Loading...
HomeMy WebLinkAbout213 Towne Center Cir 95-2393 New build out MallAddress: 183 South Oregon Ave. }; Sanford, FLA. 32771 Space No: P-4A Construction Type: IV Unprotected (Sprinklered) Occupancy Type: M (Mercantile) S for ies: 2 Total Square Footage of Mall: 1,903,000 t sq.ft. Square Footage of Tenant: 735 sq.ft. bric t...1ey & co. Seminole Towne Center Space Na. P-4A Sanford, Florida TonyaWlker Charter Store 5100 Main Street Willi amsville, New York 14221 (716) 632-8156 h pia A-o A-1 A-2 A-3 A-4 M-1 E-1 11 r, i1 • 1 ro'. Title Sheet Floor, and Reflected Ceiling plan, and Misc. Details Elevations, Work Purchase Schedule Storefront Sections Architectual Specifications Mechanical plan & Specifications Electrical plans & Specifications r i ✓ , - r i � r i , a k � ° z O OO O O t7 y k �a1�4 OC O El a - r i • y Q , JUTI► I` Y CONfl,ECTION FEE: n (� rv� �1vrr41•Jd ��k1-1!� z O 1' � r-1 .. A I G�� zz Q �4 r Cover -.r Sheet A_o JO u ssi t° REFLECTED CEILING PLAN LEGEND 2' X 2' Paracube fixtures, suspend from structure above. Bottom of fixture to be ® 12'4" A.F.F. O — Recessed downlight Ughtoller 1102/1105. 100 R/ FL, 90wm total (16) { — new sprinkler heads, see sheet M-1 for requirements. lease line new rated �. ^+%, �"o lsi.i ucu, 3 5/8" metal studs by "landlord" 5/8" fire c--- ...,..�.. _, ._..�.-- G.C. Carry drywall to metal deck above, coordinate with mall owners construction standards. U.L. Design No. U465 PARTITION SCHEDULE ��, New wall construction "BY LANDLORD use 3 5/80 20 gauge mtl. studs at 244 O.C. w/ bridging per stud manufacturer. Use 5/8" Fire code Gyp. Bd. (U.L. Design No. U465) NOTE: "Tenants GC. to install and supply drywall to 'Landlords" metal studs. New wall construction "BY TENANTS GC." use 3 5/8" 20 gauge mtl. studs at 24" O.C. W/ 6/8" Fire code Gyp. drywall each side. carry mt. studs and drywall a minimum of 6" above highest adjacent ceiling. brace walls to structure above as required. 4 Soffit Detail A-1 1" = 1'-0" 6" adjacent tenant new 3 ,1 /8" (20 gage) metal stud hangers @ 4'- 0" O.C. tie with stand-offs to runner track at rated wall, do not penetrate wall. 3 5/8" runner, continuous new 3 5/8" (20 gage) metal studs @ 24" o.c. 1'- 6" lease line I I G.F.R.C. neutral pier, screw att ch to fire rated wd. blocking an or metal stud,. "by landlord" set glass back 1 /4" fro n face of neutral pier. provid silicone sealant per manufacturers require ents. Aussie Outfitters 3 Plan Detail Al 1 1/2" =1 �_0�� I Y 4 fi lease line 1 '-0" 2' W.10 folding bench hinges shown ' dotted. Handicap dressing ----- 3'-(?x 5-8" - room b o 102 LO , b 1 Supply NIc- room 6'- 3'-0" x 0-8" 0 4 103 c� A-2 Ic- CV Electric Room - O O , , 104 d 3'-(r x 6-8" cr) W CV b CV C0 CV M 1 CV 0 CV O CV New gypsum ceiling Q 8'4% Paint; Ellicott Eggshell Pro White 49'- 0" 39'-3"t neutral pier construction by "tenant" 30'- 0" '-0" lease line I back counter Schluter transition strip Schlene- M profile, brass finish (MS 58). Contractor to verify height of the trim inaccordance to mall file counter thickness. 3 A_2 _ carpet all til T_ b Sales 2 101 A-2 �t A-2 r A 2 typical elevation symbol I wall fixture supplied by Advantage column enclosure by "tenant" Floor Plan O 1/4�t _ 1 _0H Reflected Ceiling Plan.",-,,-, lease line neutral pier construction by "Landlord" internally illuminated sign above. ;1° �C C/1 N M + woE a U U N M w �w.� S 01 N ®U a z U U � � a '4 8 z,0 N U o �' o� w 0 L � �W a g n b 0. 0 + o tl e Q z o 0 cn r-, Q w z° Q Floor " & Reflected Ceiling Plans JOB NO. �' 95020 1 S I CV T— a O iv Handicap T dressing room 102 Interior Elevation , 1/4" = 1'-or' Interior Storefront Elevation 1/4 . =1 _Orr Interior Storefront Elevation 1/411 =1'-0" 0 Co T counter by advantage 3 5/8" mtl. studs @24" O.C. 5/8" drywall 3/4" plywood w/ plastic laminate, post formed radius as shown. 4" min "Hafele" Hebgo folding bracket Heavy duty model Catalog No. 287.47.917, provide (2) hinges wood blocking for hinges. FF Bench Detail (:6 1 1/211 = 1 I -Off 31 Storefront Elevation 1/4" = 1 1_011 1 CV I CV ;0 T 00 O co N T Bo Oo T I N 0 CV T (�1 14 11 �=l _011 Work Turnkey / Finish Schedule No. Itom Name Specifications Provided Installed Comments BY (� 01 :Y(P 0 < 6) A _L Storefront (100) 1 storefront flooring existing mall floor to remain verify condition and repair/replace as required, contact Landlord's representative for new material if required. 2 walls & soff�L painted gypsum surfaces - (1) coat primer by Pratt & Lambert, Latex Interior V V V note: see plan detail 3 sheet A-1 Vinyl Acrylic Primer or equal, (2) coats by Pratt & Lambert, Pro -Hide Gold Interior Latex Eggshell, # Z8250, Pro White or equal. 3 base painted wood surfaces - (1) coat primer by Pratt & Lambert, Latex Interior Vinyl Note: All wood to receive a "Class A" flame spread rating as Acrylic Primer, (1) coat by Flame Control # 20-20, Flat Latex Intumescent indicated or equal, white finish Flame Retardant Coating, White, (1) coat by Flame Control # 40-40, Eggshell Latex Intumescent Flame Retardant Coating, White. 4 storefront doors & See sheet A-4 for complete specifications V display window 5 neutral pier neutral pier construction by "Landlord" V 6 slgnage per manufacturer's shop drawing contact owners representative, GC shall provide electrical connection Sales Area (101) 11 floor carpet & pad - Dimensions Finesse - 40 oz. com'I cut pile Black - # 68814 v 12 base painted wood - see note # 3 4 1 /2" high (profile by Advantage) 13 walls painted gypsum board - see note # 2 14 fixtures by Advantage V 15 door pre -hung 6-panel door with trim, 3'-0"w x 6'-8"h x 1 3/4" each leaf - see V Note: profile for trim provided by Advantage note # 3. 16 kick plate black plate steel 17 fixtures (product display bars) by Advantage 1/ v 18 hardware (2) privacy set, 'Schlage' S-40D, Saturn design, satin chrome US26D J final approval by tenant< (2) lockset set, 'Schlage' S-51 PD, Saturn design, satin chrome US26D 19 slatwall by Advantage , J 20 gypsum soffit Painted gyp. bd. - see note # 2 21 open ceiling painted open structure - (2) coats by Pratt & Lambert, Effecto Enamel, # 6-181 V V Note: Paint all visually exposed surfaces seen from space below Black or equal to include but not limited to, the existing structure, decking, tenant partition walls, electrical conduit and junction boxes, �n HVAC ductwork & equipment, and lighting fixtures. UN �yCyyy�1 M � N OU vaA� s� 0 U 0 U UU C:8 z� 0 0 �•yi O h r., :i. F d w o 0. l ,, �� ;f 1 0 off 2 CL Q H� i U'S� Q w zo O � 7 Q z° Q .,Elevations & 'Work Purchase Schedule _ �I. w2 }. Awl jOB NO. 95020 O H z 0 O H 0 a a a 7 1 1 1 I a 4 3 5/8" metal studs @ 24" O.C. by tenants G.C. 3 5/8" continuous runner. ) 5/8" type-x drywall match existing mail tile "by tenant's G.C." Section Th.ru to.A.refront .