HomeMy WebLinkAboutSailpointe Maintenance Load CalcComponent Performance Method for Commercial Buildings Form 400B-94
ENERGY EFFICIENCY CODE FOR,BUILDING CONSTRUCTION
Florida Department of Community Affairs
FLA/COM-94 Version 2.1
PROJECT NAME_SAILPOINTE MAINTENANCE
ADDRESS:
OWNER:
AGENT: _
PERMITTING OFFICE:
SEM I NOLE COUNTY_
CLIMATE ZONE: 5
PERMIT NO:
JURISDICTION N0: 691000
BUILDING TYPE: _Multifamily-
CONSTRUCTION CONDITION: New construction
DESIGN COMPLETION: _Finished Building
CONDITIONED FLOOR AREA: _1373 _- NUMBER OF ZONES: 1
MAX. TONNAGE OF EQUIPMENT PER SYSTEM:
COMPLIANCE CALCULATION:
METHOD B DESIGN CRITERIA RESULT
ENVELOPE PERFORMANCE 41.42 79.07 PASSES
OTHER ENVELOPE REQUIREMENTS PASSES
LIGHTING
INTERIOR LIGHTING 2520.00 2541.41 PASSES
EXTERIOR LIGHTING 0.00 640.02 PASSES
LIGHTING CONTROL REQUIREMENTS PASSES
RVAC EQUIPMENT
COOLING EQUIPMENT
1. SEER 10.00 10.00 PASSES
HEATING EQUIPMENT
1. Et 1.00 N/A
AIR DISTRIBUTION SYSTEM INSULATION LEVEL
1. Unconditioned Space 6.00 4..20 PASSES
WATER HEATING EQUIPMENT
PIPING INSULATION REQUIREMENTS
COMPLIANCE CERTIFICATION:
I hereby certify" that he plans and Review of the plans and specifica-
specificat-ions c- ered b t is calcu- tions covered by this calculation
lation are i.n c li th the indicates compliance with the
Florida Energy f'c ode. Florida Energy Efficiency Code.
PREPARED BY: Before construction is completed,
DATE: 7- ^_- this building will be inspected
for compliance in accordance with
I hereby certify that this building is Section 553.908, Florida Statutes.
in compliance with the Florida Energy BUILDING OFFICIAL:
Efficiency Code. DATE:-_._._.-.
OWNER/AGENT:
DATE:
I hereby certify(*) that the system design is in compliance with the Florida
Energy Efficiency Code.
SYSTEM DESIGNER REGISTRATION/STATE
ARCHITECT :
MECHANICAL:
PLUMBING _--.._---
ELECTR I CAL : —
L I GHT I NG-
Signature is required where Florida law requires design to be performed
by registered design professionals. Typed names and registration numbers may
be used where all relevant information is contained on signed/sealed plans.
BUILDING INFORMATION COMPLIANCE
CHECK
401.------GLAZING--ZONE 1-------:-----------------------------------
v- w
Elevation Type U SCE' VLT Shading Area(Sgft)
South Residential 1.11 9 .8 None 2
South Residential 1.11. 9 .6 Overhang Witho 6
North Residential 1.11 9 .8 None
Total Glass Area in Zone 1 = 9
Total Glass Area = 9
402.------WALLS--ZONE 1---------------------
Elevation Type U Added R Gross(Sgft)
North STUCCO, 8" BLOCK, AIR 32 0 544
544
South STUCCO, 8" BLOCK, AIR 32 0
579
East STUCCO, 8" BLOCK, AIR 32 0
0 827
West STUCCO, 8" BLOCK, AIR 32
0 248
Adjacent STUCCO, 8" BLOCK, AIR 32
1 = 2740TotalWallAreainZone
Total Gross Wall Area = 2740
403.------DOORS=-ZONE 1-----------------------------------U- Area(Sgft)
Elevation Type
South 1-3/4 Steel Door-Fiberglass/Mineral woo 0.60 40
South 1-3/4 Steel Door-Fiberglass/Mineral woo 0.60 56
Total Door Area in Zone 1 = 96
Total Door Area = 96
404.------ROOFS--ZONE 1--- .----------
U Added R Area(Sgft)
Type Color
TILE ON PLYWOOD W R-19 CEIL INS Dark .05 0 1488
1488TotalRoofAreainZone1 =
Total Roof Area = 1488
405.------FLOORS-ZONE 1------------------
R Area(Sgft)
Type ----------
0 1488
Slab on Grade/Uninsulated
Total Floor Area in Zone 1 = 1488
Total Floor Area = 1488
406------- INFILTRATION ---------------------------------
IInfiltrationCriteriain406.1.ABC.1 have been met. t
407.------COOLING SYSTEMS--------------------------
IPLV Tons
Type No Efficiency
1. Split System 1 5.00
408.------HEATING SYSTEMS----------------------------------
No Efficiency B-/hr
Type
1.-Electric Resistance 1 17065
409.------VENTILATION ----------------------------------------------
CHECK
Ventilation Criteria in 409.1.ABC.1 have been met. I
410.-----AIR DISTRIBUTION SYSTEM ------------------------------- R-value
AHU Type Duct Location
1. Split / PTAC Air Conditioner Unconditioned Space
411.-----PUMPS AND PIPING; -ZONE 1--------
R-value/in Diameter Thickness
Type.
412.-----WATER HEATING SYSTEMS -ZONE 1----------------
Efficiency StandbyLoss InputRate Gallons
Type--------------------
413.-----ELECTRICAL POWER DISTRIBUTION ------ =---------------------------- CHECK
Metering criteria in 413.1.ABC.1 have been met.
T.r_a.n.s_f_.nrmer rrit.erda in 413.1.,ABC.2 have been met.
409.------VENTILATION------- -------------------------
CHECK
Ventilation Criteria in 409.1.ABC.1 have been met. I
410.-----AIR DISTRIBUTION SYSTEM- --------------------------- ------------
AHU Type :Duct Location R-value
1. Split / PTAC Air Conditioner Unconditioned Space 6
s 411.-----PUMPS AND PIPING -ZONE 1----------------------------------------
Type R-value/in Diameter Thickness
412.-----WATER HEATING SYSTEMS -ZONE 1----------------------------------
Type Effic,iency'StandbyLoss InputRate Gallons
413.-----ELECTRICAL POWER DISTRIBUTION----=-----------------------------
CHECK
Metering criteria in 413.1.ABC.1 have been net.
Transformer criteria in 413.1.ABC.2 have been net.
414.-----MOTORS ------------------------ ----------------------------
Motor efficiencies in 414.1.ABC.1 have been met.
415.-----LIGHTING SYSTEMS -ZONE 1----------------------------------------
Space Type No Control Type 1- No Control Type 2 No Watts Area(Sgft)
Club 1 Programmable T 1 1600 800
Machinery 1 On/Off 2 800 510
Toilet and 1 Occupancy Sens 1 120 33
Total Watts for Zone 1 _ 2520
Total Area for Zone 1 _. 1343
Total Watts = 2520
Total Area _-. 1343
I CHECK
Lighting criteria in 415.1.ABC have been met.
j 16. HVAC load sizing has been performed. (407.1.ABC.1)"
17. Duct sizing and design have been performed..(410.1.ABC.1.2) B
18. Testing and balancing will be performed. (410.1.ABC.4)
19. Operation/maintenance manual will be provided. to owner.(102.1)