Volume Air Cooled Split
System < 65000 Btu/hr
No. Of Units 1
Component Category
Capacity
Efficiency IPLV
I Cooling System (Air Cooled < 65000 Btu/h Cooling
Capacity)
2 Air Handling System -Supply (Air Handler (Supply) -
Constant Volume)
48000.00
1600.00
13.00 8.00
0.80
Equipment Category
Plant
Size
Inst.No Eff.
IPLV
Water Heaters
W-Heater Description Capacit Cap.Unit I/P Rt.
Efficienc
Loss
I Electric water heater 30 [Gal]
5 [kW]
0.9500 [Ef]
[Btu/h]
❑
5/7/2007 EnergyGauge FlaCom v 2.11
Ext-Lighting
Description
Category No. of
Watts per Area/Len/No. of units
Control Type
Wattage
Luminaires
Luminaire
[sf/ft/Noj
[WI
1 Ext Light I
Building Entrance with (or 1
20
7.50 Photo Sensor control
20.00 ❑
free standing) Canopy
Piping
No Type
yp
Operating
Insulation
Nomonal pipe
Insulation
Is Runout?
Temperature
Conductivity
Diameter
Thickness
[F[
[ Btu-in/h.sf.F]
[in[
[in[
I Heating System (Steam, Steam Condensate, & 105.00
0.28
0.25
0.75
No El
Wat
Fenestration Used
Name
Glass Type No. of
Glass SHGC
Conductance
VLT
Panes
[Btu/h.sf.F[
ASHULSg1CIrAll
User Defined 1
1.2500 0.8200
0.7600
❑
Frm
Materials Used
Mat No Acronym
Description
Only R-Value RValue Thickness
Conductivity
Density
SpecificHeat
Used [h.sf.FBtul
A
[Btu/h.ft.F[
[lb/cf[
[Btu/Ib.F]
187 Matl187
GYP OR PLAS
No 0.4533
0.0417
0.0920
50.00
0.2000 ❑
BOARD,1 /21N
151 Matl151
CONC HW, DRD, 140LB,
No 0.4403
0.3333
0.7570
140.00
0.2000 ❑
41N
5/7/2007
EnergyGauge FlaCom v 2.11
5
178
Mat] 178
CARPET W/RUBBER PAD
Yes
1.2300
105
Matl105
CONC BLK HW, 81N,
No
1.1002
0.6667
0.6060
69.00
❑
HOLLOW
0.2000
❑
269
Mat1269
.75" ISO BTWN24" oc
No
2.2321
0.0625
0.0280
4.19
0.3000
❑
23
Mat123
6 in. Insulation
No
20.0000
0.5000
0.0250
5.70
0.2000
❑
4
Matl4
Steel siding
No
0.0002
0.0050
26.0000
480.00
0.1000
❑
271
Mat1271
2x4@24" oc + RI I Batt
No
10.4179
0.2917
0.0280
7. l 1
0.2000
❑
94
Matl94
BUILT-UP ROOFING,
No
0.3366
0.0313
0.0930
70.00
0.3500
El
Constructs Used
No Name
Simple
Massless
Conductance
Heat Capacity
Density
RValue
Construct
Construct
[Btu/h.sf.F]
[Btu/sf.Fl
[Ib/cfl
[h.sLF/Btul
1004 Concrete floor, carpet and rubber pad
No
No
0.60
9.33
140.00
1.6703
❑
Layer Material Material
Thickness Framing
No.
[ftl
Factor
1 151 CONC HW, DRD,
140LB, 4IN
0.3333
0.00
❑
2 178 CARPET W/RUBBER PAD
0.00
❑
No Name
Simple
Massless
Conductance
Heat Capacity
Density
RValue
Construct
Construct
[Btu/h.sf.F[
[Btu/sf.Fl
[lb/cfl
[h.sf.F/Btu)
1014 8"CMU/3/4"ISO BTWN24"oc/5/8 Gyp
No
No
0.26
9.70
62.72
3.7856
❑
Layer Material Material
No.
1 105 CONC BLK HW, 81N, HOLLOW
2 269 .75" ISO BTWN24" oc
3 187 GYP OR PLAS BOARD, 1/2 IN
Thickness
Framing
[fti
Factor
0.6667
0.00
❑
0.0625
0.00
❑
0.0417
0.00
❑
5/7/2007 EnergyGauge FlaCom v 2.11 6
I
No Name Simple Massless
Construct Construct
1019 Metal siding/2x4@24"+Rl 1 Batt/5/8°Gyp No No
L M
Conductance
Heat Capacity
Density
RValue
(Btu/h.sf.F]
jBtu/sfFj
jib/cfj
(h.sf.F/Btu]
0.09
1.07
19.38
10.8713 ❑
ayer
aterial
Material
Thickness
Framing
No.
IN
Factor
1
4
Steel siding
0.0050
0.00
❑
2
271
2x4@24" oc + RI I Batt
0.2917
0.00
❑
3
187
GYP OR PLAS BOARD,1/2IN
0.0417
0.00
❑
No Name
Simple
Massless Conductance Heat Capacity
Density RValue
Construct
Construct jBtu/h.sLF]
[Btu/sf.Fj
jib/cfj (h.sf.F/Btu]
1047 Mtl Bldg Roof/R-19 Batt
No
No 0.05
1.34
9.49 20.3366 ❑
Layer
Material
Material
Thickness
Framing
No.
IN
Factor
1
94
BUILT-UP ROOFING, 3/8IN
0.0313
0.00
❑
2
23
6 in. Insulation
0.5000
0.00
❑
5/7/2007 EnergyGauge FlaCom v 2.11 7