� 1 o lease line match existing mall tile "by tenant's G.C." Section Thru Storefront 1 11 _ 1 1-011 3 5/8" metal studs @ 24" O.C. by tenants G.C. 3 5/80 continuous runner. )T 5/8" type-x drywall N 'Vie N + VI " (A 'n 0&0 5 U N U � a z a V) oQ U U � U z 4� y � p W � Cn U 4A W (r n. w O _o p m 1+ G� ff ,Y ,9F 5 Y•� � � o ' Focbl i o .� A aUaaAy� AM'Q W VI z 0 > Q � A A °z Storefront Sections A-3 JOB NO. 95020 ll �G 0 U z 0 O rr4 F� F4 0 z a a a -r 1 , ,1 r - r , J 1 r J r J r - r - r r 5UPPI IMENTARY GLNERAL CONDITIONS Article 8 • Time Insofar as job site safety Is concerned, the architect Is "General Conditions of the Contract for Construction of Supplement as follows In paragraphs 8.1.3, 8.3.1: responsible solely for his own and his employees' activities onThe the jobsite, but this shall not construed to relieve the owner or ,. Buildings," American Institute of Architects document A-301, any construction contractors from their responsibilities for r. 1987, articals 1 to 14, are hereby made a part of this Change the words "architect" In this paragraph to read Instead maintaining a safe jobslte. neither the professional activities of specffication, and are found herein. J These suppementary general conditions shall take "owner's representative". ' the architect, nor the presents of the architect or his employees and subcontractors, shall be construed to Imply the architect has �ecldence over and moll a pages or statements P modify any P 9 Article 9 • Pa Payments and Completion any responsibility for methods of work performance, aformentioned "General conditions of the Contract for superintendent, sequencing of construction, or safety In, on, or construction and Buildings" and shall be used in conjunction with Supplement as follows In paragraphs 9.2.1, 9.3.1, 9.4.1, 9.4.2, about the jobslte. The owner agrees the T.G.C. Is solely them as part of the contract documents. 9.5.1, 9.6.1, 9.6.3, 9.6.4, 9.7.1, 9.8.2, 9.8.3, 9.9.1, 9.9.2, 9.10.1, responsible for Jobsite safety and warrants that this intent shall • Where any article of the "A. I.A. General conditions" Is 9.10.2. 9.10.3: be made evident in the owner's agreement with the T.G.C.• The supplemented hereby, the .I.A. provisions of such article shall owner also warrants that the architect shall be made additional remain In effect. All suppmental provisions shall be considered Change the words "architect" In this paragraph to read Instead insured under the T.G.C.'s general liability Insurance policy. as added thereto and modified same, where any such article Is "owner's representative". �h A The owner's representative shall review any shop drawing not specifically amended,'yiilded, or superseded, It shall remain# submissions solely for their conformance with the architect's In effect. 9.6.7 Payment shall be made to the contractor for work under design Intent and conformance information given in the • It Is Intended that by these supplementary general this contract as follows: construction documents. the owner's representative shall not be conditions that the architect will have no Involvement In this responsible for any aspects of a shop drawing submission that project + ter the construction documents are completed and Ninety (90%) percent of the total contract amount within affect or are affected by the means, methods, techniques, turned over to the owner for bidding purposes. All references to thirty (30) days following completion and preliminary Inspection sequences and operations of the construction, safety the architect and architect's work pertaining to phases beyond by owner's representative, submission of release of liens from all precautions and programs incidental thereto, all of which are the the construction document phases are hereby removed and his rub -contractors and materials suppliers involved In the work, contractor's responsibility. The owner warrants that the normal work In these phases beyond the construction document 6xal municipality and delivery of occupancy. No payments will contractor shall be made aware of his responsibilities to review phase are given over, In their entirety, to the owner's • be made without fully executed release of liens, shop drawings In these respects before submitting them to the representative. If any work by the architect Is lriferred in the 4 Ten (10%) percent final payment within twenty (20) days owner's representative. corrected G.C. or S.P.C., notify the architect and supplementary following final Inspection by owner's representative and receipt condttlons will be corrected to exclude these references. of "as built cost breakdown". Artical 12 • Uncovering and correction of work • Contractor to submit with final Invoice the attached coot Article 2 breakdown for use by owner's representative for tax and Supplement as follows In paragraphs 12.1.1, 12.1.2, 12.21, accounting purposes and remaining releases of (lens property 12.2.4: Supplement as follows: executed covering all labor and material. 2.1 Definition • add the following: 9.6.8 The owner's representative may, If he/she deems Change the words "architect" in this paragraph to read Instead "owner's representative". necessary, direct contractor to work overtime and, ff so The words owner, tenant, and tenant owner shall mean one and Instructed, contractor will work said overtime and, provided that Article 13 • Miscellaneous provisions the same thing and can be used interchangeably for purposes of contractor Is not In default of any of the provisions herein, the this document. owner's representative shall pay contractor for the actual Supplement as follows In paragraphs 13.5.2, 13.5.4, 13.5.5; additional premium wages paid plus insurance and taxes 2.1.1 add the following: Imposed by law on such additional wages. ff, however, Change the words "architect" In this paragraph to read instead contractor Is, In owner's representative opinion, behind schedule "owner's representative". n the owner Is leasing the property, he cannot furnish a copy of with the work, contractor shall, at Its owns expense work such the record legal title as stated above. The contractor may contact overtime as may be necessary to get back on schedule and to Article 14 • Termination or suspension of the contract the mall owner to see it such Information can be made available. complete work. No claim for reimbursement shall be accepted on overtime work due to delays within the contractor's control Supplement as follows In paragraphs 14.1.1.3, 14.1.2, 14.1.3, 2.2-1 Information & Services Required of the Owner • delete nor without prior written approval of owner's representative. 