HomeMy WebLinkAbout205b Contract Change Order w/CPH - North Water Reclamation FacilityCONTRACT CHANGE ORDER
50640.03
November 8, 2005
Sanford North Water Reclamation Facility (SNWRF)
Additive
This change order addresses items required to ensure a complete, safe and durable Primary
Treatment/Disinfection System as well as the treatment capabilities of the Sanford North Water
Reclamation Facility. The changes included in this change order are the removal and replacement of the
existing Secondary Clarifier No. 3 sludge rake mechanism and bridge structure and the addition of a
second automatic continuous cleaning bar screen and a screenings conveyor at the new influent structure.
This change order also includes credits from the contractor for Owner Direct Purchase items.
Reason for Change:
Secondary Clarifier No. 3 has been in operation for 20 years which is the typical life expectancy for clarifier
equipment. Due to the age of the equipment, continued increases in time and cost for maintenance and
to ensure reliability of treatment and continuous operation, the total replacement of the operational
mechanism has become necessary. This will complete the replacement of all of the SNWRF's clarifier
equipment which was begun three years ago.
A automatic continuous cleaning second bar screen is being added to the new influent structure in the
channel already constructed for this purpose. This will provide the new influent structure with the capability
of accommodating the entire raw wastewater flow to the SNRWF and will allow for the demolition of the
existing grit and wastewater screening structure and eliminate another source of wastewater plant odors.
Due to the efficiency of the new bar screens installed in the new influent structure, waste screenings have
increased significantly, resulting in additional operator time to monitor, rotate and empty the screening
dumpsters. The addition of a screenings conveyor will allow for the removal of water from the screenings,
reducing the volume of waste being collected in the dumpster, and will allow for the use of a single
dumpster to handle both mechanical bar screens. This will reduce operator time currently being dedicated
to the new influent structure.
ADDITIONS
a.) Furnish and install new bar screen and screenings conveyor and all $240,000.00
associated appurtenances and electrical controls. (CHP -35 )
b.) Remove and replace Clarifier No. 3 equipment and bridge structure.$355,000.00
(CHP -36) 11
C.) Owner Direct Purchase deduction for Clarifier and Bar screen
equipment. (CHP -39)
Subtotals:
($316,875.70)
00 11 ($316.875.70
Recommended by:
Engineer Date
Accepted by: i P r-, aw / 5
v Contractor Date
Accepted by:
wner
Date
NOV704-2005 FRI 01:56 PM W -H SMITH 8'' " ADMIN
November 4, 2005
CP14 Enginters, Inc
500 W. Fulton Street
Sanford, Fl. 32771
A.TTN: Benjamin M. Fries
RE: Barscreen and Compactor .
Dear Mr. Fries;
FAX NO, 407321468 P. 02/02
Wharton -Smith, Inc.
CONSTRUCTION GROUP
The cost to add a second barscreen, a compactor and a new control panel on the influent
structure on the Sanford North PT/D job will be $240 ,000.00. Please log this as
proposed change order ##35. We request a time extension of 90 days from proposal
acceptance due to equipment lead time and installation time,
Please advise on how you would like -us to proceed.
Sincerely,
Wharton -Smith, INC.
Christopher Gayner
Project Manager
CC: bile 04-003 C- l0A & C-8 A
750 County Road 15 - P.O. Box 471028 • Lake Monrou, r1,5rida 32747-1028 • Phone: 407/321-8410 • Pux 407/323-1236
CG C03266q PC (:048585 CU C056506
NOV,07-2005 MON 02:10 PM FAX NO. V. uz/u�
Wharton -Smift), Inc.
CONSTRUCTION GROUP
October 5, 2005
CPH Engineers, Inc
SOO W. Fulton Street
Sanford, Fl. 32771
ATTN: Benjamin M, Pries
RE, Clarifier #3
Dear Mr. Fries:
The cost to demolish the existing clarifier #3 mechanism and add a new mechanism on,
the Sanford North PT/D job will be $355,000.00. Please log this as change proposal #36,
We request a time extension of 90 days fToin proposal acceptance due t . o equipment lead
time and installation time.
