HomeMy WebLinkAbout500 Aero Ln 97-809 (plan review committee)RESPONSES TO PLANS REVIEW COMMITTEE
COMMENTS OF SEPTEMBER 24,1996
1. Sch. N.3.2, LDR; specifically references "subdivision" requirements, thus
existing "street lighting" along Aero Lane is current and complies with the
minimum standards. Additionally, there are three (3) 250 watt metal halide
flood light fixtures at the roof line for lighting at parking areas.
2. Although our plans are not to disturb any existing roads, all disturbed
roadways will be restored to minimum standards per LDR and City of Sanford.
3. All parking lot striping to conform to Sch. M, Section 5.0; Figure N-13,
Paragraph E.
4. 1/2" expansion joint material will be installed next to the existing flush curbing
along Aero Lane at the point of connection to the drive/entryway, similar to
N.10, 11 & 12, Sch. N., Section 5.0, LDR.
5. Rock pavement will have 8" x 8" railroad ties with 5/8" rebar securing the
railroad ties to the subbase, thus providing containment along the perimeter of
the rock area.
6. Solid waste container shall abide by Sch. N, Section 5.2 of the LDR with
proper screening.
7. Retention facilities will meet minimum standards of the City of Sanford and
the St. Johns River Water Management District permitting.
8. Retention facilities will meet minimum standards of the City of Sanford and
the St. Johns River Water Management District permitting.
9. See Culvert Pipe Design Criteria attached.
10. Drainage systems shall comply with the City of Sanford's LDR and St. Johns
River Water Management District. Fencing and swales shall comply with
LDR, similar to existing adjacent properties; i.e.: Aero Products and Truck
Drivers Institute complex.
11. The "fuel island" will be permitted by the company supplying the double -
walled, state approved system. Spolski General Contractor, Inc. has not been
retained for installation or permitting at this time, thus conceptual only at this
time.
12. F.D.C. and 4" STORS will be permitted through Southern Fire Protection of
Orlando, Inc. supplying shop drawings to the Fire Marshall for approval, prior
to installation.
13. All chain link fencing will be separately permitted prior to installation,
complying with minimum front yard building setbacks of 25' in RI-1 zoning.
14. 25 foot front yard building setbacks are indicated at both Aero Lane and Fifth
Street.
15. Utilities Review:
a) Existing 10" main water line to have a "wet -tap" installation with a
corp. stop to a 1" copper service line hooked -up to a 3/4" water meter.
b) 6" SDR 35 p.v.c. relocated to "on -site" property hooking up to the
existing 6" SDR 35 at the south property line's manhole existing
lateral.
c) Clean -out from proposed building to be installed at pavement; i.e.: not
in "rock" planter.
d) Additional clean -out to be installed within the property line, not in
right-of-way.
e) Potable water meter with backflow device, per City of Sanford LDR.
f) Wastewater is 4" schedule 40 p.v.c. connecting to the 6" SDR 35
sanitary lateral.
g) 3/4" water meter is to be placed in the Aero Lane right-of-way.
16. Engineering Review:
a) Geotechnical Report is being provided by "Dynamic Testing and
Engineering Co."
b) Stormwater calculations and St. Johns River Water Management
District permitting is being submitted by "Site Engineering and
Planning."
c) 4" of gravel rock is being used in rock drive areas.
d) Concrete drive and pad is shown at dumpster area.
e) 30' x 30' concrete wash pad is to be used for an equipment wash area,
in compliance with no harmful chemicals, oils or non -biodegradable
solvents entering the retention area.
f) Parking lot lighting to be illuminated by three (3) 250 watt metal halide
flood lights from building.
g) 8" x 8" railroad ties to encompass rock drive, thus containing rock area.
h) Elliptical concrete pipe has been changed to a 15" round concrete pipe
with culvert pipe design criteria attached.
i) Revised grades and inverts along Aero Lane indicated with M.E.S. per
D.O.T. Index #272 noted.
VERT PIPE DESI N CRITERIA:
Water flows from the north property line to the south, with no additional off -site
water contributing to the culvert pipe volume or velocity.
According to Seele's Manual:
15" round concrete pipe @
N = .013
V = 2.5 F.P.S.
P = 15" = 3.11 C.F.S.
Thus, based upon a 12' asphalt road and,
a 20' drainage easement;
a 200 L.F. of property line:
Formula:
Asphalt road): A = 2,400 S.F. x N = 2,160
Grass R.O.W.): A = 4,800 S.F. x 2F = 960
Totals 1 7,200 S.F. 3,120
Thus: '3,120 / 7,200 = .43 C
Q= 7,200/43,560 x .43 x I(1.2) _ .09 C.F.S.