14.2.2, 14.2.4; paragraph 2.2.1 Article 10 • Protection of Persons and Property Change the words "architect" in this paragraph to read Instead Article 3 •Contractor "owner's representative". Supplement as follows In paragraphs 10.1.2., 10.2.6: 3.1 Definition • add the following: Change the words "architect" In this paragraph to read instead The words contractor, general contractor, and tenant general "owner's representative", contractor shall mean one and the same thing and can be used Interchangeably for purposes of this document. Article 11 • Insurance and Bonds 3.5 Warranty • add the following to paragraph 3.5.1: Supplement as follows: Warranty exclusions listed apply only after the store is occupied 11.1 Contractor's Liability Insurance by the owner. 11.1.1.8 Amounts and type of Insurance shall be as directed by 3.7 Permits, Fees, and Notices • paragraph 3.7.1. the owner, owner's representative and landlord for the building In which the project occurs. delete the following words: "which are customary secured after execution of the contract and T.G.C. shall maintain orderly housekeeping during the which are legally required when bids are received or negotiations process of construction, and upon completion shall thoroughly concluded." clean all areas. final clean-up shall Include the following: sweep, camp mop, and wax resilient flooring; blemishes shall be 3.11 documents and Samples at the Site • paragraph 3.11.1 removed from all surfaces, Including piping and equipment; windows, glass units, glass doors and mirrors shall be washed. Change the words "architect" In this paragraph to read Instead Paint overruns, and putty smears shall be removed; hardware "owner's representative". shall be rubbed clean with a flannel cloth. • T.G.C. shall be responsible to the mall for any damage 3.12 Shop Drawings, Product Data and Samples • In paragraphs occurring to any of the landlord's facilities before, during, or after 3.12.4, 3.12.5, 3.12.8r construction procedures caused by the contractor, his employees or his subcontractors. Change the words "architect' In this paragraph to read Instead Manufactures on specified items are noted for quality and "owner's representative". design. T.G.C. may substitute "equal" products subject to approval by the architect. The T.G.C. in encouraged to submit Article 4 • Administration of the Contract alternate "equal" products for consideration of the architect in an effort to reduce the construction costs. All reasonable requests Supplement as follows: will be reviewed by the architect for compliance with the intent of the products originally specified. 4.2 Architect's Administration of the Contract • In paragraphs All products and materials shall be Installed in strict 4.21, 4.2.2, 4.24, 4.2.5, 4.2.6,4.27, 4.2.8, 4.2.9, 4.2.11 conformance with the manufacture's published recommendations, T.G.C. shall provide a copy of the Change the words "architect" in this paragraph to read Instead manufacturer's installed recommendations upon request of the "owner's representative", architect. • T.G.C. shall verity that the work adheres to all fire, safety, 4.210 • Delete this paragraph and building codes. T.G.C. shall verity that work complies with the landlord and Insurance requirements. 4.4 Resolution of claims & disputes • In paragraphs 4.4.1, 4.4.2, All scaffolding shall be built In accordance to the 4.4.3, 4.4.4 requirements of all federal, state, and local laws. All temporary shoring required for the removal of existing work of the Change the words "architect" in this paragraph to read Instead Installation of new work shall be included In the contract. "owner's representative". Contractor shall be responsible for this work and shall make good any damage caused by improper support or failure of Article 5 • Subcontractors shoring In any respect. • T.G.C. shall provide and maintain full Insurance as required In paragraphs 5.2.1, 5.2.2. 5.2.3, 5.24 by the General Conditions and the landlord. Evidence of Insurance shall be provided to the owner before payments shall Change the words "architect" In this paragraph to read Instead commence to the contractor. "owner's representative". Applicable standards of construction industry have same force and effect on the performance of the work as If copied Article 6 • Construction by Owner or by Separate directly Into construction documents or bound and published Contractors therewith. Comply with the standards In effect as of date on contract documents, unless otherwise Indicated. Supplement as follows In paragraphs 6.2.2: Upon completion of the work, T.G.C. shall compile for and deliver to the owner a complete set of record documents. This Change the words "architect" in this paragraph to read Instead set of documents shall consist of record specifications and "owner's representative". record drawings showing the reported location of the work. While this information Is believed to be reliable, the architect Article 7 • Changes In Work cannot assure Its accuracy, and thus Is not responsible for the accuracy of this record drawing, and thus Is not responsible for Supplement as follows In paragraphs 7.1.2, 7.2.1, 7.3.1, 7.3.4, any errors and ornisslons which may have been Incorporated 7.3.9, 7.4.1: Into it as a result. Those relying on this record document are advised to obtain Independent verification of its accuracy before Change the words "architect" in this paragraph to read Instead applying it for any purpose. "owner's representative". W, SPECIFI QATIONS 02050 Temporary Protection • T.G.C. shall coordinate erection t temporary protection of 08M Class and Glazing Special Conditions the construction with the landlord T, 1C. shall Incur any costs • Tenant general contractor (T.G.C.) shall visit the job site for temporary protection unless oth'r`�t(se stated by the tenant. prior to submitting bid. The bid shall be based upon -the work Tempered glass doors shall be Blumcratt Series 1301 in strict indicated In the construction documents. 