HomeMy WebLinkAbout123 Spanish Bay Dr 00-3755 New SFH)Pon iS��Pic-
SUBDIVISION:��`
ZONE DATE 2 -,2K 0y
CONTRACTOR Pll(--tn%nda--tcm es J) C•
ADDRESS I�C>l�L�CJ ��i ►C!1�J, t�L
PHONE # Lf /`�_" C'I/�Z _3�23
LOCATION / sh Ac,-14- /-)C
OWNER
ADDRESS
PHONE #
/1
PERMIT' #
JOB C_J�s��,�Lt� �SI F ees
COST $ L C i CUU
LOT NO. --7 %
BLOCK:
SECTION:
SQUARE FEET: y�
FEE $ MODEL:
STATE NO. CI\ e `' OCCUPANCY CLASS:
&(j _ �� PLUMBING CONTRACTOR �c, �►l e FEE $
ADDRESS
PHONE #
ELECTRICAL CONTRACTOR FEE $ Z1
ADDRESS
PHONE #
Co z -7 MECHANICAL CONTRACTOR :�) G 21 (f-
ADDRESS
PHONE #
MISCELLANEOUS CONTRACTOR
ADDRESS
SEPTIC TANK PERMIT NO.
SOIL TEST REQUIREMENTS �)
FINISHED FLOOR
ELEVATION REQUIREMENTS (__)
ARCH ITECTURALAPPROVAL
DATE:
FEE $
INSPECTIONS I
TYPE DATE OK REJECT BY
FEE $ ENERGY SECT
CERTIFICATE OF OCCUPANCY
ISSUED #
FINAL DATE " �•� DO
EPI:
DATE: _ a -I T O Z:) _
w
CERTIFICATE OF OCCUPANCY / COMPLETION
rz
this'?to''tiify/�hat;-the''building,:loc�atgd atr(= ii���r 1� �� �,
123 SPANISH BAI DR 7' ' fbr
which permit 00-00003755 has heretofore been issued on 8/28/00
has been completed according to plans and specifications filed in the
office of the Building Official prior to the issuance of said building
permit, to wit as kna `I) �I'Fr complies with all the
building, plumbing,'eiectrical, zoning and subdivision regulations
ordinances of the City of Sanford and with the provisions of these
regulations.
STAFF APPROVAL Subdivision Regulations Apply: Yes No
DATE APPROVARATE APPROVAL
BUILDING: FIRE:
Finaled 1gAvda-) L Inspected
ZONING:
Inspected
UTILITIES: '
Water Sewer
M
Lines In � P li l k l�f e� Lines In
Meter"�-
Set ap
Reclaimed
Water
ENGINEERING:
Street ,
Drainage -�—
Paved
Maintenance
'ug
Bond
PUBLIC WORKS:
Street
Name
Signs t Z
�' �k?,
Street
Lights
_-
Storm
U1
Sewer
Driveway
Street
Work
_
FEES
PAID
WATER -SEWER IMPACT FEES
01-APPLCTN FEE -BUILDING
01-FIRE IMPACT - RESIDENT
01-LIBRARY IMPACT FEE
01-OPEN SPACE
01-POLICE IMPACT - RESID
01-RADON GAS TAX FEE
01-ROAD IMPACT FEES
01-RECOVERY FD/CERT_ PGM.
8/29/00
10.00
8/29/00
59.27
8/29/00
54.00
8/29/00
279.61
".8%29/00
91.93
8/29/00
10.72
8/29/00
847.00
8/29/00
10.71
PAGE: 2
This is to certify that the building located at
123 SPA_NISH BAY DR for
which permit 00-00003755 has heretofore been issued on _8/28/00
has been completed according to plans and specifications filed in the
office of the Building Off 1,prior to the issuance of said building
permit, to wit as � Vf '-3-11:::- complies with all the
building, plumbing, electrical, zoning and subdivision regulations
ordinances of the City of Sanford and with the provisions of these
regulations.
STAFF APPROVAL Subdivision Regulati.ons Apply: Yes No
O1-SCHOOL IMPACT FEE 8/29/00 1384.00
WT IMPACT:SINGLE FAMILY 8/29/00 650.00
SW IMPACT:SINGLE FAMILY 8/29/00 1700.00
n-
M
t c. k tiJ - I2 CCU
I�
OWNER •BUILDING OFFICIAL / DATWO
�n
Fema Rec'd
Slab Rec'd AF�
Inspector App'd
REQUEST FOR FINAL INSPECTION
CERTIFICATE OF OCCUPANCY
****SINGLE FAMILY RESIDENCE****
DATE ��'�`-i'0D
PERMIT# 00-3-1�L-
ADDRESS
SUBDIVISION
CONTRACTOR Maronda Homes
The Building Division has received a request for a final inspection and a
Certificate of Occupancy for the above referenced address. We would appreciate
a final inspection of the site by your department. Approval by your department
would result in a granting a C.O. for the address. If you have any issues that the
contractor will need to address, please submit a statement for denial of C.O. or a
conditional agreement to be attached to the C.O.