Please advise on bow you would like us to proceed.
Sincerely,
Wharton -Smith, INC.
Christopher Gayner
Project Manager
CC: File 04-003 C -10A & C -BA
750 County Road 15 - PC). Box 47102A i -alto Monroe, Floridu 32747-1028 - Pholla: 4071321-h410 , Fnx-4071323-1236
CG C032669 01COSW6.
N04#7,04-2005 FRI 02:43 PM W -H SMITH F' ' ADMIN FAX NO. 407321468e P. 02
November 4, 2005
CPH Engineers, Inc
500 W. Fulton Street
Sanford, Fl. 32771
ATTN: Benj ainin M. Fries
RE: Owner Direct Purchase-Barscreen and Clarifier
Dear Mr. Fries:
Wharton -Smith, Inc.
CONSTRUCTION GROUP
Attached is the deduct for the owner direct purchase of the second
cond barscreea mechanism
and the clarifier mechanism. in tank #3 on the Sanford North. WR.F job.
The deduct will be $316,875.70.
Plense advise on how you would like us to proceed.
Sincerely,
Wharton -Smith, INC.
Cli0stopher Gayner
'I-09ect Manager
CC- 'file 04-003 C-1 OA & C -SA
750 County.Rnad 15 - P.O. Box 471028 - 7-akf: MOLIMC, Florida 32747-1029 - Phone: 4071321-8410 - Fax 407/123-1236
CCI C*03266t) PC C048385 CLIC0,56916
NOV-.04-2005 FR 02:44 PM W -H SMITH P^7 ADMIN FAX NO. 40732146810 P. 03
Summary
VAvvian-SinrWth. lnr--. PROPOSAL SUMMARY
Revision 0 PCO 1111039-1
TE
1
Credit to the City to purchaso equipment directly from vendors and utilize their tax exempt status,
—THIS IS FOR THE CLARIFIER AND SECOND BARSCREEN EQUIPMENT...
Theirs Is one additional adder for some ductwork that was added to tho DEI order.
The duration for the additional work outlined In this proposal I., JQ working days.
11. 11
The Contract Time Extension due to this-Ohaage-Ordar, 1working days.
2
3
4
5 -
6
7
7..
8
9
101
.. .... ...
11
From Page 2 $ (316,875.70)
12
13
14
875'(7A.)
16
17
From Page 3 0
18
201
.. ... .. ...
21
77
77777777=1,
22
From Page 4
23
24
25
26
j, ,
Tax i't ... . ....... I
�I� ix
fT�14. .I it
27,
S"ij9CQNTR4� INV
281
291
30
31
33
34
.. ... ........... ..
11tarkii xk
35
0 ii i ............ ....
tl�"!Q7�,y�;!,:i�'!",:,*,!;:**"';":! I ....... .... ... I
it
36
Extended Project Overhead
0 Days Cost Per Day $
37,
Additional Insurance
0.00% M + L + T&E + S
S (316,875.70
38
Additional Bond
0.00% M + L T&E + S
$ (316,875.70)
39
40
41
421
43
V, VJICITA
44
...........................
(316,875.70)3
I NOV-104-2005 FRI 02:44 PM W -H SMITH P"" ADMIN FAX NO. 40732146814 P. 04
Pg 2 Materials
MATERIAL ESTIMATE
13M
IEM=
UNI.
-Tax an above
a■Ef'.nviroquip-Clarifier
Jax an above
ONION
ME
INNEENIENIN
0110001001
ININE
mm
NNEINNIN
ININEN
INNNIN
INNN
NNININ No
m.NIN
NNIN
INNNIN
WOTAL
TAX SAVINGS
Mor
NONE
00
INNIN
MIN
NIN
INIEN
ma
� I
ININNINIENE
MKIN
-
000110001
INNNINNNI
m
m
01100
m