0206 Existing Conditions accordance with the following or equal: • The T.G.C. shall meet with an authorized representative a T.G.C. shall visit the job site to Inspect the existing of the mall/landlord and shall review mall construction conditions and to verify the amount of work that will be Glass - shall be 1 /2" thick, fully tempered, clear glass. requirements. T.G.C. shall review coordinate his/her work with necessary for the project to be completed as shown on the regard to temporary utilities, allowable materials, traffic routs, architectural plan. Top & Bottom Pivot Trim - shall be as indicated on drawings. storage of tools and materials, use of tollet facilities, hours In Verify elevation of existing floor substrate and report top which work Is allowed, noise and dust control, dean -up and the owner If there Is a variation of more than 1 /2" out of level. Sidelights - shall have bottom trim to match doors, top of glass other matters required adherence to mall requirements. The T.G.C. shall receive Instructions from the owner on shall be recessed Into ceiling as detailed. • T.G.C. shall review with landlord's representative the method of correction. manner In which all connections to structure will be made. Any • Ceiling track C-7500 - shall be recessed in ceiling to receive penetrations In the building envelope or structure shall be 02061 Demolftion upper portion of glass sidelights and upper portion of transom reviewed with the landlord and approved In writing. If the mall a The architect does not certify that all demolition work Is glass. requires that portions of the work be performed by Its own indicated on the architectural / demolition plan. T.G.C. is to contractor, T.G.C. shall Incur all costs associated with that Inventory existing construction and furnishings to determine 0 Deadbolt Handles - shall be DB-150 deadbolt with exterior portion of the work unless stated otherwise In writing by the any Items can be reused. T.G.C. is to obtain permission from fixed pull handle including key cylinder, lock on exterior side of owner. During performance work, T.G.C. Is responsible for the tenant before transporting any part of the existing tenant work from the premises. All demolition work is to be door and thumbturn on interior side/ or key cylinder on interior side. provision and maintenance of warning signs, light signal coordinated with the mall tenant coordinator. devices as appropriately located on and around the job site • Transom Bar - shall be Bumcraft B-1250 solid steel clad in which will giver proper and understandable warning to all 03010 Concrete Work stainless steel. persons with regard to hazardous conditions, equipment and Where there Is an existing concrete floor slab, prepare the operations being performed In conjunction with the T.G.C.'s slab to receive finish as Indicated on drawings. • Floor Closers - shall be Dorma BTS-80 to be furnished by work. a Inspect job site conditions and report any variations In the Blumcraft in a special steel case. Hold open feature is built in. • All existing conditions and dimensions are from level or surface of the existing slab that would affect the Information furnished by the landlord and any discrepancy aesthetics or wear ability of the floor finish. • Finish - of all exposed stainless steel shall be high polished or found on the drawings shall be brought to the attention of the 4 Finish level of slab shall be coordinated with landlord satin• architect no later than five (5) days prior to the bid due date. requirements. Discrepancies during bidding will be handled by addendum. Seal concrete In areas to receive carpeting. • Construction and testing - of doors shall be completeelt built in • Discrepancies found during construction are to be Blumcraft's factory with top & bottom members bonded to the immediately brought to the attention of the architect. 03015 Floor Slab Modifications . glass with a special process under controlled procedure. Each Discrepancies during construction will be handled by change Inspect the existing slab conditions to determine the door shall be physically tested in Blumcraft's factory for all orders, amount of concrete floor slab to be removed and replaced for functions before delivery. • T.G.C. will be responsible for all costs Incurred for installation of plumbing, electrical and mechanical work. All non-compliance with these contract documents. T.G.C. will not penetrations of slab shall be coordinated with the mall tenant Installation - shall be made in accordance with manufacturer's be allowed change orders for problems arising from T.G.C.'s neglect of the provisions Included In these conditions. coordinator. recommendations. Door framing and jambs shall be rigidly set • T.G.C. shall accomplish all work In accordance with local 05400 Light Gauge Metal Framing square and plumb. Clearances between the doors, header and jamb shall be as recommended by door manufacturer. Top pivot codes and In compliance with the restrictions and • Provide and Install 20 gauge metal studs of depth shown and floor closer shall be properly aligned using adjustment requirements of the landlord. on plans. If toad bearing or unusual structural conditions exist, features shown on instruction sheets furnished by Blumcraft. • T.G.C. shall remove all construction rubbish, scaffolding, T.G.C. shalt provide metal studs of a heavier gauge for The installation contractor shall be fully for properly aligning and equipment, temporary protection, temporary field structures, sufficient strength for that particular application. setting the doors all in accordance with the manufacturer's and anything else required In connection with construction, but Space studs used In construction at 160 o.c. unless recommendations. not a permanent part thereof. drawings Indicate otherwise. • T.G.C. shall maintain orderly housekeeping during the Furring channels shall be hat shaped 16 gauge steel. Protection - during and after installation, the general contractor process of construction, and upon completion shall thoroughly clean all areas. final clean-up shall include the following: 05405 Light Gauge Metal Trusses and Storefront Support shall provide adequate protection against stains and damage during construction. sweep, damp mop, and wax resilient flooring; dust, dirt, paint T.G.C. Is to design, engineer, provide and Install drippings, oil, grease, and other blemishes shall be removed storefront configuration In accordance with the design Shop Drawings - shall be prepared by Blumcraft of Pittsburgh. from all surfaces, Including piping and equipment; windows, Information shown on the drawings. Inspect existing conditions glass units, glass doors and mirrors shall be washed. Paint to determine loading and connection details. All connections to overruns and putty smears shall be removed; hardware shall the mall structure shall be coordinated with the mall tenant QQ50 Gypsum Drywall e rubbed clean with a flannel cloth. coordinator and/or architect. Wall board shall be W type x' to edges and delivered to yp tapered edge l • T.G.C. shall be responsible to the mall for any damage • Shop drawings and calculations shall be provided to mail the job site with and tapers bearing underwriters laboratories label, with occurring to any of the landlord's facilities before, during or and building department when required. the correct design number for these drawings and specifications unless after construction procedures caused by the contractor, his shown differently on plans. T.G.C. shall use type 'x" fire code gypsum employees or his sub -contractors. 