Thank you for your cooperation. co./C.C. CHECKLIST - UTILITIES DEFT.
6Request Received te;-4 Ao 14 To Utility Inspector
INITIALS DATE
Engineering Utility Inspector's Final--------------------
FDEP Clearance - Water ---------- ----------
Public Works FDEP Clearance - Sewer -------
Utilities City Services Easements -------- -----------
Mointencince Bond (10% - 2yr)------L ------------
Other-------------------- ---------- ----------
Conditions: to be com feted onl if a roval is conditional
u�
Fema Rec'd
Slab Rec'd
Inspector App'd
REQUEST FOR FINAL INSPECTION
CERTIFICATE OF OCCUPANCY
`"""SINGLE FAMILY RESIDENCE"""
DATE �,�
PERMIT # C;0
ADDRESS
SUBDIVISION L)
CONTRACTOR Maronda Homes
The Building Division has received a request for a -final inspection and a
Certificate of Occupancy for the above referenced address. We would appreciate
a final inspection of the site by your department. Approval by your department
would result in a granting a C.O. for the address. If you have any issues that the
contractor will need to address, please submit a statement for denial of C.O.. or a
conditional agreement to be attached to the C.O.
Thank you for your cooperation.
Engineering
Public Works
Utilities
C.O./C.C. CHECKLIST - UTZLiTiES DE:'T.
&Request Received Lz1z0 ?y-_<_To utility Inspector t',.�s
INITIALS DATE
_ Utility Inspector's Final_`-°----f-- 10`
P
�p Clearance - Water --------------------
FDEP Clearance - Sewer --------------------
City Services Easements -------------------
Maintenance Bond (10% - 2yi)
Other-------------------- ---
Conditions: (to be completed only if approval is conditional
Fema Rec'd l�
Slab Rec'd
Inspector App'd
REQUEST FOR FINAL INSPECTION
CERTIFICATE OF OCCUPANCY
****SINGLE FAMILY RESIDENCE****
DATE I L- N - O-0
PERMIT #
ADDRESS NU
SUBDIVISION
CONTRACTOR Maronda Homes
The Building Division has received a request for a final inspection and a
Certificate of Occupancy for the above referenced address. We would appreciate
a final inspection of the site by your department. Approval by your department
would result in a granting a C.O. for the address. If you have any issues that the
contractor will need to address, please submit a statement for denial of C.O. or a
conditional agreement to be attached to the C.O.
Thank you for your cooperation.
I� Qt7
Engineering
Public Works
Utilities
Conditions: (to be completed only if approval is conditional)_
Fema Rec'd
Slab Rec'd
Inspector App'd
REQUEST FOR FINAL INSPECTION
CERTIFICATE OF OCCUPANCY
****SINGLE FAMILY RESIDENCE****
DATE D-HZ'O
PERMIT #
ADDRESS 1 �3 SOcan lS k
SUBDIVISION C)C, �S
CONTRACTOR Maronda Homes
The Building Division has received a request for a final inspection and a
Certificate of Occupancy for the above referenced address. We would appreciate
a final inspection of the site by your department. Approval by your department
would result in a granting a C.O. for the address. If you have any issues that the
contractor will need to address, please submit a statement for denial of C.O. or a
conditional agreement to be attached to the C.O.
Thank you for your cooperation.
Engineering
Public Works' « 1
Utilities
Conditions: (to be completed only if approval is conditional)
I ST FL-00 PL_AN
1/4.4-0"
20'-0"
I 1
14
I
I �
I
I3' 5.W.5. 23 5.H. 6065 5.6D.
Ll
las
I N
(vl\ -la
y
5LAWPOR61-1 LOCATION
5UNBURY
0
Iq'-O 1/2"
(2) 245H IN I
3SW5
30 ARGH OVER
lr9
REGE55 PREGA5T LINTEL
W LINTEL BLOCK OVER
n
O_
UI
i
O
_ N
FAMILY RM.
l'-4
ta
1.3' 5.W.5.