Loading...
HomeMy WebLinkAbout101 Coastline Rd+^ r t Whole Building Performance Method for Commercial Buildings ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Community Affairs FLA/COM-97 Version 2.2 PROJECT NAME_MACK WAREHOUSE ADDRESS: _COASTLINE ROAD SANFORD FL OWNER: MACK PLUMBING_ AGENT: Form 400A-97 PERMITTING OFFICE: _Sanford CLIMATE ZONE: 5 PERMIT NO: 6 '—) JURISDICTION NO: 6915i10 BUILDING TYPE: _Business (Office) CONSTRUCTION CONDITION: New construction DESIGN COMPLETION: _Finished Building CONDITIONED FLOOR AREA: _4900 NUMBER OF ZONES: 1 MAX. TONNAGE OF EQUIPMENT PER SYSTEM: 5 COMPLIANCE CALCULATION: METHOD A DESIGN CRITERIA RESULT ----------------- -------------- ------ A. WHOLE BUILDING 63.14 100.00 PASSES PRESCRIPTIVE REQUIREMENTS: LIGHTING EXTERIOR LIGHTING 200.00 825.0.0 PASSES LIGHTING CONTROL REQUIREMENTS PASSES HVAC EQUIPMENT COOL'ING EQUIPMENT 1. SEER 10.00 10.00 PASSES HEATING EQUIPMENT 1. Et 1.00 N/A AIR DISTRIBUTION SYSTEM INSULATION REQUIREMENTS 1. Unventilated 6.00 6.00 PASSES REHEAT SYSTEM TYPES USED NO REHEAT SYSTEM is USED WATER HEATING EQUIPMENT PIPING INSULATION REQUIREMENTS ---------------------------------------------------------------------------- COMPLIANCE CERTIFICATION: I hereby certify that the plans and Review of the plans and specifica- specifications covered by this calcu- tions covered by this calculation lation are in compliance with the indicates compliance with the Florida Energy Efficiency CodeFlorida Energy Efficiency Code. PREPARED BY: �"' 14 'OCT 19 19qp Before construction is completed, DATE: this building will be inspected for compliance in accordance with I hereby certify that this .building is Section 553.908, Fl rida Statutes. in compliance with the Florida Energy BUILDING O VICTAL: _ (� Efficiency Code. DATE:— OWNER/AGENT: "DATE: e f' ,iereby certify(*) that the /iergy Efficiency Code. SYSTEM DESIGNER ARCHITECT : MECHANICAL: PLUMBING . ELECTRICAL: LIGHTING system design is in compliance with the Florida REGISTRATION/STATE (*) Signature is required where Florida law requires design to be performed by registered design professionals. Typed names and registration numbers may be used where all relevant information is contained on signed/sealed plans. ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- BUILDING ENVELOPE SYSTEMS COMPLIANCE CHECK 40-•1.------GLAZING--ZONE 1------------------------------------------------ v- Elevation --------- Type --------------- U SC VLT Shading ---- ---- ---- Area(Sgft) North Commercial -------------- 1.26 1 1 None ---------- 48 West Commercial 1.26 1 1 None 96 South Commercial 1.26 1 1 None 48 South Commercial 1.26 1 1 None 16 Total Glass Area in Zone 1 = 208 Total Glass Area = 208 402.------WALLS--ZONE 1------------------------------------------------ --- Elevation --------- Type U Insul R Gross(Sgft) North -------------------------------- 5/8"Stco/8"CMU/3/4"ISO ----- ------- BTWN24"oc 0.149 4 ----------- 840 West 5/8"Stco/8"CMU/3/4"ISO BTWN24"oc 0.149 4 950 South 5/8"Stco/8"CMU/3/4"ISO BTWN2411oc 0.149 4 410 East 5/8"Stco/8"CMU/3/4"ISO 13TWN24"oc 0.149 4 250 Adjacent 3/4"Stco/2x4@16"oc+RllBatt/""Gyp 0.080 11 1160 Total Wall Area in Zone 1 = 3610 Total Gross Wall Area = 3610 403.------DOORS--ZONE 1------------------------------------------------ --- Elevation Type ------------------------------------------ U Area(Sgft) --------- West 1-3/4 Steel Door-Fiberglass/Mineral ----- woo 0.60 ---------- 42 North 1-3/4 Steel Door-Fiberglass/Mineral woo 0.60 168 East 1-3/4 Steel Door-Fiberglass/Mineral woo 0.60 168 Adjacent 1-3/4 Steel Door-Fiberglass/Mineral woo 0.60 21 Total Door Area in Zone 1 = 399 Total Door Area = 399 404.------ROOFS--ZONE 1------------------------------------------------ --- Type ------------------------------------ Color U Insul R Area(Sgft) Mtl Bldg Roof/R-11 Batt ------ ------------ Medium .084 11 ---------- 4900 Total Roof Area in Zone 1 = 4900 Total Roof Area = 4900 405------- FLOORS -ZONE 1------------------------------------------------ --- Type ------------------------------------------------ Insul R Area(Sgft) Slab on Grade/Uninsulated ------- 0 ---------- 4900 Total Floor Area in Zone 1 = 4900 Total Floor Area = 4900 406------- INFILTRATION -------------------------------------------------- --- CHECK Infiltration Criteria in 406.1.ABCD have been meta MECHANICAL SYSTEMS ------------------------------------------------------------------ CHECK HVAC load sizing has been performed. (407.1.ABCD) ---- --- 407------- COOLING SYSTEMS----------------------------------------------- --- Type ---------------------------- No Efficiency IPLV Tons 1. Split System ------------- ------------------- 3 10 0 5.00 408------- HEATING SYSTEMS----------------------------------------------- --- Type No Efficiency BTU/hr F . Electric Resistance 3 1 51195 j!09.------VENTILATION --------------------------------------------------- Ventilation Criteria in 409.1.ABCD have been met. (CHECK 410.-----AIR DISTRIBUTION SYSTEM__________________________________ --------------------------- CHECK --------------------------------- - Duct sizing and design have been performed. (410.1.ABCD) ----- ----- --- AHU Type Duct Location R-value ---------------------- ------- 1. Air Conditioners Unventilated CHECK ------------------------------------------------------------------ Testing and balancing will be performed. (410.1.ABCD) 411.-----PUMPS AND PIPING -ZONE _________________________________________ --- Basic prescriptive requirements in 411.1.ABCD have been met. PLUMBING SYSTEMS 411------ PUMPS AND PIPING -ZONE 1--------------------------------------- --- Type __ -_-- _--- - R-value/in Diameter Thickness - ------------------ 412 -----WATER HEATING SYSTEMS -ZONE 1__________________________________ Type Efficiency y In Standb Loss utRate Gallons P ELECTRICAL SYSTEMS 413.-----ELECTRICAL POWER DISTRIBUTION_________________________CHECK ___ Metering criteria in 413.1.ABCD have been met. 414.-----MOTORS --------------------------------------------------- Motor efficiencies in 414.1.ABCD have been met. 415.-----LIGHTING SYSTEMS -ZONE 1______________________________ --------- --- pace Type No Control Type 1 No Control Type 2 No Watts Area(Sgft) ---------- ----------------- --- ---------------- Reading, T 1 On/Off 10 None 0 8575 4900 Total Watts for Zone 1 = 8575 Total Area for Zone 1 = 4900 Total Watts = 8575 Total Area = 4900 Lighting criteria in 415.1.ABCD have been met. CHECK -------------------- ------------------------ 1 . Operation/maintenance manual will be provided to owner.(102.1) ----------------------------------