06200 Finish Carpentry board unless not required by local codes or mall requirements. Drywall Installed on metal studs shall be fastened with power driven, • Manufacturers on specified items are noted for quality 0 Sand all exposed wood surfaces smooth and stain self -tapping drywall screws, one (1) Inch or longer If required. and design. T.G.C. may substitute "equal" products subject to according to finish schedule. Apply two coats spar varnish and Comer and casing beads and trim shall be galvanized steel. approval by the architect. The T.G.C. is encouraged to submit sand ilghi y bat'wean coats for clear finish. Use boards of a m"mum practicable la-sgth so mat as absolute alternate "equal" products for consideration of the architect In a Finish wood shall be straight and free of blemishes and of minimum number of and joints occur. Locate wallboard joints at openings an effort to reduce the construction costs. All reasonable sufficient length to permit a minimum number of joint& so that no and screws shall be located 1184 minimum to 12" maximum requests will be reviewed by the architect for compliance with Install all finish millwork neatly and prepare for staining or eight (8) Inches o./c. on walls. Drywall as demising walls, separating well, the Intent of the products originallys eciiied. P P finish painting p g per details and schedules, storefront and columns shall coped around and to deck. oP • All products and materials shall be Installed In strict Use 3/4" Birtch Plywood for shelves, end panels and Tape and joint material shall be applied to the joints approximately conformance with manufacturer's published recommendations, bottoms in units where these parts are concealed by doors, four (4) Inches wide. Use the normal tree coat process, allowing 24 hours T.G.C. shall provide a copy of manufacturer's Installation ect• drying time between coats. All nails, screws heads or dimples shall also recommendations upon request of the architect. Submit three sets of shop drawings for all fabricated work 9 receive a three coat finish using dsame material as that for the jams applied In the same manner. Sand joints smooth. • T.G.C. shall verify that the work adheres to all fire, safety, and building codes. T.G.C. shall verity that the work compiles for approval by architect. All Inside corners shall be coated with at least 2 coats of joint with landlord and Insurance requirements. 06400 Architectural Millwork compound feathered out approximately 9 Inches on sides of the exposed metal nose. • All scaffolding shall be built In accordance with a All work is to be performed in compliance with Conceal flanges of comer beads and trim with at least 2 coast of joint requirements of all federal, state and local laws. All temporary "Architectural Woodwork Quality Standards, Guide compound feathered out approximately 9 inches on sides of the exposed shoring required for the removal of existing work of the Specifications and Quality Certification Program" as published metal nose. Installation of new work shall include In the contract. by the Architectural Woodwork Institute. Any questions Use 12' the backer board'Durock' by USG or approved equal as Contractor shall make good any damage caused by improper concerning application of these standards shall be refereed to substrate for marble the as detailed. support or fallureof shoring in any respect. the architect. Use 10 file backer board (USG Durock or approved equal) as a • T.G.C. shall provide and maintain full Insurance as T.G.C. to provide and install woodwork as indicated on substrate for file to applied to vertical surfaces unless otherwise Indicated. • All wallboard and treated areas shall be smooth and ready for wall required by the general conditions and the landlord. Evidence the plans. finish. of Insurance shall be provided to the owner before payments Provide and Install plastic laminate on surfaces as Verify that the existing wall surface is smooth and suitable as a shall commence to the contrctor. Indicated on plans, substrate for the flnlsh(es) listed on the finish schedule. • Applicable standards.of construction Industry have same Provide closed grain hardwood door frames primed and force and effect on performance of the work as if copied ready for paint for wood doors that are not pre -hung. directly Into contract documents or bound and published 09680 carpeting therein. Comply with standards In effect as of date of contract 08210 Wood Doors Install carpet using direct glue -down method as recommended by the documents, unless otherwise indicated. 0 Prehung wood doors shall be a 6 panel solid wood 1 3/4" carpet manufacturer. • Upon completion of work, T.G.C. shall compile for and thick with paint grade finish, factory primed and sized as Install transition strips at transition from carpet to vinyl composite file deliver to the owner a complete set of record documents. This shown on the drawings, 1 1 /2 butts per leaf to be included. or other hard floor surface as directed by tenant set of documents shall consist of record speciflcatlons and Carpeting shall not be Installed as to bridge expansion joints. Provide record drawings showing the reported location of work. While 08700 Hardware an expansion joint assembly similar to that used by the mail. this information Is believed to be reliable, the architect cannot Provide brand and type or equal as indicated on drawings. • Any existing carpet of appreciable size shall be cleaned and become the property of the tenant. assure its accuracy, and thus is not responsible for the accuracy of this record drawing, or for any errors and 08730 Door Accessories 09900 Painting omissions which may have been Incorporated into It as a Provide Ives 407 12 stainless steel wall stop where Paint wall surfaces Indicated on plans using a minimum of two coats resault. Those relying on this record document are advised to hardware contacts a wall surface. of paint and priming where required. Stock area and tdlet room shall only obtain independent verification of its accuracy before applying receive one coat, see plans for Inclusion of stock area or toilet room. it for any purpose. All paint work shall be first quality with no defects. Sand all surfaces, • Insofar as jobsite saftey is concerned, the architect Is except drywall, between coats. responsible