HomeMy WebLinkAbout500 Aero Ln 97-809 (plan review committee)RESPONSES TO PLANS REVIEW COMMITTEE COMMENTS OF SEPTEMBER 24,1996 1. Sch. N.3.2, LDR; specifically references "subdivision" requirements, thus existing "street lighting" along Aero Lane is current and complies with the minimum standards. Additionally, there are three (3) 250 watt metal halide flood light fixtures at the roof line for lighting at parking areas. 2. Although our plans are not to disturb any existing roads, all disturbed roadways will be restored to minimum standards per LDR and City of Sanford. 3. All parking lot striping to conform to Sch. M, Section 5.0; Figure N-13, Paragraph E. 4. 1/2" expansion joint material will be installed next to the existing flush curbing along Aero Lane at the point of connection to the drive/entryway, similar to N.10, 11 & 12, Sch. N., Section 5.0, LDR. 5. Rock pavement will have 8" x 8" railroad ties with 5/8" rebar securing the railroad ties to the subbase, thus providing containment along the perimeter of the rock area. 6. Solid waste container shall abide by Sch. N, Section 5.2 of the LDR with proper screening. 7. Retention facilities will meet minimum standards of the City of Sanford and the St. Johns River Water Management District permitting. 8. Retention facilities will meet minimum standards of the City of Sanford and the St. Johns River Water Management District permitting. 9. See Culvert Pipe Design Criteria attached. 10. Drainage systems shall comply with the City of Sanford's LDR and St. Johns River Water Management District. Fencing and swales shall comply with LDR, similar to existing adjacent properties; i.e.: Aero Products and Truck Drivers Institute complex. 11. The "fuel island" will be permitted by the company supplying the double - walled, state approved system. Spolski General Contractor, Inc. has not been retained for installation or permitting at this time, thus conceptual only at this time. 12. F.D.C. and 4" STORS will be permitted through Southern Fire Protection of Orlando, Inc. supplying shop drawings to the Fire Marshall for approval, prior to installation. 13. All chain link fencing will be separately permitted prior to installation, complying with minimum front yard building setbacks of 25' in RI-1 zoning. 14. 25 foot front yard building setbacks are indicated at both Aero Lane and Fifth Street. 15. Utilities Review: a) Existing 10" main water line to have a "wet -tap" installation with a corp. stop to a 1" copper service line hooked -up to a 3/4" water meter. b) 6" SDR 35 p.v.c. relocated to "on -site" property hooking up to the existing 6" SDR 35 at the south property line's manhole existing lateral. c) Clean -out from proposed building to be installed at pavement; i.e.: not in "rock" planter. d) Additional clean -out to be installed within the property line, not in right-of-way. e) Potable water meter with backflow device, per City of Sanford LDR. f) Wastewater is 4" schedule 40 p.v.c. connecting to the 6" SDR 35 sanitary lateral. g) 3/4" water meter is to be placed in the Aero Lane right-of-way. 16. Engineering Review: a) Geotechnical Report is being provided by "Dynamic Testing and Engineering Co." b) Stormwater calculations and St. Johns River Water Management District permitting is being submitted by "Site Engineering and Planning." c) 4" of gravel rock is being used in rock drive areas. d) Concrete drive and pad is shown at dumpster area. e) 30' x 30' concrete wash pad is to be used for an equipment wash area, in compliance with no harmful chemicals, oils or non -biodegradable solvents entering the retention area. f) Parking lot lighting to be illuminated by three (3) 250 watt metal halide flood lights from building. g) 8" x 8" railroad ties to encompass rock drive, thus containing rock area. h) Elliptical concrete pipe has been changed to a 15" round concrete pipe with culvert pipe design criteria attached. i) Revised grades and inverts along Aero Lane indicated with M.E.S. per D.O.T. Index #272 noted. VERT PIPE DESI N CRITERIA: Water flows from the north property line to the south, with no additional off -site water contributing to the culvert pipe volume or velocity. According to Seele's Manual: 15" round concrete pipe @ N = .013 V = 2.5 F.P.S. P = 15" = 3.11 C.F.S. Thus, based upon a 12' asphalt road and, a 20' drainage easement; a 200 L.F. of property line: Formula: Asphalt road): A = 2,400 S.F. x N = 2,160 Grass R.O.W.): A = 4,800 S.F. x 2F = 960 Totals 1 7,200 S.F. 3,120 Thus: '3,120 / 7,200 = .43 C Q= 7,200/43,560 x .43 x I(1.2) _ .09 C.F.S. Then: Pipe = 3.1 C.F.S. >_ .09 C.F.S. (Actual) O.K Component Performance Method for Commercial Buildings Form 400B-94 ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Community Affairs FLA/COM-94 Version 2.1A PROJECT NAME_ALDEN EQUIPMENT RENTAL PERMITTING OFFICE: ADDRESS: 500 AERO LANE _Sanford SANFORD, FL 32771 CLIMATE ZONE: 5 - OWNER: _B/C FAMILY PARTNERSHIP, LTD PERMIT NO: AGENT: JURISDICTION NO: 691500 