June 25, 1985
RE: Sanford Auto Parts Inc. NAPA
115 West First Street
SUBJECT: Addendum•#1
Invitation to Bid
Gentlemen:
The following addendum ,items hereby modify, change or re --
vise the work as shown on the drawings and the Bidders
are hereby instructed to include the cost of these items
in their Bid.
1. Exterior face of east and west party walls and eight
feet in a southerly direction (above roof) paint
existing stucco to match new stucco color coat.
2. The width of single leaf wood french doors is changed
from 216" wide to 3°0" wide.
3• On top of the canopy on the eastern and western corner
mount 2 each PAR 150 watt floods (exterior type) to
be aimed at sign location.
4. Extend 3/4" water line from existing plumbing in
storage through exterior face of wall and mount hose
bibb. Also install valve in storage room to control
this water line.
e
5. Change carpet to Tarkett Gafstar "Coppini" vinyl floor
tile or equal as approved by Architect.
C. Bolton Abernethy
Architect
architect
206 east first street O sanford,fl 32771 O phone 305-323-7566
June 25, 1985
RE: Sanford Auto Parts Inc. NAPA
115 West First Street
SUBJECT: INVITATION TO BID
Gentlemen:
You are hereby invited to submit sealed proposals to the
architect for the above captioned project by Wednesday,
July 3, 1985 at 4:00 p.m.
T,he following items shall be complied with for this project:
1. The Owner will continue his business operation during
the remodeling process and the contractor shall en-
deavor to maintain his construction work in a neat,
orderly manner with all refuse from his work being
properly disposed of at the end of each day.
2. All aluminum siding and trim removed from front of
building shall be neatly stored at rear of building
and remain the owners property.
3. All Bidders are instructed to use 1 x 6 T & G Cedar
on furring strips as the cost basis of their base bid.
As an Alternate Deduct from Base Bid, each bidder shall
quote prefinished "masonite" paneling for wall and ceil-
ing finish and 5/8 T-1-11 fir plywood (stained) for
exterior finish. The Base Bid for all timber framingisunfinishedcedar. As an Alternate Deduct from Base
Bid, quote P.T. southern yellow pine (stained).
4. All work to be performed in accordance with Southern
Standard Building Code and local, state and Federal
laws. The contractor shall pay all workmen's compen-
sation and have in effect liability insurance as re-
quired by law and hold the owner harmless as the result
of any act on the part of the contractor.
5. Method of Payments on or before the'28th day of eachmonth, the contractor shall prepare an Application for
Payment for work completed and materials suitably stored
i
Sanford Auto Parts Inc. NAPA
115 West First Street
INVITATION TO BID
June 25, 1985
Page 2
at site for the Architect's review and Certification
of Approval. The owner shall pay the amount as cer-
tified by the architect by the 8th day of the follow-
ing month.
6. Time of Completion: upon the owner's acceptance of
of the Low Bid and Award of Contract, the contractor
agrees to commence work immediately and complete the
contract in 90 days from Date of Contract.
7. Each Bidder shall inspect the site of the project
prior to preparation of his bid to fully acquaint him-
self with the conditions of the work.
AL6A4 icrjC. Bolton Abernethy
Architect