Then: Pipe = 3.1 C.F.S. >_ .09 C.F.S. (Actual) O.K
Component Performance Method for Commercial Buildings Form 400B-94
ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Community Affairs
FLA/COM-94 Version 2.1A
PROJECT NAME_ALDEN EQUIPMENT RENTAL PERMITTING OFFICE:
ADDRESS: 500 AERO LANE _Sanford
SANFORD, FL 32771 CLIMATE ZONE: 5 -
OWNER: _B/C FAMILY PARTNERSHIP, LTD PERMIT NO:
AGENT: JURISDICTION NO: 691500
BUILDING TYPE: _Factory - Industrial
CONSTRUCTION CONDITION: New construction
DESIGN COMPLETION: _Finished Building
CONDITIONED FLOOR AREA: _4010 NUMBER OF ZONES: 1
MAX. TONNAGE OF EQUIPMENT PER SYSTEM: 5
COMPLIANCE CALCULATION:
METHOD B DESIGN CRITERIA RESULT
ENVELOPE PERFORMANCE 40.81 72.89 PASSES
OTHER ENVELOPE REQUIREMENTS PASSES
LIGHTING
INTERIOR LIGHTING 6720.00 14433.32 PASSES
EXTERIOR LIGHTING 750.00 3000.00 PASSES
LIGHTING CONTROL REQUIREMENTS PASSES
HVAC EQUIPMENT
COOLING EQUIPMENT
1. SEER 10.00 10.00 PASSES
HEATING EQUIPMENT
1. Et 8.05 N/A
AIR DISTRIBUTION SYSTEM INSULATION LEVEL
1. With Insulated -.Roof 6.20 6.00 PASSES
WATER HEATING EQUIPMENT
1. EF 9.00 0.88 PASSES
PIPING INSULATION REQUIREMENTS
1. Non -Circulating 1.62 1.62 PASSES
COMPLIANCE CERTIFICATION:
I hereby certify that the plans and
specifications covered by this glcu- lation are in compliance with
Florida Energy iaiency Co
PREPARED BY:
DATE:
I hereby cer4eththat this building is
in compliancth o ida Energy Efficiency
C OWNER/
AGENT: DATE: -
Review
of the plans and specifica- tions
covered by this calculation indicates
compliance with the. Florida
Energy Efficiency Code. Before
construction is completed, this
building will be inspected for
compliance in accordance with Section
53.908, Flayfida Sta ute BUILDIN OF
I IP,L DATE: I
hereby
certify(*) that the system design is in compliance with the Florida
i
Energy Efficiency Code.
It SYSTEM DE.S-,IGNER REGISTRATION/STATE
ARCHITECT
MECHANICAL: 4 A
1?,LUMB ING
ELECTRICAL
LIGHTING
Signatu4r7i—srequired 0here Florida law requires design to-,be-,er-fofme-d
by registered design professionals. Typed names and registration.'.'ii,,i'mbe,r's'may
be used where all relevant information is contained on signed/sealed plans.
a-
BUILDING INFORMATION COMPLIANCE
CHECK
401------- GLAZING --ZONE 1 v-
I Elevation Type U SC VLT Shading Area(Sgft)
East Commercial 1.31 .71 .73 Continuous Ove 293
South Commercial 1.31 .71 .73 None 32
West Commercial 1.31 .71 .73 None 32
Total Glass Area in Zone 1 = 357
Total Glass Area = 357
402.------WALLS--ZONE 1------------------------------------------------
Elevation Type U Added R Gross(Sgft)
East Hvywt. Concrete Wall + 8" Concre 0.187 0 750
North Hvywt. Concrete Wall + 8" Concre 0.187 0 680
South Hvywt. Concrete Wall + 8" Concre 0.187 0 500
West Hvywt. Concrete Wall + 8" Concre 0.187 0 750
Total Wall Area in Zone 1 = 2680
Total Gross Wall Area = 2680
403------- DOORS --ZONE 1------------------------------------------------
Elevation Type U Area(Sgft)
East 1-3/4 Steel Door Polyurethane core (24 0.29 42
West 1-3/4 Steel Door Polyurethane core (24 0.29 21
Total Door Area in Zone 1 = 63
Total Door Area = 63
404.------ROOFS--ZONE 1------------------------------------------------
Type Color U Added R Area(Sgft)
Steel Sheet with 1" Insulation White 0.213 11 3750
Total Roof Area in Zone 1 = 3750
Total Roof Area = 3750
405------- FLOORS -ZONE 1------------------------------------------------
Type R Area(Sgft)
Slab on Grade/Uninsulated 0 3750
Total Floor Area in Zone 1 = 3750
Total Floor Area = 3750
406.------INFILTRATION --------------------------------------------------
Infiltration Criteria in 406.1.ABC.1 have been met.
CHECK
407------- COOLING SYSTEMS -----------------------------
Type No Efficiency IPLV Tons
1. Split System 2 10 0 4.79
408------- HEATING SYSTEMS-----------------------------------------------
Type No Efficiency BTU/hr
1. Electric Resistance 2 8.05 42100
409------- VENTILATION ---------------------------------------------------
Ventilation Criteria in 409.1.ABC.1 have been meta
CHECK
410.-----AIR DISTRIBUTION SYSTEM----------------------------------------
AHU Type Duct Location R-value
1. Split / PTAC Air Conditioner With Insulated Roof 6.2
411------ PUMPS AND PIPING -ZONE 1---------------------------------------
U
Type R-value/in Diameter Thickness
1. Non -Circulating 3 1 1.62
412------ WATER HEATING SYSTEMS ZONE 1 -----------------------------------
Type Efficiency StandbyLoss InputRate Gallons
1. <=12 kW 9 0 5 40
413------ ELECTRICAL POWER DISTRIBUTION----------------------------------
CHECKMeteringcriteriain413.1.ABC.1 have been met.
Transformer criteria in 413.1.ABC.2 have been met.
414.-----MOTORS ---------------------------------------------------
Motor efficiencies in 414.1.ABC.1 have been met.
415------ LIGHTING SYSTEMS ZONE 1 ---------------------------------------
Space Type No Control Type 1 No Control Type 2 No Watts Area(Sgft)
Reading, T 1 On/Off 15 None 0 4800 3750
Material H 1 On/Off 5 None 0 1920 5625
Total Watts for Zone 1 = 6720
Total Area for Zone 1 = 9375
Total Watts = 6720
Total Area = 9375
CHECK
Lighting criteria in 415.1.ABC have been met.
16. HVAC load sizing has been performed. (407.1.ABC.1)
17. Duct sizing and design have been performed. (410.1.ABC.1.2)
18. Testing and balancing will be performed. (410.1.ABC.4)
19. Operation/maintenance manual will be provided to owner.(102.1)
i
A Id P r, u,pmg„+ 5otD