BUILDING TYPE: _Factory - Industrial CONSTRUCTION CONDITION: New construction DESIGN COMPLETION: _Finished Building CONDITIONED FLOOR AREA: _4010 NUMBER OF ZONES: 1 MAX. TONNAGE OF EQUIPMENT PER SYSTEM: 5 COMPLIANCE CALCULATION: METHOD B DESIGN CRITERIA RESULT ENVELOPE PERFORMANCE 40.81 72.89 PASSES OTHER ENVELOPE REQUIREMENTS PASSES LIGHTING INTERIOR LIGHTING 6720.00 14433.32 PASSES EXTERIOR LIGHTING 750.00 3000.00 PASSES LIGHTING CONTROL REQUIREMENTS PASSES HVAC EQUIPMENT COOLING EQUIPMENT 1. SEER 10.00 10.00 PASSES HEATING EQUIPMENT 1. Et 8.05 N/A AIR DISTRIBUTION SYSTEM INSULATION LEVEL 1. With Insulated -.Roof 6.20 6.00 PASSES WATER HEATING EQUIPMENT 1. EF 9.00 0.88 PASSES PIPING INSULATION REQUIREMENTS 1. Non -Circulating 1.62 1.62 PASSES COMPLIANCE CERTIFICATION: I hereby certify that the plans and specifications covered by this glcu- lation are in compliance with Florida Energy iaiency Co PREPARED BY: DATE: I hereby cer4eththat this building is in compliancth o ida Energy Efficiency C OWNER/ AGENT: DATE: - Review of the plans and specifica- tions covered by this calculation indicates compliance with the. Florida Energy Efficiency Code. Before construction is completed, this building will be inspected for compliance in accordance with Section 53.908, Flayfida Sta ute BUILDIN OF I IP,L DATE: I hereby certify(*) that the system design is in compliance with the Florida i Energy Efficiency Code. It SYSTEM DE.S-,IGNER REGISTRATION/STATE ARCHITECT MECHANICAL: 4 A 1?,LUMB ING ELECTRICAL LIGHTING Signatu4r7i—srequired 0here Florida law requires design to-,be-,er-fofme-d by registered design professionals. Typed names and registration.'.'ii,,i'mbe,r's'may be used where all relevant information is contained on signed/sealed plans. a- BUILDING INFORMATION COMPLIANCE CHECK 401------- GLAZING --ZONE 1 v- I Elevation Type U SC VLT Shading Area(Sgft) East Commercial 1.31 .71 .73 Continuous Ove 293 South Commercial 1.31 .71 .73 None 32 West Commercial 1.31 .71 .73 None 32 Total Glass Area in Zone 1 = 357 Total Glass Area = 357 402.------WALLS--ZONE 1------------------------------------------------ Elevation Type U Added R Gross(Sgft) East Hvywt. Concrete Wall + 8" Concre 0.187 0 750 North Hvywt. Concrete Wall + 8" Concre 0.187 0 680 South Hvywt. Concrete Wall + 8" Concre 0.187 0 500 West Hvywt. Concrete Wall + 8" Concre 0.187 0 750 Total Wall Area in Zone 1 = 2680 Total Gross Wall Area = 2680 403------- DOORS --ZONE 1------------------------------------------------ Elevation Type U Area(Sgft) East 1-3/4 Steel Door Polyurethane core (24 0.29 42 West 1-3/4 Steel Door Polyurethane core (24 0.29 21 Total Door Area in Zone 1 = 63 Total Door Area = 63 404.------ROOFS--ZONE 1------------------------------------------------ Type Color U Added R Area(Sgft) Steel Sheet with 1" Insulation White 0.213 11 3750 Total Roof Area in Zone 1 = 3750 Total Roof Area = 3750 405------- FLOORS -ZONE 1------------------------------------------------ Type R Area(Sgft) Slab on Grade/Uninsulated 0 3750 Total Floor Area in Zone 1 = 3750 Total Floor Area = 3750 406.------INFILTRATION -------------------------------------------------- Infiltration Criteria in 406.1.ABC.1 have been met. CHECK 407------- COOLING SYSTEMS ----------------------------- Type No Efficiency IPLV Tons 1. Split System 2 10 0 4.79 408------- HEATING SYSTEMS----------------------------------------------- Type No Efficiency BTU/hr 1. Electric Resistance 2 8.05 42100 409------- VENTILATION --------------------------------------------------- Ventilation Criteria in 409.1.ABC.1 have been meta CHECK 410.-----AIR DISTRIBUTION SYSTEM---------------------------------------- AHU Type Duct Location R-value 1. Split / PTAC Air Conditioner With Insulated Roof 6.2 411------ PUMPS AND PIPING -ZONE 1--------------------------------------- U Type R-value/in Diameter Thickness 1. Non -Circulating 3 1 1.62 412------ WATER HEATING SYSTEMS ZONE 1 ----------------------------------- Type Efficiency StandbyLoss InputRate Gallons 1. <=12 kW 9 0 5 40 413------ ELECTRICAL POWER DISTRIBUTION---------------------------------- CHECKMeteringcriteriain413.1.ABC.1 have been met. Transformer criteria in 413.1.ABC.2 have been met. 414.-----MOTORS --------------------------------------------------- Motor efficiencies in 414.1.ABC.1 have been met. 415------ LIGHTING SYSTEMS ZONE 1 --------------------------------------- Space Type No Control Type 1 No Control Type 2 No Watts Area(Sgft) Reading, T 1 On/Off 15 None 0 4800 3750 Material H 1 On/Off 5 None 0 1920 5625 Total Watts for Zone 1 = 6720 Total Area for Zone 1 = 9375 Total Watts = 6720 Total Area = 9375 CHECK Lighting criteria in 415.1.ABC have been met. 16. HVAC load sizing has been performed. (407.1.ABC.1) 17. Duct sizing and design have been performed. (410.1.ABC.1.2) 18. Testing and balancing will be performed. (410.1.ABC.4) 19. Operation/maintenance manual will be provided to owner.(102.1) i A Id P r, u,pmg„+ 5otD Aey-o Ln 41--- 9'I 8or1