HomeMy WebLinkAbout205a Contract Change Order w/CPH - South Water Resource CtrCPH Project N S0628.09 Change Order 1 Date: 11 November 8, 2005 Location: U Sanford South Water Resource Center Type: 11 Additive Description of Change: This change order addresses items required to ensure a complete, safe and fully operationalvv@SteVv8[er treatment facility to meet the dBDO8OdS of the City of SaDfOnd'S new SSVVRC. The first OlOdUhC8U0R associated with this change orderwill reinstate the originally designed and bid 3.0 million gallon Reclaimed Water ground storage tank in lieu of the 1.0 million gallon Reclaimed Water ground storage tank proposed and originally accepted as cost saving measure during initial value engineering reviews performed to bring the project to within budgeted funds. Subsequent value engineering indicated that the cost for un increase in the tank storage capacity was o viable alternative and would allow for storage of the initial SSF|C`Sstartup production. The cost for a 2.OK8Gtank was considered but the tank contractor was willing to hold the O[igiO8| bid price for the 3.0 MG C8Ok and final evaluation found this to be the most CD8t effective alternative for additional reclaimed water storage. The second modification associated with this change order iSfor the purpose Ofincreasing the base slab thickness DDthe two /2\secondary clarifiers UJensure the structures are sufficiently weighted tDprevent flotation during the event Ofmaximum high ground water table. The 20O1 prSQOOS1[UCUOOsoils reports indicated an expected high water table at three feet below grade (The base of the secondary clarifiers are approximately seven feet below g[ade). OU[iOg recent tropical events the groundwater level has been observed ato[near the ground surface elevation. Evaluation of the floatation calculations with the ground water atthese levels indicated the need tOincrease the weight Ofthe secondary clarifiers tOprevent the possibility of floatation of the structures should they ever be emptied during a time period of extreme high gnOUOd water table. Reason for Change: This change order is for adjustments UDthe contract cost k}complete miscellaneous improvements and upgrades t0the project tOp[oVde arOo[e complete, durable and functional process. Funding iSavailable ADDITIONS aj Upgrade 11}MGReclaimed Water Ground Storage Tank boa3D $490.000.00 Reclaimed Water Ground Storage Tank 11 bj Additional concrete to beom of CbhDoa 1 and 2 to ensure anti- U $32.300.00 flotation of structures. 11 114=10111" 161 10'r Recommended by: X4,-�Zo, 11,5�, C Engineer f" Date Accepted by: aloe 57 9V Contractor Date Accepted by: 0 1 Q- I I - 2- 9-'" C>..5- - (Z Owner Date .h Wharton -Smith, Inc. CONSTRUCTION GROUP November 3, 2005 Benjamin M. Fries CPH Engineers, Inc. 500 West Fulton Street Sanford, Florida 32771 Re: Sanford South WRC- Phase 1 3.0 MG Reclaim Domed Storage Tank Dear Mr. Fries: As requested, the cost increase for providing a 3.0 MG Reclaim Domed Storage Tank with Interior and Exterior Coatings is $490,000.00. This is in lieu of the originally specified, 1.0 MG Reclaim Domed Storage Tank with no Interior or Exterior Coatings. Please issue a Change Order to reflect the added costs at your earliest convenience. Should you have any questions feel free to contact me, thank you for your time. Sincerely, Wharton -Smith, Inc. Jeffrey A. James Project Manager JAJ/dcs cc: File: 05-009 — C-1 OA 750 Monroe Road • Sanford, Florida 32771 Phone: 407/321-8410 - Fax 407/323-1236 Mailing Address: P.O. Box 471028 Lake Monroe, Florida 32747-1028 CG C032669 PC C048385 CU C056506 Wharton -Smith, Inc. CONSTRUCTION GROUP November. 3, 2005 enjamirl M., Fries CPH Engineers, Inc. 500 West Fulton Street Sanford, Florida 32771 Re: Sanford South WRC- Phase 1 Clarifier Anti -Flotation Concrete Dear Mr. Fries: As requested, the cost increase for providing the 334 cubic yards of Clarifier Anti - Flotation Concrete is $32,300. The Clarifier base slab will be 2'-0" thick. This is in lieu of the originally specified 1'-0" thick slab with 1'-2" thickened edges. Please issue a Change Order to reflect the added costs at your earliest convenience. Should you have any questions feel free to contact me at any time. Sincerely, Wharton -Smith, Inc. Jeffrey A. James Project Manager JAJ/dcs cc: File: 05-009 — C-1 OA V 8 5 750 Monroe Road - Sanford, Florida 32771 Phone: 407/321-8410 - Fax 407/323-1236 Mailing Address: P.O. Box 471028 Lake Monroe, Florida 32747-1028 CG C032669 PC C048385 CU C056506 U �u