HomeMy WebLinkAbout115 Spanish Bay Dr 00-1598 New SFHSUBDIVISION: Oa' C
ZONE DATE A a -00
CONTRACTOR
ADDR
PHONE# AL
LOCATION
-
OWNER Ak&/L4AA'0L-
ADDRESS
PHONE #
PLUMBING CONTRACTOR
ADDRESS
0a-1(DO 1
PERMIT* #
JOB S
COST $
LOT NO. S l
BLOCK:
SECTION:
SQUARE FEET:
FEE $ MODEL:
STATE NO.
FEE
PHONE #
ELECTRICAL CONTRACTOR �17 �) FEE $ 5
ADDRESS
PHONE #
MECHANICAL CONTRACTOR
ADDRESS
PHONE #
MISCELLANEOUS CONTRACTOR
ADDRESS
SEPTIC TANK PERMIT NO.
()Orgy toC7Z
SOIL TEST REQUIREMENTS ()
FINISHED FLOOR
ELEVATION REQUIREMENTS
ARCHITECTURAL APPROVAL DATE:
FEE $ 5 3
OCCUPANCY CLASS:
FEE $ ENERGY SECT. EPI:
CERTIFICATE OF OCCUPANCY
ISSUED # / DATE:
FINAL DATE 7/ ZO OZJ
4,1\,l CERTIFICATE OF OCCUPAt1CY / COMPLETION
This is to certify that the building :Located at
115SPANT,yH BAY DR ,� for
Ma k1�U:d6bo+598 has j`he��e ore ahem dJon
l id been completed according to p1a�f:3 and v ci£i.cat`ion� -filed'i-Iri Pii
office of the Building Official prior to theVissuance of.said bihild►ing
permit, to wit as 11:5 complies with all the
building, plumbing, elebtrical,. zon'_.ng and subdivision regulations
ordinances of the City of Sanford and with the provisions of these
regulations.
STAFF APPROVAL Subdivision Regulations Apply: Yea No
DAT APPROVAL DATE APPROVAL
BUILDING: �Q - FIRE:
Finaled 8 Inspected
ZONING:
Inspected
UTILITIES:
Water Sewer
Lines In _ Liners In
Meter Sewer
Set Tap
Reclaimed
Water
ENGINE IER NG:
Drainage ����
Maintenance V
Bond /�
PUBLIC W RO KS:
Street
Name r"
Signs __1 Jim
Storm U0
Sewer
Street _
Work
Pa •._', -toT+I
WATER -SEWER IMPACT FEES
01-APPLCTN FEE -BUILDING
01-FIRE IMPACT - RESIDENT
01-LIBRARY IMPACT FEE
01-OPEN SPACE
01-POLICE IMPACT - RESID
01-RADON GAS TAX FEE
01-ROAD IMPACT FEES
01-RECOVERY FD/CERT. PGM.
Street
Paved
Street
Lights
Driveway
_ .may 161010
3/03/00
10.00
3/03/00
59.27
3/03/00
54.00
3/03/00
279.61
3/03/00
91.93
7.14
1-3/03/00
`J/W/00
847.00
3/03/00
7.14
PAGE: 2
This is to certify that the building :Located at
115 SPANISH BAY DR for
which permit 00-00001598 has hez'-etofore been issued on S/02/00
has been completed according to plans and specifications filed in the
office of the Building Officia rior to the issuance of said building
permit, to wit as �e complies with all the
building, plumbing, electrical, zon.ng and subdivision regulations
ordinances of the City of Sanford and with the provisions of these
regulations.
STAFF APPROVAL Subdivision Regulat9.ons Apply: Yes No
01-SCHOOL IMPACT FEE
WT IMPACT:SINGLE FAMILY
SW IMPACT:SINGLE FAMILY
3/03/00 1384.00
3/03/00 650.00
3/03/00 1700.00
BUILDING OFFICIAL / DA
CERTIFICATE OF OCCUPANCY
REQUEST FOR FINAL INSPECTION
""RESIDENTIAL SINGLE: FAMILY RESIDENCE"*'t'4
DATE -"I I I'1 Op
ADDRESS��
CONTRACTOR
The Building department has prepared a C of O for the
above location and is requesting final inspection by
your department. After your inspection, please sign off
on the C.O. or submit an addendum if it has been
denied. Your prompt attention will be appreciated.
Thank you.
Engineering
Public Works
Utilities/Cross Connection
t�t,(AW,WU
�0 ff�la-1
'CERTIFICATE OF OCCUPANCY
REQUEST FOR FINAL INSPECTION
*******RESIDENTIAL SINGLE FAMILY RESIDENCE"'k**
DATE '-I I I'I Qp
ADDRESS
CONTRACTOR
`L1
The Building department4as prepared a C of O for the
above location and is requesting final inspection by
your department. After your inspection, please sign off
on the C.O. or submit an addendum if it has been
denied. Your prompt attention will be appreciated.
Thank you.
j
Engineering /
Public Works
Utilities/Cross Connection
I
'CERTIFICATE OF OCCUPANCY
REQUEST FOR FIIVAL INSPECTION
*******RESIDENTIAL SINGLE FAMILY RESIDENCE*******
DATE —II 1'1 100
ADDRESS
Coo -150)
CONTRACTO
The Building department has, prepared a C of O for the
above location and is requesting final inspection by
your department. After your inspection, please sign off
on the C.O. or submit an addendum if it has been
denied. Your prompt attention will be appreciated.
Thank you.
Engineering
Public Works
Utilities/Cross Connection_
C.O./C.C. CHECKUST - UTi° MES
Re pest Received 7 U�� ¢.00 Utility Inspects
q INITIALS PATE
'---`7-�
� r s Final
1ltility Inspec o --
FDEP Clearance - Water ---------- -------
_-
FDEP Clearance - Sewer ---------- -- ----
City Services Easements --------
-
Maintenance Bond (1096 ZYr% ---------- ---------
l/
7�w�
LA.) D (0,50 03 00 _
M-F Flo 0
q S uo
3�35 ° °
-\ - 1)c o5,1—
FC 5-Z 3� 1
CERTIFICATE OF OCCUPANCY
REQUEST FOR FINAL INSPECTION
*******RESIDENTIAL SINGLE FAMILY RESIDENCE*******
DATE —1I l'I Op
ADDRESS��
CONTRACTOR
The Building department has prepared a C of O for the
above location and is requesting final inspection by
your department. After your inspection, please sign off
on the C.O. or submit an addendum if it has been
denied. Your prompt attention will be appreciated.
Thank you. /.s>
Engineering'
Public Works
Utilities/Cross Connection
C.U./C.C. ��,._�,,.`�. - s
-S
oo_¢ �o titi'tity Inspec'or-�
z
�RegLest F.eceived 7�INMALS ONCE
l;tility ln144-1
spec,or's Final --
FDEP Clearance - \dater _--------- ------_
-----
FDEP Clearance - Sewer ---------- ---- -""---
City Services Easements ---------- ----------
Maintenance Bond (10% - 2yr)----------
Other-------------------- ---------
iF�`''.,_„y+[3`; �c►eS"„tir��E.Y._,_...T ,,� ti ^�<- `4.. ale •- .,�f.-•.-•.. •:r,,,..;�,..�+,•.[�i]�i.-,tee
s:Tt�'4y S.Ef!���-tf.�'��. 3.—u�.e....»�`Lei-',+�+tr'*.t�:•:�firrwt;F�x�.s�..:��
RAkPI® MEMO
- T
ec /s i ),/ CD/. C ,� / {V �r/��
GAdarrs SC1158