soley for his own employees' activities on the Apply drywall paint by roller. Apply paint to wood shall be brushed jobsite, but this shall not be construded to relieve the owner or on. any construction contractors from their responsibilities for Seal all drywall to receive wail coverings. Apply wall coverings In maintaining a safe jobsite. Neither the professional activities of accordance with manufacturer's specifications. T.G.C. shall do all touch-up at completion of the job More trades the architect or his employees' and subcontractors, shall be construed to imply the architect has any responsibility for have marred the painted surfaces and dean paint droppings from methods of work performance, superintendence, sequencing hardware, floor, etc. of construction, or saftey In, on or about jobshe. The owner 10620 Fire Extinguishers agrees that the T.G.C. is solely responsible for Jobsite safety T.G.C. shall provide 2A4013C fir extinguishers and Install 4'-0' a.f.f. as and warrents that this Intent shall be made evident in the location Indicated on the plans. It location is not shown on the plans, Install owner's agreement with the T.G.C, the owner also warrents fire extinguisher on stock room side of opening between the sales and that the architect shall be made an additional Insured under stock area the T.G.C.'s general liability Insurance policy. • The owner's representative shall review shop drawing 12000 Furnishings submissions solely for their conformance with the architect's Install fixtures plumb and level. Attach fixtures to wall with concealed design intent and confromance with information given In the fasteners. Attach to metal studs More possible. construction documents. The owner's representative shall not Protect fixtures until construction is completed. If problems are experienced In the placement of fixtures, contact architect to resolve the ,be responsible for any aspects of a shop drawing submission that affect or are affected by the means, methods, techniques, method In which the shuatlon is to be corrected. Repair any damage to sequences and operations of the construction, safety fixtures before completing construction. precautions and programs Incidental thereto, all of which are the contractor's responsibility. The owner warrents that the contractors shall be made aware of his responsibilities to review shop drawings In these respects before submitting r U W A eMri O `ra° a � O to O O a, K!� U 2~pI U U U �" � y&jp•?N lb- - r ' s r - r s � a CT co z O o > .. f� a� FZT A E-+ Specifications `A A' 4 . JOB NO. 95M0 A r r - r r , - r i --- 60" x 20" high pressure high velocity primary air duct by "landlord" Nam. 1.) All horizontal ductwork tight to underside of steel roof joists. 2•)_A1 ductwork.(supply & return.) to be lined. See specifications. 3.) Provide flexible couplings (supply and return) for ductwork connections to unit. 4.) See, detail for new steel supports for roof -top -unit. E control cable to temperature cor-trol module, - -- transfer duct see enlarged plan grille & fire damper this sheet.--, -- transfer duct grille & fire damper HVAC Plan 1/4�� _. 1 Pair,-Tfial Plan 1/4" = 1'-0" - temperature control control cable to sensor & backplate temperature 54" AFF. module back counter T I i i counter --__ - T � i i I I Air Distribution Devices Designation DESCRIPTION ' Three-way supply -air diffuser of aluminum construction with 'matte white finish for surface.mounting on drywall ceiling, Anemostat #XDM-32 with 9" X 6" neck, model "DOB" opposed blade damper, key operated. Four-way supply -air diffuser of aluminum construction with matte white finish for surface mount.ing on drywall ceiling, w EE]► Anemostat #XDM-32 with 9" X 6" neck, model "DOB" r opposed blade damper, key operated. Grid Core, return grille of aluminum construction with r1 matt -white finish, and surface mounting flange, Anemostat ---u #GC5, 18" X 24" size with 1/2" polycube grille. return grilles for transfer duct - 64"x36" size, surface (transfer grille) mounted with fixed horizontal blades at 0 - degree angle, Anemostat #53 HS• notes: 1. All air distribution devices shall have matching finish. 2. All air distribution devices shall be from a single manufacturer. Sprinkler_(Fi- PrQLwtiQa) WQrki This complete system will be furnished & installed under a seporate contract between Tenant and Owner's Fire Protection Contractor. HYA.C_WQrk. A. General 1 ) All work shall conform to the applicable requirements of the Owner's (Landlord's) requirements as outlined in the "Des.ign criteria for mechanical & electrical work by tenant". Notify Tenant of any descrepancies before starting work. 2.) All work shall conform to the applicable requirements of NFPA-90 A, local, State & National Codes. This contactor shall obtain all required permits.& shall arrange all required inspections upon completion of the work. A certification of conformance shall be provided to the Owner and Tenant. 3.) The completed installation shall be guaranteed and warranted for one year afte-[ final acceptance. 4.) Manufacturer's names on which this specification is based indicate the minimum quality of product required. Substitution may be made to those specified if deemed equivalent by the owner's representative. All work and products shall meet the requirements. 5.) See architectural general and special conditions. These requirements shall apply unless otherwise specified. 6.) As -built drawings shall indicate installed layouts with dimensions plus the manufacturer's model number of each equipment item actually installed, (includes' air distribution devices; VAV boxes & temperature control components) 7.) Deficiencies and non -conforming items shall be corrected by the contractor. Failure to correct such items shall permit the landlord to correct same and pass the cost on to the contractor. B. Scope of Work 1.) The furnishing and installation of a ventilation & air conditioning system derived from the Landlord's high velocity,high pressure, (cooling only) conditioned air system,cosi sting generally of the following: a. VAV box with electronic control & thermostat. b. primary air duct & tap into Landlords' trunk duct c. complete system of supply air (secondary) ductwork including air distribution devices. d. transfer ductwork a shown for return including grilles & fire dampers. 2.) Contractor shall adjust the temperature control system & leave in full operating condition. 3.) Contractor shall balance the supply air system to provide the terminal . values shown. 4.) Contractor shall provide a final air balance report and temperature .control adjustment report to the owner upon completion. 5.) Contractor shall deliver to the Landlord & tenant all warrantees, certificates and reports as required herein. VAC Work: C, Installatiorf & Materials 1.) Primary.Air Ductwork & Tap into Landlords trunk duct shall be shop fabricated from galvanized sheet steel in accordance with the standards of both ASH RAE & SMACNA for 4 inch pressure classification, high velocity system. 2.) Ductwork Construction: ductwork shall be shop fabricated from galvanized sheet steel in accordance with the standards of both ASH RAE & SMACNA for low pressure -low velocity systems. Provide all accesory features including splitters, scoops, etc. To conform to the referenced standards. Duct sizes are "Net'° and shall be increased to allow.for the specified duct liners. 3.)Flexible Duct: No flexible duct will be required, 4.) Duct insulation (secondary supply and return ducts) 'shall be lined with 1 'duct liner' with K-factor of 2.6 at 100 degrees F. Insulation shall be of "Certainteed" or equivalant manufacture & shall be installed in strict accordance with manufacturers recommendations. 5.) Air Distribution Devices: See Schedule 6.) Transfer duct fire dampers'shall be fusible link type,fabricated of .galvanized steel, with integrated blades or shutter to close & lock when released by.fusible link. Fusible links shall release at 160 degrees F. 7.) The VAV box shall be for single duct cooling only application and for control by a Johnson controls "VAV box controller system". The VAV box unit shall have an 8" inlet for 1100 cfm primary air supply, and 8" straight flanged outlet with damper, Unit shall have full 1" matte -faced insulation overall. VAV Box shall be Trane #VCCE-1 1-MT1-FL-8W-E105-120-fctr. Control circuit shall be derived from a 120 volt source. 8.) Temperature control shall cosist of a VAV box controller with rermote wall mounted sensorunit, all of which shall interface with the Trane VAV box above. The box controller shall be Johnson Controls # AS-VAVDPT-2, with # TE-6000-4 sensor, transformer with 120Volt primary,sensor mounting plate and NT jack, all of which shall form a complete operating system. 9.) Install settings for the VAV box. Control system shall -provide the.following air volumes: maximum setting 900 cfm minimum setting 225 cfm 10.) The contractor for the HVAC work shall engage the following specific contractors(as required and selected by the Landlord) to perform desegnated work: a. Testing and Balancing: Bay To Bay. Balancing, Inc. Tampa, Florida b, Temperature Control Flanal Connections and temperature Control programming: Johnson Controls Orlando, Florida Cif � N I VV wN . A o r„�1 ply � �• �y G.� d. Q o, 2� Q, U o v� r�U U N U z D �° Ll - V • A o � o . .° h x a r w q i +.���A� U U + z y a .. O El p l o Q b O r y� w •o � p m a • Mechanical r� Plan M-1 JOB N(. 95021 Q - r ' a - r , - r s 3/4" conduit with four (4) #8 c.u. str, THHN by landlord, termination by electrical contractor per landlord requirements 1. 4#8-CU 1" C-- I I -�J 30A, 4 PSN, fusable, 480V safety switch, fuse wflh three FRS - 25. meter (if required) -- 7-jaw, 125 Amp meter base (socket) by electrical Contractor. PANEL LP -A ----------------, - 4#8-CU 1 C ' Misc. branches 15KVA 30 dry type I as scheduled. surface fransformer. mounted 60A 3P MCB 480A �0°A 120v a... _ by landlord. _ 4#8-cu 1 1 /`2"c - -- 1 #8-cu grnd #6-CU-THHN IN 1 /2"C to Bldg struct. col. terminate on column with cadweld connection One line Diagram n.t.s. Schedule of Lightin.g Fixutres Symbol Description & Catalog Number Lamp r0_71 2 ft. square, 2 - "U" lamp, 9-cell parabolic fixture for open, suspended mntg, cell assembly to consist of 3" deep, two (2) Ll FJ specular aluminum parabolic cells, lamps to be 78"; ballast to be electronic type (less than 20% total harmonic FB31-T8-41 K distortion) for 120 volt supply. Fixture to have solid -metal sides & back, Lithonia a 2PM3X-2-U31-9-S-120 C 150 Watt, 6" aperture recessed downlight with thermal protector, Matt -black minigroove baffle & matte - white trim one (1)150R40/fl Gotham 0 R-4MI3. 130 volt - = [xitj Illuminated, Edge -sit, single face exit sign with satin aluminum housing, red -letters on clear -background, battery two (2) F8T5 emergency backup, Llthionia #FRP2-I-RC-120-ELN-EA FOR 120 volt operation. of � Recessed ceiling mounted, two -head emergency. lighting fixture with lead -calcium battery for 120 volt supply. I -amps to , furnished w/ p (� be "designer square" - halogen, Lithonia # ELR2-H-DS fixture -` Schedule of Symbols --- Symbol Description & Rating Make &Catalog # 20 ampere, 120 volt, duplex receptacle (NFMA 5-20R) with "smooth" plastic plate. Locate 16" above floor unless Hubbell #5352-W otherwise noted. (White) . 15 ampere, 277 volt, single pole switch with matching "smooth plastic plate . Locate 54" above floor. Hubbell #15AC1 ampere, 120 volt, duplex floor recepticle consisting of formed steel floor box, duplex receptide & duplex "Flap" cover -W (white) Hubbell ;B-2527 O20 ® with satin aluminum or satin stainless finish. + 5,352 + S-3925 Floor outlet for telephone installation, covering of formed steel floor box and "combination" cover with satin aluminum or Hubbell ;B-2527 satin stainless finihs. + 52525 Time Switch, surface mounted, seven day type, 4-pole, 20 amperes/pole minimum with 120 volt motor & spring wound carryover, controls circuit # 1,3,4, & 6. Intermatic ffT7401 -BC Panel Board Schedule Symbol Description_ & Rating — — Make & Catalog # New panel Flush mounted With 6" deep backbox, 60 ampere M.L.O., for 208V/120 volt, 3-phaE�e, 4wire operation, with mechanical ground SQ-D. NQOD-4L LP -A bar: with type QO-B one(1) 3-pole • 60 ampere MCB Bolt -in branchE, sixteen(l6) - 1-pole - 20 ampere branches five(5) 1-pole space(fixture branch ) Provide handle lock devices for Circuits #1,3, 4, 5, 6, 7, 10, 11 u 12. F�F�.IEif �9L_�PECI Fl CAS QI�1 Note: The manufacturer's names on which this specification and the Eschedules are based indicate the minimum quality of products required. Substitution may be made to those specified if deemed 3/4° X 24° X 24° pIyW00d - equivalent by the owner's representative. All work and products j shall meet the requirements of the landlord. panel for tel, equip. locate In "back counter" 1. The general conditions and supplementary general conditions - back Counter ' shall be considered as part of this specification. 2. Contractor shall visit site prior to bidding. Bids shall serve as ' evidence of knowledge of existing conditions. 11)9 Field verify landlord's electrical and telephone equipment and distance from leased space. ---- I I Contractor shall record all field changes in his work as the job -- --- - -- - -- _ - -- — ----- _ progresses and upon completion shall turn over to the tenant a contractor to install conduit for --- I. i for traffic counter- record set of prints shown with these changes. incoming telephone cables by -� (� _ 3. Furnish all labor, materials, equipment and tools to perform __. GFI landlord and conduit for �j9 4Llf1t�C - - electrical work shown, noted or scheduled for a complete and sound system by tenant. 9 11 -__ ----__ _ finished installation. All materials and equipment shall be commercial grade or 10 10 - - `- ____..,-___-----_-__r_ _-� _ institutional and shall carry a UL. Label. .--� Materials, products and equipment, including components thereof, shall be new and such as appears on the underwriter's 1, laboratory list of approved items and shall meet the requirements of 10 recognized standards. / All equipment, materials, etc, shall be in strict accordance with the 1995 version of the National Bo trio Code and other applicable codes and ordinances. - LP -A \ _ 1 _ -- 4. The word "provide' as used herein means to furnish and install 15 K VA transformer - i - l e com letmaterials and equipment used herein shall be commercial or mounted @ 9 -0 a.f.f. 10 1 institutional grade. ' - __� _-- -- _-- -- ----- _ _ - _----)_-•.- ----__-- --- - __-- __--- --- - - - -_ - - - -� -� 10 I All material and equipment shall be standard products which are 31 both listed by and carry the table of the Underwriters Laboratories (ia: UQ. — 30 AMP, 480 Volt saftey switch The complete installation including all material & equipment - socket for Watthour meter shall conform with all applicable requirements of the 1994 edition of the National Electrical Code (NEC) including the 1995 amendments. 5. Secure and pay for all required permits and inspections; certificates of compliance shall be presented to the owner. PowerPlan ? 6. Electrical Distribution System; 1 This demised area is to be supplied from the landlords 1 - -- -- - - - --- - - 1 distribution apparatus at 408Y/277 volt 3phase 4 wire 1/411 ^ 11_011 7 7 LP -A - 7c 7 D E X i I 4 i�.4 4�2 4 ��� ---u-- - . .- - u 1---- ` c 5 c �I c = I I b I F F F -- -F- ----- ---- ---- . F I 2 c 4 I \ c 1,3 j { 3 6 8 % 8 8 8 2 4 I c c F F F F F 5 �r pect on-� or---V �l-bo & - {- - - - -- -- - -- -- c c 4 8 6F-1 to eft tUr COn ols ( 2 4 LightingPlan 1 /4 11 1 1_011 Provide "unistrut" framing between structural members for support 1/4" allthread rod w/ ---� double nuts at top & r bottom typical of 4/fixture 3/8" fixture stem set with - - canopy for 'wiring to fixture • _ bottom of___ fixture 12'- 0" aff Type "F" Flourescent Fixture n.t. s. The landlord will finish and install the feeder conduit & main fusable for this suite. Contractor shall furnish and install feeder cable and fuses. 7. Scope of Work; • lighting fixtures and lamps. • Convenience outlets, equipment connections, etc. • Telephone raceways (with pullcord) & outlets. • Branch wiring. Permits, etc. as required. Testing of the completed insla?,latlon • Certificate of final inspection & approval by local Code enforcement Authority • One year waranty on the compete installation. 8. Raceways: • Conduit shall be standaid steel, rigid, imc or ernt (thin wall), according to code requirements. Conduit shall be concealed in finished areas, except as otherwise approved by owner's representative. Emt connections shall be compression type. • All branch circuit wiring shall be run in an approved raceway. ----for sign in Minimum sizes of conduit shall be 3/4", except 112' for switch canopy legs. Emt shall be galvanized or electro-galvanized. Emt may be used for feeders and Brach circuits run above suspended ceilings or concealed in interior partitions. Emt shall not be concealed in poured concrete floor or walls. • Use heavy wall conduit or imc for under slab installations. Imc is permitted only with threaded connections. • Flexible metal conduit may be used only for short (6ft or less) connections to fixtures and equipment, as permitted by code. 9. Wiring: • All conductors shall be soft drawn, annealed copper , with 600v insulation: • Insulation may be THHN, THWN or THW. 1 Conductors #8 and larger shall be stranded. Color coded as per NEC standards. i Wire connections shall be equivalent to "Scotchlock". • Aluminum conductors acre prohibited. 10. Grounding: Provide grounding for equipment & systems in strict accordance with the National Electric Code. • Dry type transformer housing &.secondary neutral grounding shall conform to NEC Art cal # 250. • Make all joints and connections of the conduit system tight to maintain continuity of mechanical and electrical ground throughout our entire system. • Ground all 3 wire receptacles to the outlet boxes. • Ground conductor shall be supplied in all non-metallic conduit, 11. This contractor shall do all cutting, chasing, or channeling and patching required for any work herein specified, any cx-Ming shall have prior approval by the landlord. • Contractor is responsible to take whatever measures are necessary including but not limited to those measures prescribed by the landlord in the exercise of its reasonable judgment to as%re that coreboting will not damage landlord's structure, conduits, etc. Or the work of other tenants below. The cost of such tests or repair of any damage will be home by this contractor. • All sleeves, openings, etc. Through fire rate walls and floors shall be sealed after conduit installation with sealer equal to or exceeding fire rating of floor or wall. 12. All electrical wor shall be installed so as to be readily accessible y a for operating, servicing, maintaining and repair. • Hangers shall include all miscellaneous steel, such as channels, rods, etc., Necessary for the installation of work and shall be' secured to the building structure, not to piping or ductwork. • All conduit shall be concealed where possible. Exposed conduit shall be run in straight lines parallel with or at right angle to column lines and separated at least 3' from water lines wherever they run along side or across such lines. i 13.) The contractor for the electrical work shall engage:• Trl•Clty Electrical Corib actore Inc. A wiriente Springe, Florida To poi form the final 'tenant feeder hookup to the Landlords' distribution panel. Thlo.requirem.ont k mandated by the "Landlord". N M y > c Q N O C� V O ;Z � ram' Qi N e� U� 0 '! M U a p �' n Z V) n V) E�4 LU 1-- F- u_ �I .c7 4 U U° o o 0 ° O V G �{ � •.� � � � N :s TS Q iQ w x rn f O � t- � U TQ rn Electrical Plan E1. J013 NO. 95020 u c o - r p z U a O U O Z 1 - r � v� x W W ! � - r �T r O H x r X �1 • c� r-•1 W -r 20 ���-�, �� Y d n`/ �^�'1xA ��� / ^ / �9�I ;- � _- f !i